C - Drawings.pdf
PDF 20 MB Posted
- Solicitation number
- S-C01010-00017019
- Issued by
- Clackamas County, Mission CDP, Oregon
About this file
This is a comprehensive design drawing package for the Kellogg Creek Water Resource Recovery Facility (WRRF) Disinfection Project, prepared for Clackamas Water Environment Services in Milwaukie, Oregon. The project involves the design and installation of a new UV disinfection system to replace existing chlorine-based disinfection at the facility. The design includes two parallel UV disinfection channels, each with dual UV light banks (3 lamps per bank), operating at a maximum capacity of 25 million gallons per day (MGD) when both channels are operational. The UV system is designed with a horizontal, low-pressure configuration delivering a dose of 24 mJ/cm² at 55% UV transmittance. Supporting infrastructure includes a new electrical shelter, UV canopy structure with crane rail support systems, a tie-in vault for flow management, gate actuators for flow control, and associated mechanical equipment including slide gates, knife gate valves, magnetic flow meters, and a cleaning system control panel. The drawings indicate two construction sequencing alternatives: one involving sequential installation of UV channels to minimize bypass pumping, and another allowing simultaneous installation of both channels for shorter overall construction duration. The project must be executed without disrupting the facility's daily treatment operations, with individual unit processes coordinated offline as needed.
The design criteria documents show the facility processes flows of 10 to 29 MGD across multiple unit processes including primary clarifiers, aeration basins, and secondary clarifiers. The project includes demolition of existing UV equipment, structural modifications to support new systems, installation of new electrical feeders and control systems, and modifications to existing piping infrastructure. All structural design conforms to the 2022 Oregon Structural Specialty Code (OSSC) and relevant standards including ACI 318 for concrete and AISC standards for structural steel. Special inspections are required for concrete construction, steel work, soil classifications, and anchor installations in compliance with International Building Code Chapter 17. The drawings represent a 30% design submittal prepared by Parametrix with the design file dated April 2026, indicating this is preliminary documentation prepared for UV procurement package purposes. Construction costs, contract duration, and specific award details are not addressed within these technical design documents.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP 2026-44 Clarifying Questions 1.pdf | ||
| RFP 2026-44 UV Disinfection.pdf | ||
| RFP 2026-44 Clarifying Questions 2.pdf | ||
| B - Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C O
L U
M B
I A R I V E R
W I L
L A
M E
T T
E R
I V
E R
PORTLAND
BEAVERTON
GRESHAM
MILWAUKIE
LAKE
OSWEGO
GLADSTONE
OREGON
CITY
WILSONVILLE
TIGARD
TUALATIN
VANCOUVER
CAMAS
TROUTDALE
NW 219TH ST
TUALATIN
P A
C
IF
IC
HW
Y
W
99E
99E
99E
ROA D
L O
W E
R R
IV
E
R R
D
L O
W E
R R
IV
ER
N
EW FOURTH
PLAIN RD
N E
7T
H A
VE
N
E
N
D
AV
E
LEWIS AND CLARK HWY
SE POWELL BLVD
NE SANDY
BLVD
N LOMBARD ST
NE COLUMBIA BLVD
SAUVIE
ISLAND
Y
WH
CI FI CAP
W
ILL
AMETT
E
R
IV
ER
CLACKAMAS
R
IVER
HILLSBORO
SW
SW
SCHOLLS
FE
RR
Y
HWY
H
IL
LS
BO
R O
S
IL
VE
R
TO
N
H W
Y
RIVER RD
FARMINGTON
RD
HWY219
219 210
SUNSET HWY
10BEAVERTON HILLSDALE HWY
SW
CANYON RD
SW BASELINE ST
9t h
AV
5t h
AV
LONGVIEW
KELSO
WOODLAND
ST. HELENS
LA CENTER
BATTLE GROUND502
99W
99W
99W
VALLEY
YAMHILL
HWY
GALES
CREEK
RD
WILSON
RIVER
HWY
N
EH
AL
EM
HW
Y VERNONIA
BANKS
FOREST
GROVE
CORNELIUS
GASTON
YAMHILL
CARLTON
NORTH
PLAINS
DUNDEE
NEWBURG
LAFAYETTE
SAINT
PAUL
MCMINNVILLE
CANBY
BARLOW
AURORADONALD
KING CITY
SCAPPOOSE
RIDGEFIELD
PROJECT
LOCATION
PROJECT LOCATION:
KELLOGG CREEK WATER
RESOURCE RECOVERY
FACILITY (WRRF)
REVISIONS
PRE
LIM
INA
RY
ONE INCH AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
FILE NAME
JOB No.
DATE
DATE BY PROJECT NAME DRAWING NO.DESIGNED
DRAWN
CHECKED
APPROVED
OF
NOT FOR CONSTRUCTION
5 SE Martin Luther King Jr. Blvd, Suite 400 • Portland, OR 97214 Ph: 503.233.2400 G1
TITLE SHEET, VICINITY AND
LOCATION MAPS
KELLOGG CREEK WATER RESOURCE RECOVERY
FACILITY DISINFECTION PROJECT
MILWAUKIE, OR
APRIL 2026
Kellogg Creek WRRF.rvt
216-1751-035
CLACKAMAS WATER
ENVIRONMENT SERVICES
B. MOSS/E. SHEETS
A. PETERSON
A. MAAS
CLACKAMAS WATER ENVIRONMENT SERVICES
KELLOGG CREEK WATER RESOURCE RECOVERY FACILITY DISINFECTION PROJECT
MILWAUKIE, OR
30% REVIEW SUBMITTAL
30% DESIGN INFORMATION FOR UV PROCUREMENT PACKAGE
INDEX OF DRAWINGS
DRAWING NUMBER DRAWING NAME
GENERAL
G1 TITLE SHEET, VICINITY AND LOCATION MAPS
G2 GENERAL NOTES AND LEGEND
G3 DISINFECTION AREA PERSPECTIVE VIEW - NEW
CONDITIONS
G4 CONSTRUCTION SEQUENCING PLAN
G5 DESIGN CRITERIA AND PROCESS FLOW DIAGRAM
G6 HYDRAULIC PROFILE
PROCESS
P1 P&ID PROCESS LEGEND AND ABBREVIATIONS
P2 P&ID - UV DISINFECTION CHANNELS 1
P3 P&ID - UV DISINFECTION CHANNELS 2
DEMOLITION
D1 DEMOLITION LOWER PLAN
D2 DEMOLITION UPPER PLAN
VICINITY MAP
LOCATION MAP
INDEX OF DRAWINGS
DRAWING NUMBER DRAWING NAME
STRUCTURAL
S1 STRUCTURAL NOTES
S2 STRUCTRUAL SPECIAL INSPECTIONS
S3 STRUCTURAL OVERALL PLAN
S4 UV CANOPY
S5 ELECTRICAL SHELTER
S6 TIE-IN VAULT
MECHANICAL
M1 MECHANICAL LEGEND AND ABBREVIATIONS
M2 MECHANICAL LOWER PLAN
M3 MECHANICAL UPPER PLAN
M4 MECHANICAL SECTIONS
M5 MECHANICAL SECTIONS
M6 MECHANICAL DETAILS
ELECTRICAL
E1 ELECTRICAL LEGEND AND ABBREVIATIONS
E2 ELECTRICAL ONE-LINE DIAGRAM
E3 ELECTRICAL LOAD SCHEDULES
E4 480V SITE PLAN
M1
D1
INDICATES DETAIL NUMBER
INDICATES DRAWING / SHEET
WHERE DETAIL IS SHOWN
INDICATES SECTION LETTER
INDICATES DRAWING / SHEET
WHERE SECTION IS SHOWN
INDICATES DETAIL NUMBER INDICATES SECTION LETTER
INDICATES DRAWING / SHEET
WHERE SECTION IS REFERRED TO
DEMOLITION PHOTO NUMBER
INDICATES DRAWING / SHEET
WHERE PHOTO IS SHOWN
APPROXIMATE VIEW DIRECTION OF PHOTO
OR EXISTING EQUIPMENT OR
MATERIALS TO BE REMOVED
NEW FACILITIES (SOLID)
EXISTING (SCREENED)
HIDDEN LINE, BURIED OR
FUTURE IMPROVEMENTS
PROPERTY LINE
CENTERLINE
WATER SURFACE
AT
AND
ROUND OR DIAMETER
ANGLE
CENTER LINE
GENERAL NOTE
KEY NOTE DESIGNATION1
1.
G GENERAL
P PIPING & INSTRUMENTATION DIAGRAM (P&ID)
D DEMOLITION
C CIVIL
A ARCHITECTURAL
S STRUCTURAL
M MECHANICAL
E ELECTRICAL
I INSTRUMENTATION & CONTROL
M4
DISCIPLINE DESIGNATOR SHEET NUMBER
1.
2.
3.
4.
5.
6.
7.
THE LOCATIONS OF EXISTING UTILITIES, STRUCTURES, EQUIPMENT,
AND OTHER ITEMS SHOWN ON DRAWINGS AREA ARE APPROXIMATE.
THE CONTRACTOR SHALL VERIFY THE LOCATIONS AND ELEVATIONS
OF ALL EXISTING ITEMS PRIOR TO CONSTRUCTION.
MATERIALS REMOVED FROM THE SITE SHALL BE DISPOSED OF PER
LOCAL, STATE, AND FEDERAL REGULATIONS.
CONTRACTOR TO COORDINATE PARKING, MATERIAL STORAGE,
EQUIPMENT STORAGE, AND STAGING AREA WITH OWNER.
ENTRANCE AND EXIT ROUTES TO THE PROJECT SHALL BE
COORDINATED WITH OWNER.
ALL SITE CONSTRUCTION AND UTILITY RELOCATION ACTIVITIES
SHALL BE DONE WITHOUT DISRUPTION TO THE TREATMENT
FACILITIES' DAILY OPERATION. INDIVIDUAL UNIT PROCESSES MAY BE
TAKEN OFF-LINE FOR A LIMITED PERIOD OF TIME TO PERFORM
CONSTRUCTION ACTIVITIES AS SPECIFIED IN THE CONTRACT
DOCUMENTS. ANY UNIT PROCESS TAKEN OFF-LINE WILL BE
COORDINATED THROUGH THE OWNER.
RETAIN AND PROTECT ALL EXISTING ITEMS NOT DESIGNATED TO BE
REMOVED OR MODIFIED.
THE P&ID DRAWINGS ONLY DEPICT PROCESS EQUIPMENT, PROCESS
PIPING, PROCESS VALVING, AND ASSOCIATED INSTRUMENTATION
PROVIDED FOR THIS PROJECT. REFER TO THE MECHANICAL
DRAWINGS FOR INFORMATION ON ALL OTHER EQUIPMENT, PIPING,
VALVING, AND APPURTENANCES TO BE MODIFIED OR RECONFIGURED
UNDER THIS PROJECT.
SCREENED ELEMENTS ON AREA MAPPING AND ON PROCESS AND
INSTRUMENTATION DRAWINGS REPRESENTS EXISTING FACILITIES
OR ELEVATIONS.
SCREENED BACKGROUNDS ON OTHER DRAWINGS CAN REPRESENT
EXISTING FACILITIES OR FACILITIES TO BE CONSTRUCTED UNDER
THIS CONTRACT WHICH, IF DRAWING IN SOLID LINES, WOULD
OBSCURE THE PARTICULAR DETAILS BEING SHOWN. CONSULT THE
ENGINEER IF SCREENING OF ANY ELEMENTS IS NOT SELF-
EXPLANATORY.
