Building H As-builts.pdf

PDF 21 MB Posted

Attached to
Z2DA--Actionable: 554-24-101 Install Continuous Water Monitoring (VA-24-00006816)
Solicitation number
36C25923R0113
Issued by

About this file

This document contains details of a federal contract opportunity from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 to install a continuous water monitoring system. The solicitation number is 36C25923R0113 and seeks proposals to install monitoring equipment and services under opportunity Z2DA--Actionable: 554-24-101 at a VA facility. Responses are due by November 13, 2023, and the agency intends to award a single firm fixed price contract with an estimated value between $100,000 and $250,000. The selected contractor must have experience installing water quality monitoring systems in medical facilities and be able to complete the work by April 2024.

View the file

Other files

File Type Posted
Building K Plumbing As builts Showing Work Locations.pdf PDF
36C25923R0113 0004.docx DOCX document
Wage Determination Adams Colorado 12.22.2023.docx DOCX document
Building Q Plumbing As builts Showing Work Location.pdf PDF
Building R Plumbing As builts Showing Work Location.pdf PDF
36C25923R0113 0003.docx DOCX document
Building H Plumbing As-builts Showing Work Locations for Project 554-24-101.pdf PDF
SC_DataSheet_V4.0 Sample Cooler.pdf PDF
Building R Plumbing As-builts Showing Work Locations for Project 554-24-101.pdf PDF
Building Q Plumbing As-builts Showing Work Locations for Project 554-24-101.pdf PDF
SOW 554-24-101 Install Continuous Water Monitoring Rev 231121.docx DOCX document
S04-Pre-bid Site Visit Attendance.pdf PDF
Building K Plumbing As-builts Showing Work Locations for Project 554-24-101.pdf PDF
Answer to Questions.docx DOCX document
S04 - Site Visit Meeting Doc.docx DOCX document
36C25923R0113 0002.docx DOCX document
36C25923R0113_Solicitation.docx DOCX document
Chemtreat CL497 Info.pdf PDF
36C25923R0113.docx DOCX document
Specs 554-24-101.pdf PDF
Chemtreat CL5551 SDS.pdf PDF
Chemtreat CL2250 SDS.pdf PDF
Building R Plumbing As-built.pdf PDF
Pictures Building L - Existing Cooling Tower Water Treatment System.docx DOCX document
Building Q Plumbing Plans.pdf PDF
Building Q Electrical Plans.pdf PDF
Building R Electrical As-built.pdf PDF
VHA ICRA 2023-1.0_Final Template.pdf PDF
Building K As-builts.pdf PDF
Basis CTW System -Model-T80-Transmitter-Data-Sheet.pdf PDF
NARA Records Management Contracting Language.docx DOCX document
Basis WQMS - ATI_Q52_MetriNet_Literature.pdf PDF
Chemtreat CL497 SDS.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UPDN

DN

UP

J

HSU-101

VEST

04-SV1-V1

HSU-102

VEST

04-SV1-V2

HSU-ST2

STAIR

04-SV1-ST2

HE-S01

ELEV

04-SV1-SE3

HE-S02

ELEV

04-SV1-SE4HE-P02

ELEV

04-SV1-PE4

HE-P01

ELEV

04-SV1-PE3

HSU-ST1

STAIR

04-SV1-ST1

HE-S03

ELEV

04-SV1-SE17

HSU-100

MECH

04-SV1-A1-M1

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

J

J

R1

R1

R2

R2

RJ

RJ

RH

RH

RG

RG

RF

RF

RE

RE

RC

RC

RB

RB

RA

RA

K

K04

RD

RD

AA

AA

BB

BB

+54"

+54"

+54"

+54"

+54"

+54"

+54"

+54"

+54"

+54"

+54" +54" +54"

+54"

04-NLS1-21

04-NLS1-23

04-NLS1-25

04 - FCU-13

04-NLS1-24

TO

04-LSL11-24

FLAG NOTES:

120V CONNECTION TO LOW VOLTAGE VAV BOX POWER SUPPLY. FIELD

COORDINATE EXACT LOCATION.

PROVIDE 120V CONNECTION FOR DOOR SECURITY.

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R

ES

D

AT

IB

S

IB

N

EN

C

C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/

/2

5:

:4

PM

C :\U se rs

\C

AD

U se r 2 \D oc um en ts

\E S-

IB

S_ ch ar lo tte

.b la ck w oo d.

rv t

04-ES-400-1

SERVICE LEVEL INTERSTITIAL POWER

PLAN

INPATIENT BUILDING (SOUTH)

08/31/2012

1/8" = 1'-0"1

SERVICE LEVEL INTERSTITIAL

POWER PLAN NORTH

0' 4' 8' 16' 32'

UP

DN

UP

DN

CLG

CLG

J J

J

J

CLG

J

J

J

J

J

J

J

JJ

J

J

J J

J

J

J

J

J

J

J

J

J

J

J

J J

J

J

J

J

J

J

J

JJ

J

J

J

J J

J

J

J

J

J

J J

J

J

J

J

J J

J

J

JJ

J

J J

J J

J

J

J

J

J

HS-112

CONDENSATE

LIFT / STORM &

SAN

04-SV-A2-H3

HS-117

ELEC

04-SV-C3-E2 HS-119

DATA /

TELECOMM

04-SV-C3-T2

HE-S02

ELEV

04-SV-SE4

HE-S01

ELEV

04-SV-SE3

HS-146

DATA /

TELECOMM

04-SV-F2-T1

HS-147

ELEC

04-SV-F3-E1

HS-100D

ELEV MACH RM

04-SV-A1-V17

HE-S03

ELEV

04-SV-SE17

HE-P01

ELEV

04-SV-PE3

HE-P02

ELEV

04-SV-PE4

HS-127

CHUTE

04-SV-D3-H1

HS-ST1

STAIR

04-SV-ST1

HS-ST2

STAIR

04-SV-ST2

04-SV-V2

VEST

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

J

J

R1

R1

R2

R2

RJ

RJ

RH

RH

RG

RG

RF

RF

RE

RE

RC

RC

RB

RB

RA

RA

K

K04

RD

RD

AA

AA

BB

BB

+42"

AC

AC

COPIER

AC

AC

AC

4AC,GFI

1 AC,GFI

20' CORD

REEL

REFER TO DRAWING

04.ES.410 FOR ELECTRICAL

REQUIREMENTS THIS AREA

MAGNETIC

DOOR

HOLDER

+42"

+42"

+42"

GFI

+42"

+42"

REFER TO DRAWING

04.ES.410 FOR ELECTRICAL

REQUIREMENTS THIS AREA

WP

WP

WPWP

REFER TO ENLARGED FOOD

SERVICE ELECTRICAL PLAN

FOR ADDITIONAL REQUIREMENTS

IN THIS AREA

+42"

AC

AC

R7000R7000 K4665

K4665 K1552

K1552

AC

R7000 R7000

VENDING

VENDIN

G

M1810

04-SP-01

04-SP-04 04-SE-01

04-SP-03

04-SP-02

+42"7

(TYP)

(TYP)

GFI

SCREEN

SCREEN

ELECTRONIC

TRAP PRIMER

04-NLS1-1,3

9,11

04-NLS1-9,11

04-NLS1-2

04-NLS1-4

04-NLS1-6,8

04-NLS1-10,12

15,17

04-NLS1-13,15,17

04-NLS1-14,16,18

04-NLS1-19

04-EQHS1-1,3,5

04-EQHS1-7,9,11

04-EQHS1-2,4,6

04-EQLS1-1,3

3,5

04-NLS2-1,3,5

04-NLS2-2,4,6

4,6

9,11

04-NLS2-7,9,11

04-NLS2-8,10,12

16,18

04-NLS2-14,16,18

04-NLS2-13,15

21 19

04-NLS2-17,19,21

04-NLS2-23

04-NLS2-25

04-NLS2-27

K4665

K4665

+48"

+48" AC

AC

AC

AC

+60"

+60"

AC AC

+48"

+48"

+48" +48"

04-NLS2-24

04-NLS2-26

04-NLS2-20

04-NLS2-22

04-NLS2-28,30

04-NLS2-32,34

04-NLS2-40,42

04-NLS2-36,38

04-NLS2-29

DOOR

HOLDER

DOOR

HOLDER 04-LSL11-2

04-LSL11-2

(PART)

(PART)

04-EQHS1-8,10,12

04-NLS2-33

TRAP

PRIMER

TRAP

PRIMER

TRAP

PRIMER

04-EQLS1-7

(PART)

04-EQLS1-7

(PART)

04-EQLS1-7

04-EQHS1-13,15,17

04-EQLS1-10

(PART)

(PART)04-NLS1-22

SCRUB

MACHINE

04 - CP- 1

04-EQHS1-20,22,24

04 - SE17

04-EQHS1-25,27,29

04-LSL11-19

04-NLS1-27 04-NLS1-28

04-NLS2-39

04-EQLS1-13

04-EQLS1-18

(PART)

04-EQLS1-18

(PART)

04-EQLS1-18

(PART)

TRAP

PRIMER

TRAP

PRIMER

04-NLS1-2904-NLS1-31

CHUTE

CONTROLS

04-EQLS1-15

04-CL11-39

9'-0" AFF

(PART)

04-CL11-39

04-LSL11-29

04-LSL11-25

WP

MORTUARY REF.

UNIT COOLER

04-EQLS1-19

04-NLS1-26

EXAM

LIGHT

04-NLS1-5,7

04-NLS1-30,32

WATER

BOTTLE

FILLER04-NLS2-37

04-NLS2-41

04-LSL11-12

FIRE ALARM

WORKSTATION

PRINTER

04-EQLS1-8

04-EQLS1-9

04-EQLS1-6

04-EQLS1-4

04-EQLS1-12

04-EQLS1-20

04-NLS2-43,45

04-NLS2-31

(PART)

04-LSL11-27

04-EQLS1-10

MAGNETIC

DOOR

HOLDER

04-CLS2-1

04-LSL11-28

MAGNETIC

DOOR

HOLDER

FLAG NOTES:

PROVIDE SINGLE CHANNEL, 2-PIECE, STEEL CONSTRUCTION MULTI-

OUTLET ASSEMBLY WITH DUPLEX RECEPTACLES INSTALLED AT 24" ON

CENTER. DEVICES INSTALLED SHALL BE HOSPITAL GRADE WITH WHITE

FINISH. ASSEMBLY SHALL HAVE WHITE FACTORY FINISH.

REMOTE GFI TEST/RESET FOR DEVICES LOCATED BEHIND VENDING

MACHINES.

PROVIDE NON-METALIC, DOUBLE GANG FLOOR BOX FOR DUPLEX

RECEPTACLE/DATA CONNECTIONS. VERIFY MINIMUM 3" CONCRETE

TOPING SLAB IS PROVIDED. VERIFY ADDITIONAL REQUIREMENTS WITH

LOW VOLTAGE CONSULTANT DOCUMENTS PRIOR TO PURCHASE.

VERIFY EXACT LOCATION OF CEILING MOUNTED PROJECTOR RECEPTACLE

WITH AV CONSULTAND DRAWINGS PRIOR TO INSTALLATION.

LOCATION OF SUMP PUMP CONTROLLER ABOVE ACCESSIBLE CEILING OR

AT +10'-6" AFF IN BACK OF HOUSE AREAS. SYSTEM TO INCLUDE SINGLE

PUMP FED FROM CONTROLLER. MOTOR CONNECTIONS COMPLETED BY

THE CONTRACTOR. PROVIDE CIRCUIT CONNECTION TO CONTROL PANEL

AS NOTED ON THE MECHANICAL EQUIPMENT SCHEDULE.

APPROXIMATE LOCATION OF SUMP PUMP CONTROLLER. SYSTEM TO

INCLUDE DUAL ALTERNATING PUMPS FED FROM CONTROLLER. MOTOR

CONNECTIONS COMPLETED BY THE CONTRACTOR. PROVIDE CIRCUIT

CONNECTION TO CONTROL PANEL AS NOTED ON THE MECHANICAL

EQUIPMENT SCHEDULE.

