This document contains as-built plumbing piping plans and details for a federal medical center project. It specifies the locations of various water, gas, medical air, and drain piping throughout multiple levels of an inpatient building. Piping includes sizes ranging from 1/2" to 8" for domestic cold and hot water, compressed air, oxygen, nitrogen, medical vacuum systems, and other utilities. It depicts the routing of pipe risers, branches serving patient rooms in interstitial spaces, and notes requirements for remote monitoring of key systems. The related solicitation is for installation of a continuous water monitoring system on this project to sample potable water at eight locations according to plans shown. The requirement is being solicited through the Department of Veterans Affairs with anticipated award by January 2023.

View the file

Other files

File Type Posted
Building K Plumbing As builts Showing Work Locations.pdf PDF
36C25923R0113 0004.docx DOCX document
Wage Determination Adams Colorado 12.22.2023.docx DOCX document
Building Q Plumbing As builts Showing Work Location.pdf PDF
Building R Plumbing As builts Showing Work Location.pdf PDF
36C25923R0113 0003.docx DOCX document
Building H Plumbing As-builts Showing Work Locations for Project 554-24-101.pdf PDF
SC_DataSheet_V4.0 Sample Cooler.pdf PDF
Building R Plumbing As-builts Showing Work Locations for Project 554-24-101.pdf PDF
Building Q Plumbing As-builts Showing Work Locations for Project 554-24-101.pdf PDF
SOW 554-24-101 Install Continuous Water Monitoring Rev 231121.docx DOCX document
S04-Pre-bid Site Visit Attendance.pdf PDF
Answer to Questions.docx DOCX document
S04 - Site Visit Meeting Doc.docx DOCX document
36C25923R0113 0002.docx DOCX document
36C25923R0113_Solicitation.docx DOCX document
Chemtreat CL497 Info.pdf PDF
36C25923R0113.docx DOCX document
Building H As-builts.pdf PDF
Specs 554-24-101.pdf PDF
Chemtreat CL5551 SDS.pdf PDF
Chemtreat CL2250 SDS.pdf PDF
Building R Plumbing As-built.pdf PDF
Pictures Building L - Existing Cooling Tower Water Treatment System.docx DOCX document
Building Q Plumbing Plans.pdf PDF
Building Q Electrical Plans.pdf PDF
Building R Electrical As-built.pdf PDF
VHA ICRA 2023-1.0_Final Template.pdf PDF
Building K As-builts.pdf PDF
Basis CTW System -Model-T80-Transmitter-Data-Sheet.pdf PDF
NARA Records Management Contracting Language.docx DOCX document
Basis WQMS - ATI_Q52_MetriNet_Literature.pdf PDF
Chemtreat CL497 SDS.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

DN

UP

DN

3"DCW

1 1/2"DHW

1"DHWR

1"DHWR DN FROM

LEVEL ABOVE.

1 1/2"DHW DN FROM

LEVEL ABOVE.

3"DCW DN FROM

LEVEL ABOVE.

1 1/2"O2 RISER

PIPING EXTEND

FROM MAINS AT

CONCOURSE

SERVICE LEVEL.

RE: CONCOURSE

PLUMBING DWGS.

8"DCW

8"DCW

8"DCW

5"DCW RISER

3"DHW RISER

2"DHWR RISER

P-801

8"DCW

8"DCW

8"COMBINATION

FIRE/DCW. RE: CIVIL

DRAWINGS FOR

CONTINUATION.

5373.0' USGS

CENTERLINE OF

PENETRATION

8"FIRE DN TO FIRE

ENTRY RPBFP. RE:

FIRE SUPPRESSION

DWGS.

8"DCW DN TO DCW

ENTRY RPBFP

8"DCW DN TO DCW

ENTRY RPBFP

P-804 (IN CEILING SPACE).

3/4"DCW

2' - 7"

EXTEND 3/4"CA TO

SANITARY SEWER

HOLDING TANK. RE: CIVIL

DWGS.

EXTEND 3/4"CA TO

SANITARY SEWER

HOLDING TANK. RE: CIVIL

DWGS.

3/4"DCW

P-804 (IN

CEILING SPACE).

3/4"CA DN TO BELOW.