SUBTITLE
DETAIL
SCALE: NONE -
SUBTITLE
SECTION
SCALE: NONE M1
A
LEGEND VIEW TITLES AND REFERENCES GENERAL NOTES
DETAILS
PHOTOS
SECTIONS
SHEET NAMING CONVENTION
DISCIPLINE DESIGNATOR AND DISCIPLINE ORDER
SHEET NUMBER COMPONENTS
SCREENING
PLATE OR PROPERTY LINEPL EQUIPMENT LABELING CONVENTION
ACT ACTUATOR
B BLOWER
CKV CHECK VALVE
CV CONTROL VALVE
DISC DISCONNECT
FE FLOW ELEMENT
JBOX JUNCTION BOX
HTR HEATER
IV ISOLATION VALVE
COMMONLY USED EQUIPMENT TYPE ABBREVIATIONS:
LCP LOCAL CONTROL PANEL
MIX MIXER
P PUMP
SG SLIDE GATE
SV SOLENOID VALVE
T TANK
UVLB UV LIGHT BANK
VFD VARIABLE FREQUENCY DRIVE
XFMR TRANSFORMER
EQUIPMENT TYPE ID NUMBER
BUILDING OR AREA NUMBER
XXX##-###
LOOP NUMBER
DETAIL REFERENCES SECTION REFERENCES
A M1
MATCH LINES
MATCH LINE AND SHEET REFERENCE
MATCH LINE SEE SHEET M1
REVISIONS
PRE
LIM
INA
RY
ONE INCH AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
FILE NAME
JOB No.
DATE
DATE BY PROJECT NAME DRAWING NO.DESIGNED
DRAWN
CHECKED
APPROVED
OF
NOT FOR CONSTRUCTION
5 SE Martin Luther King Jr. Blvd, Suite 400 • Portland, OR 97214 Ph: 503.233.2400 G2GENERAL NOTES AND LEGENDKELLOGG CREEK WATER RESOURCE RECOVERY
FACILITY DISINFECTION PROJECT
MILWAUKIE, OR
APRIL 2026
Kellogg Creek WRRF.rvt
216-1751-035
CLACKAMAS WATER
ENVIRONMENT SERVICES
B. MOSS/E. SHEETS
A. PETERSON
A. MAAS
30% REVIEW SUBMITTAL
TIE-IN VAULT
42" FLOW METER
42" SE
EXIST 42" SE
EXIST 42" SE
FROM SECONDARY
CLA
RIFIERS
UV CANOPY
UV POWER PANEL, TYP
UV LIGHT BANKS, TYP
6" D
6" SC
ELECTRICAL SHELTER
SAMPLER
UV TRAIN 2
UV TRAIN 1
DOWNWARD OPENING WEIR
GATES W/ ACTUATORS (BEHIND)
REVISIONS
PRE
LIM
INA
RY
ONE INCH AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
FILE NAME
JOB No.
DATE
DATE BY PROJECT NAME DRAWING NO.DESIGNED
DRAWN
CHECKED
APPROVED
OF
NOTES:
NOT FOR CONSTRUCTION
5 SE Martin Luther King Jr. Blvd, Suite 400 • Portland, OR 97214 Ph: 503.233.2400 G3
DISINFECTION AREA PERSPECTIVE
VIEW - NEW CONDITIONS
KELLOGG CREEK WATER RESOURCE RECOVERY
FACILITY DISINFECTION PROJECT
MILWAUKIE, OR
APRIL 2026
Kellogg Creek WRRF.rvt
216-1751-035
CLACKAMAS WATER
ENVIRONMENT SERVICES
B. MOSS/E. SHEETS
A. PETERSON
30% REVIEW SUBMITTAL
DISINFECTION AREA
PERSPECTIVE VIEW
NO SCALE -
1. THIS DRAWING IS A PERSPECTIVE VIEW AND IS INCLUDED
FOR THE CONTRACTOR'S CONVENIENCE ONLY. REFER TO
DETAILED DRAWINGS FOR CONSTRUCTION WORK.
DN
UP
REVISIONS
PRE
LIM
INA
RY
ONE INCH AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
FILE NAME
JOB No.
DATE
DATE BY PROJECT NAME DRAWING NO.DESIGNED
DRAWN
CHECKED
APPROVED
OF
NOT FOR CONSTRUCTION
5 SE Martin Luther King Jr. Blvd, Suite 400 • Portland, OR 97214 Ph: 503.233.2400 G4
CONSTRUCTION SEQUENCING
PLAN
KELLOGG CREEK WATER RESOURCE RECOVERY
FACILITY DISINFECTION PROJECT
MILWAUKIE, OR
APRIL 2026
Kellogg Creek WRRF.rvt
216-1751-035
CLACKAMAS WATER
ENVIRONMENT SERVICES
B. MOSS/E. SHEETS
A. PETERSON
A. MAAS
30% REVIEW SUBMITTAL
SCALE: 3/16" = 1'-0"
PLAN
N
1.
2.
1.
2.
3.
4.
5.
1.
2.
3.
4.
5.
PRELIMINARY BYPASS
ALTERNATIVE 1: ONE UV CHANNEL AT A TIME, MINIMUM BYPASS PUMPING
ELECTRICAL SERVICE, ELECTRICAL AND CONTROLS BUILDING, NEW CANOPY:
INSTALL NEW FEEDER FROM GENERATOR SWITCHGEAR TO NEW BUILDING SLAB.
CONSTRUCT NEW BUILDING AND NEW CANOPY WITH NEW LIGHTING. DO WE HAVE
TO WAIT FOR THE EXISTING BRIDGE CRANE TO BE DEMO'D?
RUN CONDUIT FROM NEW ELECTRICAL AND CONTROLS CABINETS IN NEW
BUILDING TO THE UV CHANNEL FUTURE EQUIPMENT LOCATIONS.
UV UNITS:
ONE CHANNEL OUT OF SERVICE AT A TIME, TEMPORARY BULKHEAD LIKELY
NEEDED BETWEEN CURRENT INFLUENT CHANNEL AND UV UNITS.
DEMO EXISTING UV UNITS AND EFFLUENT LEVEL CONTROL GATE IN ONE
CHANNEL. SET NEW UV BANKS AND LOCAL EQUIPMENT. INSTALL NEW EFFLUENT
CONTROL GATE.
REMOVE BULKHEAD FROM CHANNEL 1 AND TEST OPERATION OF NEW
EQUIPMENT.
INSTALL TEMPORARY BULKHEAD IN CHANNEL 2, DEMO EXISTING UV UNITS AND
EFFLUENT LEVEL CONTRL. SET NEW UV BANKS AND LOCAL EQUIPMENT. INSTALL
NEW EFFLUENT CONTROL GATE.
REMOVE BULKHEAD FROM CHANNEL 2 AND TEST OPERATION OF NEW
EQUIPMENT.
VAULT INSTALLATION:
EXCAVATION AND INSTALLATION OF NEW "DOG HOUSE" VAULT. INSTALLATION OF
ALTERNATE/UPDATED EFFLUENT COMPOSITE SAMPLER LINE TO ALLOW FOR
SAMPLING WHEN FLOW IS GOING OVER WEIR AT THE END OF THE WEST CCB.
BYPASS FROM SECONDARY CLARIFIER LAUNDER/ DOWNSTREAM OF WEIR AND
TO THE PARSHALL FLUME FOR THE SELECT TREAT. PROVIDE DISINFECTION
THROUGH CHLORINATION AND THE USE OF THE CCB ONLY.
CUT OUT SECTION OF PIPE AND INSTALL NEW MAGMETER, DOWNSTREAM
ISOLATION VALVE, PIPING TO UV INFLUENT CHANNEL, AND ISOLATION GATE INTO
UV CHANNELS. REPLACE UV CHANNEL INFLUENT GATES.
TEST NEW MAGMETER AND CONTROL GATES. PLACE NEW UV SYSTEM IN
SERVICE AND ISOLATE FLOW FROM THE CCB (I.E. ALL FLOW IS THROUGH UV).
REPLACE PIPING WITHIN THE CCB.
1.
2.
1.
2.
3.
4.
5.
ALTERNATIVE 2: BOTH UV CHANNELS AT THE SAME TIME, SHORTER CONSTRUCTION DURATION
ELECTRICAL SERVICE, ELECTRICAL AND CONTROLS BUILDING, NEW CANOPY:
INSTALL NEW FEEDER FROM GENERATOR SWITCHGEAR TO NEW BUILDING SLAB. CONSTRUCT NEW BUILDING AND NEW CANOPY WITH NEW LIGHTING. DO WE HAVE TO WAIT FOR THE EXISTING BRIDGE CRANE TO BE DEMO'D?
RUN CONDUIT FROM NEW ELECTRICAL AND CONTROLS CABINETS IN NEW BUILDING TO THE UV CHANNEL FUTURE
EQUIPMENT LOCATIONS.
UV UNITS, ETC:
INSTALL ALTERNATE/UPDATED EFFLENT COMPOSITE SAMPLER LINE TO ALLOW FOR SAMPLING WHEN FLOW IS
GOING OVER WEIR AT THE END OF THE WEST CCB.
BYPASS FROM SECONDARY CLARIFIER LAUNDER/ DOWNSTREAM OF WEIR AND TO THE PARSHALL FLUME FOR THE
SELECT TREAT.
PROVIDE DISINFECTION THROUGH CHLORINATION AND THE USE OF THE CCB ONLY. EXCAVATE AND INSTALL NEW "DOG HOUSE" VAULT. CUT OUT SECTION OF PIPE AND INSTALL NEW MAGMETER, DOWNSTREAM ISOLATION VALVE, PIPING TO UV INFLUENT CHANNEL, AND ISOLATION GATE INTO UV CHANNELS. DEMO BOTH EXISTING UV UNITS, INFLUENT GATES, LEVEL CONTROL GATES. SET NEW UV BANKS AND LOCAL EQUIPMENT. INSTALL NEW INFLUENT
AND EFFLUENT CONTROL GATE.
TEST OPERATION OF NEW UV SYSTEM, NEW MAGMETER, AND GATES. PLACE NEW UV SYSTEM IN SERVICE AND
ISOLATE FLWO FROM THE CCB.
REPLACE PIPING WITHIN THE CCB. DEMO EXISTING BRIDGE CRANE AND INSTALL NEW CANOPY AND LIGHTING IF
NOT PREVIOUSLY DONE.
AERATION BASIN NO. 4
AERATION BASIN NO. 3
AERATION BASIN NO. 2
AERATION BASIN NO. 1
SECONDARY
CLARIFIER NO. 2
SECONDARY
CLARIFIER NO. 1
PRIMARY
CLARIFIER NO. 2
PLANT PUMP
STATION
HEADWORKS
PRIMARY
CLARIFIER NO. 1
DISINFECTION AREA:
UV TRAINS & CHLORINE
CONTACT BASIN
ACTIVATED
SLUDGE
RECIRCULATION
PUMP STATION
SOLIDS
HANDLING
COMPLEX
SLUDGE
HOLDING
TANK
SCUM
HOLDING
TANK
BLOWER
BUILDING
PRIMARY
SLUDGE
PUMP
STATION
MILWAUKIE
METERING
STATION
JUNCTION
BOX
SLUDGE
LOADING
DOCK
TO PLANT
WASTEWATER
TO OUTFALL IN
WILLAMETTE
RIVER
PRIMARY EFFLUENT
MI
XE
D
LIQ
UO
R
SECONDARY
SPLITTER BOX
RECIRCULATED ACTIVATED SLUDGE
WASTE ACTIVATED SLUDGE
PRIMARY SCUM
PRIMARY SLUDGE
FROM LOWER
KELLOGG CREEK
INTERCEPTOR
FROM NORTH
MILWAUKIE SEWER
CONNECTIONS
FROM SOUTH
MILWAUKIE SEWER
CONNECTIONS
PLANT
WASTEWATER
PRIMARY SLU
DGE
SECONDARY SCUM
RECIRCULATED
ACTIVATED SLUDGE
SECONDARY EFFLUENT
PR
IM
AR
Y
EF
FL
UE
NT
PL
AN
T
BY
PA
SS
FLOW
MANAGEMENT
PARSHALL
FLUME
RE
CI
RC
UL
AT
ED
AC
TI
VA
TE
D
SL
UD
GE
TEMP
CONSTRUCTION
BYPASS
LEGEND
PLANT PROCESS
PLANT BYPASS
SLUDGE
SCUM
DESIGN CRITERIA
UV DISINFECTION
TYPE HORIZONTAL, LOW-PRESSURE
CHANNELS 2
BANKS PER CHANNEL 3*
LAMPS / BANK XXX*
kW / LAMP XXX*
UV TRANSMITTANCE 55%
DOSE 24 mJ/cm²*
SINGLE CHANNEL FLOW MAX 12.5 MGD*
TWO CHANNEL FLOW MAX 25 MGD*
*TO BE FINALIZED AFTER UV SUPPLIER SELECTION
REVISIONS
PRE
LIM
INA
RY
ONE INCH AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
FILE NAME
JOB No.