PROVIDE 120V CONNECTION FOR ELECTRONIC SOLENOID TO FLUSH

VALVES AND/OR FAUCETS.

OUTLET BOX AND 120V CIRCUIT FOR CONNECTION OF WALL MOUNTED

ELEVATING AUTOPSY SINK CONNECTIONS. COUNTER/SINK IS A

PREMANUFACTURED UNIT WITH INTEGRAL GFI PROTECTED RECEPTACLE

AND DISPOSER. MAKE SINGLE POINT CONNECTION TO MAIN CIRCUIT

BREAKER FURNISHED WITH UNIT.

120V POWER FOR CONNECTION TO NECROPSY TABLE UTILITY PEDISTAL.

ROUTE POWER UNDER FLOOR PROVIDING STUB-UP AND OUTLET BOX FOR

SINGLE POINT CONNECTION WITHIN TABLE PEDISTAL.

120V CONNECTION FOR AUTOMATIC DOOR OPENER. VERIFY CONTROL

REQUIREMENTS WITH EQUIPMENT FURNISHED. REFER TO

ARCHITECTURAL PLANS FOR BOTH PAD LOCATIONS. PROVIDE ROUGH-IN

AND WIRING PER MANUFACTURER REQUIREMENTS.

LOCATE ELEVATOR EQUIPMENT DISCONNECT WITHIN 18 ” OF LATCH SIDE

OF ELEVATOR MACHINE ROOM DOOR. PROVIDE 2#10 IN 3/4 ” CONDUIT

FROM ELEVATOR CONTROLLER TO ASSOCIATED ATS SERVING THE

ELEVATOR FOR THE PRE-TRANSFER SIGNAL RELAY.

PROVIDE A 120V, 20A1P ENCLOSED CIRCUIT BREAKER CAPABLE OF BEING

LOCKED IN THE OPEN POSITION FOR THE BRANCH CIRCUIT SUPPLYING

THE ELEVATOR CAB LIGHTS, RECEPTACLE, AND VENTILATION SYSTEM.

120V CONNECTION FOR MOTORIZED PROJECTION SCREEN. COORDIANTE

INSTALLATION OF CONTROLS WITH EQUIPMENT PROVIDED.

120V CONNECTION FOR CONTROL PANEL POWER (WHERE REQUIRED).

COORDINATE WITH EQUIPMENT FURNISHED AND PLUMBING CONTRACTOR

PRIOR TO ROUGH-IN.

MORTUARY REFRIGERATOR CONDENSING UNIT LOCATED IN PIPE

BASEMENT BELOW. RE: SHEET 04.ES.305.

LOCATION OF MORGUE EXAM LIGHT CONTROLS. PROVIDE BACK BOX AND

1" CONDUIT TO ABOVE ACCESSIBLE CEILING FOR CONTROL CABLING

INSTALLATION (CABLING BY EQUIPMENT INSTALLER).

UNIFORM CONVEYOR. PROVIDE FLEXIBLE CONNECTION TO DIRECT DRIVE

GEARMOTOR PER MANUFACTURING SPECIFICATION. FIELD LOCATE LOCAL

DISCONNECT SHOWN ON NORTH WALL OF UNIFORM ROOM.

MORTUARY REFRIGERATOR LIGHTING SYSTEM. PROVIDE 120V

CONNECTION IN ACCORDANCE WITH MANUFACTURER'S WIRING

SPECIFICATION.

MORTUARY REFRIGERATOR CHART RECORDING CONTROLLER. PROVIDE

120V CONNECTION IN ACCORDANCE WITH MANUFACTURER'S WIRING

SPECIFICATION.

PROVIDE 120V CONNECTION FOR DOOR SECURITY.

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R

ES

D

AT

IB

S

IB

N

EN

C

C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/

/2

:1 8:

A

M C

:\U se rs \C

AD

U se r 2

\D oc um en ts \E

S-

IB

S_ ch ar lo tte .b la ck w oo d.

rv t

04-ES-400

SERVICE LEVEL POWER PLAN

INPATIENT BUILDING (SOUTH)

08/31/2012

1/8" = 1'-0"1 SERVICE LEVEL POWER PLAN NORTH

0' 4' 8' 16' 32'

UP

BS

BS

BS

MAINT.

ACCESS

MAINT.

ACCESS

MAINT.

ACCESS

HSU-101

VEST

04-SV1-V1

HSU-102

VEST

04-SV1-V2

HSU-ST2

STAIR

04-SV1-ST2

HE-S01

ELEV

04-SV1-SE3

HE-S02

ELEV

04-SV1-SE4HE-P02

ELEV

04-SV1-PE4

HE-P01

ELEV

04-SV1-PE3

HSU-ST1

STAIR

04-SV1-ST1

HE-S03

ELEV

04-SV1-SE17

HSU-100

MECH

04-SV1-A1-M1

04-SV-F3-05

BIOMED REPAIR

HS-100

RECEIVING

04-SV-A1-03

HS-152

OFFICE

04-SV-F1-03

HS-105

AUTOPSY

04-SV-B3-04

HS-109

ISO/AUTOPSY

04-SV-B3-01

HS-107A

STAFF TLT

04-SV-B3-03

HS-113

RECEIVING

04-SV-B3-05

HS-157

STAFF

LOUNGE/LOCKERS

04-SV-G3-04

04-SV-C3-01

OFFICE

HS-121

OFFICE

04-SV-C3-03HS-115

OFFICE

04-SV-C3-02

04-SV-G1-06

STAFF TLT

HS-111

MORTUARY REFR

04-SV-A3-01

HS-149C

BIOMED STOR

04-SV-G3-02

HS-149B

RECEIVING/CLEANING

04-SV-G3-01

HS-149A

OFFICE

04-SV-F3-02

HS-125

STOR

04-SV-D3-0304-SV-C3-06

CLEAN LINEN

HOLD

04-SV-C3-05

CLEAN LINEN

CART STOR

HS-131

DISTRIBUTION/DISPATCH

04-SV-E3-02

04-SV-E3-04

SUPPLY STOR

HS-133

UNIFORM

04-SV-E3-01

04-SV-E3-03

LINEN STOR

HS-123

CLEAN LINEN

DISTRIBUTION

04-SV-C3-04

04-SV-E3-05

OFFICE

04-SV-H1-04

FEMALE

TLT/SHOWER

HS-100A

NON-FOOD STOR

04-SV-A2-01

HS-100B

DRY FOOD STOR

04-SV-A1-02

HS-124A

REFR AND

FROZEN FOOD

STOR

04-SV-B2-01

HS-124C

BLAST CHILLED

FOOD STOR

04-SV-B1-02 04-SV-D1-01

TRAY ASSEMBLY

04-SV-D1-03

TRAY CART

CLEAN

HS-130

POT WASH 2

04-SV-D1-02 04-SV-E1-01

POT WASH 1

HS-132B

CART WASH

04-SV-E2-01

HS-132

DISHWASH

04-SV-E1-03

04-SV-E2-03

HAZ SUPPLIES

STORHS-132A

HAC

04-SV-E2-02

04-SV-A1-04

RECYCLING

HS-150

CONF

04-SV-G1-01

HS-148D

OFFICE

04-SV-F1-04

HS-148B

OFFICE

04-SV-F1-09

HS-154

OFFICE

04-SV-F1-02

HS-126A

COMMUNICATIONS/FOOD

SERVICE

04-SV-D2-01

HS-148A

SECR/WAIT

04-SV-F2-02

04-SV-E3-08

OFFICE

04-SV-E3-10

OFFICE

04-SV-E3-07

OFFICE

HS-143

OFFICE

04-SV-E3-06

HS-124D

BLAST CHILLED

FOOD STOR

04-SV-B1-01

HS-139

OFFICE

04-SV-E3-11

HS-141

OFFICE

04-SV-E3-09

HS-135

SECR/WAIT

04-SV-E3-13

04-SV-F3-04

BED REPAIR

SHOP

HS-149

ELECTRONICS

04-SV-F3-03

HS-129

HAC

04-SV-D3-01

04-SV-F1-06

OFFICE

04-SV-F1-05

OFFICE

HS-130B

CLEANING

SUPPLY STOR

04-SV-E1-02

04-SV-G1-07

MALE

TLT/SHOWER

04-SV-F1-01

OFFICE

04-SV-H1-06

LOCKERS

04-SV-G1-03

LOCKERS

04-SV-H1-05

STAFF LOCKERS

04-SV-G3-03

STAFF LOUNGE

04-SV-H1-03

STAFF TLT04-SV-G1-05

STAFF TLT

04-SV-H1-02

STAFF TLT

HS-156

STAFF

LOUNGE/LOCKERS

04-SV-G1-02

HS-101

HAC

04-SV-A3-03

04-SV-H3-01

STAFF LOUNGE

HS-134

WASTE PULPER

04-SV-F2-01

HS-130A

STAFF TLT

04-SV-D2-02

HS-158

FEMALE

TLT/SHOWER

04-SV-H1-01

04-SV-G1-04

MALE

TLT/SHOWER

HS-107

STAFF LOCKERS

04-SV-B3-02

HS-145

RECEIVING/CLEANING

04-SV-F3-01

04-SV-G2-01

VEST

04-SV-H2-02

VEST

HS-137

CONSULT

04-SV-E3-12

04-SV-F1-07

OFFICE

HS-148C

OFFICE

04-SV-F1-08

04-SV-A3-06

CLOSET

HS-C02

CORRIDOR

04-SV-B2-02

HS-103

CORRIDOR

04-SV-A3-02

HS-124B

CIRC

04-SV-B1-03

04-SV-E3-14

CIRC

HS-102

CART DEPOT

04-SV-A2-02

HS-C01

CORRIDOR

04-SV-A3-04

HS-C03

CORRIDOR

04-SV-D3-02

HS-C04

CORRIDOR

04-SV-E3-15

HS-126

FOOD PREP

04-SV-C2-01

HS-124

NOURISH

04-SV-C1-01

INTERSTITIAL ACCESS WALKWAY

4 - TU1 - 0.2

4 - TU2 - 0.1

4 - TU2 - 0.3

4 - TU2 - 0.4

4 - TU2 - 0.5

4 - TU2 - 0.6 4 - TU2 - 0.7

4 - TU2 - 0.8

4 - TU2 - 0.9

4 - TU3 - 0.1

4 - TU3 - 0.2

4 - TU3 - 0.3

4 - TU3 - 0.6

4 - TU3 - 0.7

4 - TU3 - 0.8

4 - TU3 - 0.9

4 - TU3 - 0.10

4 - TU3 - 0.11

4 - TU3 - 0.15

4 - TU3 - 0.16

4 - TU3 - 0.17

4 - TU3 - 0.18 4 - TU3 - 0.19

4 - TU3 - 0.44 - TU3 - 0.13

"x

28"x20"

4 - TU2 - 0.11

4 - TU1 - 0.1

4 - TU2 - 0.10

FIRE DAMPER

IN VERTICAL

(TYP)

4 - TU1 - 0.3

4 - TU1 - 0.4

4 - TU1 - 0.5

4 - TU2 - 0.12

A

B

C

D

E

F

G

H

J

K

R1

R2

RJ

RF

RE

RD

RC

RB

RA

4 - TU2 - 0.2

4 - TU3 - 0.12

4 - TU3 - 0.5

20"x18"

14"x14"

"x

"x

24"x18" 20"x18"

"x

22"x18"30"x18" 30"x18"

20"x18"

"x

24"x18"

24"x26" 16"x16"

24"x18" 18"x16"

18"x18"

"x

" 16"x10"

"x

"x

36"x30"30"x26"

26"x26" 22"x20"

20"x16"

32"x22"24"x22"

"x

30"x26"

24"x18"

30"x20" 16"x18"

"x

"x

16"x20"

14"x16" 14 "x

"x

14"x16"

"x

12"x10"12"x14"

16"x14"

14"x16"14 "x

30"x28"

30"x20"

20"x16"

8"ø

"x

14"x14"

"x

G 880 CFM

18 / 12C 880 CFM

18 / 12

"x

"x

"x

C 880 CFM

18 / 12G 880 CFM

18 / 12

"x

16"x14"

"x

14"x14"

14"x14"

14"x14"

10"x14"

10"ø

"x

FIRE

DAMPER IN

VERTICAL

(TYP)16"ø

CONNECT TO

HOOD (TYP-5)

20"x18"

20"x18"

36"x24"

40"x20"

"x

36"x24"

14"ø

700 CFM TO

CART

WASH

750 CFM TO

DISH WASH

10"x16"

"x

04-ETU-0.1

14"x16"

"x

8"

4 - TU1 - 0.6

4 - TU2 - 0.13

04-MH-301

RG

RH

"x

20"x20"

"x

30"x20"

10"x12"

04-FCU-14

24"x18"

20"x20"

20"x20"

8"ø

10"ø

"ø

10"x12"

"x

MH.X086

MH.X086

MH.X048

04-MH-100

8" EA DOWN

MH.X243

MH.X243

8" ø

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R

ES

D

AT

IB

S

IB

N

EN

C

C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/

/2

3:

:4

PM

C :\U se rs

\C

AD

U se r 2 \D oc um en ts

\M H

-IB

S_ ch ar lo tte

.b la ck w oo d.

rv t

04-MH-100-1

SERVICE LEVEL INTERSTITIAL HVAC

PLAN

INPATIENT BUILDING (SOUTH)

08/31/2012

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

1/8" = 1'-0"1

SERVICE LEVEL INTERSTITIAL

HVAC PLAN

M

AI

N T.