3/4"CA DN TO BELOW.

P-801

3/4"DCW

1/2"

2"

1/2"2"

3/4"

1"

1/2"

3/4"DCW

3/4"DCW

1 1/4"DCW

1 1/4"DCW

3"DCW

1 1/4"DHW

1"DHWR

3"DCW

1"DHW

3/4"DHWR

1"DCW

1"DCW TO

GREENHOUSE

HYDRANT &

EXTERIOR

DRINKING

FOUNTAINS.

PROVIDE DRAIN DN

VALVE. SLOPE PIPING

FROM GREENHOUSE

TO DRAIN. ROUTE

3/4"IW FROM DRAIN

DN VALVE TO FD AT

WATER ENTRY.

3/4" IA

CONNECT 1/2" IA

DROP TO

PNEUMATIC DOORS.

SEE MFG. TYP.

3/4"IA

RISER

1/2" IA

1"NG UP TO INFRARED

HEATER. CONNECT W/ SHUT-

OFF VALVE IN RECESSED

MOUNTED VALVE ACCESS BOX,

FLUSH W/ GRADE. EXTEND

CONNECTION THRU HOLE IN

ACCESS COVER TO PATIO

HEATER.

1"NG UP TO

BBQ GRILL

1 1/4"NG

BELOW

FLOOR

1"NG BELOW

FLOOR

1"DCW UP TO

YARD

HYDRANT

1 1/4"NG

FROM

ABOVE

LOCATE PIPING BELOW

EGRESS STRUCTURE

ABOVE & AS TIGHT TO

STRUCTURE AS

POSSIBLE, TYP. ALL

WATER ENTRY PIPING

AT CEILING.

3/4"DCW

1 1/4"

BALANCE TO

0.5 GPM

1"DCW1"DCW

1"DCW

BALANCE

TO 0.5 GPM

1/2"

PROVIDE 2"DCW &

1"DHW VALVED &

CAPPED FOR

FUTURE.

BALANCE

TO 1.0

GPM

3/4"DHWR

3"DCW

1 1/4"DHW

3/4"DHWR

1 1/4"DHW

1"DHWR

BALANCE TO 1.0 GPM

PROVIDE 1"DHW VALVED &

CAPPED FOR FUTURE.

1 1/4"DHW

1"DHWR

3"DCW

1 1/4"DCW

3/4”DCW UP TO

DRINKING FOUNTAIN.

3/4”DCW. SLOPE TO

DRAIN BACK TO

IBN.

MINIMUM BURY DEPTH 60 ”

BELOW FINISHED GRADE.

COORDINATE EXACT

ROUTING W/ LANDSCAPE

AND CIVIL DRAWINGS.

3/4”DCW. SLOPE TO

DRAIN BACK TO

IBN.

3/4”DCW UP TO

DRINKING FOUNTAIN.

3/4”DCW UP TO

DRINKING FOUNTAIN.

MINIMUM BURY DEPTH 60 ”

BELOW FINISHED GRADE.

COORDINATE EXACT

ROUTING W/ LANDSCAPE

AND CIVIL DRAWINGS.

1”DCW. SLOPE TO

DRAIN BACK TO

IBN.

3/4"DCW PIPING

UP TO YARD

HYDRANT

ABOVE.

PROVIDE DRAIN DN VALVE. SLOPE

PIPING FROM DF TO DRAIN.

ROUTE 3/4"IW FROM DRAIN DN

VALVE TO FD AT POOL

EQUIPMENT ROOM.

3/4”DCW. SLOPE TO

DRAIN BACK TO IBN.

3/4”DCW

PROVIDE DRAIN DN VALVE. SLOPE

PIPING FROM DF TO DRAIN.

ROUTE 3/4"IW FROM DRAIN DN

VALVE TO FD AT POOL

EQUIPMENT ROOM.

3/4”DCW. SLOPE TO

DRAIN BACK TO IBN.

CONNECT 3/4”DCW TO EXTERIOR FREEZEPROOF

DRINKING FOUNTAIN. RE: LANDSCAPE DRAWINGS FOR

SPECIFICATION, LOCATION & EXACT REQUIREMENTS.