DATE
DATE BY PROJECT NAME DRAWING NO.DESIGNED
DRAWN
CHECKED
APPROVED
OF
NOT FOR CONSTRUCTION
5 SE Martin Luther King Jr. Blvd, Suite 400 • Portland, OR 97214 Ph: 503.233.2400 G5
DESIGN CRITERIA AND PROCESS
FLOW DIAGRAM
KELLOGG CREEK WATER RESOURCE RECOVERY
FACILITY DISINFECTION PROJECT
MILWAUKIE, OR
APRIL 2026
Kellogg Creek WRRF.rvt
216-1751-035
CLACKAMAS WATER
ENVIRONMENT SERVICES
B. MOSS/E. SHEETS
A. PETERSON
WILLAMETTE
RIVER
100-YEAR FLOOD
EL = 33.00
25-YEAR FLOOD
EL = 27.00
48"
T.O. WALL
EL = 36.00
36"/42"
30"
WEIR
EL = 32.60
T.O. WALL
EL = 36.00
WEIR
EL = 35.00
42"30"
T.O. WALL
EL = 39.75
30"
WEIR
EL = 38.50
T.O. WALL
EL 42.25
GRIT EFFLUENT WEIR
EL = 40.00
T.O. WALL
EL = 45.00
FROM
INFLUENT
PUMP
STATION
HGL
1 40.40 2 40.63 3 40.75 4 40.94
HGL
1 40.35 2 40.51 3 40.59 4 40.71
HGL
1 38.75 2 39.03 3 39.21 4 39.60
HGL
1 38.64 2 38.67 3 38.69 4 38.71
HGL
1 37.78 2 37.90 3 37.93 4 38.03
HGL
1 34.69 2 35.06 3 35.62 4 35.62
HGL
1 33.54 2 34.59 3 35.03 4 35.03
HGL
1 32.90 2 32.93 3 32.95 4 32.95
HGL
1 31.07 2 31.42 3 31.72 4 31.75
HGL
1 30.10 2 30.10 3 30.10 4 30.10
HGL
1 30.73 2 30.73 3 30.74 4 30.74
EFFLUENT
BOX
UV
DISINFECTION
SECONDARY
CLARIFIERS
AERATION
BASIN
PRIMARY
CLARIFIERS
PRIMARY
CLARIFIER
INFLUENT
SPLIT BOX
GRIT
CHAMBER
INFLUENT
SCREENING
36"/42"
GATE OPEN WEIR
EL = 29.75
DOWNWARD
OPENING GATE WEIR
T.O. WALL
EL = 36.00
FLUME INVERT
EL = 30.25
T.O. WALL
EL = 39.1
DIVERSION
CONTROL GATE
T.O. WALL
EL = 39.75
BOTTOM OF
V-NOTCH WEIR
EL = 38.50
EL = 28.50
EL = 30.00 EL = 29.50
EL = 16.00
CHLORINE CONTACT BASIN
(WEST BASIN)
PARSHALL
FLUME
DIVERSION
BOX
PRIMARY
CLARIFIER NO. 1
INFLUENT FLOW
(MGD)BOX
LEGEND
MAIN FACILITY HYDRAULIC PROFILE
(THROUGH UV DISINFECTION CHANNELS)
FLOW MANAGEMENT SYSTEM HYDRAULIC PROFILE
(THROUGH CHLORINE CONTACT DISINFECTION BASIN)
ORDINARY HIGH WATER
EL = 18.28
CONSTANT WSL OF XX
MAINTAINED BY LEVEL CONTROL
GATES TO BE COORDINATED WITH
SELECTED UV MANUFACTURER
HGL
1 N/A 2 N/A 3 N/A 4 36.73
HGL
1 N/A 2 N/A 3 N/A 4 32.32
HGL
1 N/A 2 N/A 3 N/A 4 32.13
HGL
1 N/A 2 N/A 3 N/A 4 30.36
HGL
1 N/A 2 N/A 3 N/A 4 30.07
RAS
(MGD)
SELECT TREAT
FLOW (MGD)
SCREEN
CHANNELS
PRIMARY
CLARIFIERS
UV
CHANNELS
AERATION
BASINS
SECONDARY
CLARIFIERS
WSL REGULATED BY
SCREEN CONTROLS
MAXIMUM UPSTREAM
WSL = 31.00
REVISIONS
PRE
LIM
INA
RY
ONE INCH AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
FILE NAME
JOB No.
DATE
DATE BY PROJECT NAME DRAWING NO.DESIGNED
DRAWN
CHECKED
APPROVED
OF
NOT FOR CONSTRUCTION
5 SE Martin Luther King Jr. Blvd, Suite 400 • Portland, OR 97214 Ph: 503.233.2400 G6HYDRAULIC PROFILEKELLOGG CREEK WATER RESOURCE RECOVERY
FACILITY DISINFECTION PROJECT
MILWAUKIE, OR
APRIL 2026
Kellogg Creek WRRF.rvt
216-1751-035
CLACKAMAS WATER
ENVIRONMENT SERVICES
B. MOSS/E. SHEETS
A. PETERSON
M
L
F
T
H
S
M
S
LINE SYMBOLS INSTRUMENT IDENTIFICATION LETTERS MECHANICAL EQUIPMENT, INSTRUMENT, AND MISCELLANEOUS SYMBOLS ABBREVIATIONS
VALVE AND GATE SYMBOLS
PRIMARY ELEMENT SYMBOLS
EQUIPMENT LABELING CONVENTION
GENERAL INSTRUMENT OR FUNCTION SYMBOLS
PIPE SIZE, SERVICE, AND
MATERIAL IDENTIFICATION
NOTE THE PIPING COLOR CODING SCHEMES SHOWN ON DRAWINGS
ARE FOR CLARITY ONLY, AND DO NOT REPRESENT THE ACTUAL
COLORS THAT EACH PIPING SYSTEM WILL BE PAINTED. REFER TO
SECTION 40 05 00 FOR THE ACTUAL COLOR CODING SCHEMES OF
EACH PIPING SYSTEM TO BE PROVIDED FOR THIS PROJECT.
LINE DESCRIPTION
FIRST LETTER SUCCEEDING LETTERS
PROCESS CONNECTORS
LINE CONNECTIONS MECHANICAL ELECTRICAL
CONNECTED
NOT CONNECTED
ANALOG I/O SIGNALS DISCRETE I/O SIGNALS
INPUT OUTPUT INPUT OUTPUT
(FOR REFERENCE ONLY. SEE SITE AND MECHANICAL DRAWINGS)
CONNECTION TO SYSTEM
OUTSIDE OF PROJECT
CONNECTION TO PROCESS
WITHIN PROJECT
MAIN PROCESS FLOW (WITH TYPICAL
DIRECTION OF FLOW SHOWN)
MAIN (EXISTING)
SUBSIDIARY PROCESS FLOW
INSTRUMENT SUPPLY, PROCESS TAPS,
NON-PROCESS FLOW
PNEUMATIC SIGNAL
ELECTRIC CONTROL SIGNAL
SOFTWARE OR DATA LINK
MECHANICAL LINK
HYDRAULIC LINE
STRUCTURES AND SPECIAL EQUIPMENT
EQUIPMENT BOUNDARY
AIR LINE
ELECTROMAGNETIC OR SONIC SIGNAL
(GUIDED)
ELECTROMAGNETIC OR SONIC SIGNAL
(UNGUIDED)
ELECTRIC POWER SUPPLY, VOLTAGE AS
NOTED
CAPILLARY TUBE OR FILLED SYSTEM
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T U
V
W X
Y
Z
MEASURED OR
PROCESS
VARIABLE
MODIFIER READOUT OR
PASSIVE FUNCTION OUTPUT FUNCTION MODIFIER
ANALYSIS ALARM
USER'S CHOICE CONTROL
DEVIATION
FLOW, FLOW RATE RATIO (FRACTION)
HIGHHAND
POWER SCAN
LEVEL LIGHT LOW
USER'S CHOICE USER'S CHOICE USER'S CHOICE
RADIATION RECORD RUN
TEMPERATURE
MULTIVARIABLE
MULTIFUNCTION TRANSMIT
MULTIFUNCTION
WEIGHT, FORCE UNCLASSIFIED
UNCLASSIFIED X AXIS UNCLASSIFIED
BURNER,
COMBUSTION USER'S CHOICE
DIFFERENTIAL,
DIFFERENCE
SENSOR (PRIMARY
ELEMENT)
GLASS, VIEWING
DEVICE
CURRENT
(ELECTRICAL)
TIME, RATE OF
CHANGE
MIDDLE,
INTERMEDIATE
INTEGRATE,
TOTALIZE
INTEGRATE,
TOTALIZE
POINT (TEST)
CONNECTION
ORIFICE,
RESTRICTION
SPEED,
FREQUENCY
EVENT, STATE,
PRESENCE
POSITION,
DIMENSION
VIBRATION,
MECHANICAL
ANALYSIS
WELL, PROBE VALVE, DAMPER,
OR LOUVER
USER'S CHOICE USER'S CHOICE
CONTROL STATIONTIME, SCHEDULE
USER'S CHOICE
PRESSURE
QUANTITY
USER'S CHOICE OPEN
VOLTAGE
SAFETY SWITCH STOP
AUXILIARY DEVICEY AXIS
Z AXIS
USER'S CHOICE
USER'S CHOICE
INDICATE
USER'S CHOICE
FIELD
MOUNTED ACCESSIBLE TO
OPERATOR
BEHIND THE
PANEL
ACCESSIBLE TO
OPERATOR
BEHIND THE
PANEL
PRIMARY LOCATION ALTERNATE LOCATION
SHARED DISPLAY,
SHARED CONTROL
PROGRAMMABLE
LOGIC CONTROLLER
PILOT LIGHT OR LED
ADDITIONAL INSTRUMENT AND FUNCTION SYMBOLS INSTRUMENT SYMBOL LEGEND
MOTOR CONTROL
CIRCUIT
VARIABLE
FREQUENCY DRIVE
CONTROL CIRCUIT
MOTOR STARTER
MANUAL RESET
HARDWIRED
INTERLOCK
INSTRUMENT SHARING
COMMON HOUSING
A = INSTRUMENT IDENTIFICATION
LETTERS (SEE TABLE ABOVE)
B = LOOP NUMBER
C = MODIFIER
D = SEQUENCE
E = USER
CENTRIFUGAL
PUMP
PROGRESSIVE
CAVITY PUMP
SUBMERSIBLE
PUMP
ROTARY
PUMP
METERING
PUMP
MIXER
POLYMER/
SLUDGE MIXER
SUBMERSIBLE
MIXER
STATIC MIXER
SCREW CONVEYOR,
HORIZONTAL
BLOWER
AIR
COMPRESSOR
FAN
SILENCER
FILTER SCREEN
OR STRAINER
HEAT TRACE
MOTOR
BACKFLOW
PREVENTER
FILTER OR
SEPARATOR
DRIP TRAP
DRAIN
IN-LINE PRESSURE
SENSOR
LUBRICATOR
DAMPER
INJECTOR
DIAPHRAGM SEAL
RUPTURE DISK,
PRESSURE
RUPTURE DISK,
VACUUM
WATER HAMMER
ARRESTOR
PULSATION
DAMPENER
PLANT WATER SUPPLY FOR
PUMP SEAL OR VALVE
WATER
REDUCER
EXPANSION JOINT
FLEXIBLE HOSE
CONNECTION
FLANGE
UNION
Y STRAINER
FLOW
STRAIGHTENING
VANE
CAP OR PLUG
BLIND FLANGE
PURGE
HOSE BIBB
CONNECTION
SPRAYER