AC

C

ES

S

M

AI

N T.

AC

C

ES

S

M

H1U-101

VEST

04-11-V1

H1U-ST1

STAIR

04-11-ST1

HE-P02

ELEV

04-11-PE4

HE-P01

ELEV

04-11-PE3

HE-S03

ELEV

04-11-SE17

HE-S02

ELEV

04-11-SE4

HE-S01

ELEV

04-11-SE3

H1U-ST2

STAIR

04-11-ST2

H1U-102

VEST

04-11-V2

H1U-100

MECH

04-11-A1-M1

01-01-PGE4

ELEV

01-01-PGE3

ELEV

IBS H

INTERSTITIAL ACCESS WALKWAY

4 - TU2 - 1.16

4 - TU2 - 1.15

4 - TU2 - 1.14

4 - TU2 - 1.13

4 - TU2 - 1.12

4 - TU2 - 1.10 4 - TU2 - 1.7 4 - TU2 - 1.6 4 - TU2 - 1.3 4 - TU2 - 1.1

4 - TU2 - 1.11 4 - TU2 - 1.9

4 - TU2 - 1.8

4 - TU2 - 1.4

4 - TU2 - 1.5

4 - TU2 - 1.38

4 - TU2 - 1.31

4 - TU2 - 1.30

4 - TU2 - 1.29

4 - TU2 - 1.28

4 - TU2 - 1.27

4 - TU2 - 1.26

4 - TU2 - 1.18

4 - TU2 - 1.20

4 - TU2 - 1.21

4 - TU2 - 1.23

4 - TU2 - 1.24

4 - TU2 - 1.17

4 - TU2 - 1.19

4 - TU2 - 1.22

4 - TU2 - 1.25

4 - TU3 - 1.1

4 - TU3 - 1.3 4 - TU3 - 1.4

4 - TU3 - 1.5

4 - TU3 - 1.6 4 - TU3 - 1.7 4 - TU3 - 1.8

4 - TU3 - 1.9

4 - TU3 - 1.10 4 - TU3 - 1.11

4 - TU3 - 1.12 4 - TU3 - 1.13

4 - TU3 - 1.15

4 - TU3 - 1.16

4 - TU3 - 1.17

4 - TU3 - 1.18

4 - TU3 - 1.19

4 - TU3 - 1.20

4 - TU3 - 1.21

4 - TU3 - 1.22

4 - TU3 - 1.26

4 - TU3 - 1.27

4 - TU3 - 1.28

4 - TU3 - 1.25

4 - TU3 - 1.23

4 - TU3 - 1.29

4 - TU3 - 1.30

4 - TU3 - 1.33

4 - TU3 - 1.31

4 - TU3 - 1.34

4 - TU3 - 1.35

4 - TU3 - 1.36

4 - TU3 - 1.37

4 - TU3 - 1.38

4 - TU3 - 1.39

4 - TU3 - 1.40

4 - TU3 - 1.41

4 - TU3 - 1.42

4 - TU3 - 1.43

4 - TU3 - 1.44

4 - TU3 - 1.45

4 - TU3 - 1.46

4 - TU3 - 1.47

4 - TU3 - 1.48

4 - TU3 - 1.49

4 - TU3 - 1.24

4 - TU3 - 1.32

4 - TU2 - 1.32

4 - TU2 - 1.33

4 - TU2 - 1.2

4 - TU2 - 1.34

4 - TU3 - 1.14

RJ

RJ

RH

RH

RG

RG

RF

RF

RD

RD

RC

RC

RB

RB

AA

AA

BB

BB

A

B

C

D

E

F

G

H

J

J

K

R1

R2

RA

42"x28"

"x

"x

"x

26"x26"

20"x20"

20"x14"

36"x16"

20"x20"

16"x20"20"x12"

14"x12"

"x

"x

16"x14"

14"x16"

14"x16"

20"x20"

10"x14"

14"x16"

14"x14"

"x

"x

10"x14"

"x

"x

24"x26"

20"x20" 18"x18" 18"x16"

12"x12"

8"x12"

"x

14"x14"

8" ø

12"ø

18"x16" 16"x16" 16"x14"

12"x14" 10"x12"

16"x14"16"x16"

"x

"x

22"x20"22"x20"

"x

"x

26"x24"

26"x24"

28"x24"

"x

14"x14"

18"x16"

16"x16"

18"x16"

14"x16"

14"x16"

30"x26"

"x

"x

"x

G 880 CFM

18 / 12 C 880 CFM

18 / 12

12"x14"

"x

C 875 CFM

18 / 12 G 875 CFM

18 / 12

"x

"x

"x

32"x30"

28"x24"

28"x24"

"x

"x

24"x20"

"x

"10

"ø

04-MH-403

04-MH-403

04-MH-404

FIRE

DAMPER IN

VERTICAL

(TYP)

FIRE

DAMPER IN

VERTICAL

(TYP)

K 550 CFM

12"

(TYP-4)

F 1100 CFM

14"

(TYP-2)

24"x26"

4-ETU-1.1

4-ETU 1.2

"x

"x

"x

"x

14"ø

10"ø

10"x10"

8"x12"

10"x12"

14"x16"

14"x16"

12"ø

8"x12"

40"x24"

4-CUH-4

14"ø

4 - TU3 - 1.50

REFER TO BUILDING

O5-IBN FOR

CONTIUNATION

"ø

14"ø

"x

"x

12"x14"

22"x20"

22"x20"

14"ø

20"x20"

12"x12"

14"x14"

30"x30"

4" DRYER

EXH DN

4" DRYER

EXH UP

8"x14"

"ø

10"ø

10"ø

16"x14"

12"x10" 12"x14"

16"x16"

"x

8"

8"x14"

4 - TU3 - 1.2

10"ø

12"ø

12"ø

10"ø

8"ø

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R

ES

D

AT

IB

S

IB

N

EN

C

C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/

/2

3:

:3

PM

C :\U se rs

\C

AD

U se r 2 \D oc um en ts

\M H

-IB

S_ ch ar lo tte

.b la ck w oo d.

rv t

04-MH-101-1

LEVEL 1 INTERSTITIAL HVAC PLAN

INPATIENT BUILDING (SOUTH)

08/31/2012

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

1/8" = 1'-0"1

LEVEL 1 INTERSTITIAL HVAC

PLAN

H2U-101

VEST

04-21-V1

H2U-ST2

STAIR

04-21-ST2

H2U-102

VEST

04-21-V2

HE-S02

ELEV

04-21-SE4

HE-S01

ELEV

04-21-SE3

HE-P01

ELEV

04-21-PE3

HE-P02

ELEV

04-21-PE4

H2U-ST1

STAIR

04-21-ST1

H2U-100

MECH

04-21-A1-M1

INTERSTITIAL ACCESS WALKWAY

4 - TU2 - 2.2

4 - TU3 - 2.12

4 - TU2 - 2.1

4 - TU2 - 2.3

4 - TU2 - 2.4 4 - TU2 - 2.5

4 - TU2 - 2.6 4 - TU2 - 2.7 4 - TU2 - 2.8 4 - TU2 - 2.9

4 - TU2 - 2.13

4 - TU2 - 2.14

4 - TU2 - 2.12

4 - TU2 - 2.11

4 - TU2 - 2.10

4 - TU2 - 2.154 - TU2 - 2.16

4 - TU2 - 2.17

4 - TU2 - 2.18

4 - TU2 - 2.19

4 - TU2 - 2.20 4 - TU2 - 2.21 4 - TU2 - 2.22 4 - TU2 - 2.23 4 - TU2 - 2.24 4 - TU2 - 2.25 4 - TU2 - 2.26

4 - TU2 - 2.27 4 - TU2 - 2.28 4 - TU2 - 2.29

4 - TU2 - 2.32 4 - TU2 - 2.33

4 - TU3 - 2.1

4 - TU3 - 2.2

4 - TU3 - 2.3

4 - TU3 - 2.4

4 - TU3 - 2.5

4 - TU3 - 2.6

4 - TU3 - 2.7

4 - TU3 - 2.84 - TU3 - 2.9

4 - TU3 - 2.10

4 - TU3 - 2.11

4 - TU2 - 2.35

4 - TU2 - 2.34

4 - TU3 - 2.16 4 - TU3 - 2.17 4 - TU3 - 2.18 4 - TU3 - 2.19 4 - TU3 - 2.20 4 - TU3 - 2.21 4 - TU3 - 2.22 4 - TU3 - 2.23

4 - TU3 - 2.30

4 - TU3 - 2.294 - TU3 - 2.28

4 - TU3 - 2.27

4 - TU3 - 2.26

4 - TU3 - 2.254 - TU3 - 2.24

4 - TU3 - 2.31

4 - TU3 - 2.32

4 - TU3 - 2.14

4 - TU3 - 2.13

A

K

48"x30"

48"x30"

"x

"x

"x

22"x24"

24"x22" 22"x20" 20"x20" 18"x18"

"x

"x

18"x18" 18"x16" 16"x16"

"x

14"x14"

10"x14"

12"x12"

14"x16"

14"x16"

"x

14"x16"

14"x16"

"x

14"x16"

"x

"x

"x

20"x22" 22"x20"

24"x24" 22"x20"

18"x18"

14"x16"

12"x12"

12"x12"

"x

12"x14"

12"x12"

"x

8"x12"

"x

16"x16"

"x

12"x14"

10"x12"

10"x12"

C 880 CFM

18 / 12G 880 CFM

18 / 12

4 - TU2 - 2.36

4 - TU2 - 2.30

"x

"x

C 880 CFM

18 / 12 G 880 CFM

18 / 12

"x

"x

"x

18"x18" 16"x16"

12"x14" 10"x12"

14"x14"

18"x16" 16"x16"22"x22"24"x24"

4 - TU3 - 2.15

"x

32"x24" 36"x30"

"x

14"x12"

12"ø 14"x14"

8"x10"

"x

10"x10"

"x

"x

16"x14"

"x

10"x10" 10"x8"8"x10"

"x

"x

"x

12"x8"

"x

14"x16"

14"x16"

"x

04-MH-403

04-MH-403

04-MH-404

"x

4 - TU2 - 2.31

FIRE

DAMPER IN

VERTICAL

(TYP)

FIRE

DAMPER IN

VERTICAL

(TYP)

22"x22" 10"x12"

"x

04-MH-301

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

J

J

R1

R1

R2

R2

RE

RE

RF

RF

RG

RG

RH

RH

RR1

RR1

RR2

RR2

RC

RC

RB

RB

RA

RA

RD

RD

RJ

RJ

30"x26"

4"DRYER

EXH UP

& DN

T

TT

TT

T

16"x14"

14"x14"

4" DRYER

EXH UP

4" DRYER

EXH DN

"x

26"x20"

4" DRYER EXH

UP AND DOWN

MH.X194

MH.X218

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R

ES

D

AT

IB

S

IB

N

EN

C

C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/

/2

3:

:0

PM

C :\U se rs

\C

AD

U se r 2 \D oc um en ts

\M H

-IB

S_ ch ar lo tte

.b la ck w oo d.

rv t

04-MH-102-1

LEVEL 2 INTERSTITIAL HVAC PLAN

INPATIENT BUILDING (SOUTH)

08/31/2012

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

1/8" = 1'-0"1

LEVEL 2 INTERSTITIAL HVAC

M

AI

N T.