COORDINATE ROUTING W/ CIVIL DRAWINGS. DF

APPROX. 50FT FROM EDGE OF BUILDING.

3/4" IA

3/4"IA

3/4"IA

PIPING EXTEND

FROM MAIN AT

CONCOURSE

SERVICE LEVEL.

RE: CONCOURSE

PLUMBING DWGS.

PROVIDE DRAIN DN VALVE. SLOPE

PIPING FROM DF TO DRAIN.

ROUTE 3/4"IW FROM DRAIN DN

VALVE TO FD AT POOL

EQUIPMENT ROOM.

3/4”DCW UP TO

DRINKING FOUNTAIN.

3/4”DCW. SLOPE TO

DRAIN BACK TO

IBN.

3/4"DCW

PROVIDE DRAIN DN VALVE. SLOPE

PIPING FROM DF TO DRAIN.

ROUTE 3/4"IW FROM DRAIN DN

VALVE TO FD AT POOL

EQUIPMENT ROOM.

3/4"DCW PIPING

UP TO YARD

HYDRANT

ABOVE.

3/4"DCW

3/4"DCW

1-1/4" DCW, DHW

DOWN TO

THERMOSTATIC MIXING

VALVE

U

U

U

U

U

C

O

M

C

O

M

S

E

E

C

O

M

E

X

B

C

D

E

F

G

H

J

K

A

B

C

D

E

F

G

H

H

J

J

K

K

R1

R2

RA

RB

RC

RD

RE

RF

RG

RH

RJ

TA

TB

TC

TD

TF

TG

TH

TJ

11 12 08 09 13

03040506

Drawing Number

Building Number

Project Number Project Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key Plan

CONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501

REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C

O N

R

E S

D

A T

I B

S

I B

N

E

N C

C

L C

C

B N

C

B C

C

B S

P

S N

P

V N

P

V S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E o n e e i g h t h i n c h o n e f o o t

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:

H+L Architecture

1755 Blake Street, Suite 400

Denver, CO

80202

Skidmore, Owings & Merrill LLP

224 South Michigan Avenue

Suite 1000

Chicago, IL 60604

Cator, Ruma & Associates

896 Tabor Street

Lakewood, CO 80401

S. A. Miro, Inc.

4582 South Ulster Street

Pkwy.

Suite 300

Denver, CO 80237

Professional Seal

A

M C

U s e r s k a t h l D o c u m e n t s P

L I F

O s h e e t s k m a d s e n F

F R

G r v t

05.PP.100.1

SERVICE LEVEL INTERSTITIAL

PLUMBING PIPING PLAN

INPATIENT BUILDING (NORTH)

08/31/2012

1/8" = 1'-0"

SERVICE LEVEL INTERSTITIAL

PLUMBING PIPING PLAN

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

CDI No.12 08/31/2012

JSI No. 038 10/26/2012

RFI Xyz 02/03/2014

RFI-4234 07/24/2014

JSI No. 118 POSTED SET 03/16/2015

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Service Level Remote Branch 1:

-DCW--T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Service Level Remote Branch 3:

-DCW-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Service Level Remote Branch 2:

-DCW-T

DN

DN

UP

5"DCW

3"DHW

1 1/2"DHWR

3"MV

3/4"MA

3/4"O2

1 1/2"DHWR UP TO LEVEL

ABOVE. 1"DHWR DN TO LEVEL

BELOW.

3"DHW UP TO LEVEL ABOVE. 1

1/2"DHWR DN TO LEVEL BELOW.

4"DCW UP TO LEVEL ABOVE.

3"DCW DN TO LEVEL BELOW.

1 1/2"O2 RISER.