EYE WASH
HORN UNIT
STROBE UNIT
GATE VALVE
3-WAY GATE
VALVE
BALL VALVE
GLOBE VALVE
PLUG VALVE
PLUG VALVE,
ECCENTRIC
NEEDLE VALVE
TEMPERING
VALVE
BUTTERFLY VALVE
VENTED BALL VALVE
SWING CHECK VALVE
WAFER CHECK VALVE
BALL CHECK VALVE
DIAPHRAGM VALVE
SELF-ACTUATED
REGULATING VALVE
PINCH VALVE
SELF-ACTUATED
REGULATING VALVE
W/EXTERNAL TAP
COMBINATION
AIR/VACUUM RELEASE
VALVE
PRESSURE SAFETY
VALVE
MUD VALVE
AIR RELEASE VALVE
VACUUM RELEASE
VALVE
DUCK BILL CHECK
VALVE
OPERATORS
VALVE SYMBOL LEGEND
GATE SYMBOLS
HAND WHEEL
MOTORIZED
CYLINDER ACTUATOR
SOLENOID
DIAPHRAGM
VALVE SIZE
SHADED = CLOSED
UNSHADED = OPEN
SLUICE
GATE
FLAP
GATE
STOP
GATE
SLIDE
GATE
ORIFICE PLATE
WEIR
FLOW NOZZLE MAGNETIC
FLOWMETER
SINGLE PORT PITOT TUBE
OR PITOT-VENTURI TUBE
FLUME VENTURI ULTRASONIC LEVEL
OR FLOWMETER
AVERAGING
PITOT TUBE
CEN CENTRIFUGE
CV CONTROL VALVE
CONV CONVEYOR
GR GRINDER
IV ISOLATION VALVE
MTR MOTOR
MIX POLYMER MIXING SYSTEM
COMPONENT
COMMONLY USED TYPE ABBREVIATIONS:
PRV PRESSURE REDUCING VALVE
P PUMP
SC SCREEN
SG SLIDE GATE
SV SOLENOID VALVE
T TANK
VFD VARIABLE FREQUENCY DRIVE
AC ACID
AL ALUM
ARD ACID RINSE DRAIN
AS AIR SUPPLY
BD BACK DRAFT
CA COMPRESSED AIR
CCC CHLORINE CONTACT CHANNEL
CCB CHLORINE CONTACT BASIN
CD CONDENSATE
CHF CHEMICAL FILL
CLA CLASS A RECLAIMED WATER
CN CENTRATE
CONN CONNECTION
CP CONTROL PANEL
CPA CONTROL POWER AVAILABLE
D GRAVITY DRAIN
DAFT DISSOLVED AIR FLOATATION
THICKENER
DCS DECHLORINATION SYSTEM
DS DIGESTED SLUDGE
ED EQUIPMENT DRAIN
EX EXISTING
EFF EFFLUENT
ES ELECTRICAL SUPPLY
E-STOP EMERGENCY STOP
F FIRE SPRINKLER
FAE FOUL AIR EXHAUST
FC FULLY CLOSED
FD FLOOR DRAIN
FE FINAL EFFLUENT
FIL FILTRATE
FL FAIL LAST
FLT FAULT
FO FULLY OPEN
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FV FUEL OIL, GASOLINE OR OIL
VENT
G STOP GATE
GR GRIT
H2S HYDROGEN SULFIDE
HIM HUMAN INTERFACE MODULE
HMI HUMAN-MACHINE INTERFACE
HOA HAND-OFF-AUTO
HOR HAND-OFF-REMOTE
HP HORSEPOWER
HWL HIGH WATER LINE
HWN,WNH NON-POTABLE WATER (HOT)
HWS DOMESTIC HOT WATER SUPPLY
IA INSTRUMENT AIR
ISB INTRINSICALLY SAFE BARRIER
ISR INTRINSICALLY SAFE RELAY
IV ISOLATION VALVE
I/O ON/OFF
JOR JOG-OFF-REMOTE
LCP LOCAL CONTROL PANEL
LHRS LOW TEMPERATURE HEAT
RESERVOIR SUPPLY
LHRR LOW TEMPERATURE HEAT
RESERVOIR RETURN
LOR LOCAL-OFF-REMOTE
LRS LOCAL-REMOTE-STOP
LSR LOWER-STOP-RAISE
ML MIXED LIQUOR
MS MOTOR STARTER
MUD MUD VALVE
MV MOTORIZED VALVE
NaOH SODIUM HYDROXIDE
NC NORMALLY CLOSED
NG NATURAL GAS
NO NORMALLY OPEN
OA ODOROUS AIR
OC OPEN-CLOSE
OF OVERFLOW
OIL CENTRIFUGE OIL LUBE
OIT OPERATOR INTERFACE
TERMINAL
OSC OPEN-STOP-CLOSE
OSCA OPEN-STOP-CLOSE-AUTO
OT OVER TEMPERATURE
PA PROCESS AIR
PD PUMPED DRAINAGE
PE PRIMARY EFFLUENT
PLC PROGRAMMABLE LOGIC
CONTROLLER
PLE PLANT EFFLUENT
PLY DRY POLYMER
PSO POLYMER SOLUTION
PSV PRESSURE SAFETY VALVE
PV PNEUMATIC VALVE
PVC POLYVINYL CHLORIDE
Q FLOW
RNG RUNNING
RP RAW POLYMER
RS RAW SEWAGE
RWP RAIN WATER PIPE
SA SERVICE AIR
SAM SAMPLE
SC SCUM
SD SANITARY DRAIN
SDS SCREENED/DEGRITTED
SEWAGE
SE SECONDARY EFFLUENT
SG SLUICE GATE
SLD SLOP DRAIN
SLG SLIDE GATE
SN SUPERNANANT
SPL SAMPLE
STD STORM DRAIN
SV SOLENOID VALVE
TCN TEMPORARY CENTRATE
TD TANK DRAIN
TDS TEMPORARY DIGESTED
SLUDGE
THS THICKENED SLUDGE
TURB TURBIDITY
TWN TEMPERED NON-POTABLE
WATER
UNO UNLESS NOTED OTHERWISE
UV ULTRAVIOLET
UVLB UV LIGHT BANK
UVPP UV POWER PANEL
V VENT
VAC VACUUM
VFD VARIABLE FREQUENCY DRIVE
WP POTABLE WATER
WN NON-POTABLE WATER
WR RECLAIMED WATER
WS PUMP SEAL PURGE WATER
PIPE DIAMETER
IN INCHES
FLOW STREAM
IDENTIFICATION
MS I
R
SCREW CONVEYOR,
VERTICAL
VERTICAL TURBINE
PUMP
ROTAMETER
ROTAMETER, WITH
INTEGRAL VALVE
FLEXIBLE TANK
CONNECTION
TEE
TANK
PRESSURE
VESSEL
WELDED CAP
TURBINE PUMP
SUBMERSIBLE
PUMP, RAIL
MOUNTED
REGULATED SIDE
AIR RELEASE
NO NC
NO NC
NO NC
EQUIPMENT /VALVE TYPE ID NUMBER
BUILDING NUMBER (IF USED)
XXX##-###
A B
C
DE
SIGHT TUBE
DOUBLE DISC CHECK
VALVE
SNUBBER
SPRAY NOZZLE
DISCRETE
INSTRUMENT
OR
OR
BUBBLER
CLOSE
120V
ID SHEET
SYSTEM ID
8" SYS
VFD
M
PERISTALTIC
PUMP
W
P
OPEN CHANNEL FLOW
WEIR OVERFLOW
REVISIONS
PRE
LIM
INA
RY
ONE INCH AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
FILE NAME
JOB No.
DATE
DATE BY PROJECT NAME DRAWING NO.DESIGNED
DRAWN
CHECKED
APPROVED
OF
NOT FOR CONSTRUCTION
5 SE Martin Luther King Jr. Blvd, Suite 400 • Portland, OR 97214 Ph: 503.233.2400 P1
P&ID PROCESS LEGEND AND
ABBREVIATIONS
KELLOGG CREEK WATER RESOURCE RECOVERY
FACILITY DISINFECTION PROJECT
MILWAUKIE, OR
APRIL 2026
Kellogg Creek WRRF.rvt
216-1751-035
CLACKAMAS WATER
ENVIRONMENT SERVICES
B. MOSS/E. SHEETS
A. PETERSON
M
M
M
D
ACT-2940
HS
????B
OSC
HS
????A
HOA
ZSC
ZSO
HS
4563A
HOA
HS
4563B
OSC
ZSC
ZSO
ACT-7006-3
G-7006-3
KCTP-2939
KCTP-2940
KCTP-2942
ACT-2942
HS
4561B
OSC
HS
4561A
HOA
ZSC
ZSO
KCTP-2943
HS
????B
OSC
HS
????A
HOA
ZSC
ZSO
ACT-2943
FI
FL
OW
ZI
O4
FU
LL
O
PE
N
ZI
C4
FU
LL
C
LO
SE
YI
FA
IL
SE
DISTRIBUTION
BOX
FIT
FE
SE
CCB NO. 1
CCB NO. 2
ACT-2939
HS
4181B
OSC
HS
4181A
HOA
ZSC
ZSO
P
RO
FI
NE
T
P
RO
FI
NE
T
P
RO
FI
NE
T
(BELOW)
(BELOW)
(BELOW)
D D
P
RO
FI
NE
T
P
RO
FI
NE
T
DC
S
DI
FF
US
ER
DCS
ZI
O?
FU
LL
O
PE
N
ZI
C?
FU
LL
C
LO
SE
YI
FA
IL
ZI
O?
FU
LL
O
PE
N
ZI
C?
FU
LL
C
LO
SE
YI
FA
IL
ZI
O?
FU
LL
O
PE
N
ZI
C?
FU
LL
C
LO
SE
YI
FA
IL
ZI
O?
FU
LL
O
PE
N
ZI
C?
FU
LL
C
LO
SE
YI
FA
IL
TIE-IN VAULT
FROM
DECHLORINATION
SYSTEM
FROM
SECONDARY
CLARIFIERS
A P3
UV CONTROL
PANEL
PNL-UV-1
REVISIONS
PRE
LIM
INA
RY
ONE INCH AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
FILE NAME
JOB No.
DATE
DATE BY PROJECT NAME DRAWING NO.DESIGNED
DRAWN
CHECKED
APPROVED
OF
NOT FOR CONSTRUCTION
5 SE Martin Luther King Jr. Blvd, Suite 400 • Portland, OR 97214 Ph: 503.233.2400 P2
P&ID - UV DISINFECTION CHANNELS
KELLOGG CREEK WATER RESOURCE RECOVERY
FACILITY DISINFECTION PROJECT
MILWAUKIE, OR
APRIL 2026
Kellogg Creek WRRF.rvt
216-1751-035
CLACKAMAS WATER
ENVIRONMENT SERVICES
B. MOSS/E. SHEETS
D. MILES
M
M
M
M
UV CONTROL
PANEL
PNL-UV-1
480 480V 480V
480V 480V 480V
DA
TA
H
IG
HW
AY
UVLB-2A
UVLB-1A
UVPP-1A
UVLB-2B
UVLB-1B
UVPP-2B
UVLB-2C
UVLB-2C
UVPP-1C
UVPP-2C
UV CHANNEL NO. 2
UV CHANNEL NO. 1
PLE
SAM
SAM
TO
SAMPLE
PUMPS
HS
SS
ARD
6" D
KCTP-2944
UV DIFFUSERS
UV CLEANING BASIN
CHLORINE CONTACT
CHAMBERS SCUM SUMP
6" D
LSL
7004-2
LSL
7004-1
OUTFALL
KCTP-2937
KCTP-2837
KCTP-2826
P
RO
FI
NE
T
HS
????A
HOA
HS
????B
OSC
ZSC
ZSO
ACT-2837
HS
????A
HOA
HS
????B
OSC
ZSC
ZSO
ACT-2826
HS
????B
OSC
HS
????A
HOA
ZSC
ZSO
ACT-2937
P
RO
FI
NE
T
P
RO
FI
NE
T
ZC
O?