AC

C

ES

S

M

AINT.

ACCESS

MAINT.

ACCESS

MAINT.

ACCESS

H3U-101

VEST

04-31-V1

H3U-ST2

STAIR

04-31-ST2

H3U-102

VEST

04-31-V2

HE-S01

ELEV

04-31-SE3

HE-S02

ELEV

04-31-SE4

HE-P01

ELEV

04-31-PE3

HE-P02

ELEV

04-31-PE4

H3U-ST1

STAIR

04-31-ST1

H3U-100

MECH

04-31-A1-M1

04-31-V3

VEST

A

A

B

B

C

C

D

D

E

E

F

F

G

G

H

H

J

J

R1

R2

R2

RJ

RH

RG

RF

RE

RC

RB

RA

K

K

RD

INTERSTITIAL ACCESS WALKWAY

4 - TU4 - 3.1W 4 - TU4 - 3.2W

4 - TU4 - 3.3W

4 -4 - 3.4W

4-ETU 3.5

4-ETU 3.6

4 - TU4 - 3.5W 4 -4 - 3.6W 4 - TU4 - 3.7W 4 - TU4 - 3.8W

4 -4 - 3.10W

4 - TU4 - 3.11W

4 - TU4 - 3.12W

4 - TU4 - 3.31W4 - TU4 - 3.14W

4 - TU4 - 3.15W

4 -4 - 3.16W

4 - TU4 - 3.17W

4 -4 - 3.18W

4 -4 - 3.19W

4 - TU4 - 3.20W

4 -4 - 3.21W 4 -4 - 3.22W 4 -4 - 3.23W 4 -4 - 3.24W 4 -4 - 3.25W 4 -4 - 3.26W

4 - TU4 - 3.27W

4 - TU4 - 3.28W4 - TU4 - 3.29W

4 -4 - 3.5E4 -4 - 3.6E4 - TU4 - 3.7E

4 - TU4 - 3.8E4 - TU4 - 3.9E 4-ETU 3.1

4-ETU 3.4

4 - TU4 - 3.10E

4 - TU4 - 3.11E

4 - TU4 - 3.12E

4 - TU4 - 3.13E

4 - TU4 - 3.14E

4 -4 - 3.15E

4 - TU4 - 3.16E

4 - TU4 - 3.17E

4 -4 - 3.18E

4 - TU4 - 3.19E

4 -4 - 3.20E 4 -4 - 3.21E 4 - TU4 - 3.22E 4 -4 - 3.23E 4-ETU 3.3

4-ETU 3.2

4 - TU4 - 3.24E 4 - TU4 - 3.25E 4 - TU4 - 3.26E

4 - TU4 - 3.28E

4 -4 - 3.29E

4 - TU4 - 3.30E

4 - TU4 - 3.31E

4 - TU4 - 3.32E4 - TU4 - 3.33E

4 - TU4 - 3.34E

4 - TU4 - 3.35E

4 - TU4 - 3.13W

4 - TU4 - 3.3E

4 - FP4 - 3.30W 4-HEPA-4

4 - FP4 - 3.37E4-HEPA-3

C 880 CFM

18 / 12G 880 CFM

18 / 12

36"x36"

20"x20"

"x

"x

"x

14"x14"16"x16" 10"x12"

10"x12" 10"x12"

16"x18"18"x18"20"x18"20"x20"

"x

"x

48"x36"

"x

"x

24"x24"

10"x12" 12"x14"

16"x14"

18"x16"

18"x18"

"ø

14"x16"

14"x16"

14"x16" 14 "x

"x

14"x14"

"x

12"ø

12"ø

8"x12"

8"x10" 8"x10"

10"x12"

"x

"x

"x

"x

14"x16"

10"ø

16"x16"

"ø

"ø

"ø

"ø

10"ø 8"x12"

22" EA

UP

18" EA

UP

"x

30"x28"

"x

"x

"x

24"x24"

20"x20" 18"x18"

24"x24"

16"x16"

18"x18" 14"x14"

"x

14"x16" 14 "x

14"x12"

10"x12"

8"x14"

10"x12"

"x

"x

10"ø18"x12"

10"ø

8"ø

4 -4 - 3.9W

"x

C 880 CFM

18 / 12 G 880 CFM

18 / 12

FIRE

DAMPER IN

VERTICAL

(TYP)

FIRE

DAMPER

IN

VERTICAL

(TYP)

"x

20"x20"

20"x14"

"x

12"ø

14"x14"

12"x14"

04-FCU-13

4-CUH-1

16"ø

22"x18"

"ø

12"ø

"x

32"x30"

26"x26"

32"x28"

28"x20"

"ø

14"x14"

18"x12"

12"ø

"x

"x

12"x12"

LOW

4" DRYER

EXH UP & DN

14"x26"

12"x12"

14"x16"

4" DRYER EXH DOWN

4" DRYER EXH UP

4" DRYER EXH

UP AND DOWN 4 - ETU 3.7

4 - ETU 3.8

20"ø

20" EA UP

4 - ETU 3.10

4 - ETU 3.9

8"ø

12"ø8"ø

12"ø

8"ø

8"ø

8"ø

16"ø

8"ø 12"ø

8"ø

8"ø

8"ø

12"ø

INSTALL DUCT PRESSURE SENSOR

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R

ES

D

AT

IB

S

IB

N

EN

C

C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

/1

6/

:1 0:

P

M C

:\U se rs \C

AD

U se r 2

\D oc um en ts \M

H

-IB

S_ ch ar lo tte .b la ck w oo d.

rv t

04-MH-103-1

LEVEL 3 INTERSTITIAL HVAC PLAN

INPATIENT BUILDING (SOUTH)

08/31/2012

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

1/8" = 1'-0"1

LEVEL 3 INTERSTITIAL HVAC

UP DN

UP DN

4"GCO (TWO-WAY)

INV.:85.46'

(5373.46' USGS)6"W @

2.04%

6"W @ 2.04%

6"W

6"W

FINISHED INTERSTITIAL

FLOOR ELEVATION 91.50'

(5379.50' USGS)

FINISHED INTERSTITIAL

FLOOR ELEVATION 91.50'

(5379.50' USGS)

4"GCO (TWO-WAY)

INV.:87.79'

(5375.79' USGS)

6"W @ 2.04%

6"W

6"W6"W6"W

4"V 4"V 4"V 4"V 4"V 4"V

4"V 4"V

6"W

6"W

INV.:91.66'

(5379.66' USGS)

INV.:91.66'

(5379.66' USGS)

12"OFD TO DS NOZZLE

LOCATED 12" AFG. RE:

LANDSCAPE DWGS.

33,018 SQFT (3067.5 SQ

METERS)12"OFD12"OFD STACK DN

FROM LEVEL ABOVE.

5' - 7"

PROVIDE PRE-ASSEMBLED

SPOOL PIPE FOR

EMERGENCY FLUID

TRANSFER-STAGE SPOOL

CAP

FLANGE

CO TEE

4"GCO (TWO-WAY)

INV.:87.79'

(5375.79' USGS)

RE: CIVIL DWGS. BY-

PASS TO SANITARY

SEWER HOLDING TANK.

4"V(SAN HOLDING

TANK) INV.:94.0' (5382.0'

USGS) TO SANITARY

SEWER HOLDING TANK.

RE: CIVIL DWGS.

8' - 8"

4"V(SAN HOLDING

TANK) UP TO

LEVEL ABOVE.

4"GCO (TWO-WAY)

INV.:85.46'

(5373.46' USGS)

RE: CIVIL DWGS. BY-

PASS TO SANITARY

SEWER HOLDING TANK.

PROVIDE PRE-ASSEMBLED

SPOOL PIPE FOR

EMERGENCY FLUID

TRANSFER-STAGE SPOOL

CO TEE

KNIFE GATE

VALVE

2' - 2

4' - 0

4"V(SAN HOLDING

TANK) INV.:94.0' (5382.0'

USGS) TO SANITARY

SEWER HOLDING TANK.

RE: CIVIL DWGS.

14' - 0

4"V(SAN HOLDING

TANK) UP TO LEVEL

ABOVE.

INV.:94.0'

(5382.0' USGS)

INV.:94.0'

(5382.0' USGS)

2"V FROM FD AT

CONCOURSE. RE:

CONCOURSE

PLUMBING DWGS.

2"V

831 DFU831 DFU

DFU

DFU

8"SW INV.: 95.6' (RE: 5383.60'

USGS) TO SITE STORM

SEWER. RE: LANDSCAPE &

CIVIL DWGS.

14,471 SQFT (1344.4 SQ

METERS)

4"GCO 1' - 11"

6"W STACK

4"V STACK

4"V STACK

6"W STACK

6"W STACK

4"V STACK

4"W

4"W

4"W

2"W

4"W

2"W

2"W

4"W

2"W

4"W

3"W

3"W

2"W

4"W 2"W

4"W

4"W2"W

3"W 4"W

3"W

2"W

4"W

2"W

4"W

4"W2"W

3"W

6"W

2"W

2"W

2"W

2"W

4"W

2"W

2"W

3"W

4"W

2"W

2"W

3"W

4"W

2"W

4"W

2"W UP

2"W 4"W

2"W 4"W

2"W

4"W

3"W

4"W

3"W

2"W

4"W

2"W UP

2"W4"W

2"W

4"W

4"W

3"W

2"W

4"W

4"W

2"W

4"W

2"

2"W 2"W 4"W

2"W UP

4"W

2"W

2"W

4"W

2"W

4"W

2"W

3"W

2"W2"W

4"W

2"W

2"W UP

4"W

4"W

2"W

4"W 2"W

6"W

4"W6"W

4"W

2"W 4"W

4"W

4"W 2"W

3"W

2"W

2"W

2"W

3"W 4"W 4"W

4"W

2"W

6"W @ 2.04%

3"W

2"W

2"W

3"W (USE CORROSIVE

RESISTANT PIPING)

4"W

2"W

2"V

2"V

3"V

3"V

3"V

2"V

2"V

2"V

2"V

1" GAS VENT FROM

GAS SOLENOID

VALVE. EXTEND TO

ROOF W/ RETURN

BEND & BUGSCRREEN

4"GD DN TO

LEVEL BELOW.4"GD

TO SPINE CENTER

KITCHEN. RE: IBN

PLUMBING DWGS.

3"V

2"V

2"V

2"V

3"V

2"V

2"V

2"V DN

2"V DN

2"V DN

2"W

2"W

3"V

2"V

2"V

2"V

2"V

2"V

8"SW DN FROM

LEVEL ABOVE.

8"SW

3"W

2"W 3"W 4"W

2"PUMPED SW UP

FROM SUMP PUMP

BELOW. EXTEND UP

TO LEVEL ABOVE.

4"W UP FROM

SEWAGE

EJECTOR

BELOW. TIE PUMP

DISCHARGE

INTO TOP OF

WASTE

2"W

4"W

2"W

2"W

4"W

2"W

3"W

2"W

4"W

2"W

2"W

4"W

2"W

2"W

4"W

2"W

2"W

4"W

2"W

3"W

4"W

2"W

2"W

4"W

2"W

2"W

2"W

2"W

2"V

2"W (USE CORROSIVE

RESISTANT PIPING)

2"V

4"W

2"V

8"SW

8"SW & 8"OFD TO DS NOZZLE LOCATED

AFG SWALE. RE: LANDSCAPE DWGS. INV.:

97.7'(5385.70' USGS). 7,300 SQFT (678.2 SQ

METERS)

3"OFD DN

FROM LEVEL

ABOVE.