3/4"MA RISER

3"MV RISER

5"DCW, 3"DHW,

2"DHWR

SUBMETERS

5"DCW

3"DHW

1 1/2"DHWR

INTERSTITIAL

ACCESS

WALKWAY

INTERSTITIAL

ACCESS

WALKWAY

3/4"

2"

3/4"

2-1/2" DN

TO HEADER

2-1/2"

1-1/4"

1/2"

1/2"

2"

3/4"

1/2" 3/4"

3/4"2"

2-1/2"

1"

3/4"

1/2"

3/4"

1/2"

2"

2"

1" 2"

2-1/2" 1-1/4"

1/2"

1/2"

3/4" 3/4"

1"

1/2"

1/2" 1/2" 1/2" 1/2" 1/2"

3/4"

2"

2"

1/2"

3/4"

1"

1"

1"2 1/2" DN

TO HEADER

3"DCW

1 1/2"DHW

1"DHWR

2"DCW

1"DHW

3/4"DHWR

2 1/2"DCW

1 1/4"DHW

1"DHWR

3/4"DHWR

1"DHW

1"DCW

1 1/4"DCW

1 1/4"DHW

3/4"DHWR

2 1/2"DCW

1 1/2"DHW

1"DHWR

3"DCW

2"DHW

1"DHWR

3/4"MV

1/2"MA

1/2"O2

3/4"MV

1/2"MA

1/2"O2

3/4"O2

1/2"MA

1"MV

1"MV

3/4"MA

3/4"O2

3/4"MV

1/2"MA

1/2"O2

1"MV

3/4"MA

3/4"O2

1 1/4"MV

3/4"MA

3/4"O2

3/4"02

3/4"MA

1 1/4"MV

M V

M A

O

MV MA O

OMAMV

M V

M A

O

O M A M

V

MV MA O

3/4" IA

CONNECT 1/2" IA

DROP TO

PNEUMATIC

DOORS. SEE MFG.

TYP.

3/4"IA

RISER

1/2" IA

3/4"DHWR

2"DHW

2"DCW

EMERGENCY

SOLENOID SHUT-

OFF VALVE

GAS PRESSURE

REGULATOR. EXTEND 1"

RELIEF VENT TO EXTERIOR

ROOF W/RETURN BEND &

BUGSCREEN.

1/2"NG

(2PSI)

BALANCE

TO 1.0 GPM1"

1"

1" 3/4"

3/4"

1" 1/2"1"

1 1/2" 1"

3/4"

1"NG

DN BELOW

FLOOR

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

3/4"

BALANCE

TO 0.5 GPM

3/4"DCW

3/4"DCW

1"

1"

1/2"BALANCE

TO 0.5 GPM

2"

3/4" 2"

1/2"

1/2"

1/2"

1/2"

BALANCE TO

0.5 GPM

3/4"

1/2"

3/4"

3/4"

BALANCE

TO 0.5

GPM

2"

1 1/4"IRW

1 1/4"IRW

1 1/4"IRW UP

TO ROOF

ABOVE.

1 1/4"IRW UP

TO ROOF

ABOVE.

BALANCE

TO 1.0 GPM

3/4"DHWR

BALANCE

TO 0.5 GPM

PROVIDE 2 1/2"DCW & 1

1/4" DHW CAPPED FOR

FUTURE.

1"DHWR

1 1/2"DHW

2 1/2"DCW

3/4"DHWR

1"DHW

1"DCW

BALANCE

TO 0.5 GPM 1 1/4"DCW

1 1/4"DHW1 1/4"DCW

1 1/4"DHW

3/4"

DHWR

2"DCW

1/2"DHW

BALANCE

TO 0.5

GPM

2"DCW

2 1/2"DCW

3"DCW

3"DCW

1"DHWR

2"DHW

1 1/4"DHWR

5"DCW

3"DHW

1 1/2"DHWR

1"DHW

1"DHW

1 1/4"DHW

1 1/2"DHW

1 1/2"DHW2"DHW

1 1/2"NG

1 1/2"NG

3/4"O2

3/4"MA

AREA ALARM

SENSORS FOR

EACH GAS.

RE: DETAIL,

TYP.