OP
EN
G
AT
E
ZC
C?
CL
OS
E
GA
TE
ZI
O?
FU
LL
O
PE
N
ZI
C?
FU
LL
C
LO
SE
YI
FA
IL
ZC
O?
OP
EN
G
AT
E
ZC
C?
CL
OS
E
GA
TE
ZI
O?
FU
LL
O
PE
N
ZI
C?
FU
LL
C
LO
SE
YI
FA
IL
ZI
O?
FU
LL
O
PE
N
ZI
C?
FU
LL
C
LO
SE
YI
FA
IL
FROM DECK
FLOOR DRAINS
A P2
PLE
UVPP-1B
UVPP-2A
AE
7004-1
UVT
AE
7004-2
AE
7004-1
UVT
AE
7004-2
CLEANING
SYSTEM
CONTROL
PANEL
CSC-1
HS
????A
LOR
PB
????A
1A CLEAN CYC
PB
????A
1B CLEAN CYC
PB
????A
1C CLEAN CYC
PB
????A
2A CLEAN CYC
PB
????A
2B CLEAN CYC
PB
????A
2C CLEAN CYC
1.
2.
3.
PART OF UV SUPPLIER PREPROCUREMENT PACKAGE.
PROFINET DATA MAP TO BE COORDINATED WITH
MANUFACTURER AND OWNER PRIOR TO FACTORY
ACCEPTANCE TESTING. DATA MAPPING TO BE
CONFIRMED VIA EXCEL AND GSDML FILES SUBMITTED
FOR REVIEW AND APPROVAL.
UV SYSTEM TO CONTROL UV CHANNEL INFLUENT GATE
POSITION.
TO PLANT NETWORK
(IN CHEM BLDG)
AE
-1
UV
T
RA
NM
IT
TA
NC
E
AE
-2
UV
T
RA
NM
IT
TA
NC
E
PL
C
FLOW CONDITIONER
(IF REQ. BY UV MANF.)
HS
????B
OSC
HS
????A
HOA
ZSC
ZSO
HS
????B
OSC
HS
????A
HOA
ZSC
ZSO
ZC
O?
OP
EN
G
AT
E
ZC
C?
CL
OS
E
GA
TE
ZI
O?
FU
LL
O
PE
N
ZI
C?
FU
LL
C
LO
SE
YI
FA
IL
ACT-28XX
ACT-28XX
P
RO
FI
NE
T
P
RO
FI
NE
T
ZC
O?
OP
EN
G
AT
E
ZC
C?
CL
OS
E
GA
TE
ZI
O?
FU
LL
O
PE
N
ZI
C?
FU
LL
C
LO
SE
YI
FA
IL
DOWNWARD
OPENING WEIR
GATES
3 (IF NOT INTEGRATED
INTO MAIN PANEL / IF
REQ. BY UV MFR)
REVISIONS
PRE
LIM
INA
RY
ONE INCH AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
FILE NAME
JOB No.
DATE
DATE BY PROJECT NAME DRAWING NO.DESIGNED
DRAWN
CHECKED
APPROVED
OF
NOTES:
NOT FOR CONSTRUCTION
5 SE Martin Luther King Jr. Blvd, Suite 400 • Portland, OR 97214 Ph: 503.233.2400 P3
P&ID - UV DISINFECTION CHANNELS
KELLOGG CREEK WATER RESOURCE RECOVERY
FACILITY DISINFECTION PROJECT
MILWAUKIE, OR
APRIL 2026
Kellogg Creek WRRF.rvt
216-1751-035
CLACKAMAS WATER
ENVIRONMENT SERVICES
B. MOSS/E. SHEETS
D. MILES
EXIST 42" SE
EXIST 42" SE
DEMO PORTION
OF 42" SE
EXIST 30" PE
EXIST 30" PE
DEMO CHANNEL
MOUNT SLIDE
GATES
EXISTING
SLIDE GATES
CORE HOLE
FOR NEW 42"
SE PIPING
6'
- 4
1/ 2"
4 1
/2"
3/
4"
DEMO EXIST 6" D
DEMO EXIST LEVEL
CONTROLLERS
UV TRAIN 2
UV TRAIN 1
DEMO EXIST 6" SC
DEMO EXIST UV LIGHT BANK, 6 PLCS DEMO MUD
VALVE STEM
REVISIONS
PRE
LIM
INA
RY
ONE INCH AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
FILE NAME
JOB No.
DATE
DATE BY PROJECT NAME DRAWING NO.DESIGNED
DRAWN
CHECKED
APPROVED
OF
NOT FOR CONSTRUCTION
5 SE Martin Luther King Jr. Blvd, Suite 400 • Portland, OR 97214 Ph: 503.233.2400 D1DEMOLITION LOWER PLANKELLOGG CREEK WATER RESOURCE RECOVERY
FACILITY DISINFECTION PROJECT
MILWAUKIE, OR
APRIL 2026
Kellogg Creek WRRF.rvt
216-1751-035
CLACKAMAS WATER
ENVIRONMENT SERVICES
B. MOSS/E. SHEETS
A. PETERSON
30% REVIEW SUBMITTAL
SCALE: 3/16" = 1'-0"
LOWER
PLAN
DEMO FLOOR DRAIN
DEMO ACTUATORS
PEDESTALS, AND STEMS
ON EXISTING WALL-MOUNT
SLIDE GATE
DEMO EFFLUENT
SAMPLER SYSTEM
DEMO CRANEDEMO CRANE TRACKS
DEMO CRANE WIRE REEL AND PEDESTALDEMO CHANNEL COVER, TYP
DEMO AREA LIGHTING
AND PEDESTAL, TYP
DEMO EXIST UV
POWER PANEL, 6 PLCS
DEMO PROPELLER
FLOW METER
DEMO BLOWER, ABANDON
PEDESTAL IN PLACE
REVISIONS
PRE
LIM
INA
RY
ONE INCH AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
FILE NAME
JOB No.
DATE
DATE BY PROJECT NAME DRAWING NO.DESIGNED
DRAWN
CHECKED
APPROVED
OF
NOT FOR CONSTRUCTION
5 SE Martin Luther King Jr. Blvd, Suite 400 • Portland, OR 97214 Ph: 503.233.2400 D2DEMOLITION UPPER PLANKELLOGG CREEK WATER RESOURCE RECOVERY
FACILITY DISINFECTION PROJECT
MILWAUKIE, OR
APRIL 2026
Kellogg Creek WRRF.rvt
216-1751-035
CLACKAMAS WATER
ENVIRONMENT SERVICES
B. MOSS/E. SHEETS
A. PETERSON
30% REVIEW SUBMITTAL
SCALE: 3/16" = 1'-0"
UPPER
G1 SCOPE
G. GENERAL STRUCTURAL
THE NOTES AND DETAILS ON THIS DRAWING ARE GENERAL AND APPLY
TO THE ENTIRE PROJECT EXCEPT WHERE THERE ARE SPECIFIC
INDICATIONS TO THE CONTRARY.
G2 APPLICABLE SPECIFICATIONS AND CODES
CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 2022 OREGON
STRUCTURAL SPECIALTY CODE (OSSC) AND SHALL GOVERN EXCEPT
WHERE OTHER APPLICABLE CODES OR THE CONTRACT DOCUMENTS
ARE MORE RESTRICTIVE.
G3 ALTERNATIVE DESIGNS
THE STRUCTURAL SYSTEMS AND DETAILS ON THESE PLANS ARE THE
BID BASIS DESIGN. HOWEVER, ALTERNATIVE SYSTEMS AND DETAILS
MAY BE CONSIDERED IF THE CONTRACTOR SUBMITS PLANS WITH
SUBSTANTIATING CALCULATIONS AND TEST DATA WHICH BEAR A
OREGON STATE LICENSED ENGINEERS SEAL AND SIGNATURE FOR
APPROVAL OF THE REGISTERED DESIGN PROFESSIONAL IN
RESPONSIBLE CHARGE WHOSE EFFORTS FOR REVIEW OF SUCH
ALTERNATIVE DESIGNS SHALL BE PAID FOR BY THE CONTRACTOR.
G4 DIMENSIONS
STRUCTURAL DIMENSIONS CONTROLLED BY OR RELATED TO FIELD
CONDITIONS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO
CONSTRUCTION. DEVIATIONS FROM THAT WHICH IS SHOWN ON THE
DRAWINGS SHALL BE BROUGHT TO THE ATTENTION OF THE
REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE.
WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALES
SHOWN ON THE DRAWINGS.
G5 CONSTRUCTION LOADS
STRUCTURES HAVE BEEN DESIGNED FOR OPERATIONAL LOADS ON THE
COMPLETED STRUCTURE. DURING CONSTRUCTION, THE STRUCTURES
SHALL BE PROTECTED BY BRACING AND SUPPORTS AS REQUIRED. THE
CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND MAINTENANCE
OF TEMPORARY SUPPORTS. THE DESIGN OF THE TEMPORARY
SUPPORTS SHALL BE PERFORMED BY AN ENGINEER LICENSED IN THE
STATE OF THE PROJECT AND HIRED BY THE CONTRACTOR.
G6 PROVISIONS FOR EQUIPMENT
MECHANICAL AND ELECTRICAL EQUIPMENT SUPPORTS, ANCHORAGES,
OPENINGS, PIPE SLEEVES, RECESSES AND REVEALS NOT SHOWN ON
THE STRUCTURAL DRAWINGS, BUT REQUIRED BY OTHER CONTRACT
DRAWINGS SHALL BE PROVIDED FOR, PRIOR TO CASTING CONCRETE.
F1 DESIGN CODE
F. STRUCTURAL DESIGN
DESIGN IS IN ACCORDANCE WITH THE 2022 OSSC.
F2 FOUNDATION DESIGN
DESIGN BASED ON GEOTECHNICAL ENGINEERING REPORT PREPARED
BY XX DATED XXX.