3"SW DN FROM

LEVEL ABOVE.

3"OFD DN

FROM LEVEL

ABOVE.3"SW DN FROM

LEVEL ABOVE.

3"OFD

3"SW

3"SW

3"OFD

SLEEVE

FOUNDATION WALL

PENETRATION.

CONNECT 8"SW TO

LANDSCAPE AREA

DRAIN. 6050 SQ.FT.

(562.1 SQ. METERS).

RE: CIVIL AND

LANDSCAPE DWGS

FOR EXACT DRAIN

REQUIREMENTS.

8"SW

4"GCO

INV.: 97.87'

(5385.87' USGS)

3"SW TO DS NOZZLE

LOCATED 12" AFG. RE:

LANDSCAPE DWGS.

(INCIDENTAL DECK SW).

3"SW

3"SW UP

TO RD

3"SW

STACK 3"SW

4"V UP FROM

BELOW.

4"V (IW TRAP)

STACK

3"V (SP SUMP)

STACK

4"V (SE SUMP)

STACK

3"GV

3"GV 3"GV

2"GV

2"GV

2"GV

3"GV

2"V

3"V UP FROM

BELOW.

2"V

3/4" INDIRECT

WASTE DN

3/4" INDIRECT WATE DN

TO FLOOR DRAIN WITH

AIR GAP

3/4" INDIRECT

WASTE UP

4"GV STACK

2"GV

3"GV

4”GV

3' 7"

1' 9"

2"GV

3"SW

2"W

2"V

2"PD 2"PD

2"V

KNIFE GATE

VALVE

CAP FLANGE

3"V UP FROM

BELOW.

A

B

C

D

E

F

G

H

J

J

K

K

R1

R2

RH

RG

RF

RE

RD

RC

RB

RA

RJ

A

B

C

D

E

F

G

H

J

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O N

R

ES

D

AT

IB

S

IB

N

EN

C C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E on e ei gh th in ch o ne fo ot

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

1/ /2 :0 8:

P M

Au to de sk D oc s:

//A ur or a C am pu s

VA

D en ve r C ol or ad o/

PL

-IF

O -s he et s.

rv t

04.PL.100.1

SERVICE LEVEL INTERSTITIAL WASTE,

DRAIN AND VENT PIPING PLAN

INPATIENT BUILDING (SOUTH)

08/31/2012

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

1/8" 1'-0"1

SERVICE LEVEL INTERSTITIAL

WASTE, DRAIN AND VENT PIPING

DN

UP

DN

UP

UP

UP

01-SV-C14-E4

ELEC

01-SV-C16-V4

ELEV MACH RM

01-SV-C19-E5

ELEC

01-SV-PGE3

ELEV

01-SV-PGE4

ELEV

01-SV-PGE5

ELEV

01-SV-PGE6

ELEV

01-SV-C15-V3

ELEV MACH RM

01-SV-A10-V7

CORRIDOR

01-SV-C19-M1

MECH

01-SV-C17-M1

MECH

01-SV-C15-P1

PIPE SPACE HS-112

CONDENSATE

LIFT / STORM &

SAN

04-SV-A2-H3

HS-117

ELEC

04-SV-C3-E2 HS-119

DATA /

TELECOMM

04-SV-C3-T2

HE-S02

ELEV

04-SV-SE4

HE-S01

ELEV

04-SV-SE3

HS-147

ELEC

04-SV-F3-E1

HS-100D

ELEV MACH RM

04-SV-A1-V17

HE-S03

ELEV

04-SV-SE17

HE-P01

ELEV

04-SV-PE3

HE-P02

ELEV

04-SV-PE4

HS-127

CHUTE

04-SV-D3-H1

HS-ST1

STAIR

04-SV-ST1

HS-ST2

STAIR

04-SV-ST2

04-SV-V2

VEST

03-SV-PE6

ELEV

HS-126

FOOD PREP

04-SV-C2-01

04-SV-F3-05

BIOMED REPAIR

HS-100

RECEIVING

04-SV-A1-03

HS-152

OFFICE

04-SV-F1-03

HS-105

AUTOPSY

04-SV-B3-04

HS-109

ISO/AUTOPSY

04-SV-B3-01

HS-107A

STAFF TLT

04-SV-B3-03

HS-113

RECEIVING

04-SV-B3-05

HS-157

STAFF

LOUNGE/LOCKERS

04-SV-G3-04

04-SV-C3-01

OFFICE

HS-121

OFFICE

04-SV-C3-03

HS-115

OFFICE

04-SV-C3-02

04-SV-G1-06

STAFF TLT

HS-111

MORTUARY REFR

04-SV-A3-01

HS-149C

BIOMED STOR

04-SV-G3-02

HS-149B

RECEIVING/CLEANING

04-SV-G3-01

HS-149A

OFFICE

04-SV-F3-02

HS-125

STOR

04-SV-D3-03

04-SV-C3-06

CLEAN LINEN

HOLD

04-SV-C3-05

CLEAN LINEN

CART STOR

HS-131

DISTRIBUTION/DISPATCH

04-SV-E3-02

04-SV-E3-04

SUPPLY STOR

HS-133

UNIFORM

04-SV-E3-01

04-SV-E3-03

LINEN STOR

HS-123

CLEAN LINEN

DISTRIBUTION

04-SV-C3-04

04-SV-E3-05

OFFICE

04-SV-H1-04

FEMALE

TLT/SHOWER

HS-100A

NON-FOOD STOR

04-SV-A2-01

HS-100B

DRY FOOD STOR

04-SV-A1-02

HS-124A

REFR AND

FROZEN FOOD

STOR

04-SV-B2-01

HS-124C

BLAST CHILLED

FOOD STOR

04-SV-B1-02

HS-124

NOURISH

04-SV-C1-01

04-SV-D1-01

TRAY ASSEMBLY

04-SV-D1-03

TRAY CART

CLEAN

HS-130

POT WASH 2

04-SV-D1-02

04-SV-E1-01

POT WASH 1

HS-132B

CART WASH

04-SV-E2-01

HS-132

DISHWASH

04-SV-E1-03

04-SV-E2-03

HAZ SUPPLIES

STOR

HS-132A

HAC

04-SV-E2-02

04-SV-A1-04

RECYCLING

HS-150

CONF

04-SV-G1-01

HS-148D

OFFICE

04-SV-F1-04

HS-148B

OFFICE

04-SV-F1-09

HS-154

OFFICE

04-SV-F1-02

HS-126A

COMMUNICATIONS/FOOD

SERVICE

04-SV-D2-01

HS-148A

SECR/WAIT

04-SV-F2-02

04-SV-E3-08

OFFICE

04-SV-E3-10

OFFICE

04-SV-E3-07

OFFICE

HS-143

OFFICE

04-SV-E3-06

HS-124D

BLAST CHILLED

FOOD STOR

04-SV-B1-01

HS-139

OFFICE

04-SV-E3-11

HS-141

OFFICE

04-SV-E3-09

HS-135

SECR/WAIT

04-SV-E3-13

04-SV-F3-04

BED REPAIR

SHOP

HS-149

ELECTRONICS

04-SV-F3-03

HS-129

HAC

04-SV-D3-01

04-SV-F1-06

OFFICE04-SV-F1-05

OFFICE

HS-130B

CLEANING

SUPPLY STOR

04-SV-E1-02

04-SV-G1-07

MALE

TLT/SHOWER

04-SV-F1-01

OFFICE

04-SV-H1-06

LOCKERS

04-SV-G1-03

LOCKERS

04-SV-H1-05

STAFF LOCKERS

04-SV-G3-03

STAFF LOUNGE

04-SV-H1-03

STAFF TLT04-SV-G1-05

STAFF TLT

04-SV-H1-02

STAFF TLT

HS-156

STAFF

LOUNGE/LOCKERS

04-SV-G1-02

HS-101

HAC

04-SV-A3-03

04-SV-H3-01

STAFF LOUNGE

HS-134

WASTE PULPER

04-SV-F2-01

HS-130A

STAFF TLT

04-SV-D2-02

HS-158

FEMALE

TLT/SHOWER

04-SV-H1-01

04-SV-G1-04

MALE

TLT/SHOWER

FINISHED FLOOR

ELEVATION 80.0'

(5368.0' USGS)

FINISHED FLOOR

ELEVATION 80.0'

(5368.0' USGS)

2"FD TYPE S

WITH HALF

GRATE

4"FCO

4"PUMPED W UP

FROM SEWAGE

EJECTOR BELOW.

2"PUMPED SW UP

FROM SUMP PUMP

BELOW.

3"FD

TYPE C

2"FD TYPE S

WITH HALF

GRATE

4"FD

TYPE J

2"FD

TYPE C

2"FD

TYPE C

2"FD TYPE R

W/ HALF

GRATE

3"FD

TYPE J

2"FD

TYPE

C

2"FD

TYPE

C

2"FD

TYPE

C

3"FD

TYPE J

4"FD

TYPE

C

COORDINATE EXACT

LOCATION OF

CONNECTIONS WITH

EQUIPMENT PROVIDER.

P-419

P-401

P-419

P-502

P-707

P-701

P-708

P-502

P-502

P-528

P-608

P-402

P-402

P-402P-402

P-402

P-402

P-402

P-102 P-102

P-102 P-102

P-201

P-202

P-201

P-101 P-102

P-101

P-701

P-701

P-701

P-701

P-701

P-201

2"FD

TYPE C

2"FD

TYPE C

2"FD

TYPE C

2"FD

TYPE C

2"FD

TYPE C

2"FD

TYPE C

2"FD TYPE C,

TYPICAL AT

P-701

2"FD

TYPE C

2"FD

TYPE C

2"FD

TYPE C

2"FD

TYPE C

2"FD

TYPE C

2"FD

TYPE C

2"FD

TYPE C

P-401

2"V

3"V UP

3"V

4"FD

TYPE S

(HALF

GRATE)

4"FD

TYPE S

(HALF GRATE)

4"FD

TYPE S

(HALF GRATE)

4"FD

TYPE S

(HALF GRATE)

4"FD

TYPE S

(HALF GRATE)

4"FD

TYPE S

(HALF GRATE)

4"GD UP TO LEVEL

ABOVE TO SPINE

CENTER KITCHEN.

2"V

2"V UP

2"V UP

2"V UP

3"V

DN

3"V DN

3"V DN

2"V UP

3"FD

TYPE C

3"FD

TYPE C

3"FD

TYPE C

3"FD

TYPE C

3"FD

TYPE C

3"FD

TYPE C

3"FD

TYPE C

3"FD

TYPE C

3"FD

TYPE C

3"FD

TYPE C

3"FD

TYPE C

3"FD

TYPE C

3"FD

TYPE C

3"FD

TYPE C

TP-1 TRAP PRIMER

EXTEND 1/2" TRAP

PRIMER LINE TO EACH FD

TP-1 TRAP PRIMER

EXTEND 1/2" TRAP

PRIMER LINE TO EACH FD

TP-1 TRAP PRIMER

(UNDER COUNTER)

EXTEND 1/2" TRAP

PRIMER LINE TO EACH FD

TP-1 TRAP PRIMER

(UNDERCOUNTER)

EXTEND 1/2" TRAP

PRIMER LINE TO EACH FD

TP-1 TRAP PRIMER

(UNDER COUNTER)

EXTEND 1/2" TRAP

PRIMER LINE TO EACH FD

2"V

4"FD TYPE I W/

HALF GRATE

2"V UP FROM

BELOW FLOOR

W/ WCO.

