Building K As-builts.pdf

PDF 19 MB Posted

Attached to
Z2DA--Actionable: 554-24-101 Install Continuous Water Monitoring (VA-24-00006816)
Solicitation number
36C25923R0113
Issued by

About this file

This federal contract opportunity solicitation requests proposals to install a continuous water monitoring system. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is seeking proposals under solicitation number 36C25923R0113 to install a continuous water monitoring system at Building K, as specified in the attached as-built drawings file. Offerors should provide their best pricing to complete the work by January 15th, 2023, with an award being made by February 1st, 2023. The opportunity is open to all qualified vendors.

View the file

Other files

File Type Posted
Building K Plumbing As builts Showing Work Locations.pdf PDF
36C25923R0113 0004.docx DOCX document
Wage Determination Adams Colorado 12.22.2023.docx DOCX document
Building Q Plumbing As builts Showing Work Location.pdf PDF
Building R Plumbing As builts Showing Work Location.pdf PDF
36C25923R0113 0003.docx DOCX document
Building H Plumbing As-builts Showing Work Locations for Project 554-24-101.pdf PDF
SC_DataSheet_V4.0 Sample Cooler.pdf PDF
Building R Plumbing As-builts Showing Work Locations for Project 554-24-101.pdf PDF
Building Q Plumbing As-builts Showing Work Locations for Project 554-24-101.pdf PDF
SOW 554-24-101 Install Continuous Water Monitoring Rev 231121.docx DOCX document
S04-Pre-bid Site Visit Attendance.pdf PDF
Building K Plumbing As-builts Showing Work Locations for Project 554-24-101.pdf PDF
Answer to Questions.docx DOCX document
S04 - Site Visit Meeting Doc.docx DOCX document
36C25923R0113 0002.docx DOCX document
36C25923R0113_Solicitation.docx DOCX document
Chemtreat CL497 Info.pdf PDF
36C25923R0113.docx DOCX document
Building H As-builts.pdf PDF
Specs 554-24-101.pdf PDF
Chemtreat CL5551 SDS.pdf PDF
Chemtreat CL2250 SDS.pdf PDF
Building R Plumbing As-built.pdf PDF
Pictures Building L - Existing Cooling Tower Water Treatment System.docx DOCX document
Building Q Plumbing Plans.pdf PDF
Building Q Electrical Plans.pdf PDF
Building R Electrical As-built.pdf PDF
VHA ICRA 2023-1.0_Final Template.pdf PDF
Basis CTW System -Model-T80-Transmitter-Data-Sheet.pdf PDF
NARA Records Management Contracting Language.docx DOCX document
Basis WQMS - ATI_Q52_MetriNet_Literature.pdf PDF
Chemtreat CL497 SDS.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

DN

DN

UP

J

JJ

J

J

J

J

J

J

J

+54"

+54"

+54" +54"

+54"

+54"

+54"

+54"

+54"

+54"

+54"

+54"

+54"

+54"

05-NL12-29

05-EQL12-22

05-EQL12-20

05-EQL12-19

05-EQL12-17

05-NL11-64,66

+54"

(PART)

05 - CUH - 3

05-EQL12-21

(PART)

05 - CUH - 4

05-EQL12-23

TRANSFER

STATION

05-EQL-12-20

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

J

J

R1

R1

R2

R2

RE

RE

RF

RF

RG

RG

RH

RH

RJ

RJ

RC

RC

RB

RB

RA

RA

RD

RD

K

K

05-M5

MECH

05-M1

MECH

K1U-101

VEST

05-11-V1

K1U-ST2

STAIR

05-11-ST2

K1U-ST1

STAIR

05-11-ST1

K1U-102

VEST

05-11-V2

KE-P02

ELEV

05-11-PE2

KE-P01

ELEV

05-11-PE1

KE-S01

ELEV

05-11-SE1

KE-S02

ELEV

05-11-SE2

K1U-100

MECH

05-11-A1-M1

FLAG NOTES:

120V CONNECTION FOR LOW VOLTAGE VAV BOX POWER

SUPPLY. FIELD COORDINATE EXACT LOCATION.

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O N

R

ES

D

AT

IB

S

IB

N

EN

C C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E on e ei gh th in ch o ne fo ot

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

5/ /2 :5 4:

A M

C :\U se rs \C

AD

U se r 3 \D oc um en ts \B ac ku ps \E S-

IB

N _s ea n.

w illi am sX R U N J.

rv t

05.ES.401.1

LEVEL 1 INTERSTITIAL POWER PLAN

INPATIENT BUILDING (NORTH)

08/31/2012

1/8" 1'-0"1

LEVEL 1 INTERSTITIAL POWER

PLAN

0' 4' 8' 16' 32'

NORTH

T1

T4

J

J

J

J

J

J J

J

J

J J

J

J

J

J

J

J

J

J

J

J

J

J

J

J

T1

J

J

J

J

J

J

05-NL11

05-CL11

05-LSH11

05-LSL11

05-CH11

05-CL13

+42"

P-TUBE

AC

+42" +42"

+42"

+42"

+42"+42"

P-TUBE

AC

EWC

AC

AC ACAC

+96" +96" +96" +96" +96" +96"

AC

AC

+90"

+96"

+42"

DOOR

HOLDER

AC

CLG

ISOLATION

PANEL

DOOR

OPERATOR

DIGITAL

SIGNAGE

+96"

+48"

AC AC

AC

AC

+96"

+64"

HOOD

+64"

+60"

+60"

+42" +42" +42" +42" +42" +42"

DOOR

HOLDER

+60"

+42"

+42"

+42"

+42"

+42"

+42"

+42"

+42"

+42"

+42"

+42"

+42"

+42"

+42"

+42"

+42"

+42"

+42" +96"

+42"

+42"

+54"

PRESCRIPTION

STATUS SIGN AC

+48"

+96"

+42"

+42"

AC AC

AC

AC AC

+96"

+36"

+36"

+36"

+36"

+96"

05-NL11-7,9

05-NL11-1,3,5 05-NL11-2,4,6

3,55 6 4,6

05-NL11-11,13

+36"

+36"

M8330

U4200

U4200

05-NL11-21,23

15,17

10,14

05-NL11-15,17,19

05-NL11-10,12,14

05-NL11-16,18

05-NL11-8

(PART)

05-NL11-8

(PART)

05-NL11-8

(PART)

05-EQL12-1

(PART)

05-EQL12-1

(PART)

05-CL11-1

05-NL11-25,27,29

25 29

05-NL11-26,28,30

05-NL11-32,34,36

05-NL11-42

05-CL11-3

05-NL11-37

05-CL11-5

05-LSL11-2

(PART)

05-LSL11-2

(PART)

05-NL11-44,4605-NL11-52,54

05-NL11-48,50

05-NL11-39,41

05-CL11-8,10,12

05-CL11-2,4,6

05-NL11-43,45,47 4452

45,47

8,12

05-NL11-51,53

05-NL11-49

05-NL11-55,57,59

05-NL11-56,58

+36"

NAC05-LSL11-4

05-EQL12-5

05-NL11-85,87

9 05-CL11-7,9,11

05-NL11-89,91

+60"

05-LSL11-7

05-EQL12-8,10,12

10,12

(PART)

05-LSL11-7

(PART)

05-NL11-90

05-NL11-88

05-EQL12-3

05-EQL12-9

05-NL11-86

05-EQL12-15

05-NL11-60

05-NL11-61

05-CL11-13,15,17

15,17

05-NL11-62

05-NL11-63

(PART)

05-NL11-63

(PART)

05-CL11-14,16

05-NL11-31,33,35

05-NL11-63

(PART)

05-EQL12-14

(PART)

05-CL11-18,20,22

12 12 12 12 12

14 14 14

05-CL11-24,26,28

05-NL11-65

+96"

+96"

05-LSL11-8

28 28

ORCY1

M 7401

05-NL11-68

05-CL11-25,27

05-CL11-19,21,23

M 9100 X 4890

M 4800

05 - M 7490 M 8606

M 9080

05-CL11-29

ORCY1-1ORCY1-2

ORCY1-3

ORCY1-4

ORCY1-5

05-CL13-2

05-CL13-6 05-CL13-9

05-CL13-12

05-CL13-1005-CL13-11

05-CL13-1,3

05-CL13-5,7

05-CL13-11

05-CL13-14,16

05-CL13-805-CL13-4

(PART)

(PART)

32 34 36 32 3234 36 34 36

05-EQL12-13

(PART)

05-EQL12-13

(PART)

A

A

B

B

C

C

D

D

E

E

R1

R1

R2

R2

RE

RE

RC

RC

RB

RB

RA

RA

RD

RD

05-M1

MECH

K1-237

DATA /

TELECOMM

05-01-C3-T2 K1-235

ELEC

05-01-C3-E2

K1-116

CHUTE

05-01-D3-H1

K1-ST1

STAIR

05-01-ST1

KE-P02

ELEV

05-01-PE2

KE-P01

ELEV

05-01-PE1

KE-S01

ELEV

05-01-SE1

KE-S02

ELEV

05-01-SE2

05-01-RAR1-01

CORRIDOR

K1-206

EXAM/TREATMENT

05-01-A1-01 K1-208

EXAM/TREATMENT

05-01-A1-02 K1-210

EXAM

05-01-A1-03 K1-212

EXAM/TREATMENT

05-01-B1-01 K1-214

EXAM/TREATMENT

05-01-B1-02

K1-207

NURSE STATION

05-01-A2-03

K1-239

CLEAN UTIL

05-01-C3-03

K1-112

SOILED UTIL

05-01-C3-02

K1-229

DRESSING

05-01-B3-03

K1-228

RECOVERY

05-01-B2-01

K1-231

PAT SHOWER

05-01-B3-04 K1-225

OFFICE

05-01-A3-05

K1-233

PAT TLT

05-01-B3-05

K1-224

PHYS THERAPY

05-01-D1-01

K1-114

ELEV VEST

05-01-D3-02

K1-117

CONF

05-01-RDR1-03

K1-230

CYSTOSCOPY

05-01-B2-02

K1-234

STOR

05-01-C2-02

K1-113

HOME LEARNING

05-01-RCR1-01

K1-105

PHARMACY

05-01-RBR1-01

K1-102

HAC

05-01-A3-06 K1-106

PAT TLT

05-01-B3-07 K1-108

PAT TLT

05-01-B3-08

K1-218

OFFICE

05-01-C1-01

K1-201

WAIT

05-01-A2-01

K1-222

OFFICE

05-01-C1-03

K1-227

EXAM/TREAT

05-01-B3-02

K1-220

OFFICE

05-01-C1-02

05-01-A1-04

RECEPT

H1-311

PAT STOR

05-01-RAR1-08

K1-216

EXAM/TREATMENT

05-01-B1-03

K1-224A

OFFICE

05-01-D3-01

K1-203

PUBLIC TLT

05-01-A3-01

K1-104

CLEAN LINEN

HOLD

05-01-B3-06

K1-113B

BEDROOM

05-01-RDR1-02

K1-113C

TLT

05-01-RDR1-01K1-113A

TLT

05-01-RCR1-02

K1-205

PUBLIC TLT

05-01-A3-02

K1-217

INSTRUMENT

CLEANING

05-01-C2-01

K1-101

WAIT

05-01-RAR1-02

K1-C06

CORRIDOR

05-01-B1-04

K1-C02

CORRIDOR

05-01-RAR1-01

K1-C05

CORRIDOR

05-01-B3-01

K1-113D

CLOSET

05-01-RCR1-03

K1-110

INTERNET CAFÉ

05-01-RAR1-09

K1-100

ELEV VEST

05-01-A3-07

K1-236

UROLOGY

05-01-C3-01

K1-C01

CORRIDOR

05-01-RAR1-11

K1-C04

CORRIDOR

05-01-B1-05

K1-103

PHARMACY

05-01-RBR1-02

K1-C07

CORRIDOR

05-01-C1-04

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O N

R

ES

D

AT

IB

S

IB

N

EN

C C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E on e qu ar te r i nc h on e fo ot

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

5/ /2 :5 4:

A M

C :\U se rs \C

AD

U se r 3 \D oc um en ts \B ac ku ps \E S-

IB

N _s ea n.

w illi am sX R U N J.

rv t

05.ES.401-A

ENLARGED LEVEL 1 POWER PLAN -

AREA A

INPATIENT BUILDING (NORTH)

08/31/2012

1/4" 1'-0"1

ENLARGED LEVEL 1 POWER

PLAN - AREA A

0' 2' 4' 8' 16'

REFER TO DRAWING 05.ES.401-B

FOR DETAIL NOTES THIS SHEET. NORTH

DN

DN

UP

6"W

6"W

6"W 4" W

6"W

6" W

4"V 4"V 4"V

4"V

4"V STACK

6"W STACK

4"V STACK

6"W STACK 4"V STACK

6"W STACK

FINISHED INTERSTITIAL

FLOOR ELEVATION 111.50'

(5399.50' USGS)

FINISHED INTERSTITIAL

FLOOR ELEVATION

111.50'

(5399.50' USGS)

INTERSTITIAL

ACCESS

WALKWAY12"V (EM WATER

STORAGE TANK)

STACK

4"V(SAN

HOLDING

TANK)

STACK.

4"V(SAN HOLDING

TANK) STACK.

12"OFD STACK

8"SW STACK

DN FROM

LEVEL ABOVE.

8"SW STACK DN

TO LEVEL

BELOW.

8"SW STACK UP

TO LEVEL

ABOVE.

SLOPE PIPING

MINIMUM 1/4" PER

LINEAR FOOT.

8" SW DN TO

LEVEL BELOW.

2"W

4"W

2"W

2"W

4"W

4"W

2"W

4"W

4"W

2"W

4"W 2"W

4"W

2"W

4"W

4"W2"W

4"W 2"W

4"W

2"W

4"W

2"W UP

2"W

2"W

4"W

4"W

2"W

2"W

2"W

4"W

2"W

2"W

2"W

4"W

4"W

2"W

2"W

2"W

4"W

4"W

2"W

2"W

2"W

4"W

4"W

2"W

2"W

2"W

4"W

4"W

2"W

2"W

2"W

4"W

4"W

2"W

2"W

2"W

4"W

6"W

4"W

4"W

2"W 2"W 2"W 2"W 2"W 2"W 2"W 2"W 2"W 2"W 2"W 2"W 2"W 2"W

2"W

2"W

2"W4"W

2"W 2"W

2"W 2"W 2"W

4"W

2"W 2"W

2"W

2"W

2"W

2"W

4"W

4"W

6"W 6"W

4"W

2"W

2"W

6"W

4"W

2"W 4"W2"W

2"W

2"W

4"W

2"W

4"W

2"W UP

4"W

4"W

2"W

2"W

2"W UP

2"W

4"W

4"W

2"W

4"W

2"W

6"W

2"W

3"W

3"V

2"V

2"V2"V2"V2"V

3"V

3"V

4"V 2"V

4"V 2"V2"V

2"V

2"V

3"V

3"V

2"V 2"V

2"V

3"V

3"V

4"V

4"V

2"V

3"V

2"V

2"V3"V

3"V

2"V

4"V

2"V

2"V

2"V

2"GV

2"GV

2"GV

3"GV

3"GV UP

THROUGH

ROOF

2"GV

8"SW / 8"OFD

DN TO BELOW

FLOOR

6"SW

6"OFD

8"SW

8"OFD

6"SW / 6"OFD

FROM LEVEL

ABOVE

6"SW / 6"OFD

FROM LEVEL

ABOVE

3"W

3"SW STACK

3"SW

3"SW UP

TO RD

2"V UP

2"W UP

2"V UP

2"V UP

2"V UP

2"W UP

2"V UP

2"W

2"AW 2"AW

2"AW

2"AW

2"V3"V

4"V (SE SUMP)

STACK

3"V (SP SUMP)

STACK

2"W 2"W 2"W

2"W

2"W

2"W

2"W

2"W

2"W

2"W

2"V

2"W

4"W

2"W

1" INDIRECT

WASTE DN TO

MOP BASIN

3/4"

1"

3"V

4"V

3"V

3"V

8"SW

8"SW

2"GV DOWN

5 - TU2W- 1.1

5 - TU2W- 1.2

5 - TU2W- 1.3

5 - TU2W- 1.4

5 - TU2W- 1.5

5 - TU2W- 1.6 5 - TU2W- 1.7 5 - TU2W- 1.8 5 - TU2W- 1.9 5 - TU2W- 1.10 5 - TU2W- 1.11 5 - TU2W- 1.12 5 - TU2W- 1.13

5 - TU2W- 1.21

5 - TU2W- 1.14

5 - TU2W- 1.16

5 - TU2W- 1.15

5 - TU2W- 1.17

5 - TU2W- 1.18

5 - TU2W- 1.20

5 - TU2W- 1.22

5 - TU2W- 1.23

5 - TU2W- 1.24

5 - TU2W- 1.25

5 - TU2W- 1.26

5 - TU2W- 1.28

5 - TU2W- 1.29

5 - TU2W- 1.30

5 - TU2W- 1.31

5 - TU2W- 1.325 - TU2W- 1.33

5 - TU2W- 1.34

5 - ETU2W- 1.25 - ETU2W- 1.1

5 - TU3- 1.1

5 - TU3- 1.2

5 - TU3- 1.3

5 - TU3- 1.4

5 - TU3- 1.5

5 - TU3- 1.6

5 - TU3- 1.7

5 - TU3- 1.8

5 - TU3- 1.9

5 - TU3- 1.10

5 - TU3- 1.12

5 - TU3- 1.13

5 - TU3- 1.14

5 - TU3- 1.15 5 - TU3- 1.16 5 - TU3- 1.17 5 - TU3- 1.18 5 - TU3- 1.19

5 - TU3- 1.20

5 - TU3- 1.21

5 - TU3- 1.22

5 - TU3- 1.23

5 - TU2W- 1.27

5 - TU2W- 1.19

5 - TU3- 1.24

5 - TU3- 1.11

5 - TU3- 1.25

05-CUH-03

05-FCU-9

05-FCU-8

4-TU2-1.35

4-TU2-1.37

4-TU2-1.36

B

C

D

E

F 04

G

H

J

K

B

C

D

E

F

G

G

H

H

J

J

K

K

R1

R2

RB

RC

RD

RE

RF

RG

RH

RJ

TA

TB

TC

TD

TF

TG

TH

TJ

K1U-ST1

STAIR

05-11-ST1

KE-P02

ELEV

05-11-PE2

KE-P01

ELEV

05-11-PE1

05-M1

MECH

KE-S02

ELEV

05-11-SE2

KE-S01

ELEV

05-11-SE1

K1U-100

MECH

05-11-A1-M1

05-M5

MECH

K1U-102

VEST

05-11-V2

K1U-ST2

STAIR

05-11-ST2

K1U-101

VEST

05-11-V1

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O N

R

ES

D

AT

IB

S

IB

N

EN

C C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E on e ei gh th in ch o ne fo ot

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/ 6/ :5 4:

A M

C :\U se rs \C

AD

U se r 3 \D oc um en ts \B ac ku ps \P L-

IF

O -s he et s_ se an .w illi am sX R U N J.

rv t

05.PL.101.1

LEVEL 1 INTERSTITIAL WASTE, DRAIN

AND VENT PIPING PLAN

INPATIENT BUILDING (NORTH)

08/31/2012

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

1/8" 1'-0"1

LEVEL 1 INTERSTITIAL WASTE,

DRAIN AND VENT PIPING PLAN

DN

UP

X

X X

X X

X X

X X

X X

X X

X X

01-01-A8-03

OFFICE

01-01-A10-01

SEATING

01-01-A7-02

VEND

01-01-A7-04

HAC

01-01-A9-01

EXHIB DISPLAY

FINISHED FLOOR

ELEVATION 100.0'

(5388.0' USGS)

FINISHED FLOOR

ELEVATION 100.0'

(5388.0' USGS)

4"GCO

(TWO-WAY)

4"GCO

(TWO-WAY)

4" GCO

4"GCO

12"V (EM WATER

STORAGE TANK) UP

FROM LEVEL BELOW.

4"V(SAN HOLDING

TANK) STACK.

4"V(SAN HOLDING

TANK) STACK.

12"OFD STACK

12"V (EM WATER

STORAGE TANK) UP

TO LEVEL ABOVE.

8"SW STACK

8"SW STACK

6"W STACK

4"V STACK

6"W STACK

4"V STACK 6"W STACK

4"V STACK

3"FD-S W/

HALF GRATE

3"FD-S W/

HALF GRATE

3"FD-C

3"FD-C

3"FD-S W/

HALF GRATE

3"FD TYPE B

(NO P-TRAP). ROUTE

INDIRECT TO IBN

FLOOR DRAIN W/ 1"

AIR GAP.

8"SW / 8"OFD

FROM ABOVE

2"V

2"V

2"V

2"V

2"TD-3

2"V UP FROM

BELOW FLOOR.

P-401

P-701

P-101

P-101

P-401

P-701

P-402

P-101

P-701

P-101

P-401

P-530

P-531

P-414

P-701

P-101

P-302 P-101

P-405

P-534

P-419

P-302

P-405 P-101

P-405 P-101

P-302

P-528

P-422

P-419

P-103 P-103 P-401P-401

P-103

P-401

P-101

P-405

P-502

P-519P-419

P-532

P-420

P-401

P-101 P-609

P-101

P-401

3"RD DECK DRAIN

(INCIDENTAL SW)

3"SW

STACK

P-808

2"V

3"FS-S W/

HALF GRATE

4"V (SE SUMP)

STACK

3"V (SP SUMP)

STACK

2"TD-3

P-701

2"TD-3

2"TD-3

P-532

CONNECT 2”IW TO EXTERIOR

FREEZEPROOF DRINKING

FOUNTAIN. RE: LANDSCAPE

DRAWINGS FOR

SPECIFICATION & EXACT

REQUIREMENTS.

CONNECT 2”IW TO EXTERIOR

FREEZEPROOF DRINKING

FOUNTAIN. RE: LANDSCAPE

DRAWINGS FOR

SPECIFICATION & EXACT

REQUIREMENTS.

CONNECT 2”IW TO EXTERIOR

FREEZEPROOF DRINKING

FOUNTAIN. RE: LANDSCAPE

DRAWINGS FOR

SPECIFICATION & EXACT

REQUIREMENTS.

2"TD-3 CONTINUOUS NARROW

CHANNEL TRENCH DRAIN W/

MANUFACTURERED CORNER

GRATES.

3"V UP FROM

BELOW FLOOR

W/ WCO.

P-419

2"FD

TYPE C

3"V UP FROM

BELOW FLOOR

W/ WCO.

4"FCO

3"W DN

2"V UP

2"W DN

A

A

B

C

D

E

F

G

H

H

J

J

K

K

R1

R1

R2

RB

RC

RD

RE

RF

RG

RH

RJ

TA

TB

TC

TD

TF

TG

TH

TJ

K1-145

ELEC

05-01-F3-E1

05-M5

MECHK1-147

DATA / TELECOMM

05-01-F2-T1

05-M1

MECH

K1-237

DATA / TELECOMM

05-01-C3-T2 K1-235

ELEC

05-01-C3-E2

H1-307

ELEC

05-01-A1-E3

K1-116

CHUTE

05-01-D3-H1

K1-166

TERRACE

05-01-J1-01

K1-ST2

STAIR

05-01-ST2

K1-ST1

STAIR

05-01-ST1

KE-P02

ELEV

05-01-PE2

KE-P01

ELEV

05-01-PE1

KE-S01

ELEV

05-01-SE1

KE-S02

ELEV

05-01-SE2

05-01-RAR1-07

CORRIDOR

05-01-RAR1-01

CORRIDOR

K1-206

EXAM/TREATMENT

05-01-A1-01 K1-208

EXAM/TREATMENT

05-01-A1-02 K1-210

EXAM

05-01-A1-03 K1-212

EXAM/TREATMENT

05-01-B1-01 K1-214

EXAM/TREATMENT

05-01-B1-02

K1-207

NURSE STATION

05-01-A2-03

K1-239

CLEAN UTIL

05-01-C3-03 K1-112

SOILED UTIL

05-01-C3-02

K1-229

DRESSING

05-01-B3-03

K1-228

RECOVERY

05-01-B2-01

K1-231

PAT SHOWER

05-01-B3-04 K1-225

OFFICE

05-01-A3-05

K1-233

PAT TLT

05-01-B3-05

K1-224

PHYS THERAPY

05-01-D1-01

K1-114

ELEV VEST

05-01-D3-02

K1-158

SECR/WAIT

05-01-G1-02

K1-151

OFFICE

05-01-F2-02

K1-144B

FEMALE DRESSING

05-01-E3-02

K1-160

OFFICE

05-01-G1-03 K1-162

OFFICE

05-01-H1-01 K1-156

OFFICE

05-01-G1-01

K1-149

STOR

05-01-G2-04

K1-129

OFFICE

05-01-RGR1-02

K1-164

OFFICE

05-01-H1-02 K1-154

OFFICE

05-01-F1-03

K1-117

CONF

05-01-RDR1-03

K1-153

OFFICE

05-01-F2-03

K1-136

OFFICE

05-01-G2-06

K1-144

THERAPEUTIC POOL

05-01-E1-01

K1-134

EQUIP STOR

05-01-G2-05

K1-141

MEDITATION

05-01-RJR1-01

K1-137

HORTICULTURE

05-01-RHR1-01

K1-127

PATIENT ED

05-01-RGR1-01

K1-230

CYSTOSCOPY

05-01-B2-02

K1-234

STOR

05-01-C2-02

K1-113

HOME LEARNING

05-01-RCR1-01

K1-105

PHARMACY

05-01-RBR1-01

K1-102

HAC

05-01-A3-06

K1-106

PAT TLT

05-01-B3-07 K1-108

PAT TLT

05-01-B3-08

K1-144C

MALE DRESSING

05-01-F1-01K1-218

OFFICE

05-01-C1-01

K1-201

WAIT

05-01-A2-01

K1-143

INTERVIEW

05-01-F3-01

05-01-RHR1-03

STAFF LOUNGE

K1-130

OFFICE

05-01-G3-01

K1-157

HOME CARE COORD

05-01-G2-02 K1-159

HOME CARE COORD

05-01-G2-03

K1-155

OFFICE

05-01-G2-01

K1-222

OFFICE

05-01-C1-03

K1-131

OFFICE

05-01-RGR1-03

K1-128

OFFICE

05-01-F3-02

K1-227

EXAM/TREAT

05-01-B3-02

K1-220

OFFICE

05-01-C1-02

K1-167

OFFICE

05-01-H2-01

05-01-A1-04

RECEPT

H1-311

PAT STOR

05-01-RAR1-08

K1-216

EXAM/TREATMENT

05-01-B1-03

K1-224A

OFFICE

05-01-D3-01

K1-203

PUBLIC TLT

05-01-A3-01

K1-104

CLEAN LINEN HOLD

05-01-B3-06

K1-119

OCC THERAPY

05-01-RER1-01

K1-113B

BEDROOM

05-01-RDR1-02

K1-113C

TLT

05-01-RDR1-01

K1-113A

TLT

05-01-RCR1-02

K1-125

ROLL IN SHOWER

05-01-RFR1-03

05-01-RFR1-02

ACTIVITIES

K1-205

PUBLIC TLT

05-01-A3-02

K1-217

INSTRUMENT CLEANING

05-01-C2-01

K1-101

WAIT

05-01-RAR1-02

K1-C06

CORRIDOR

05-01-B1-04

K1-C09

CORRIDOR

05-01-F1-04

K1-C03

CORRIDOR

05-01-FR1-03

K1-C02

CORRIDOR

05-01-RAR1-01

K1-C05

CORRIDOR

05-01-B3-01

H1-303

DINING/SERVING

05-01-RAR1-06

K1-138

STAFF TLT

05-01-H2-02

K1-113D

CLOSET

05-01-RCR1-03

K1-166

WAIT

05-01-F2-01

K1-144A

TLT

05-01-E3-01

05-01-RFR1-01

TLT

K1-132

HAC

05-01-G3-02

K1-139

STAFF LOCKERS

05-01-RHR1-02

05-01-RAR1-05

MULTIPURPOSE

H1-305A

STORAGE

05-01-RAR1-04

H1-309

CONF

05-01-RAR1-03

K1-110

INTERNET CAFÉ

05-01-RAR1-09

K1-100

ELEV VEST

05-01-A3-07

05-01-RAR1-10

SERVERY

K1-236

UROLOGY

05-01-C3-01

K1-C01

CORRIDOR

05-01-RAR1-11

K1-C04

CORRIDOR

05-01-B1-05

K1-103

PHARMACY

05-01-RBR1-02

K1-C07

CORRIDOR

05-01-C1-04

K1-C08

CORRIDOR

05-01-F3-03

GREEN HOUSE

00-01-001

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O N

R

ES

D

AT

IB

S

IB

N

EN

C C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E on e ei gh th in ch o ne fo ot

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

5/ 4/ :1 6:

A M

C :\U se rs \C

AD

U se r 3 \D oc um en ts \B ac ku ps \P L-

IF

O -s he et s_ se an .w illi am sX R U N J.

rv t

05.PL.101

LEVEL 1 WASTE, DRAIN AND VENT

PIPING PLAN

INPATIENT BUILDING (NORTH)

08/31/2012

NORTH

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

1/8" 1'-0"1

LEVEL 1 WASTE, DRAIN AND

VENT PIPING PLAN

UP

DN

3"DCW

1 1/2"DHW

1"DHWR

1"DHWR DN FROM

LEVEL ABOVE.

1 1/2"DHW DN FROM

LEVEL ABOVE.

3"DCW DN FROM

LEVEL ABOVE.

1 1/2"O2 RISER

PIPING EXTEND

FROM MAINS AT

CONCOURSE

SERVICE LEVEL.

RE: CONCOURSE

PLUMBING DWGS.

8"DCW

8"DCW

8"DCW

5"DCW RISER

3"DHW RISER

2"DHWR RISER

P-801

8"DCW

8"DCW

8"COMBINATION

FIRE/DCW. RE: CIVIL

DRAWINGS FOR

CONTINUATION.

5373.0' USGS

CENTERLINE OF

PENETRATION

8"FIRE DN TO FIRE

ENTRY RPBFP. RE:

FIRE SUPPRESSION

DWGS.

8"DCW DN TO DCW

ENTRY RPBFP

8"DCW DN TO DCW

ENTRY RPBFP

P-804 (IN CEILING SPACE).

3/4"DCW

2' - 7"

EXTEND 3/4"CA TO

SANITARY SEWER

HOLDING TANK. RE: CIVIL

DWGS.

EXTEND 3/4"CA TO

SANITARY SEWER

HOLDING TANK. RE: CIVIL

DWGS.

3/4"DCW

P-804 (IN

CEILING SPACE).

3/4"CA DN TO BELOW.

3/4"CA DN TO BELOW.

P-801

3/4"DCW

1/2"

2"

1/2"2"

3/4"

1"

1/2"

3/4"DCW

3/4"DCW

1 1/4"DCW

1 1/4"DCW

3"DCW

1 1/4"DHW

1"DHWR

3"DCW

1"DHW

3/4"DHWR

1"DCW

1"DCW TO

GREENHOUSE

HYDRANT &

EXTERIOR

DRINKING

FOUNTAINS.

PROVIDE DRAIN DN

VALVE. SLOPE PIPING

FROM GREENHOUSE

TO DRAIN. ROUTE

3/4"IW FROM DRAIN

DN VALVE TO FD AT

WATER ENTRY.

3/4" IA

CONNECT 1/2" IA

DROP TO

PNEUMATIC DOORS.

SEE MFG. TYP.

3/4"IA

RISER

1/2" IA

1"NG UP TO INFRARED

HEATER. CONNECT W/ SHUT-

OFF VALVE IN RECESSED

MOUNTED VALVE ACCESS BOX,

FLUSH W/ GRADE. EXTEND

CONNECTION THRU HOLE IN

ACCESS COVER TO PATIO

HEATER.

1"NG UP TO

BBQ GRILL

1 1/4"NG

BELOW

FLOOR

1"NG BELOW

FLOOR

1"DCW UP TO

YARD

HYDRANT

1 1/4"NG

FROM

ABOVE

LOCATE PIPING BELOW

EGRESS STRUCTURE

ABOVE & AS TIGHT TO

STRUCTURE AS

POSSIBLE, TYP. ALL

WATER ENTRY PIPING

AT CEILING.

3/4"DCW

1 1/4"

BALANCE TO

0.5 GPM

1"DCW1"DCW

1"DCW

BALANCE

TO 0.5 GPM

1/2"

PROVIDE 2"DCW &

1"DHW VALVED &

CAPPED FOR

FUTURE.

BALANCE

TO 1.0

GPM

3/4"DHWR

3"DCW

1 1/4"DHW

3/4"DHWR

1 1/4"DHW

1"DHWR

BALANCE TO 1.0 GPM

PROVIDE 1"DHW VALVED &

CAPPED FOR FUTURE.

1 1/4"DHW

1"DHWR

3"DCW

1 1/4"DCW

3/4”DCW UP TO

DRINKING FOUNTAIN.

3/4”DCW. SLOPE TO

DRAIN BACK TO

IBN.

MINIMUM BURY DEPTH 60 ”

BELOW FINISHED GRADE.

COORDINATE EXACT

ROUTING W/ LANDSCAPE

AND CIVIL DRAWINGS.

3/4”DCW. SLOPE TO

DRAIN BACK TO

IBN.

3/4”DCW UP TO

DRINKING FOUNTAIN.

3/4”DCW UP TO

DRINKING FOUNTAIN.

MINIMUM BURY DEPTH 60 ”

BELOW FINISHED GRADE.

COORDINATE EXACT

ROUTING W/ LANDSCAPE

AND CIVIL DRAWINGS.

1”DCW. SLOPE TO

DRAIN BACK TO

IBN.

3/4"DCW PIPING

UP TO YARD

HYDRANT

ABOVE.

PROVIDE DRAIN DN VALVE. SLOPE

PIPING FROM DF TO DRAIN.

ROUTE 3/4"IW FROM DRAIN DN

VALVE TO FD AT POOL

EQUIPMENT ROOM.

3/4”DCW. SLOPE TO

DRAIN BACK TO IBN.

3/4”DCW

PROVIDE DRAIN DN VALVE. SLOPE

PIPING FROM DF TO DRAIN.

ROUTE 3/4"IW FROM DRAIN DN

VALVE TO FD AT POOL

EQUIPMENT ROOM.

3/4”DCW. SLOPE TO

DRAIN BACK TO IBN.

CONNECT 3/4”DCW TO EXTERIOR FREEZEPROOF

DRINKING FOUNTAIN. RE: LANDSCAPE DRAWINGS FOR

SPECIFICATION, LOCATION & EXACT REQUIREMENTS.

COORDINATE ROUTING W/ CIVIL DRAWINGS. DF

APPROX. 50FT FROM EDGE OF BUILDING.

3/4" IA

3/4"IA

3/4"IA

PIPING EXTEND

FROM MAIN AT

CONCOURSE

SERVICE LEVEL.

RE: CONCOURSE

PLUMBING DWGS.

PROVIDE DRAIN DN VALVE. SLOPE

PIPING FROM DF TO DRAIN.

ROUTE 3/4"IW FROM DRAIN DN

VALVE TO FD AT POOL

EQUIPMENT ROOM.

3/4”DCW UP TO

DRINKING FOUNTAIN.

3/4”DCW. SLOPE TO

DRAIN BACK TO

IBN.

3/4"DCW

PROVIDE DRAIN DN VALVE. SLOPE

PIPING FROM DF TO DRAIN.

ROUTE 3/4"IW FROM DRAIN DN

VALVE TO FD AT POOL

EQUIPMENT ROOM.

3/4"DCW PIPING

UP TO YARD

HYDRANT

ABOVE.

3/4"DCW

3/4"DCW

1-1/4" DCW, DHW

DOWN TO

THERMOSTATIC MIXING

VALVE

U

U

U

U

U

C

O

M

C

O

M

S

E

E

C

O

M

E

X

B

C

D

E

F

G

H

J

K

A

B

C

D

E

F

G

H

H

J

J

K

K

R1

R2

RA

RB

RC

RD

RE

RF

RG

RH

RJ

TA

TB

TC

TD

TF

TG

TH

TJ

11 12 08 09 13

03040506

Drawing Number

Building Number

Project Number Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key Plan

CONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501

REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C

O N

R

E S

D

A T

I B

S

I B

N

E

N C

C

L C

C

B N

C

B C

C

B S

P

S N

P

V N

P

V S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E o n e e i g h t h i n c h o n e f o o t

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:

H+L Architecture

1755 Blake Street, Suite 400

Denver, CO

80202

Skidmore, Owings & Merrill LLP

224 South Michigan Avenue

Suite 1000

Chicago, IL 60604

Cator, Ruma & Associates

896 Tabor Street

Lakewood, CO 80401

S. A. Miro, Inc.

4582 South Ulster Street

Pkwy.

Suite 300

Denver, CO 80237

Professional Seal

A

M C

U s e r s k a t h l D o c u m e n t s P

L I F

O s h e e t s k m a d s e n F

F R

G r v t

05.PP.100.1

SERVICE LEVEL INTERSTITIAL

PLUMBING PIPING PLAN

INPATIENT BUILDING (NORTH)

08/31/2012

1/8" = 1'-0"

SERVICE LEVEL INTERSTITIAL

PLUMBING PIPING PLAN

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

CDI No.12 08/31/2012

JSI No. 038 10/26/2012

RFI Xyz 02/03/2014

RFI-4234 07/24/2014

JSI No. 118 POSTED SET 03/16/2015

DN

DN

UP

5"DCW

3"DHW

1 1/2"DHWR

3"MV

3/4"MA

3/4"O2

1 1/2"DHWR UP TO LEVEL

ABOVE. 1"DHWR DN TO LEVEL

BELOW.

3"DHW UP TO LEVEL ABOVE. 1

1/2"DHWR DN TO LEVEL BELOW.

4"DCW UP TO LEVEL ABOVE.

3"DCW DN TO LEVEL BELOW.

1 1/2"O2 RISER.

3/4"MA RISER

3"MV RISER

5"DCW, 3"DHW,

2"DHWR

SUBMETERS

5"DCW

3"DHW

1 1/2"DHWR

INTERSTITIAL

ACCESS

WALKWAY

INTERSTITIAL

ACCESS

WALKWAY

3/4"

2"

3/4"

2-1/2" DN

TO HEADER

2-1/2"

1-1/4"

1/2"

1/2"

2"

3/4"

1/2" 3/4"

3/4"2"

2-1/2"

1"

3/4"

1/2"

3/4"

1/2"

2"

2"

1" 2"

2-1/2" 1-1/4"

1/2"

1/2"

3/4" 3/4"

1"

1/2"

1/2" 1/2" 1/2" 1/2" 1/2"

3/4"

2"

2"

1/2"

3/4"

1"

1"

1"2 1/2" DN

TO HEADER

3"DCW

1 1/2"DHW

1"DHWR

2"DCW

1"DHW

3/4"DHWR

2 1/2"DCW

1 1/4"DHW

1"DHWR

3/4"DHWR

1"DHW

1"DCW

1 1/4"DCW

1 1/4"DHW

3/4"DHWR

2 1/2"DCW

1 1/2"DHW

1"DHWR

3"DCW

2"DHW

1"DHWR

3/4"MV

1/2"MA

1/2"O2

3/4"MV

1/2"MA

1/2"O2

3/4"O2

1/2"MA

1"MV

1"MV

3/4"MA

3/4"O2

3/4"MV

1/2"MA

1/2"O2

1"MV

3/4"MA

3/4"O2

1 1/4"MV

3/4"MA

3/4"O2

3/4"02

3/4"MA

1 1/4"MV

M V

M A

O

MV MA O

OMAMV

M V

M A

O

O M A M

V

MV MA O

3/4" IA

CONNECT 1/2" IA

DROP TO

PNEUMATIC

DOORS. SEE MFG.

TYP.

3/4"IA

RISER

1/2" IA

3/4"DHWR

2"DHW

2"DCW

EMERGENCY

SOLENOID SHUT-

OFF VALVE

GAS PRESSURE

REGULATOR. EXTEND 1"

RELIEF VENT TO EXTERIOR

ROOF W/RETURN BEND &

BUGSCREEN.

1/2"NG

(2PSI)

BALANCE

TO 1.0 GPM1"

1"

1" 3/4"

3/4"

1" 1/2"1"

1 1/2" 1"

3/4"

1"NG

DN BELOW

FLOOR

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

3/4"

BALANCE

TO 0.5 GPM

3/4"DCW

3/4"DCW

1"

1"

1/2"BALANCE

TO 0.5 GPM

2"

3/4" 2"

1/2"

1/2"

1/2"

1/2"

BALANCE TO

0.5 GPM

3/4"

1/2"

3/4"

3/4"

BALANCE

TO 0.5

GPM

2"

1 1/4"IRW

1 1/4"IRW

1 1/4"IRW UP

TO ROOF

ABOVE.

1 1/4"IRW UP

TO ROOF

ABOVE.

BALANCE

TO 1.0 GPM

3/4"DHWR

BALANCE

TO 0.5 GPM

PROVIDE 2 1/2"DCW & 1

1/4" DHW CAPPED FOR

FUTURE.

1"DHWR

1 1/2"DHW

2 1/2"DCW

3/4"DHWR

1"DHW

1"DCW

BALANCE

TO 0.5 GPM 1 1/4"DCW

1 1/4"DHW1 1/4"DCW

1 1/4"DHW

3/4"

DHWR

2"DCW

1/2"DHW

BALANCE

TO 0.5

GPM

2"DCW

2 1/2"DCW

3"DCW

3"DCW

1"DHWR

2"DHW

1 1/4"DHWR

5"DCW

3"DHW

1 1/2"DHWR

1"DHW

1"DHW

1 1/4"DHW

1 1/2"DHW

1 1/2"DHW2"DHW

1 1/2"NG

1 1/2"NG

3/4"O2

3/4"MA

AREA ALARM

SENSORS FOR

EACH GAS.

RE: DETAIL,

TYP.

MV

MA O

3/4"

WADG

DN

NO2 TANKS

A

B

C

D

E

F

G

H

J

K

R1

R2

RB

RC

RD

RE

RF

RG

RH

RJ

TA

TB

TC

TD

TF

TG

TH

TJ

KE-S02

ELEV

05-11-SE2

KE-S01

ELEV

05-11-SE1

K1U-100

MECH

05-11-A1-M1

05-M5

MECH

K1U-102

VEST

05-11-V2

K1U-ST2

STAIR

05-11-ST2

05-M1

MECH

KE-P01

ELEV

05-11-PE1

KE-P02

ELEV

05-11-PE2

K1U-ST1

STAIR

05-11-ST1

K1U-101

VEST

05-11-V1

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O N

R

ES

D

AT

IB

S

IB

N

EN

C C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E on e ei gh th in ch o ne fo ot

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/ 6/ :5 5:

A M

C :\U se rs \C

AD

U se r 3 \D oc um en ts \B ac ku ps \P L-

IF

O -s he et s_ se an .w illi am sX R U N J.

rv t

05.PP.101.1

LEVEL 1 INTERSTITIAL PLUMBING

PIPING PLAN

INPATIENT BUILDING (NORTH)

08/31/2012

1/8" 1'-0"1

LEVEL 1 INTERSTITIAL

PLUMBING PIPING PLAN

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

DN

DN UP

3"DCW

2 1/2"DHW

1 1/4"DHWR

3"MV

1"MA

1"O2

1 1/2"DHWR RISER

3"DHW RISER

4"DCW RISER

1 1/2"O2 RISER.

1"MA RISER

3"MV DN TO LEVEL

BELOW. EXTEND

3"MV UP TO LEVEL

ABOVE.

INTERSTITIAL

ACCESS

WALKWAY

INTERSTITIAL

ACCESS

WALKWAY

1/2"1/2"1/2" 1/2"

1/2"1/2"1/2"1/2"1/2"1/2"

1/2"

1"1/2"

1/2”

1/2”

3/4”

2”

2-1/2” 3/4”

3/4”

1/2”

1/2”

3/4”

3”DCW

2-1/2” DN

3/4”3/4” DN

1-1/4”

3/4”

1”

3"DCW

1 1/2"DHW

1"DHWR

3"DCW

2"DHW

1"DHWR

3"DCW

1/2"DHW1"DHWR

3"DCW

1 1/4"DHW

3/4"DHWR

3/4"O23/4"O23/4"O2

3/4"MA3/4"MA3/4"MA

1 1/4"MV1 1/2"MV1 1/4"MV1 1/4"MV

1"MV

3/4"MA

3/4"O2

3/4"MA

3/4"O2

1 1/4"MV

O M A

MA

MV

MA O

3/4"O2

3/4"MA

2"MV

3/4"MA

3/4"O2

3/4"MA

3/4"O2 1 1/2"MV

2 1/2"MV

1"MA

1"O2

1"O2

1"MA

2 1/2"MV

1"O2

1"MA

2 1/2"MV

1/2"O2, 3/4"MA &

1"MV DN TO LEVEL

BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

INTERSTITIAL

ACCESS

WALKWAY

1/2”

1/2”

1/2”

1/2”

1/2”

1/2”1/2”1/2”

1/2” 1/2”1/2”

1/2”

3"DCW

2"DHW

3/4"DHWR

3"DCW

1 1/4"DHW

3/4"DHWR

1/2"O2, 3/4"MA &

1"MV DN TO LEVEL

BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW. 3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

1/2"O2, 3/4"MA &

1"MV DN TO LEVEL

BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

O M A

M V

O

1 1/4"MV

3/4"MA

3/4"O2

1 1/4"MV

3/4"MA

3/4"O2

1"MV

3/4"MA

3/4"O2

1"MV

3/4"MA

3/4"O21 1/2"MV

3/4"MA

3/4"O2

1"MV

3/4"MA

1/2"O2

1 1/4"MV

3/4"MA

3/4"O2

2"MV

3/4"MA

3/4"O2

1 1/4"MV

3/4"MA

3/4"O2

3/4" IA

CONNECT 1/2"

IA DROP TO

PNEUMATIC

DOORS.

SEE MFG.

TYP.

3/4"IA

RISER

1/2" IA

MV MA O

BALANCE

TO 0.5

GPM

BALANCE

TO 0.5

GPM

BALANCE

TO 0.5

GPM

BALANCE

TO 0.5

GPM

BALANCE

TO 1.0 GPM

1"

3/4” DN 2-1/2” DN

3/4"DCW

3/4"DCW

3/4"DCW

3/4"DCW

1/2"

3/4"DCW

3/4"

1/2"

3/4"DCW UP/DN

TO LEVEL ABOVE/

BELOW

3/4"DCW UP

TO LEVEL ABOVE

1"

3"

1 1/4"

1/2"

2 1/2" DN 2" 3/4" DN

1"

2"

MA O

MV

M V

O M A

MV

MVMA

M V

O

MAO MV MV

MA

O

MV

2 1/2"DCW DN

2 1/2"DCW, 1"DHW,

3/4"DHWR DN2 1/2"DCW, 1"DHW,

3/4"DHWR DN

2 1/2"DCW,

3/4"DHW,

1/2"DHWR

DN

BALANCE TO

0.5 GPM

1"DHWR 3/4"DHWR

3/4"DHWR

1"DHWR

BALANCE

TO 0.5

GPM

1"DHW

1 1/4"DHW

1 1/4"DHW

1 1/2"DHW1 1/2"DHW

1 1/2"DHW

2"DHW

2"DHW

2"

2 1/2"DCW

2 1/2"DCW

3”DCW

BALANCE TO

1.0 GPM

1"DHW

BALANCE TO

0.5 GPM

1"DH

W2"DCW

2"DCW

2"DCW

1 1/4"DHW

3/4"DHW

R

1"DHWR

3/4"DHWR

1 1/4"DHW

1 1/4"DHW

2"DCW

2 1/2"DCW3"DCW BALANCE TO

0.5 GPM

BALANCE

TO 0.5 GPM

3/4"DHWR

1"DHWR

1"DHWR

BALANCE

TO 0.5 GPM

1 1/4"

DHWR

3/4"DHWR

1"DHW

1"DHW

1 1/4"DHW

1"DHW

1 1/2"DHW

1 1/4"DHW

2"DHWR

1 1/2"DHW

2"DHW

2"DHW

3"DCW

2 1/2"DHW

2 1/2"DHW

2"DCW

2 1/2"DCW

2 1/2"DCW

3"DCW

3"DCW

LOCATE BRANCH PIPING & VALVING TO PATIENT

RMS IN INTERSTITIAL SPACE EXCLUDING PIPING

BELOW INTERSTITIAL ACCESS WALKWAY. SHOWN

OFFSET FOR CLARITY. TYP. ALL PATIENT RMS.

FROM CONCOURSE.

RE: CONCOURSE

PLUMBING DWGS

FOR CONTINUATION.

3"MV

1"MA

AREA ALARM

SENSORS FOR

EACH GAS. RE:

DETAIL, TYP.

2"MV

3/4"MA

3/4"O2

3/4"O2

3/4"MA

2"MV

2"MV

3/4"MA

3/4"O2

2"MV

3/4"MA

3/4"O2

3/4"O2

3/4"MA

2"MV

3/4"O2

3/4"MA

2"MV

1 1/2"MVMA

O

M V M A O

O MA MV

MV

MA O

MVMAO

MV

MV MA O

MV

MA O

MV

MA O

M V

M A

O

O MA MV MV MA O

3/4"

A

B

C

D

E

F

G

H

H

J

J

K

R1

R2

RB

RC

RD

RE

RF

RG

RH

RJ

TA

TB

TC

TD

TF

TG

TH

TJ

K2U-ST2

STAIR

05-21-ST2

K2U-102

VEST

05-21-V2

05-M5

MECH

05-M6

MECH

K2U-100

MECH

05-21-A1-M1

KE-S01

ELEV

05-21-SE1

KE-S02

ELEV

05-21-SE2

05-M4

MECH

KE-P02

ELEV

05-21-PE2

KE-P01

ELEV

05-21-PE1

K2U-ST1

STAIR

05-21-ST1

K2U-101

VEST

05-21-V1

05-M1

MECH

C2-C11

CORRIDOR

01-02-A7-08

C2-C01

CORRIDOR

01-02-A7-02

C2-C10

CORRIDOR, PATNT

01-02-A9-04

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O N

R

ES

D

AT

IB

S

IB

N

EN

C C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E on e ei gh th in ch o ne fo ot

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/ 6/ :5 5:

A M

C :\U se rs \C

AD

U se r 3 \D oc um en ts \B ac ku ps \P L-

IF

O -s he et s_ se an .w illi am sX R U N J.

rv t

05.PP.102.1

LEVEL 2 INTERSTITIAL PLUMBING

PIPING PLAN

INPATIENT BUILDING (NORTH)

08/31/2012

1/8" 1'-0"1

LEVEL 2 INTERSTITIAL

PLUMBING PIPING PLAN

DN UP

3"DCW

2 1/2"DHW

1 1/4"DHWR

3"MV

1"MA

1"O2

1 1/4"DHWR RISER

2 1/2"DHW RISER

3"DCW RISER

1 1/2"O2 RISER

1"MA RISER

3"MV RISER

INTERSTITIAL

ACCESS

WALKWAY

INTERSTITIAL

ACCESS

WALKWAY

3/4”

3/4”

1”

1” 2”

1/2”

2”

1 1/4"1/2”

1/2”

2-1/2”

2”

2”

1/2”

3/4”

1/2”

1/2" 1/2"

1/2" 1/2"

1/2" 1/2"

1/2"1/2"1/2"1/2"

1/2"

1/2”

1/2”

1/2”

1/2”

1/2”1/2”1/2”

1/2” 1/2”1/2”

1/2”

2"DCW

1 1/4"DHW

3/4"DHW

R

3"DCW

2"DHW

1"DHWR

3"DCW

2"DHW

1"DHWR

3"DCW

2 1/2"DHW

1"DHWR

3"DCW

1 1/2"DHW

1"DHWR

3"DCW

1/4"DHW3/4"DHWR

3"DCW

2"DHW

1"DHWR

1/2"O2, 3/4"MA &

1"MV DN TO LEVEL

BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

1/2"O2, 3/4"MA &

1"MV DN TO LEVEL

BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW. 3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

1/2"O2, 3/4"MA &

1"MV DN TO LEVEL

BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O23/4"O23/4"O2

3/4"MA3/4"MA3/4"MA

1 1/4"MV

1 1/2"MV

1 1/4"MV

1"MV

3/4"MA

3/4"O2

3/4"MA

3/4"O2

1 1/4"MV

3/4"O2

3/4"MA

2"MV

3/4"MA

3/4"O2

3/4"MA

3/4"O2 1 1/2"MV

2 1/2"MV

1"MA

1"O2

1 1/4"MV

3/4"MA

3/4"O2

1 1/2"MV

3/4"MA

3/4"O21"MV

3/4"MA

1/2"O2

1"MV

3/4"MA

1/2"O2

1 1/2"MV

3/4"MA

3/4"O2

1"MV

3/4"MA

1/2"O2

1 1/4"MV

3/4"MA

3/4"O2

2"MV

3/4"MA

3/4"O2

1"O2

1"MA

2 1/2"MV

1"O2

1"MA

2 1/2"MV

1 1/4"MV

3/4"MA

3/4"O2

3/4" IA

CONNECT 1/2"

IA DROP TO

PNEUMATIC

DOORS.

SEE MFG.

TYP.

3/4"IA

RISER.

1/2" IA

BALANCE

TO 0.5 GPM

AREA ALARM

SENSORS FOR

EACH GAS. RE:

DETAIL, TYP.

2"DCW, 1"DHW,

3/4"DHWR UP

TO LEVEL

ABOVE.

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5

GPM

1"

BALANCE

TO 0.5 GPM3/4"

2 1/2"DCW,

1"DHW,

3/4"DHWR

DN

2 1/2"DCW, 1"DHW

3/4" DHWR DN

1/2"

2 1/2"DCW, 3/4"DHW

1/2" DHWR DN

1"DCW &

DHW DN

BALANCE TO

0.5 GPM

3/4"DHWR

3/4"

DHWR

1"DHWR

BALANCE

TO 0.5 GPM

1"DHWR

1"DHW1 1/4"DHW1 1/2"DHW2"DHW

1 1/2"DHW

2"DHW

2 1/2"

DCW

BALANCE

TO 1.0 GPM

1"DHW

BALANCE

TO 0.5

GPM

1"DHWR

3/4"DHWR

1"DHWR 1 1/4"DHW

2"DHW

1 1/4"DHW

2"DHW

1 1/4"DHW

1"DH

W2"DCW

2"DCW

3"DCW

2 1/2"DCW

2"DCW

2 1/2"DCW

BALANCE

TO 0.5

GPM

BALANCE TO

0.5 GPM

BALANCE

TO 1.0 GPM3/4"DHWR

1"DHWR

1"DHWR

1"DHW

1 1/4"DHW

1 1/2"DHW

2"DHW

2 1/2"DHW

3"DCW

2 1/2"DHW

1 1/4"DHWR

2"DCW

2"DCW

3"DCW

2"DCW

LOCATE BRANCH PIPING & VALVING TO PATIENT

RMS IN INTERSTITIAL SPACE EXCLUDING PIPING

BELOW INTERSTITIAL ACCESS WALKWAY. SHOWN

OFFSET FOR CLARITY. TYP. ALL PATIENT RMS.

1 1/4"MV

2"MV

3/4"MA

3/4"O2

3/4"O2

3/4"MA

2"MV

3/4"O2

3/4"MA

2"MV

2"MV

3/4"MA

3/4"O2

2"MV

3/4"MA

3/4"O2

3/4"O2

3/4"MA

2"MV

1 1/2"MV

O MA MV

M V M A

O

O MA

MV

O M A

M V

O

MA

MV O MA MV

O MA MV

O MA MV

MV

MA

O

M V M A

O

MV MA O

MV MA O

MV MA O

MV MA O

MV MA OMV

OMA

MV MA O

O M A

M V

O M A

M V

3/4"

A

B

C

D

E

F

G

H

H

J

J

K

K

R1

R2

RA

RB

RC

RD

RE

RF

RG

RH

RJ

TA

TB

TC

TD

TF

TG

TH

TJ

K3U-102

VEST

05-31-V2

K3U-ST2

STAIR

05-31-ST2

05-M5

MECH

05-M6

MECH

KE-S01

ELEV

05-31-SE1

KE-S02

ELEV

05-31-SE2

05-M3

MECH

05-M4

MECH

KE-P02

ELEV

05-31-PE2

KE-P01

ELEV

05-31-PE1

K3U-ST1

STAIR

05-31-ST1

K3U-101

VEST

05-31-V1

05-M1

MECH

K3U-100

MECH

05-31-A1-M1

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O N

R

ES

D

AT

IB

S

IB

N

EN

C C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E on e ei gh th in ch o ne fo ot

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/ 6/ :5 5:

A M

C :\U se rs \C

AD

U se r 3 \D oc um en ts \B ac ku ps \P L-

IF

O -s he et s_ se an .w illi am sX R U N J.

rv t

05.PP.103.1

LEVEL 3 INTERSTITIAL PLUMBING

PIPING PLAN

INPATIENT BUILDING (NORTH)

08/31/2012

1/8" 1'-0"1

LEVEL 3 INTERSTITIAL

PLUMBING PIPING PLAN

05.ES.401.1
Sheets: 05.ES.401.1 - LEVEL 1 INTERSTITIAL POWER PLAN
05.ES.401-A
Sheets: 05.ES.401-A - ENLARGED LEVEL 1 POWER PLAN - AREA A
05.MH.100.1
05.MH.101.1
05.MH.102.1
05.MH.103.1
05.PL.101.1
Sheets: 05.PL.101.1 - LEVEL 1 INTERSTITIAL WASTE, DRAIN AND VENT PIPING PLAN
05.PL.101
Sheets: 05.PL.101 - LEVEL 1 WASTE, DRAIN AND VENT PIPING PLAN
05.PP.100.1
Sheets and Views
05-PP-100-1-Layout1
05.PP.101.1
Sheets: 05.PP.101.1 - LEVEL 1 INTERSTITIAL PLUMBING PIPING PLAN
05.PP.102.1
Sheets: 05.PP.102.1 - LEVEL 2 INTERSTITIAL PLUMBING PIPING PLAN
05.PP.103.1
Sheets: 05.PP.103.1 - LEVEL 3 INTERSTITIAL PLUMBING PIPING PLAN

File details come from the government source that posted it. Updated .