(1) ALLOWABLE BEARING PRESSURE = 1500PSF*
(2) FROST DEPTH = 18 INCHES
(3) ACTIVE SOIL PRESSURE = 32 PCF (EXCLUDES HYDROSTATIC)
(4) AT-REST SOIL PRESSURE = 55 PCF (EXCLUDES HYDROSTATIC)
(5) SURCHARGE PRESSURE = 75 PCF (UNIFORM)
(6) SEISMIC SOIL PRESSURE = 14H PSF (UNIFORM)
(7) STATIC PASSIVE PRESSURE = 300 PCF
(8) SEISMIC PASSIVE PRESSURE = 350 PCF
(9) FRICTION COEFFICIENT = 040
(10) GROUND WATER ELEVATION = 3 FEET BGS
(11) SEE GEOTECHNICAL REPORT FOR PILE CAPACITIES
*LIQUEFACTION RISK - 3 TO 6 INCHES OF LIQUEFACTION INDUCED
SETTLEMENT FOR NON-PILE SUPPORTED STRUCTURES / SHALLOW
FOUNDATIONS, SEE GEOTECHNICAL REPORT FOR MORE INFORMATION
A. LIVE
L. DESIGN LOADS
(1) FOUNDATION SLABS / SLABS-ON-GRADE = 250 PSF
(2) ELEVATED PLATFORMS = 100 PSF
(3) ROOF = 20 PSF / 300 LB CONCENTRATED
(4) STAIRS = 100 PSF / 300 LB CONCENTRATED
(5) TRAFFIC RATED SURFACES = AASHTO HL-93
B. SNOW
(1) GROUND SNOW LOAD Pg = 20 PSF
(2) FLAT ROOF SNOW LOAD Pf = 25 PSF
(3) RISK CATEGORY III
(4) IMPORTANCE FACTOR Is = 1.1
(5) EXPOSURE FACTOR Ce = 0.9
(6) THERMAL FACTOR Ct = 1.1
C. WIND
(1) NOMINAL DESIGN WIND SPEED = 89 MPH
(2) ULTIMATE DESIGN WIND SPEED = 115 MPH
(3) RISK CATEGORY III
(4) IMPORTANCE FACTOR Iw = 1.0
(5) WIND EXPOSURE D
(6) INTERNAL PRESSURE COEFFICIENTS
ENCLOSED BUILDING GCpi = +/- 0.18 OPEN BUILDING GCpi = +/- 0.00
D. SEISMIC
(1) RISK CATEGORY III
(2) IMPORTANCE FACTOR le = 1.25
(3) SITE CLASS = D
(4) SS = 1.332 S1 = 0.543
(5) SDS = 0.888 SD1 = 0.543
(6) SEISMIC DESIGN CATEGORY = D
(7) ANALYSIS PROCEDURE = EQUIVALENT LATERAL FORCE
(8) BNR BASIN MECHANICAL / ELECTRICAL BUILDING
INTERMEDIATE PRECAST SHEAR WALLS (R = 4.0)
CS = 0.2777 / V= 264k
C1 APPLICABLE CODE
C. CAST-IN-PLACE CONCRETE
CONCRETE DESIGN AND CONSTRUCTION SHALL CONFORM TO THE 2019
EDITION OF THE ACI BUILDING CODE REQUIREMENTS FOR STRUCTURAL
CONCRETE, ACI 318, AND TO THE 2021 EDITION OF THE ACI CODE
REQUIREMENTS FOR ENVIRONMENTAL ENGINEERING CONCRETE
STRUCTURES, ACI 350, WHERE APPLICABLE.
C2 REINFORCING STEEL DETAILS
DETAILING, FABRICATION AND ERECTION OF REINFORCING STEEL,
UNLESS OTHERWISE NOTED, SHALL BE IN ACCORDANCE WITH DETAILS
AND DETAILING OF CONCRETE REINFORCEMENT ACI 315.
C3 DESIGN STRENGTHS
A. CAST-IN-PLACE CONCRETE
(1) WATER RETAINING STRUCTURES - f'c = 5000 PSI @ 28 DAYS
(2) GENERAL USE/BUILDING FOUNDATION - f'c = 4500 PSI @ 28
DAYS
B. MAX WATER TO CEMENTITIOUS MATERIAL RATION PER
SPECIFICATIONS
C. MINIMUM CEMENTITIOUS MATERIAL CONTENT PER
SPECIFICATIONS
D. AIR CONTENT PER SPECIFICATIONS
E. REINFORCING STEEL SHALL BE ASTM A 615, GRADE 60
F. GROUT SHALL BE ASTM C 1107 WITH f'c = 7000 PSI @ 28 DAYS
G. CONCRETE SHALL BE PROPORTIONED TO MEET THE AVERAGE
COMPRESSIVE STRENGTH REQUIREMENTS IN ACI 301.
C4 CONCRETE COVER
CONCRETE COVER FOR REINFORCING BARS SHALL BE AS FOLLOWS:
A. FOOTINGS AND FOUNDATION MATS CAST ON GROUND - 3"
B. FORMED OR FINISHED SURFACES - 2"
C5 DOWELS
DOWELS SHALL BE AT LEAST THE SAME SIZE AND SPACING AS BARS
WITH WHICH THEY ARE LAPPED. THE DOWEL EMBEDMENT SHALL BE AS
REQUIRED BY ACI 318 OR AS NOTED.
C6 BAR SPLICES
SPLICES OF REINFORCING STEEL BAR SHALL BE IN ACCORDANCE WITH
SCHEDULE SHOWN ON CONCRETE DETAILS AND ACI 318 AND SHALL BE
CLASS B UNLESS OTHERWISE NOTED. THE LENGTH OF LAP SPLICE OF
BARS OF DIFFERENT DIAMETER SHALL BE BASED ON THE SMALLER
DIAMETER. BAR SPLICES MAY ALSO BE MADE BY WELDING IN
ACCORDANCE WITH AWS SPEC D 1.4 IF APPROVED BY THE ENGINEER.
C7 RESTRICTED BAR ANCHORAGE
IN CASES WHERE REINFORCING BARS CANNOT BE EXTENDED AS FAR
AS REQUIRED DUE TO THE LIMITED EXTENT OF THE ADJACENT
CONCRETE STRUCTURE, THE BARS SHALL EXTEND AS FAR AS
POSSIBLE AND END IN STANDARD HOOKS.
C8 STANDARD HOOKS
BARS ENDING IN RIGHT ANGLE BENDS OR HOOKS SHALL CONFORM TO
THE REQUIREMENTS OF ACI 318.
C9 CHAMFERS
EXCEPT AS OTHERWISE REQUIRED, EXPOSED CONCRETE CORNERS
AND EDGES SHALL HAVE 3/4" CHAMFERS. RE-ENTRANT CORNERS SHALL
NOT HAVE FILLETS.
C10 CAST-IN-PLACE CONCRETE ANCHORS
ANCHORS SHALL BE HEADED BOLTS OF ASTM F1554 GRADE 55 (WITH
SUPPLEMENT S1) WITH ASTM A563 HEAVY HEXAGONAL NUTS AND ASTM
A36 PLATE WASHERS WITH MINIMUM SIZE CONFORMING TO TABLE 14-2
OF THE CURRENT AISC STEEL CONSTRUCTION MANUAL, UNLESS
NOTED OTHERWISE. ALTERNATELY, ANCHORS SHALL BE THREADED
AND NUTTED ROD CONFORMING TO ASTM F1554 GRADE 55 (WITH
SUPPLEMENT S1) WITH THE EMBEDDED NUT THREADED ON AND
WELDED TO THE ROD. ALL MATERIALS SHALL BE HOT DIP GALVANIZED.
C11 POST-INSTALLED CONCRETE ANCHORS
ADHESIVE ANCHORS AND THEIR PROPERTIES SUCH AS DIAMETER,
SPACING, EDGE DISTANCE, EMBEDMENT AND MATERIAL/FINISH SHALL
CONFORM TO THE DETAILS IN THESE DRAWINGS. ADHESIVE SHALL BE
HILTI HIT-HY 200 OR APPROVED EQUAL. THREADED ROD SHALL BE
F1554 GRADE 55 (WITH SUPPLEMENT S1) HOT DIP GALVANIZED UNLESS
NOTED OTHERWISE. POST-INSTALLED ANCHORS SHALL BE STAINLESS
STEEL WHERE NOTED ON THE DRAWINGS.
C12 INSTALLATION OF POST-INSTALLED CONCRETE ANCHORS
ALL ADHESIVE ANCHORS SHALL BE INSTALLED IN STRICT
CONFORMANCE TO MANUFACTURER'S DIRECTIONS. ALL HOLES SHALL
BE HAMMER DRILLED WITH A CARBIDE BIT.
C13 SPECIAL WEATHER CONCRETING
FOR SPECIAL WEATHER CONCRETING (HOT & COLD CONCRETING)
ADHERE TO REPORTS OF ACI COMMITTEE 305, "HOT WEATHER
CONCRETING", AND ACI 306, "COLD WEATHER CONCRETING".
C14 CURING
CONCRETE SHALL BE CURED IN ACCORDANCE WITH ACI 308.1.
C15 CONSTRUCTION JOINTS
LOCATION OF CONSTRUCTION JOINTS SHALL HAVE THE APPROVAL OF
THE ENGINEER. CONSTRUCTION JOINTS SHALL BE DETAILED AS SHOWN
ON THE DRAWINGS. UNLESS A METAL KEYED FORM IS USED, ALL
CONSTRUCTION JOINTS SHALL BE ROUGHENED TO A MINIMUM 1/4"
AMPLITUDE. ALL JOINT SURFACES SHALL BE THOROUGHLY CLEANED TO
REMOVE GREASE, LOOSE CONCRETE, AND LAITANCE OR OTHER BOND
REDUCING MATERIAL. SURFACES SHALL BE SATURATED SURFACE DRY
PRIOR TO PLACING FRESH CONCRETE.
C16 CRACK CONTROL JOINTS
CCJ INDICATES A 1/8" WIDE CONTINUOUS SAW CUT CRACK CONTROL
JOINT FILLED WITH ELASTOMERIC JOINT SEALANT. JOINTS SHALL BE
SAWCUT AS SOON AS POSSIBLE, TYPICALLY WITHIN 4-12 HOURS AFTER
THE CONCRETE HAS BEEN FINISHED. VERTICAL CONTROL JOINTS SHALL
BE FORMED WITH 3/4" CHAMFER STRIP AND FILLED WITH ELASTOMERIC
JOINT SEALANT. THE ELASTOMERIC JOINT SEALANT SHALL CONFORM
TO ASTM C920, TYPE S OR M, GRADE NS, CLASS 50.
C17 WATERSTOP
WATERSTOP SHALL BE FLEXIBLE PVC MEETING THE REQUIREMENTS OF
CE CRD-C572. FACTORY FABRICATED T'S AND L'S.
C18 CONCRETE FINISHES
CONCRETE FINISHES SHALL CONFORM TO PROJECT SPECIFICATIONS.
C19 PIPE PENETRATIONS
MAINTAIN CLEARANCE BETWEEN REBAR AND ALL NON-PVC PIPING OR
SLEEVES OF NOT LESS THAN 1" OR NOT LESS THAN 1-1/3 TIMES THE
NOMINAL MAXIMUM AGGREGATE SIZE, WHICHEVER IS GREATER. ALL
WET/SUBMERGED LOCATION SHALL HAVE WEEP RINGS UNLESS NOTED
OTHERWISE.
P1 DESIGN
PC. PRECAST CONCRETE
PRECAST CONCRETE COMPONENTS AND STRUCTURES SHALL BE
DESIGNED BY THE PRECAST SUPPLIER. THIS INCLUDES GRAVITY AND
LATERAL LOAD RESISTING SYSTEMS, FOUNDATIONS, WALLS, TOP SLABS,
OPENINGS AND ANY ACCESSORIES. STRUCTURES SHALL BE DESIGNED
ACCORDING TO THE LOADS REQUIRED BY THE APPLICABLE BUILDING
CODE AND IN ACCORDANCE WITH ACI AND PCI STANDARDS. DESIGN
LOADS SHALL NOT BE LESS THAN THOSE SHOWN ON THE DRAWING.
MATERIAL SPECIFICATIONS SHALL BE AS SHOWN ON THE DRAWINGS.
DESIGN CALCULATIONS AND SHOP DRAWINGS SHALL BE STAMPED AND
SIGNED BY AN ENGINEER IN THE STATE OF PROJECT LOCATION.
P2 FABRICATION
THE PRECAST MANUFACTURER SHALL BE REGULARLY ENGAGED IN THE
DESIGN AND FABRICATION OF PRECAST STRUCTURES AND CERTIFIED BY
PCI. FABRICATION SHALL BE IN ACCORDANCE WITH PCI AND ACI
STANDARDS. PRODUCT DATA AND SHOP DRAWINGS SHALL BE SUBMITTED
FOR REVIEW AND SHALL BE APPROVED PRIOR TO FABRICATION.
P3 RESPONSIBILITY
PARAMETRIX IS NOT RESPONSIBLE FOR THE DESIGN OF ANY ASPECTS OF
THESE COMPONENTS OR STRUCTURES.