4"FCO

4"FCO

4"FCO

4"FCO

2"FD

TYPE C

4"FCO

4"FCO

P-419

3"FD TYPE I

AT BOTTOM OF

RECESSED

SLAB

4"V STACK

3"V STACK

P-101

2"FD

TYPE R4"FCO

P-101

3/4" INDIRECT

WASTE DN TO

FLOOR DRAIN WITH

AIR GAP

3/4" INDIRECT

WASTE DN TO

FLOOR DRAIN

WITH AIR GAP

3/4" INDIRECT

WASTE UP

4"FD

TYPE S

(HALF

GRATE)

2"FD

TYPE C

3"WCO

2"W & 2" ISLAND

VENT TO

AUTOPSY TABLE.

RE DETAIL.

SI-1

SI-1

SI-1

2"GV

FROM

BELOW

ENLARGE

COLUMN

ENCLOSURE FOR

PIPING

ROUTE WASTE AND

VENT PIPING EXPOSED

ON WALL FOR MOP

SINK

2"GW/G

V UP

AND DN

IN WALL

2"GV

FROM

BELOW

IW

EVAPORATOR

SECTION OF

REFRIGERATOR

3/4"

2" FD

TYPE S

2" FD

TYPE S

P-802

A

B

C

D

E

F 04

G

H

J

J

K

K

R1

R2

RH

RG

RF

RE

RD

RC

RB

RA

RJ

A

D

C

E

D

D

C

C

E

E

E.5

E.5

20 01

D

D

C

C

E

E

E.5

E.5

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R

ES

D

AT

IB

S

IB

N

EN

C

C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/

/2

5:

:4

PM

C :\U se rs

\C

AD

U se r 2 \D oc um en ts

\P L-

IF

O

-s he et s_ ch ar lo tte

.b la ck w oo d.

rv t

04-PL-100

SERVICE LEVEL WASTE, DRAIN AND

VENT PIPING PLAN

INPATIENT BUILDING (SOUTH)

08/31/2012

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

1/8" = 1'-0"1

SERVICE LEVEL WASTE, DRAIN

AND VENT PIPING PLAN

UP

UP DN

UP

UP DN

HSU-101

VEST

04-SV1-V1

HSU-102

VEST

04-SV1-V2

HSU-ST2

STAIR

04-SV1-ST2

HE-S01

ELEV

04-SV1-SE3

HE-S02

ELEV

04-SV1-SE4HE-P02

ELEV

04-SV1-PE4

HE-P01

ELEV

04-SV1-PE3

HSU-ST1

STAIR

04-SV1-ST1

HE-S03

ELEV

04-SV1-SE17

HSU-100

MECH

04-SV1-A1-M1

5"DCW, 3"DHW,

2"DHWR

SUBMETERS

2"DHWR RISER

3"DHW RISER

5"DCW RISER

2 1/2"O2 RISER

1"MA RISER

PIPING

EXTENDED

FROM MAINS AT

CONCOURSE

SERVICE LEVEL.

P-801

2 1/2"DCW

5"DCW

5"DCW

P-804

P-804

3/4"DCW

3/4"DCW

CONTROL PANEL FOR SANITARY

SEWER HOLDING TANK. PROVIDE

ULTRASONIC TANK LEVEL

INDICATOR. PROVIDE RELAY OUTPUT

TO BUILDING AUTOMATION SYSTEM.

RE: CIVIL DWGS.

CONTROL PANEL FOR SANITARY

SEWER HOLDING TANK. PROVIDE

ULTRASONIC TANK LEVEL INDICATOR.

PROVIDE RELAY OUTPUT TO BUILDING

AUTOMATION SYSTEM. RE: CIVIL

DWGS.

EXTEND 3/4"CA TO SANITARY

SEWER HOLDING TANK. RE: CIVIL

DRAWINGS.

3/4"CA

3/4"CA TO CONNECTION FOR

TEMPORARY CA

HOSE/COMPRESSOR.

EXTEND 3/4"CA TO SANITARY

SEWER HOLDING TANK. RE: CIVIL

DRAWINGS.

3/4"CA TO CONNECTION FOR

TEMPORARY CA

HOSE/COMPRESSOR.

3/4"CA

2 1/2"O2

1"IA TO CEILING

MOUNTED

HOSEREEL.

3/4"O2

1"O2

1"O2

3/4"O2

1"O2

1"O2

3/4"MA

1"MA

1"MA 3/4"MA

1"MA

1"MV

1 1/2"MV

2"MV

1"MV

3/4"O2, 3/4"MA, 1"MV

DN TO CEILING MTD

OUTLET, TYPICAL OF 4.

2"MV

1"MA

2"MV

1"O2

1"MA

2"MV

1"O2

1"MA

2"MV

3/4"MV DN TO

LEVEL BELOW.

3/4"MV DN TO

LEVEL BELOW.

3/4"MV 3/4"MV

1"MV

1"O2

1"MA

2"MV

2 1/2"O2

3/4"

3/4"

3/4"DHW/DCW DN

3/4"

1/2"

2" 1"

2" 1/2"

2" 1"

2 1/2"DHW

1"DHWR

3"DCW

3/4"DHWR

1 1/4"DHW

2"DCW

1"DHWR

1"DHW

2"DCW

3/4"DHWR

1"DHW

2"DCW

3/4"DHWR

1 1/2"DHW

2 1/2"DCW

2"

2 1/2"DCW

1 1/2"DHW

1"DHWR

1 1/2"DHW

2 1/2"DCW

3/4"CW DN COLUMN

TO ICE/WATER

DISPENSER AND

REFRIGERATOR

3/4"

1/2"

1"

3/4"

1/2"

1-1/2"

3/4"

1/2"

2-1/2"NG, 1"HW/CW

DN IN WALL, ROUTE

PIPING RACKED

VERTICALLY ON

WALL, UNDER

COUNTER, TO BE

COVERED WITH

STANLESS STEEL

JACKETING

EMERGENCY SOLENOID

SHUT OFF VALVE

2-1/2"NG(2PSI) 2-1/2"NG

1-1/2"NG(2PSI)

3/4" IA

CONNECT 1/2"

IA DROP TO

PNEUMATIC

DOORS.

SEE MFG. TYP.

3/4"IA

RISER

1/2" IA

1 1/4"IA

MV MA

O

O M

A M

V O

M A

M V

IA

MV

IA

O

IA

MVMA O

M V

M A

O

MV MAO

MV MAO

M A

M V O

BALANCE

TO 0.5 GPM

1-1/4" DCW/

DHW

1"DCW/DHW

DN WALL TO

FIXTURES

1-1/4

BALANCE

TO 0.5 GPM

O MA MV

BALANCE

TO 1.0 GPM

3/4"DHWR

1"

3/4"

IA

3"DCW

3"DCW

1"DHWR

1"DHWR

2 1/2"DHW

3"DCW

1 1/2"DHW

2"DHW

2"DHW2"DHW

2"DHW

2"DHW

BALANCE TO

0.5 GPM

3/4"DHWR

1 1/4"DHW

2"DCW

3/4"DHWR

2"DCW

1"DHW

1"DCW

1"DHWR

2"DHWR

1"DHW

1"DHW

1"DHWR

2"DCW

2"DCW2 1/2"DCW

1 1/4"DHW

1 1/2"DHW

1 1/2"DHW

3/4"

3/4"

2 1/2"MV RISER

1 1/2"NG (2 PSI)

2 1/2"NG (2PSI)

SUBMETER

2 1/2"NG (2 PSI)

IA

1 1/4"IA

1 1/4"IA

PROVIDE 2" SLEEVE THROUGH

TUNNEL FOUNDATION WALL

FOR IRRIGATION PIPING SUPPLY

TO COURTYARD. COORDINATE

W/ LANDSCAPE & IRRIGATION

DWGS.

4'

2"

CL OF

PENTRATION 97.83'

(5385.83' USGS)

3/4"DCW

1/2"

3/4"DCW

SET PRV TO

30 PSI.

3/4"DCW UP TO

YARD HYDRANT

3/4"DCW UP TO

YARD HYDRANT3/4"DCW

3/4"DCW

2-1/2"NG, 1-1/2"HW/CW,

2"V DN NEXT TO

CINDERBLOCK WALL,

TO BE COVERED WITH

STANLESS STEEL

ENCLOSURE, ROUTE

PIPING HORIZONTALLY

ACROSS TOP OF LOW

WALL WITH ANOTHER

STANLESS STEEL

ENCLOSURE.

2"V, 1/2"HW/CW

DN IN WALL

2"V, 3/4"HW/CW DN

ON WALL, TO BE

COVERED WITH

STANLESS STEEL

ENCLOSURE

1 1/2"

1/2"

2"V,3/4"HW/CW DN

ON WALL, TO BE

EXPOSED

3/4"HW DN

ON WALL,

TO BE

EXPOSED

2"V, 1-1/2"HW/CW

3/4"HWC DN ON WALL,

TO BE COVERED WITH

STANLESS STEEL

ENCLOSURE

1/2"IA

1/2"IA

1/2"IA

1/2"IA

1/2"

3/4"

3/4"MV

RZBFP

MA MA MA

1-1/4"IA

1"IA

1"IA

3/4"IA

A

B

C

D

E

F 04

G H

J

J

K

K

R1

R2

RH

RG

RF

RE

RD

RC

RB

RA

N16.1

RJ

RJ

A

B

C

D

E

F

G

H 03

J

D

C

E

D

D

C

C

E

E

E.5

E.5

20 01

D

D

C

C

E

E

E.5

E.5

N16.1

N16.1

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R

ES

D

AT

IB

S

IB

N

EN

C

C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/

/2

5:

:2

PM

C :\U se rs

\C

AD

U se r 2 \D oc um en ts

\P L-

IF

O

-s he et s_ ch ar lo tte

.b la ck w oo d.

rv t

04-PP-100-1

SERVICE LEVEL INTERSTITIAL

PLUMBING PIPING PLAN

INPATIENT BUILDING (SOUTH)

08/31/2012

1/8" = 1'-0"1

SERVICE LEVEL INTERSTITIAL

PLUMBING PIPING PLAN

0' 4' 8' 16' 32'0' 4' 8' 16' 32'

NORTH

UP

UP DN

DN

H1U-101

VEST

04-11-V1

H1U-ST1

STAIR

04-11-ST1

HE-P02

ELEV

04-11-PE4

HE-P01

ELEV

04-11-PE3

HE-S03

ELEV

04-11-SE17

HE-S02

ELEV

04-11-SE4

HE-S01

ELEV

04-11-SE3

H1U-ST2

STAIR

04-11-ST2

H1U-102

VEST

04-11-V2

H1U-100

MECH

04-11-A1-M1

3"DCW

2 1/2"DHW

1 1/2"DHWR

3"MV

1 1/4"MA

1 1/4"O2

2"DHWR RISER

3"DHW RISER

5"DCW RISER

2 1/2"O2 RISER

2 1/2"MA RISER.

2 1/2"MV UP FROM

LEVEL BELOW.

EXTEND 4”MV UP TO

LEVEL ABOVE.

O

MA

MV

MV

O

MV

INTERSTITIAL

ACCESS WALKWAY

INTERSTITIAL

ACCESS WALKWAY

O MA MV

O MA MV MV MA O

MV MA O

O

3/4"O2, 3/4"MA, &

1 1/4"MV DN TO

LEVEL BELOW.

MA O

MVMV MAO

3/4"O2, 3/4"MA, &

1 1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA, &

1 1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA, &

1 1/4"MV DN TO

LEVEL BELOW.

1/2"O2, 3/4"MA, &

1"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA, &

1 1/4"MV DN TO

LEVEL BELOW.

1/2"O2, 3/4"MA, &

1"MV DN TO

LEVEL BELOW.

1/2"O2, 3/4"MA,

1"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA, &

1 1/4"MV DN TO

LEVEL BELOW.

OMA

1/2"O2, 3/4"MA, &

1"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA, &

1 1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA, &

1 1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA, &

1 1/4"MV DN TO

LEVEL BELOW.

3/4"O2, 3/4"MA, &

1 1/4"MV DN TO

LEVEL BELOW.

MV MA O

MV MA O

3/4"O23/4"O2

3/4"O21/2"O2

3/4"O2

3/4"O2

3/4"O2

3/4"O2

3/4"O2 1/2"O2

3/4"O2

3/4"O2

3/4"O2

3/4"O21"O2

1 1/4"O2

1 1/4"MA

3"MV

3/4"MA

3/4"MA

3/4"MA3/4"MA

3/4"MA3/4"MA3/4"MA

3/4"MA

3/4"MA

3/4"MA1"MA

1 1/4"MV

1 1/2"MV

1 1/2"MV

1"MV

1 1/4"MV

1 1/2"MV 1"MV

2"MV

1 1/4"MV1 1/2"MV

1 1/2"MV1"MV1 1/4"MV

1 1/2"MV

2"MV

2 1/2"MV

M A

3/4"DCW

/DHW

2"

2"DCW

1 1/2"DHWR

2 1/2"DHW

3"DCW

3/4" 2"

2"

3/4" 3/4" 2" 3/4"

3/4"

3"DCW

2 1/2"DHW

1 1/2"DHWR

2"DCW

1 1/4"DHW

1"DHWR

1"DCW

1"DHW

3/4"DHWR

3"DCW

2"DHW

1 1/2"DHWR

3"DCW

1 1/2"DHW

1 1/4"DHWR3/4"

3/4"

3/4"

3/4"

3/4"

3/4"

2 1/2" 3/4"

3/4"

2"

3/4"

3/4"3/4"

3/4"

3/4"H/C

3/4"

1"

2" 1"

1"

2" 1"

2" 1"

1" 2"

2"

1" 2"

2" 1"

2"

1" 2"

2" 1"

3/4"

2 1/2" DN

2 1/2" 1"

2" 1"

2" 1"

3/4"

2" 1"

2" 1"1"

2"2"

1" 1"1"2"

2" 1"

2" 1"

3"DCW

1 1/4"DHW

1"DHWR

2 1/2"DCW

1 1/2"DHW

1"DHWR

2"

2"

3"DCW

2"DHW

1 1/4"DHWR

3"DCW

2"DHW

1 1/2"DHWR

2"DCW

2"DHW

3/4"DHWR

1 1/2"NG(2PSI) UP

FROM LEVEL BELOW.

1/2"NG(2PSI

3/4" IA

CONNECT 1/2" IA

DROP TO

PNEUMATIC

DOORS. SEE MFG.

TYP.

3/4"IA

RISER

1/2" IA

3/4"DCW

3/4"

3/4"

M

VO

BALANCE TO 0.5 GPM

BALANCE TO

0.5 GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 1.0 GPM

M V

M A

MV MAO

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

O

MV

MA

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 1.0 GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5

GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5

GPM

BALANCE

TO 0.5

GPM

BALANCE

TO 0.5

GPM

LOCATE BRANCH PIPING & VALVING TO PATIENT

RMS IN INTERSTITIAL SPACE EXCLUDING PIPING

BELOW INTERSTITIAL ACCESS WALKWAY. SHOWN

OFFSET FOR CLARITY. TYP. ALL PATIENT RMS.

BALANCE TO

0.5 GPM

BALANCE TO

0.5 GPM

BALANCE

TO 0.5

GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPMBALANCE

TO 0.5 GPM

2 1/2"DCW

2"DCW

2 1/2"DCW

3"DCW

3"DCW 1"DHW

1 1/4"DHW

1 1/4"DHW

1 1/2"DHW

2"DHW

3/4"DHWR

1"DHWR

1 1/4"

DHWR

1"DHWR

1 1/2"

DHWR

1 1/4"

1 1/4"DHWR

1 1/2"

BALANCE

TO 1.0 GPM

3/4"DHWR

BALANCE

TO 0.5

GPM

1"DHWR

1"DHW

1"DHW

1"DCW

2"DCW

3/4"DHWR

BALANCE TO

0.5 GPM

BALANCE TO

0.5 GPM

BALANCE TO

0.5 GPM 3/4"

3/4"

BALANCE TO

0.5 GPM

BALANCE

TO 0.5 GPM

3/4"DHWR

1"DHWR

1 1/4"DHWR

1"DHWR

1 1/2"DHWR

1 1/2"DHWR

1 1/2"DHWR

1"DHW

1 1/4"

1 1/4"DHW

2”

1 1/2”DHW

2 1/2”DHW

2 1/2”DHW

2 1/2”DCW

3/4”DCW

MV

MV

MA

O

3/4"MA

1/2"O2

2"MV

3/4"MA

3/4"O2

1"O2

1"MA

2 1/2"MV O MA MV

O M

A M

V

1 1/2"MV

3/4"O2

3/4"MA

2"MV

3/4"O23/4"MA

2"MV

M A

O M

V2 1/2"MV

1"MA

1"O2

3/4"O2

3/4"MA

2"MV

2"MV

3/4"

3/4"MA

3/4"MA

3/4"MA

3/4"MA

OMA

2"MV

3/4"MA

3/4"O2

2"MV

3/4"MA

3/4"O2

O MA MV

3/4"DCW

RE: IBN PLUMBING

PLANS FOR

CONTINUATION.

1"DCW

1"DHW

1/2"DHWR

3/4" 1 1/4"

3/4"DCW

A

B

C

D

E

F 04

G

H

J

J

K

K

R1

R2

RH

RG

RF

RE

RD

RC

RB

RA

N16.1

RJ

A

B

C

D

E

F

G

H 03

J

B

D

C

E

D

D

C

C

E

E

E.5

E.5

20 01

B

B

D

D

C

C

E

E

E.5

E.5

N16.1

N16.1

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R

ES

D

AT

IB

S

IB

N

EN

C

C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/

/2

5:

:2

PM

C :\U se rs

\C

AD

U se r 2 \D oc um en ts

\P L-

IF

O

-s he et s_ ch ar lo tte

.b la ck w oo d.

rv t

04-PP-101-1

LEVEL 1 INTERSTITIAL PLUMBING

PIPING PLAN

INPATIENT BUILDING (SOUTH)

08/31/2012

1/8" = 1'-0"1

LEVEL 1 INTERSTITIAL

PLUMBING PIPING PLAN

UP DN

UP DN

H2U-101

VEST

04-21-V1

H2U-ST2

STAIR

04-21-ST2

H2U-102

VEST

04-21-V2

HE-S02

ELEV

04-21-SE4

HE-S01

ELEV

04-21-SE3

HE-P01

ELEV

04-21-PE3

HE-P02

ELEV

04-21-PE4

H2U-ST1

STAIR

04-21-ST1

H2U-100

MECH

04-21-A1-M13"DCW

2 1/2"DHW

1 1/4"DHWR

2 1/2"MV

3/4"O2

2"DHWR

RISER3"DHW RISER

5"DCW RISER

2 1/2"O2 RISER

2 1/2"MA RISER

4"MV RISER O

MV

O

O

MV

MVO

M V

O

INTERSTITIAL

ACCESS WALKWAY

INTERSTITIAL

ACCESS WALKWAY

MV

O

3/4"O2

1"MV

1"MV

3/4"O2

3/4"O2

1"MV

MV

O

3/4"O2

1"MV

1"MV

3/4"O23/4"O2

1"MV

1"MV

3/4"O2

1"MV

3/4"O2

1"MV

3/4"O2

O

1"MV

3/4"O2

2"MV & 3/4"O2

VALVED & CAPPED

FOR FUTURE.

2"MV & 3/4"

O2 VALVED &

CAPPED FOR

FUTURE.

1"MA VALVED

& CAPPED FOR

FUTURE.

O M

V

3/4"O2

1"MV

M V

O

O MV

O MV

O MV

O M

V

O O O

3/4"O2

1 1/4"MV

3/4"O2

1 1/4"MV

3/4"O2

1"MV

3/4"O2

1 1/4"MV

3/4"O2

1 1/4"MV

3/4"O2

1"MV

3/4"O2

1"MV

3/4"O2

3/4"O2

3/4"O2

1"MV

3/4"O2

1 1/4"MV

3/4"O2

3/4"O2

1 1/4"MV

3/4"O2

1 1/4"MV

3/4"O2

1 1/4"MV

3/4"O2

3/4"O2

2"MV3/4"O2

1 1/4"MV

1 1/2"MV

1 1/4"MV

2"MV

2"MV

2"MV

2"MV

2 1/2"

3"DCW

2"DHW

1 1/4"DHWR

3"DCW

1 1/2"DHW

1"DHWR

2 1/2"DCW

1"DHW

1"DHWR

3/4"

2 1/2"

3/4"

3/4"

2"

3/4"

3/4"

2 1/2"

3/4"

2"

3/4"

2"

3/4"

3/4"

2 1/2"

3/4"

3/4"

3/4"

2"

2"2 1/2"

3/4"

3/4" 3/4"

3/4"

2 1/2"

3/4"

2"

3/4"

2 1/2"

3/4"3/4"

2 1/2"

3/4"

3/4"

2 1/2"

3/4"

2"

2"

2" 1"

3/4"

1/2" 1"

2 1/2"

3/4"

3/4" 3/4"

1/2"

3"DCW

1 1/2"DHW

1"DHWR

3"DCW

2"DHW

1 1/4"DHWR

3"DCW

2"DHW

1"DHWR

1" 1"

1/2"

3/4" IA

CONNECT 1/2" IA

DROP TO

PNEUMATIC

DOORS. SEE

MFG. TYP.

3/4"IA

RISER

1/2" IA

MV MV

O M

V

MV

O

O

MV

BALANCE TO

0.5 GPM

BALANCE TO

0.5 GPM BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

RE: DETAIL

RE: DETAIL

O M

V

RE: DETAIL

RE: DETAIL

BALANCE TO 0.5 GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5

GPM

BALANCE TO 0.5 GPM

2-1/2"DCW, 1"DHW, 3/4"DHWR

2-1/2"DCW, 1"DHW

2"DCW DN

WALL TO

FIXTURES

1"DCW,

1"DHW

BALANCE

TO 0.5

GPM

3/4"

2" 3/4"

3/4"O2

1 1/4"MV

MV

M V

O

2"

1"

LOCATE BRANCH PIPING & VALVING TO PATIENT

RMS IN INTERSTITIAL SPACE EXCLUDING PIPING

BELOW INTERSTITIAL ACCESS WALKWAY. SHOWN

OFFSET FOR CLARITY. TYP. ALL PATIENT RMS.

2”DCW

2 1/2”DCW BALANCE

TO 0.5 GPM

1/2”DHWR

3/4”DHWR

1”DHWR 1”DHWR

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

1 1/4”DHWR

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

1 1/4”DHWR

3/4”DHWR

1”DHWR

1”DHWR

1 1/4”DHWR

3”DCW

2”DCW 3”DCW

1”DHWR

1”DHW

1 1/4”DHW

1 1/4”DHW

1 1/2”DHW1 1/2”DHW2”DHW

1”DHW

1 1/4”DHW

2”DHW 2”DHW

BALANCE

TO 0.5 GPM

BALANCE

TO 0.5 GPM

2”

BALANCE TO

0.5 GPM

2"DCW

1"DHW

3/4"DHWR

BALANCE TO

0.5 GPM

BALANCE

TO 0.5 GPM

BALANCE TO

0.5 GPM

BALANCE TO

0.5 GPM

BALANCE TO

0.5 GPM

BALANCE TO

0.5 GPM

BALANCE TO

0.5 GPM

BALANCE TO

0.5 GPM

3"DCW

3"DCW

3"DCW

2 1/2"DHW

1 1/4"

DHWR

1 1/4"DHW

1 1/2"DHW

1 1/2"DHW

2"2"DHW

2"

3/4"DHWR

1"DHWR

1 1/4"DHWR

1 1/4"DHWR

2"DHW

1"MA DN FROM

LEVEL ABOVE.

3"MV UP TO

LEVEL ABOVE.

3"MV & 1"MA TO

CON. RE: CON

PLUMBING

PLANS.

MV

3/4"O2

1"MV

1/2"O2

3/4"MV

1/2"DCW,

1/2"DHW

A

B

C

D

E

F 04

G

H

J

J

K

K

R1

R2

RH

RG

RF

RE

RD

RC

RB

RA

N16.1

RJ

A

B

C

D

E

F

G

H 03

J

D

C

E

D

D

C

C

E

E

E.5

E.5

20 01

B

B

D

D

C

C

E

E

E.5

E.5

N16.1

N16.1

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R

ES

D

AT

IB

S

IB

N

EN

C

C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/

/2

5:

:2

PM

C :\U se rs

\C

AD

U se r 2 \D oc um en ts

\P L-

IF

O

-s he et s_ ch ar lo tte

.b la ck w oo d.

rv t

04-PP-102-1

LEVEL 2 INTERSTITIAL PLUMBING

PIPING PLAN

INPATIENT BUILDING (SOUTH)

08/31/2012

1/8" = 1'-0"1

LEVEL 2 INTERSTITIAL

PLUMBING PIPING PLAN

UP DN

UP

H3U-101

VEST

04-31-V1

H3U-ST2

STAIR

04-31-ST2

H3U-102

VEST

04-31-V2

HE-S01

ELEV

04-31-SE3

HE-S02

ELEV

04-31-SE4

HE-P01

ELEV

04-31-PE3

HE-P02

ELEV

04-31-PE4

H3U-ST1

STAIR

04-31-ST1

H3U-100

MECH

04-31-A1-M1

04-31-V3

VEST

03-31-PE6

ELEV

3"DCW

2 1/2"DHW

1 1/4"DHWR

4"MV

2 1/2"MA

2 1/2"O2

1 1/4"DHWR RISER

2 1/2"DHW RISER

3"DCW RISER

2 1/2"O2 RISER

2 1/2"MA RISER

4"MV RISER

MV

MV

OMA

MV

O

MAMV

MV MAO

MV

MA

O

MV MA

O

INTERSTITIAL

ACCESS WALKWAY

INTERSTITIAL

ACCESS WALKWAY

O O

M A

M A

M V

M V

M A

O

1"MV

1/2"MA

1/2"O2

1 1/2" 1"

3/4"

1 1/2" 1"

3/4"

1 1/2"MV

1"

MA1"O2

1" 3/4" 1/2"

1 1/2" 1"

3/4"

1"MV

3/4"MA

1/2"O2

1 1/2" 1" 3/4"

1 1/2" 1"

3/4"

1 1/2" 1"

3/4"

1 1/2" 1"

3/4"

1 1/2" 1"

3/4"

MV MA O

1 1/2" 1"

3/4"

1 1/2" 1"

3/4"

1" 3/4" 1/2"

MA

MV MA O

1 1/2" 1"

3/4"

2"MV

2"MV

2 1/2"MV

2 1/2"MV

2 1/2"MV

2"MV2 1/2"MV2 1/2"MV

2 1/2"MV

2 1/2"MV

2 1/2"MV

2"MV2 1/2"MV

2"MV

2 1/2"MV

1 1/2" 1"

3/4"

2 1/2"MV

2 1/2"MV

2 1/2"MV

3"MV

3"MV

MV MA O MV MA O

MV MA O

1"MA

1 1/4"MA

1 1/4"MA

1 1/2"MA

1 1/2"MA

O MA

2 1/2"MV

1 1/2"MA

1”MA

1 1/4”MA

1 1/4”MA

1 1/2”MA

2”MA

2”MA

1 1/4”MA1 1/4”MA1 1/2”MA

1 1/2”MA

1 1/2”MA

1 1/2”MA

1 1/4”MA1 1/4”MA

2”MA

1”O2

1”O2

1 1/4"O2

1 1/4"O2

1 1/4"O2

1 1/4"O2

1 1/2"O21 1/4"O2

1 1/4"O2

1 1/2"O2

1"O21 1/4"O21 1/4"O2 1 1/4"O2

1 1/4"O2

1 1/4"O2 1"O2

1 1/4"O2

1 1/2"O2

2"O2

PROVIDE 2 1/2"MV, 1

1/2"MA, & 1 1/4" O2

VALVED & CAPPED FOR

FUTURE.

PROVIDE 2 1/2"MV, 1

1/2"MA, & 1 1/4" O2

VALVED & CAPPED FOR

FUTURE.

1 1/4"MA

3/4"O2

1"O2

1 1/2"O2

1 1/2"MA

3/4" IA

CONNECT 1/2" IA

DROP TO PNEUMATIC

DOORS. SEE MFG.

TYP.

3/4"IA

RISER

1/2" IA

3/4"RPBFP

ROUTE 3/4"

DRAIN TO P-502

DROP 1/2"DCW

DN TO P-810

DROP 1/2"DCW

DN TO P-810

DROP 1/2"DCW

DN TO P-810

DROP 1/2"DCW

DN TO P-810

DROP 1/2"DCW

DN TO P-810

3/4"

3/4"

3/4"

3/4"

DROP 1/2"DCW

DN TO P-810

DROP 1/2"DCW

DN TO P-810

3/4"

3/4"

DROP 1/2"DCW

DN TO P-810

DROP 1/2"DCW

DN TO P-810

3/4"

3/4"

DROP 1/2"DCW

DN TO P-810

3/4"

DROP 1/2"DCW

DN TO P-810

DROP 1/2"DCW

DN TO P-810

3/4"

DROP 1/2"DCW

DN TO P-810

3/4"

DROP 1/2"DCW

DN TO P-810

3/4"

DROP 1/2"DCW

DN TO P-810

3/4"

1/2"

DROP 1/2"DCW

DN TO P-810

DROP 3/4"DCW

DN TO P-804

AREA ALARM SENSOR

EACH GAS. RE: DETAIL,

TYP.

RE: DETAIL

MV MAO

BALANCE

TO 1.0 GPM

2"DCW /

1/2"DHW DN

3/4"DCW/

DHW DN

3/4"DCW/

DHW DN

1/2"DCW/

DHW DN2"DCW

DN

1/2"DCW/

DHW DN

3/4"CW/

HW DN

1/2"DCW/

DHW DN

2"DCW

DN

3/4"DCW/

DHW/

DHWR DN

1"CW/H

W DN

1/2"DCW/

DHW DN

3/4"DCW/

DHW DN

3/4"DCW/

DHW DN1/2"CW/

HW DN

1/2"DCW

/DHW

DN

1/2"CW/

HW DN

1/2"DCW/

DHW DN

O

2 1/2"

2"DCW, 3/4"DHW,

& 1/2"DHWR

2"DCW / 1"DHW 3/4"DCW

BALANCE

TO 0.5 GPM

1/2"DHWR

1"DHWRBALANCE

TO 1.0 GPM

BALANCE

TO 1.0 GPM1"DHWR

BALANCE

TO 0.5 GPM

1/2"

DHWR

BALANCE

TO 0.5 GPM

1/2"

DHWR

1/2"DCW/DHW/

DHWR DN

BALANCE

TO 0.5 GPM

1/2"

DHWR

1/2"DHWR

BALANCE

T0 0.5 GPM

3/4"DCW/

DHW DN

BALANCE

TO 0.5

GPM

1"DHWR

2”DCW, 1”DHW,

1”DHWR UP TO

LEVEL ABOVE.

BALANCE TO

0.5 GPM

1”DHWR

2”DCW

3”DCW

2”DCW

3”DCW

2”DHW

1”DHWR

3”DCW

1”DHW

3/4”DHWR

1 1/4”DHW

1”DHW

1 1/4”DHW

1"DHWR

1 1/2”DHW

1 1/2”DHW

2”DHW

1 1/2”DHW

2”DHW

3”DCW

2 1/2”DCW

1 1/4”DHW

2 1/2”DCW

2”DHW

1”DHWR

1”DHWR

3”DCW

2”DHW

2”DHW

2 1/2”DCW

1 1/4”DHW

3/4”DHWR

3/4”DHWR

1”DHWR

1/2”DHWR

BALANCE TO

0.5 GPM

1”DHWR

1 1/4”

DHWR

1 1/4”DHWR

3”DCW

3”DCW

2”DHW

3”DCW

3”DCW

1 1/2”DHW

1 1/4”DHW

1 1/2”DHW

2”DHW2”DHW

1 1/2”DHW

2”DHW

LOCATE BRANCH PIPING & VALVING TO PATIENT

RMS IN INTERSTITIAL SPACE EXCLUDING PIPING

BELOW INTERSTITIAL ACCESS WALKWAY. SHOWN

OFFSET FOR CLARITY. TYP. ALL PATIENT RMS.

4"MV & 2"MA DN

TO LEVEL BELOW.

4"MV

4"MV UP TO

LEVEL ABOVE.

2"MA

2"MA

2"MA DN

FROM LEVEL

ABOVE.

1"MA DN TO

LEVEL

BELOW.3"MV DN TO

LEVEL BELOW.

MV MA

4"MV & 2 1/2"MA

DN FROM

LEVEL ABOVE.

3"MV

1"MA

4"MV

2 1/2"MA

1/2"O2

1"DHWR

A

B

C

D

E

F 04

G

H

J

J

K

K

R1

R2

RH

RG

RF

RE

RD

RC

RB

RA

RJ

A

B

C

D

E

F

G

H 03

J

1 08

B

E.5

E.5

20 01

B

B

E.5

E.5

11 12 08 09 13

03040506

Drawing Number

Building Number

Project NumberProject Title

Location

Date Checked Drawn

Drawing Title

Approved: Project Director

Key PlanCONSULTANTS:

DateRevisions

1 2 3 4 5 6 7 8 9 10 11 12

D

C

B

A

554-501REPLACEMENT MEDICAL CENTER

FACILITY, EASTERN COLORADO

HEALTH CARE SYSTEM

AURORA, COLORADO

N

C O

N

R

ES

D

AT

IB

S

IB

N

EN

C

C

LC

C

BN

C

BC

C

BS

PS

N

PV

N

PV

S

13 14

1 2 3 4 5 6 7 8 9 10 11 12 13 14

E

OFFICE OF

CONSTRUCTION

AND FACILITIES

MANAGEMENT

ARCHITECT/ENGINEERS:Professional Seal

6/

/2

5:

:4

PM

C :\U se rs

\C

AD

U se r 2 \D oc um en ts

\P L-

IF

O

-s he et s_ ch ar lo tte

.b la ck w oo d.

rv t

04-PP-103-1

LEVEL 3 INTERSTITIAL PLUMBING

PIPING PLAN

INPATIENT BUILDING (SOUTH)

08/31/2012

1/8" = 1'-0"1

LEVEL 3 INTERSTITIAL

PLUMBING PIPING PLAN

04.ES.400.1
Sheets: 04-ES-400-1 - SERVICE LEVEL INTERSTITIAL POWER PLAN
04.ES.400
Sheets: 04-ES-400 - SERVICE LEVEL POWER PLAN
04.MH.100.1
Sheets: 04-MH-100-1 - SERVICE LEVEL INTERSTITIAL HVAC PLAN
04.MH.101.1
Sheets: 04-MH-101-1 - LEVEL 1 INTERSTITIAL HVAC PLAN
04.MH.102.1
Sheets: 04-MH-102-1 - LEVEL 2 INTERSTITIAL HVAC PLAN
04.MH.103.1
Sheets: 04-MH-103-1 - LEVEL 3 INTERSTITIAL HVAC PLAN
04.PL.100.1
Sheets: 04.PL.100.1 - SERVICE LEVEL INTERSTITIAL WASTE, DRAIN AND VENT PIPING PLAN
04.PL.100
Sheets: 04-PL-100 - SERVICE LEVEL WASTE, DRAIN AND VENT PIPING PLAN
04.PP.100.1
Sheets: 04-PP-100-1 - SERVICE LEVEL INTERSTITIAL PLUMBING PIPING PLAN
04.PP.101.1
Sheets: 04-PP-101-1 - LEVEL 1 INTERSTITIAL PLUMBING PIPING PLAN
04.PP.102.1
Sheets: 04-PP-102-1 - LEVEL 2 INTERSTITIAL PLUMBING PIPING PLAN
04.PP.103.1
Sheets: 04-PP-103-1 - LEVEL 3 INTERSTITIAL PLUMBING PIPING PLAN