MV

MA O

3/4"

WADG

DN

NO2 TANKS

A

B

C

D

E

F

G

H

J

K

R1

R2

RB

RC

RD

RE

RF

RG

RH

RJ

TA

TB

TC

TD

TF

TG

TH

TJ

KE-S02

ELEV

05-11-SE2

KE-S01

ELEV

05-11-SE1

K1U-100

MECH

05-11-A1-M1

05-M5

MECH

K1U-102

VEST

05-11-V2

K1U-ST2

STAIR

05-11-ST2

05-M1

MECH

KE-P01

ELEV

05-11-PE1

KE-P02

ELEV

05-11-PE2

K1U-ST1

STAIR

05-11-ST1

K1U-101

VEST

05-11-V1

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O N

R

ES

D

AT

IB

S

IB

N

EN

C C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E on e ei gh th in ch o ne fo ot

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/ 6/ :5 5:

A M

C :\U se rs \C

AD

U se r 3 \D oc um en ts \B ac ku ps \P L-

IF

O -s he et s_ se an .w illi am sX R U N J.

rv t

05.PP.101.1

LEVEL 1 INTERSTITIAL PLUMBING

PIPING PLAN

INPATIENT BUILDING (NORTH)

08/31/2012

1/8" 1'-0"1

LEVEL 1 INTERSTITIAL

PLUMBING PIPING PLAN

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Service Level:

-DHWS-T

-DHWR-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Level 1:

-DHWS-T

-DHWR-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Building Entry:

-WQMS 8 Sensor

-DCW-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Level 1 Remote Branch 1:

-DCW-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Level 1Remote Branch 3:

-DCW-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Level 1 Remote Branch 2:

-DCW-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Telecom Room Below K1-237:

-Ethernet for WQMS

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Electrical Room Below K1-235:

-Power for WQMS

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ HAC with floor Sink Below in K1-102:

-Drain for WQMS

DN

DN UP

3"DCW

2 1/2"DHW

1 1/4"DHWR

3"MV

1"MA

1"O2

1 1/2"DHWR RISER

3"DHW RISER

4"DCW RISER

1 1/2"O2 RISER.

1"MA RISER

3"MV DN TO LEVEL

BELOW. EXTEND

3"MV UP TO LEVEL

ABOVE.

INTERSTITIAL

ACCESS

WALKWAY

INTERSTITIAL

ACCESS

WALKWAY

1/2"1/2"1/2" 1/2"

1/2"1/2"1/2"1/2"1/2"1/2"

1/2"

1"1/2"

1/2”

1/2”

3/4”

2”

2-1/2” 3/4”

3/4”

1/2”

1/2”

3/4”

3”DCW

2-1/2” DN

3/4”3/4” DN

1-1/4”

3/4”

1”

3"DCW

1 1/2"DHW

1"DHWR

3"DCW

2"DHW

1"DHWR

3"DCW

1/2"DHW1"DHWR

3"DCW

1 1/4"DHW

3/4"DHWR

3/4"O23/4"O23/4"O2

3/4"MA3/4"MA3/4"MA

1 1/4"MV1 1/2"MV1 1/4"MV1 1/4"MV

1"MV

3/4"MA

3/4"O2

3/4"MA

3/4"O2

1 1/4"MV

O M A

MA

MV

MA O

3/4"O2

3/4"MA

2"MV

3/4"MA

3/4"O2

3/4"MA

3/4"O2 1 1/2"MV

2 1/2"MV

1"MA

1"O2

1"O2

1"MA

2 1/2"MV

1"O2

1"MA

2 1/2"MV

1/2"O2, 3/4"MA &

1"MV DN TO LEVEL

BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

INTERSTITIAL

ACCESS

WALKWAY

1/2”

1/2”

1/2”

1/2”

1/2”

1/2”1/2”1/2”

1/2” 1/2”1/2”

1/2”

3"DCW

2"DHW

3/4"DHWR

3"DCW

1 1/4"DHW

3/4"DHWR

1/2"O2, 3/4"MA &

1"MV DN TO LEVEL

BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW. 3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

1/2"O2, 3/4"MA &

1"MV DN TO LEVEL

BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

O M A

M V

O

1 1/4"MV

3/4"MA

3/4"O2

1 1/4"MV

3/4"MA

3/4"O2

1"MV

3/4"MA

3/4"O2

1"MV

3/4"MA

3/4"O21 1/2"MV

3/4"MA

3/4"O2

1"MV

3/4"MA

1/2"O2

1 1/4"MV

3/4"MA

3/4"O2

2"MV

3/4"MA

3/4"O2

1 1/4"MV

3/4"MA

3/4"O2

3/4" IA

CONNECT 1/2"

IA DROP TO

PNEUMATIC

DOORS.

SEE MFG.

TYP.

3/4"IA

RISER

1/2" IA

MV MA O

BALANCE

TO 0.5

GPM

BALANCE

TO 0.5

GPM

BALANCE

TO 0.5

GPM

BALANCE

TO 0.5

GPM

BALANCE

TO 1.0 GPM

1"

3/4” DN 2-1/2” DN

3/4"DCW

3/4"DCW

3/4"DCW

3/4"DCW

1/2"

3/4"DCW

3/4"

1/2"

3/4"DCW UP/DN

TO LEVEL ABOVE/

BELOW

3/4"DCW UP

TO LEVEL ABOVE

1"

3"

1 1/4"

1/2"

2 1/2" DN 2" 3/4" DN

1"

2"

MA O

MV

M V

O M A

MV

MVMA

M V

O

MAO MV MV

MA

O

MV

2 1/2"DCW DN

2 1/2"DCW, 1"DHW,

3/4"DHWR DN2 1/2"DCW, 1"DHW,

3/4"DHWR DN

2 1/2"DCW,

3/4"DHW,

1/2"DHWR

DN

BALANCE TO

0.5 GPM

1"DHWR 3/4"DHWR

3/4"DHWR

1"DHWR

BALANCE

TO 0.5

GPM

1"DHW

1 1/4"DHW

1 1/4"DHW

1 1/2"DHW1 1/2"DHW

1 1/2"DHW

2"DHW

2"DHW

2"

2 1/2"DCW

2 1/2"DCW

3”DCW

BALANCE TO

1.0 GPM

1"DHW

BALANCE TO

0.5 GPM

1"DH

W2"DCW

2"DCW

2"DCW

1 1/4"DHW

3/4"DHW

R

1"DHWR

3/4"DHWR

1 1/4"DHW

1 1/4"DHW

2"DCW

2 1/2"DCW3"DCW BALANCE TO

0.5 GPM

BALANCE

TO 0.5 GPM

3/4"DHWR

1"DHWR

1"DHWR

BALANCE

TO 0.5 GPM

1 1/4"

DHWR

3/4"DHWR

1"DHW

1"DHW

1 1/4"DHW

1"DHW

1 1/2"DHW

1 1/4"DHW

2"DHWR

1 1/2"DHW

2"DHW

2"DHW

3"DCW

2 1/2"DHW

2 1/2"DHW

2"DCW

2 1/2"DCW

2 1/2"DCW

3"DCW

3"DCW

LOCATE BRANCH PIPING & VALVING TO PATIENT

RMS IN INTERSTITIAL SPACE EXCLUDING PIPING

BELOW INTERSTITIAL ACCESS WALKWAY. SHOWN

OFFSET FOR CLARITY. TYP. ALL PATIENT RMS.

FROM CONCOURSE.

RE: CONCOURSE

PLUMBING DWGS

FOR CONTINUATION.

3"MV

1"MA

AREA ALARM

SENSORS FOR

EACH GAS. RE:

DETAIL, TYP.

2"MV

3/4"MA

3/4"O2

3/4"O2

3/4"MA

2"MV

2"MV

3/4"MA

3/4"O2

2"MV

3/4"MA

3/4"O2

3/4"O2

3/4"MA

2"MV

3/4"O2

3/4"MA

2"MV

1 1/2"MVMA

O

M V M A O

O MA MV

MV

MA O

MVMAO

MV

MV MA O

MV

MA O

MV

MA O

M V

M A

O

O MA MV MV MA O

3/4"

A

B

C

D

E

F

G

H

H

J

J

K

R1

R2

RB

RC

RD

RE

RF

RG

RH

RJ

TA

TB

TC

TD

TF

TG

TH

TJ

K2U-ST2

STAIR

05-21-ST2

K2U-102

VEST

05-21-V2

05-M5

MECH

05-M6

MECH

K2U-100

MECH

05-21-A1-M1

KE-S01

ELEV

05-21-SE1

KE-S02

ELEV

05-21-SE2

05-M4

MECH

KE-P02

ELEV

05-21-PE2

KE-P01

ELEV

05-21-PE1

K2U-ST1

STAIR

05-21-ST1

K2U-101

VEST

05-21-V1

05-M1

MECH

C2-C11

CORRIDOR

01-02-A7-08

C2-C01

CORRIDOR

01-02-A7-02

C2-C10

CORRIDOR, PATNT

01-02-A9-04

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O N

R

ES

D

AT

IB

S

IB

N

EN

C C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E on e ei gh th in ch o ne fo ot

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/ 6/ :5 5:

A M

C :\U se rs \C

AD

U se r 3 \D oc um en ts \B ac ku ps \P L-

IF

O -s he et s_ se an .w illi am sX R U N J.

rv t

05.PP.102.1

LEVEL 2 INTERSTITIAL PLUMBING

PIPING PLAN

INPATIENT BUILDING (NORTH)

08/31/2012

1/8" 1'-0"1

LEVEL 2 INTERSTITIAL

PLUMBING PIPING PLAN

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Level 2:

-DHWS-T

-DHWR-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Level 2 Remote Branch 1:

-DCW-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Level 2 Remote Branch 3:

-DCW-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Level 2 Remote Branch 2:

-DCW-T

DN UP

3"DCW

2 1/2"DHW

1 1/4"DHWR

3"MV

1"MA

1"O2

1 1/4"DHWR RISER

2 1/2"DHW RISER

3"DCW RISER

1 1/2"O2 RISER

1"MA RISER

3"MV RISER

INTERSTITIAL

ACCESS

WALKWAY

INTERSTITIAL

ACCESS

WALKWAY

3/4”

3/4”

1”

1” 2”

1/2”

2”

1 1/4"1/2”

1/2”

2-1/2”

2”

2”

1/2”

3/4”

1/2”

1/2" 1/2"

1/2" 1/2"

1/2" 1/2"

1/2"1/2"1/2"1/2"

1/2"

1/2”

1/2”

1/2”

1/2”

1/2”1/2”1/2”

1/2” 1/2”1/2”

1/2”

2"DCW

1 1/4"DHW

3/4"DHW

R

3"DCW

2"DHW

1"DHWR

3"DCW

2"DHW

1"DHWR

3"DCW

2 1/2"DHW

1"DHWR

3"DCW

1 1/2"DHW

1"DHWR

3"DCW

1/4"DHW3/4"DHWR

3"DCW

2"DHW

1"DHWR

1/2"O2, 3/4"MA &

1"MV DN TO LEVEL

BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

1/2"O2, 3/4"MA &

1"MV DN TO LEVEL

BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW. 3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

1/2"O2, 3/4"MA &

1"MV DN TO LEVEL

BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA & 1

1/4"MV DN TO

LEVEL BELOW.

3/4"O23/4"O23/4"O2

3/4"MA3/4"MA3/4"MA

1 1/4"MV

1 1/2"MV

1 1/4"MV

1"MV

3/4"MA

3/4"O2

3/4"MA

3/4"O2

1 1/4"MV

3/4"O2

3/4"MA

2"MV

3/4"MA

3/4"O2

3/4"MA

3/4"O2 1 1/2"MV

2 1/2"MV

1"MA

1"O2

1 1/4"MV

3/4"MA

3/4"O2

1 1/2"MV

3/4"MA

3/4"O21"MV

3/4"MA

1/2"O2

1"MV

3/4"MA

1/2"O2

1 1/2"MV

3/4"MA

3/4"O2

1"MV

3/4"MA

1/2"O2

1 1/4"MV

3/4"MA

3/4"O2

2"MV

3/4"MA

3/4"O2

1"O2

1"MA

2 1/2"MV

1"O2

1"MA

2 1/2"MV

1 1/4"MV

3/4"MA

3/4"O2

3/4" IA

CONNECT 1/2"

IA DROP TO

PNEUMATIC

DOORS.

SEE MFG.

TYP.

3/4"IA

RISER.

1/2" IA

BALANCE

TO 0.5 GPM

AREA ALARM

SENSORS FOR

EACH GAS. RE:

DETAIL, TYP.

2"DCW, 1"DHW,

3/4"DHWR UP

TO LEVEL

ABOVE.

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5

GPM

1"

BALANCE

TO 0.5 GPM3/4"

2 1/2"DCW,

1"DHW,

3/4"DHWR

DN

2 1/2"DCW, 1"DHW

3/4" DHWR DN

1/2"

2 1/2"DCW, 3/4"DHW

1/2" DHWR DN

1"DCW &

DHW DN

BALANCE TO

0.5 GPM

3/4"DHWR

3/4"

DHWR

1"DHWR

BALANCE

TO 0.5 GPM

1"DHWR

1"DHW1 1/4"DHW1 1/2"DHW2"DHW

1 1/2"DHW

2"DHW

2 1/2"

DCW

BALANCE

TO 1.0 GPM

1"DHW

BALANCE

TO 0.5

GPM

1"DHWR

3/4"DHWR

1"DHWR 1 1/4"DHW

2"DHW

1 1/4"DHW

2"DHW

1 1/4"DHW

1"DH

W2"DCW

2"DCW

3"DCW

2 1/2"DCW

2"DCW

2 1/2"DCW

BALANCE

TO 0.5

GPM

BALANCE TO

0.5 GPM

BALANCE

TO 1.0 GPM3/4"DHWR

1"DHWR

1"DHWR

1"DHW

1 1/4"DHW

1 1/2"DHW

2"DHW

2 1/2"DHW

3"DCW

2 1/2"DHW

1 1/4"DHWR

2"DCW

2"DCW

3"DCW

2"DCW

LOCATE BRANCH PIPING & VALVING TO PATIENT

RMS IN INTERSTITIAL SPACE EXCLUDING PIPING

BELOW INTERSTITIAL ACCESS WALKWAY. SHOWN

OFFSET FOR CLARITY. TYP. ALL PATIENT RMS.

1 1/4"MV

2"MV

3/4"MA

3/4"O2

3/4"O2

3/4"MA

2"MV

3/4"O2

3/4"MA

2"MV

2"MV

3/4"MA

3/4"O2

2"MV

3/4"MA

3/4"O2

3/4"O2

3/4"MA

2"MV

1 1/2"MV

O MA MV

M V M A

O

O MA

MV

O M A

M V

O

MA

MV O MA MV

O MA MV

O MA MV

MV

MA

O

M V M A

O

MV MA O

MV MA O

MV MA O

MV MA O

MV MA OMV

OMA

MV MA O

O M A

M V

O M A

M V

3/4"

A

B

C

D

E

F

G

H

H

J

J

K

K

R1

R2

RA

RB

RC

RD

RE

RF

RG

RH

RJ

TA

TB

TC

TD

TF

TG

TH

TJ

K3U-102

VEST

05-31-V2

K3U-ST2

STAIR

05-31-ST2

05-M5

MECH

05-M6

MECH

KE-S01

ELEV

05-31-SE1

KE-S02

ELEV

05-31-SE2

05-M3

MECH

05-M4

MECH

KE-P02

ELEV

05-31-PE2

KE-P01

ELEV

05-31-PE1

K3U-ST1

STAIR

05-31-ST1

K3U-101

VEST

05-31-V1

05-M1

MECH

K3U-100

MECH

05-31-A1-M1

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O N

R

ES

D

AT

IB

S

IB

N

EN

C C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E on e ei gh th in ch o ne fo ot

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/ 6/ :5 5:

A M

C :\U se rs \C

AD

U se r 3 \D oc um en ts \B ac ku ps \P L-

IF

O -s he et s_ se an .w illi am sX R U N J.

rv t

05.PP.103.1

LEVEL 3 INTERSTITIAL PLUMBING

PIPING PLAN

INPATIENT BUILDING (NORTH)

08/31/2012

1/8" 1'-0"1

LEVEL 3 INTERSTITIAL

PLUMBING PIPING PLAN

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Level 3:

-DHWS-T

-DHWR-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Level 3 Remote Branch 1:

-DCW-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Level 3 Remote Branch 3:

-DCW-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Level 3 Remote Branch 2:

-WQMS 4 sensor

-DCW-T

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Electrical Room Below K3-245:

-Power for WQMS

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ Telecom Room Below K3-245:

-Ethernet for WQMS

VHAECHDaveyD Cloud+

VHAECHDaveyD Cloud+ HAC with Floor Sink Below K3-241:

-Drain for WQMS

File details come from the government source that posted it. Updated .