E1 GENERAL
E. EXISTING CONCRETE MODIFICATIONS
THE FOLLOWING NOTES ON MODIFICATION OF EXISTING CONCRETE
ARE GENERAL AND APPLY TO THE ENTIRE PROJECT, UNLESS
OTHERWISE SPECIFIED.
E2 SURFACES
A. EXISTING CONCRETE SURFACES TO BE JOINED WITH NEW
CONCRETE SHALL BE THOROUGHLY CLEANED AND ROUGHENED
TO MIN 1/4 INCH AMPLITUDE AND WET TO SATURATED SURFACE
DRY CONDITION JUST PRIOR TO PLACEMENT OF NEW CONCRETE.
PROVIDE EXPANDING WATERSTOP BETWEEN EXISTING AND NEW
CONCRETE WHERE WATERTIGHT CONSTRUCTION IS REQUIRED.
B. NEW OPENINGS IN EXISTING CONCRETE SHALL BE NEATLY SAW
CUT TO THE REQUIRED FINISHED SIZE PRIOR TO REMOVING THE
EXISTING CONCRETE.
C. EXPOSED REINFORCING BARS IN CUT SURFACES SHALL BE CUT
BACK 1" BELOW CONCRETE SURFACE AND REPAIRED WITH EPOXY
GROUT.
E3 OPENINGS
WHERE "PLUG EXISTING OPENING" IS INDICATED, CONTRACTOR SHALL
REMOVE ANY ATTACHED METALWORK, CONCRETE CURBS OR
PROJECTIONS. ROUGHEN AND KEY EXISTING CONCRETE, SATURATE
SURFACE DRY, AND POUR NEW CONCRETE FLUSH WITH ADJACENT
SURFACES.
S1 CODES AND SPECIFICATIONS
S. STEEL
STEEL CONSTRUCTION SHALL CONFORM TO THE SPECIFICATIONS AND
STANDARDS AS CONTAINED IN THE 14TH EDITION OF THE AISC MANUAL
OF STEEL CONSTRUCTION.
S2 MATERIAL
W-SHAPES SHALL CONFORM TO ASTM A992 (A572/50)
PLATES, ANGLES, CHANNELS, AND S-SHAPEDS SHALL CONFORM TO
ASTM 36
TUBES (HSS) SHALL CONFORM TO ASTM A500, GRADE B OR C
PIPES SHALL CONFORM TO ASTM A53, GRADE B
HOLLOW STRUCTURAL SECTIONS SHALL MEET ASTM A500 GRADE B.
PIPE SHALL MEET ASTM A53 TYPE E OR S GRADE B. BOLTS SHALL MEET
ASTM A325.
HEAVY HEXAGONAL NUTS SHALL MEET ASTM A563.
WASHERS SHALL MEET ASTM F436.
S3 WELDING
WELDING SHALL CONFORM TO AWS D1.1 "STRUCTURAL WELDING CODE -
STEEL". ELECTRODES SHALL BE E70XX GROUP, LOW HYDROGEN. LIGHT
GAUGE STEEL WELDING SHALL CONFORM TO AWS D1.3.
WELDING SHALL BE CONDUCTED BY WELDERS CERTIFIED BY THE AWS.
S4 HOT-DIP GALVANIZING
UNLESS OTHERWISE NOTED, ALL STEEL FABRICATIONS SHALL BE HOT-
DIPPED GALVANIZED AFTER FABRICATION.
SS1 CODES AND SPECIFICATIONS
SS. STAINLESS STEEL
STAINLESS STEEL CONSTRUCTION SHALL CONFORM TO THE
SPECIFICATIONS AND STANDARDS AS CONTAINED IN THE 14TH EDITION
OF THE AISC MANUAL OF STEEL CONSTRUCTION IN CONJUNCTION WITH
AISC DESIGN GUIDE 27.
SS2 MATERIAL
STRUCTURAL SHAPES, BARS AND PLATES INDICATED ON THE
DRAWINGS SHALL BE STAINLESS STEEL TYPE 316. WHERE SHAPES,
BARS OR PLATES WILL BE WELDED, THE MATERIAL SHALL BE TYPE 316L.
PLATE, SHEET AND STRIP SHALL BE ASTM A240.
BARS AND SHAPES SHALL BE ASTM A276.
HOLLOW STRUCTURAL SECTIONS SHALL BE ASTM A554.
BOLTS AND OTHER FASTENERS SHALL BE STAINLESS STEEL TYPE 316.
STAINLESS STEEL BOLTS AND THREADED ROD SHALL CONFORM TO
ASTM F593 ALLOY GROUP 2 CONDITION CW.
STAINLESS STEEL NUTS SHALL CONFORM TO ASTM F594 ALLOY GROUP
2 CONDITION CW.
STAINLESS STEEL WASHERS SHALL BE STAINLESS STEEL TYPE 316
MEETING THE DIMENSIONAL REQUIREMENTS OF ASTM F436.
SS3 WELDING
WELDING SHALL CONFORM TO AWS D1.6 STRUCTURAL WELDING CODE
FOR STAINLESS STEEL. WELDING SHALL BE CONDUCTED BY WELDERS
CERTIFIED BY THE AWS. WELD FILLER MATERIAL SHALL BE PRE-
QUALIFIED FILLER METAL PER AWS D1.6.
H1 SUBGRADE AND STRUCTURAL FILL
H. FOUNDATIONS
SUBGRADE AND BACKFILL SHALL BE IN ACCORDANCE WITH THE
RECOMMENDATIONS MADE IN THE GEOTECHNICAL REPORT AND AS
SHOWN ON THE CIVIL DRAWINGS.
AB ANCHOR BOLT
AFF ABOVE FINISHED FLOOR
CLR CLEAR
d PENNY WT (NAIL)
DS DOWNSPOUT
EF EACH FACE
EW EACH WAY
FDN FOUNDATION
F/G FIBERGLASS
GLB GLUE LAMINATED BEAM
STRUCTURAL ABBREVIATIONS
C CHANNEL
HP H PILE SHAPE
HSS HOLLOW STRUCTURAL SHAPE
L ANGLE
M MISCELLANEOUS SHAPE
MC MISCELLANEOUS COLUMN
ROLLED STEEL SHAPES
MB MACHINE BOLT
MO MASONRY OPENING
PT PRESSURE TREATED
PWD PLYWOOD
T&B TOP AND BOTTOM
TJI TRUSS JOIST I BEAM
OR EQUIVALENT
TOC TOP OF CONCRETE
TOW TOP OF WALL
PL PLATE
S S SHAPE
SCH PIPE SCHEDULE
ST, WT TEES CUT FROM S OR
W SHAPES
W WIDE FLANGE
M1 MASONRY DESIGN IS BASED ON FULL ALLOWABLE STRESSES.
M2 HOLLOW MASONRY UNITS SHALL CONFORM TO ASTM C90 (NORMAL
WEIGHT WITH MINIMUM ULTIMATE COMPRESSIVE STRENGTH f'm - 2000
PSI.
M3 MASONRY GROUT SHALL CONFROM TO ASTM C476 AND SHALL HAVE A
MINIMUM 28-DAY COMPRESSIVE STRENGTH OF 2000 PSI.
M4 MORTAR SHALL CONFORM TO ASTM TYPE S (2800 PSI MIN.).
M5 WHERE DRAWINGS REQUIRE ANCHOR BOLTS OR EXPANSION BOLTS TO
BE INSTALLED IN MASONRY OR GROUTED MASONRY, CELLS OF NEW OR
EXISTING MASONRY SHALL BE GROUTED BY POURING OR PRESSURE
AS REQUIRED TO ACHIEVE SOLID BOLT ANCHORAGE.
M6 VERTICAL CELLS TO BE FILLED WITH GROUT SHALL BE VERTICALLY
ALIGNED TO PROVIDE A CONTINUOUS UNOBSTRECTED OPENING FROM
TOP TO BOTTOM OF WALL.
M7 GROUT FOR FILLING CELLS SHALL BE FLUID, PLACED BY ACCEPTABLE
PRESSURE GROUTING PROCEDURES IN MAXIMUM 4'-4" LIFTS AND
CONSOLIDATED IN PLACE BY VIBRATION OF OTHER METHODS WHICH
ENSURE COMPLETE FILL OF CELLS. ALL CELLS CONTAINING BARS OR
ANCHOR BOLTS SHALL BE FULLY GROUTED.
M8 HOLLOW MASONRY UNITS SHALL BE LAID WITH FULL MORTAR
COVERAGE ON HORIZONTAL AND VERTICAL FACE SHELLS. WEBS SHALL
ALSO BE BEDDED WHERE THEY ARE ADJACENT TO CELLS TO BE
REINFORCED AND/OR FILLED WITH GROUT AND IN THE STARTING
COURSE ON FOOTINGS AND SOLID FOUNDATION WALLS.
M. MASONRY
REVISIONS
PRE
LIM
INA
RY
ONE INCH AT FULL SCALE.
IF NOT, SCALE ACCORDINGLY
FILE NAME
JOB No.
DATE
DATE BY PROJECT NAME DRAWING NO.DESIGNED
DRAWN
CHECKED
APPROVED
OF
NOT FOR CONSTRUCTION
5 SE Martin Luther King Jr. Blvd, Suite 400 • Portland, OR 97214 Ph: 503.233.2400 S1STRUCTURAL NOTESKELLOGG CREEK WATER RESOURCE RECOVERY
FACILITY DISINFECTION PROJECT
MILWAUKIE, OR
APRIL 2026
Kellogg Creek WRRF.rvt
216-1751-035
CLACKAMAS WATER
ENVIRONMENT SERVICES
J. LINKE
A. PETERSON
S. WAGNER
SPECIAL INSPECTIONS REQUIRED FOR THIS PROJECT SHALL BE PERFORMED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE CHAPTER 17. SPECIAL INSPECTIONS SHALL BE PERFORMED BY AN APPROVED INSPECTION AGENCY, AS DEFINED BY THE BUILDING OFFICIAL, AND EMPLOYED BY
THE OWNER, UNLESS NOTED OTHERWISE.
THE SPECIAL INSPECTOR SHALL BE CERTIFIED BY THE INTERNATIONAL CODE COUNCIL (I.C.C.) TO PERFORM INSPECTION FOR THE PARTICULAR TYPE OF CONSTRUCTION OF OPERATION REQUIRING
SPECIAL INSPECTION PRIOR TO THE COMPLETION OF THAT PHASE OF THE WORK.
THE SPECIAL INSPECTOR SHALL FURNISH INSPECTION REPORTS TO THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN RESPONSIBLE CHARGE. ALL DISCREPANCIES SHALL BE
BROUGHT TO THE IMMEDIATE ATTENTION OF THE CONTRACTOR FOR CORRECTION, THEN, IF
UNCORRECTED, TO THE BUILDING OFFICIAL AND THE REGISTERED DESIGN PROFESSIONAL IN
RESPONSIBLE CHARGE.
THE SPECIAL INSPECTOR SHALL SUBMIT A FINAL SIGNED REPORT STATING WHETHER THE WORK
REQUIRING SPECIAL INSPECTION WAS, TO THE BEST OF THE INSPECTOR'S KNOWLEDGE, IN
CONFORMANCE WITH THE APPROVED PLANS AND SPECIFICATIONS AND THE APPLICABLE
WORKMANSHIP PROVISIONS OF THIS CODE.
IT SHALL BE THE CONTRACTOR'S SOLE RESPONSIBILITY TO SCHEDULE SPECIAL INSPECTIONS IN
ACCORDANCE WITH THE SPECIFICATIONS.
SHOP INSPECTION OF STEEL CONSTRUCTION IS NOT REQUIRED WHEN THE WORK IS DONE ON THE
PREMISES OF A FABRICATOR REGISTERED AND APPROVED TO PERFORM SUCH WORK WITHOUT
SPECIAL INSPECTION. APPROVAL SHALL BE BASED UPON REVIEW OF THE FABRICATOR'S WRITTEN
PROCEDURAL AND QUALITY CONTROL MANUALS AND PERIODIC AUDITING OF FABRICATION
PRACTICES BY AN APPROVED SPECIAL INSPECTION AGENCY. AT COMPLETION OF FABRICATION, THE APPROVED FABRICATOR SHALL SUBMIT A CERTIFICATE OF COMPLIANCE TO THE BUILDING OFFICIAL
STATING THAT THE WORK WAS PERFORMED IN ACCORDANCE WITH THE APPROVED CONSTRUCTION
DOCUMENTS.
SPECIAL INSPECTIONS REQUIRED
EACH CONTRACTOR RESPONSIBLE FOR THE CONSTRUCTION OF A MAIN WIND - OR SEISMIC-FORCE- RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM OF A WIND- OR SEISMIC-RESISTING COMPONENT LISTED IN THE STATEMENT OF SPECIAL INSPECTIONS SHALL SUBMIT A WRITTEN STATEMENT OF RESPONSIBILITY TO THE BUILDING OFFICIAL AND THE OWNER PRIOR TO THE COMMENCEMENT OF
WORK ON THE SYSTEM OR COMPONENT. THE CONTRACTOR'S STATEMENT OF RESPONSIBILITY
SHALL CONTAIN ACKNOWLEDGMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED
IN THE STATEMENT OF SPECIAL INSPECTION.
OWNER OR OWNER'S REPRESENTATIVE SHALL BE SYNONYMOUS WITH "BUILDING OFFICIAL" IN THE
FOREGOING IF THE PROJECT IS NOT UNDER THE JURISDICTION OF A BUILDING DEPARTMENT.
CONTRACTOR RESPONSIBILITY
SPECIAL INSPECTION SHALL BE PROVIDED FOR THE FOLLOWING TYPES OF WORK PERFORMED IN THE FIELD, OR NOT PERFORMED IN AN APPROVED FABRICATION SHOP AS DEFINED ABOVE, UNLESS
NOTED AS "N/A".
REQUIRED SPECIAL INSPECTIONS AND TEST OF SOILS:
1.
2.
3.
4.
5.
6.
VERIFY MATERIALS BELOW SHALLOW FOUNDATIONS ARE
ADEQUATE TO ACHIEVE THE DESIGN BEARING CAPACITY
VERIFY EXCAVATIONS ARE EXTENDED TO PROPER DEPTH
AND HAVE REACHED PROPER MATERIAL
PERFORM CLASSIFICATION AND TESTING OF COMPACTED
FILL MATERIALS
PERFORM CLASSIFICATION AND TESTING OF NATIVE SOILS TO
VERIFY ANY SOIL PROPERTIES ASSUMED AS PART OF DESIGN
FOR THIS PROJECT IN THE ABSENCE OF A SOILS REPORT
(SEE SOIL PROPERTIES ON THIS DRAWING). THIS TESTING
SHALL BE PERFORMED IN ADVANCE OF ANY CONSTRUCTION.
THE STRUCTURAL ENGINEER SHALL BE NOTIFIED IF THE
ASSUMED VALUES ARE NOT VALID
VERIFY USE OF PROPER MATERIALS, DENSITIES AND LIFT
THICKNESSES DURING PLACEMENT AND COMPACTION OF
COMPACTED FILL
PRIOR TO PLACEMENT OF COMPACTED FILL, INSPECT
SUBGRADE AND VERIFY THAT SITE HAS BEEN PREPARED
PROPERLY
SPECIAL INSPECTIONS
REQUIRED ( YES NO)
CONT PERIODIC N/A
REQUIRED SPECIAL INSPECTIONS OF TESTS OF DRIVEN
DEEP FOUNDATION ELEMENTS:
1.
2.
3.
4.
VERIFY ELEMENT MATERIALS, SIZED AND LENGTHS COMPLY
WITH THE REQUIREMENTS
DETERMINE CAPACITIES OF TESTS ELEMENTS AND CONDUCT
ADDITIONAL LOAD TESTS, AS REQUIRED
INSPECT DRIVING OPERATIONS AND MAINTAIN COMPLETE
AND ACCURATE RECORDS FOR EACH ELEMENT
VERIFY PLACEMENT LOCATIONS AND PLUMBNESS, CONFIRM
TYPE AND SIZE OF HAMMER, RECORD NUMBER OF BLOWS
PER FOOT OF PENETRATION, DETERMINE REQUIRED
PENETRATIONS TO ACHIEVE DESIGN CAPACITY, RECORD TIP
AND BUTT ELEVATIONS AND DOCUMENT ANY DAMAGE TO
FOUNDATION ELEMENT
REQUIRED SPECIAL INSPECTIONS OF CONCRETE
CONSTRUCTION:
1.
2.
A.
B.
C.
3.
4.
A.
B.
5.
6.
7.
8.
9.
A.
B.
10.
11.
12.
INSPECT REINFORCEMENT, INCLUDING PRESTRESSING
TENDONS, AND PLACEMENT
REINFORCING BAR WELDING:
VERIFY WELDABILITY OF REINFORCING BARS OTHER
THAT ASTM A706
INSPECT SINGLE-PASS FILLET WELD, MAXIMUM 5/16"
INSPECT ALL OTHER WELDS
INSPECT ANCHORS CAST IN CONCRETE
INSPECT ANCHORS POST-INSTALLED IN HARDENED
CONCRETE MEMBERS:
ADHESIVE ANCHORS INSTALLED IN HORIZONTALLY OR
UPWARDLY INCLINED ORIENTATIONS TO RESIST
SUSTAINED TENSION LOADS
MECHANICAL ANCHORS AND ADHESIVE ANCHORS NOT
DEFINED IN 4.A
VERIFY USE OF REQUIRED DESIGN MIX
PRIOR TO CONCRETE PLACEMENT, FABRICATE SPECIMENS
FOR STRENGTH TESTS, PERFORM SLUMP AND AIR CONTENT
TESTS, AND DETERMINE THE TEMPERATURE OF THE
CONCRETE
INSPECT CONCRETE AND SHOTCRETE PLACEMENT FOR
PROPER APPLICATION TECHNIQUES
VERIFY MAINTENANCE OF SPECIFIED CURING TEMPERATURE
AND TECHNIQUES
INSPECT PRESTRESSED CONCRETE FOR:
APPLICATION OF PRESTRESSING FORCES
GROUTING OF BONDED PRESTRESSING TENDONS
INSPECT ERECTION OF PRECAST CONCRETE MEMBERS
VERIFY IN-SITU CONCRETE STRENGTH, PRIOR TO STRESSING
OF TENDONS IN POST-TENSIONED CONCRETE AND PRIOR TO
REMOVAL OF SHORES AND FORMS FROM BEAMS AND
STRUCTURAL SLABS
INSPECT FORMWORK FOR SHAPE, LOCATION AND
DIMENSIONS OF CONCRETE MEMBER BEING FORMED
CONT PERIODIC N/A
REQUIRED SPECIAL INSPECTIONS AND TESTS OF STEEL
CONSTRUCTION (STRUCTURAL STEEL):
1.
A.
B.
C.
D.
E.
2.
A.
B.
C.
D.
E.
F.
3.
A.
B.
C.
INSPECTION TASKS PRIOR TO WELDING
PROCEDURE SPECIFICATIONS (WPS S)
AVAILABLE
MANUFACTURER CERTIFICATIONS FOR WELDING
CONSUMABLES AVAILABLE
MATERIAL IDENTIFICATION (TYPE/GRADE)
WELDER IDENTIFICATION SYSTEM
FIT-UP OF GROOVE WELDS (INCLUDING JOINT
GEOMETRY)
JOINT PREPARATION
DIMENSIONS (ALIGNMENT, ROOT OPENING, ROOT
FACE, BEVEL)
CLEANLINESS (CONDITION OF STEEL SURFACES)
TACKING (TACK WELD QUALITY AND LOCATION)
BACKING TYPE AND FIT (IF APPLICABLE)
INSPECTION TASKS DURING WELDING
USE OF QUALIFIED WELDERS
CONTROL AND HANDLING OF WELDING CONSUMABLES. .
PACKAGING
EXPOSURE CONTROL
NO WELDING OVER CRACKED TACK WELDS
ENVIRONMENTAL CONDITIONS
WIND SPEED WITHIN LIMITS
PRECIPITATION AND TEMPERATURE
WPS FOLLOWED
SETTINGS ON WELDING EQUIPMENT
TRAVEL SPEED
SELECTED WELDING MATERIALS
SHIELDING FAS TYPE/FLOW RATE
PREHEAT APPLIED
INTERPASS TEMPERATURE MAINTAINED (MIN./MAX.)
PROPER POSITION (F, V, H, OH)
WELDING TECHNIQUES
INTERPASS AND FINAL CLEANING
EACH PASS WITHIN PROFILE LIMITATIONS
EACH PASS MEETS QUALITY REQUIREMENTS
INSPECTION TASKS AFTER WELDING
WELDS CLEANED
SIZE, LENGTH AND LOCATION OF WELDS
WELDS MEET VISUAL ACCEPTANCE CRITERIA
CRACK PROHIBITION
WELD/BASE-METAL FUSION
CRATER CROSS SECTION
WELD PROFILES
WELD SIZE
UNDERCUT
POROSITY
P - PERFORM THESE TASKS FOR EACH WELDED JOINT OR
MEMBER OR BOLTED CONNECTION
O - OBSERVE THESE ITEMS ON A RANDOM BASIS
P O N/A
P O N/A a.
A.
B.
C.
D.
E.
F.
G.
D. ARC STRIKES
E. K-AREA
WHEN WELDING OF DOUBLER PLATED, CONTINUITY
PLATES OR STIFFENERS HAS BEEN PERFORMED IN
THE K-AREA, VISUALLY INSPECT THE WEB K-AREA
FOR CRACKS WITHIN 3 IN. OF THE WELD
F. BACKING REMOVED AND WELD TABS REMOVED (IF
REQUIRED)
G. REPAIR ACTIVITIES
H. DOCUMENT ACCEPTANCE OR REJECTION OF WELDED
JOINT OR MEMBER
4. INSPECTION TASKS PRIOR TO BOLTING
MANUFACTURER'S CERTIFICATION AVAILABLE FRO
FASTENERS MATERIALS
FASTENERS MARKED IN ACCORDANCE WITH ASTM
REQUIREMENTS
PROPER FASTENERS SELECTED FOR THE JOINT DETAIL
(GRADE, TYPE, BOLT LENGTH IF THREADS ARE TO BE
EXCLUDED FROM SHEAR PLANE)
PROPER BOLTING PROCEDURE SELECTED FOR JOINT
DETAIL
CONNECTING ELEMENTS, INCLUDING THE APPROPRIATE
FAYING SURFACE CONDITION AND HOLE PREPARATION,
IF SPECIFIED, MEET APPLICABLE REQUIREMENTS
PRE-INSTALLATION VERIFICATION TESTING BY
INSTALLATION PERSONNEL OBSERVED AND
DOCUMENTED FOR FASTENER ASSEMBLIES AND
METHODS USED
PROPER STORAGE PROVIDED FOR BOLTS, NUTS,
WASHERS AND OTHER FASTENER COMPONENTS
5. INSPECTION TASKS DURING BOLTING
A. FASTENER ASSEMBLIES, OF SUITABLE CONDITION,
PLACED IN ALL HOLES AND WASHERS (IF REQUIRED) ARE
POSITIONED AS REQUIRED
B. JOINT BROUGHT TO THE SUNG-TIGHT CONDITION PRIOR
TO THE PRETENSIONING PROCEDURE
C. FASTENER COMPONENT NOT TURNED BY THE WRENCH
PREVENTED FROM ROTATING
D. FASTENERS ARE PRETENSIONED IN ACCORDANCE WITH
THE RCSC SPECIFICATION, PROGRESSING SYSTEMATI-
CALLY FROM THE MOST…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .