Bridge Inspection Rpt_STR 5460-006P.pdf
PDF 4 MB Posted
- Attached to
- Great Smoky Mountains National Park
- Solicitation number
- 693C73-21-B-000003
About this file
This federal solicitation seeks sealed bids from certified Small Business Concerns for two road rehabilitation and resurfacing projects within Great Smoky Mountains National Park in Tennessee. Work includes asphalt patching, milling and overlay, ultra-thin bonded wearing course, crack sealing, and permanent markings along approximately 8.62 miles of Newfound Gap Road. The project will be split into multiple schedules with a total cost estimated between $5-10 million. Bids are due by the date specified on the SF1442 form in the solicitation, which is available for download from SAM.gov along with other documents. Interested vendors must register at the website. Annual representations and certifications must be completed online. All questions should be sent to the email address provided. Firms must be registered in SAM.gov for payment. Visitors to bid openings must arrive at least one hour early and sign in at the main entrance for escort.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5460-006P
LOWER WALKER PRONG BRIDGE INSPECTION DATE: 6/21/18
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... ARCH - DECK NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 84.0 FT (25.6 M)
DECK TYPE: ......................... NOT APPLICABLE MAX. SPAN LENGTH: .......... 36.0 FT (11.0 M)
WEARING SURFACE: .......... NOT APPLICABLE DECK WIDTH: ...................... 34.5 FT (10.5 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 30.5 FT (9.3 M)
PIER FOUNDATION(S): ........ SPREAD FTG ON BEARING MAT'L YEAR BUILT:
ABUTMENT / PIER MAT'L: ... CONCRETE YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 1A1 / 1065A SKEW ANGLE: ..................... 30 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 2015 - ROADWAY REPAVED.
LOCATION
GREAT SMOKY MOUNTAINS NATIONAL PARK MILE POINT: ..................... 9.69 (KM PT 15.59)
STATE: ................................. TENNESSEE LOCATION: 7.9 MILES SOUTH OF SUGARLANDS VISITOR CENTER OR 5.1 MILES NORTHWEST FACILITY CARRIED: ............ NEWFOUND GAP ROAD
FROM NEWFOUND GAP.
FEATURE INTERSECTED: .. WALKER CAMP PRONG
STRUCTURE EVALUATION SUMMARY
This concrete arch bridge is in fair condition overall. Problems include deteriorated masonry mortar joints throughout the structure; an exposed footing along the north face and upstream side of the pier; and deteriorated concrete with exposed rebar on the underside of both arches at several locations. Additional problems include a lack of object markers at the bridge corners and debris accumulation that has completely blocked the drop inlet at the southwest corner.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: B. BUMPERS, T. POWELL (VOLKERT, INC.)
CONDITION ASSESSMENT:
BRITT BUMPERS, P.E., FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 11/8/18
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460-006P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
222.7 INSTALL REFLECTIVE OBJECT MARKERS AT BRIDGE CORNERS. 4 EA
58.7 PERIODICALLY REMOVE DEBRIS FROM DROP INLET AT SOUTHWEST CORNER
AND ALONG PARAPETS.
1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
58.6, 60.1,13,19, 222.3
CLEAN AND REPOINT MORTAR JOINTS AS NEEDED. 1 LS
59.3 CLEAN AND SEAL EXPOSED REBAR WITH APPROVED PROTECTIVE
COATING; REPAIR DELAMINATED CONCRETE ON ARCH
UNDERSIDES.
1 LS
60.16,17 REPAIR SCOUR ALONG NORTH FACE AND ON EAST (UPSTREAM)
SIDE OF PIER WITH ENGINEERED RIPRAP.
1 LS
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,
DESIGN, AND CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5460-006P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
OTHER
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
FOUNDATIONS
CAPS AND/OR BEARING SEATS
PILE BENTS
WALLS AND/OR COLUMNS
PIER(S)
OTHER
SLOPE PROTECTION
SETTLEMENT OR DEFLECTION
EROSION AND/OR SCOUR
EXPANSION JOINTS
WEEP HOLES
WINGWALLS
FOUNDATIONS
BACKWALLS AND/OR BULKHEADS
CAPS AND/OR BEARING SEATS
PILE BENTS
BREASTWALLS OR COLUMNS
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N
N N F N N N N N G
N G
G N N N N G G F G G N N
G N N G F G
G(ICEBREAKER)
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
12.
13.
14.
15.
16.
17.
18.
19.
(SPREAD FTG)
58.6, 222.3 MODERATE CRACKING AND DETERIORATION OF PARAPET
MASONRY MORTAR JOINTS AT SEVERAL LOCATIONS. MINOR TO
MODERATE VEGETATION GROWTH IN SOME JOINTS; MODERATE
MOSS GROWTH ON MASONRY.
58.7 MINOR DEBRIS ACCUMULATION WITH MOSS AND VEGETATION
GROWTH ALONG PARAPETS HINDERS DRAINAGE SLIGHTLY. DECK
DRAINS COVERED WITH PAVEMENT. SOUTHEAST DROP INLET
PARTIALLY CLOGGED.
59.3 MINOR TO MODERATE LONGITUDINAL AND TRANSVERSE CRACKING
WITH EFFLORESCENCE AND RUST STAINING ON UNDERSIDE OF
ARCHES AND RING STONES, ESPECIALLY AT CONSTRUCTION
JOINTS.
MINOR TO MODERATE DELAMINATION AND SPALLING WITH
EXPOSED REBAR ON ARCH UNDERSIDE, BOTH SPANS.
APPROXIMATELY 3' X 3' SPALLED AND DELAMINATED AREA ON
SOUTH ARCH UNDERSIDE NEAR PIER AT EAST SIDE. MINOR TO
MODERATE DELAMINATION AND SPALLING WITH EXPOSED REBAR
ON SOUTH ARCH UNDERSIDE AT PIER ALONG WEST
CONSTRUCTION JOINT. MINOR HONEYCOMBING ON SOUTH ARCH
UNDERSIDE ALONG TOP OF SOUTH ABUTMENT BREASTWALL.
MODERATE SPALLING WITH EXPOSED REBAR ON UNDERSIDE OF
NORTH ARCH NEAR WEST SIDE. MINOR HONEYCOMBING ON
NORTH ARCH UNDERSIDE AT ISOLATED LOCATIONS.
MINOR VEGETATION AND MOSS GROWTH ON SPANDREL WALLS AT
JUNCTION WITH PARAPETS.
60.1,13,19 MODERATE TO HEAVY EFFLORESCENCE ON ABUTMENT
BREASTWALLS, PIER WALLS, AND ICEBREAKER.
MINOR TO MODERATE DETERIORATION OF MASONRY MORTAR
JOINTS AT WATERLINE OF ABUTMENT BREASTWALLS, PIER WALLS,
AND ICEBREAKER.
60.6,8 MODERATE DETERIORATION OF MORTAR JOINTS, RESULTING IN
MINOR VEGETATION GROWTH IN WINGWALLS AND IN NORTH
VERTICAL JOINTS. MINOR CRACKING WITH EFFLORESCENCE AND
MOSS GROWTH ALONG ALL WINGWALLS. VERTICAL JOINT FILLER
LOOSE AT NORTH VERTICAL JOINTS.
G G N F P N
N
N
N
N
FIELD INSPECTION REPORT STRUCTURE NO. 5460-006P
ITEM REFERENCE AND REMARKS
STREAM BED COMPOSITION : 9.
AVERAGE CLEAR OPENING 8.
NORMAL VELOCITY 7.
ADEQUACY OF OPENING 6.
OTHER 5.
WATERWAY OBSTRUCTIONS 4.
CHANNEL PROTECTION 3.
EROSION AND/OR SCOUR 2.
ALIGNMENT 1.
61. CHANNEL 6
G G N F
G(FLOOD GAUGE)
MED
SUFF
11 FT.
STONES, SAND, SILT
222. APPROACHES 7
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
N N F G G G N G N
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
60.9 MINOR EROSION ALONG WEST WINGWALLS.
60.16,17 MODERATE SCOUR HAS EXPOSED PIER FOOTING APPROXIMATELY
27" H X 5.5' L ON UPSTREAM SIDE X 21' L X 12" H ON NORTH SIDE OF
PIER.
61.1,4 NORMAL FLOW IS THROUGH NORTH SPAN. MODERATE SEDIMENT
AND BOULDER ACCUMULATION UNDER SOUTH SPAN. HEAVY
VEGETATION AND BOULDER ACCUMULATION ON DOWNSTREAM
SIDE OF PIER.
61.5 FLOOD GAUGE AT WEST SIDE OF NORTH ABUTMENT.
222.7 REFLECTIVE OBJECT MARKERS NOT PROVIDED AT BRIDGE
CORNERS.
36.A,C HEIGHT OF PARAPETS AND APPROACH GUARDWALLS IS 1'-10" DUE
TO REPEATED OVERLAYS. PARAPET NO LONGER MEETS MINIMUM
SAFETY GUIDELINES FOR TRAFFIC BARRIER HEIGHT OF 2'-3".
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
STRUCTURE LOAD RATING STRUCTURE NO. 5460-006P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 112 102 186 169
HS 208 189 300 272
TYPE 3 151 137 253 230
TYPE 3S2 261 237 300 272
TYPE 3-3 300 272 300 272
DESIGN LOADING: UNKNOWN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
X ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION: 5/16
LOAD RATING CONTROLLED BY: MOMENT
REMARKS: SEE BRIDGE FILE FOR LOAD RATING CALCULATIONS.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-006P
STRUCTURE IDENTIFICATION
(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK (1) STATE: ....................................... 474 - TENNESSEE (TN)
(202) STRUCTURE NAME: .......... LOWER WALKER PRONG BRIDGE (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............1 - BRIDGE (3) COUNTY CODE: ........................ 155 - SEVIER
(204) STRUCTURE NUMBER: ..... 5460-006P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 10 (6) FEATURES INTERSECTED:....... WALKER CAMP PRONG
(207) ROAD SECTION NO: ..........006P (7) FACILITY CARRIED: .................. NEWFOUND GAP ROAD
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5460006P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 7.9 MILES SOUTH OF SUGAR
(210) OPERATING UNIT: ............. N. DIST. (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)
(211) PROJECT NO(S): ................1A1 (11) MILE POINT: .............................9.69 (KM PT 15.59)
(212) DRAWING NUMBERS: ....... 1065A (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 3 - POSSIBLY ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
11 - ARCH - DECK
36.0 FT (11.0 M)
84.0 FT (25.6 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. N - NOT APPLICABLE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 99.9 TONS (99.9 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 99.9 TONS (99.9 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/18 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-006P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°38'00.20"
(17) LONGITUDE: ......................... 83°27'40.10"
(19) DETOUR LENGTH: ............... 90 MI (145 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 00
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 5 - WATERWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... 0
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 0.0 FT (0.0 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
30.5 FT (9.3 M)
34.5 FT (10.5 M)
33.0 FT (10.1 M)
22.5 FT (6.9 M)
5.0 FT (1.5 M)
5.0 FT (1.5 M)
0 - NO MEDIAN
30 °
NO
30.5 FT (9.3 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
3 - PARAPET ONLY
9 - OTHER
1 - CONTINUOUS RAIL
1.83 FT (0.56 M)
99.99 FT (99.99 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL:
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 0101
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
4 - Stable; action required to pro
2 - REHAB/RECONSTRUCTION
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2015 - ROADWAY REPAVED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
https://83�27'40.10 https://35�38'00.20
APPENDIX STRUCTURE NO. 5460-006P
PHOTOGRAPHS STRUCTURE NO. 5460-006P
PHOTO #1 - LOOKING NORTH TOWARD GATLINBURG
FLOW
PHOTO #2 - EAST (UPSTREAM) SIDE
PHOTO #3 - GENERAL TOP SIDE VIEW LOOKING NORTH
PHOTO #4 - GENERAL UNDERSIDE VIEW OF SOUTH BARREL LOOKING
EAST; NOTE CRACKING WITH EFFLORESCENCE
PHOTO #5 - TYPICAL OPENING ON OUTSIDE OF BRIDGE BARRIER,
EAST BRIDGE RAIL SHOWN; NOTE INSIDE OPENING PAVED OVER
BLOCKING DRAINAGE
PHOTO #6 - TYPICAL MOSS AND VEGETATION GROWTH ALONG
PARAPET JOINTS; NOTE DEBRIS ACCUMULATION CLOGGING INLET
PHOTO #7 - GENERAL VIEW OF SOUTH ABUTMENT
PHOTO #8 - EFFLORESCENCE AND LEAKAGE ON WEST END OF SOUTH
ABUTMENT BREASTWALL
PHOTO #9 - DELAMINATION AND SPALLING WITH EXPOSED REBAR ON
SOUTH ARCH UNDERSIDE NEAR PIER
PHOTO #10 - GENERAL VIEW OF PIER, SOUTH FACE SHOWN
PHOTO #11 - PIER FOOTING EXPOSED ON UPSTREAM END DUE TO
SCOUR
PHOTO #12 - MISSING MASONRY MORTAR ON EAST END OF PIER
PHOTO #13 - SPALLING WITH EXPOSED REBAR ON EAST SIDE OF
NORTH BARREL
PHOTO #14 - TYPICAL LONGITUDINAL AND TRANSVERSE CRACKING
WITH EFFLORESCENCE ON UNDERSIDE OF ARCHES AND RING
STONES, NORTH BARREL ON WEST SIDE SHOWN
PHOTO #15 - LOOKING AT NORTHWEST CORNER OF NORTH
ABUTMENT; NOTE EFFLORESCENCE ON PIER WALLS
PHOTO #16 - TYPICAL SPALLING WITH EXPOSED REBAR AND
CRACKING WITH EFFLORESCENCE ON NORTH ARCH UNDERSIDE
NEAR NORTH ABUTMENT
PHOTO #17 - TYPICAL LONGITUDINAL AND TRANSVERSE CRACKING
WITH EFFLORESCENCE ON UNDERSIDE OF ARCHES AND RING
STONES, NORTH BARREL ON EAST SIDE SHOWN
PHOTO #18 - TYPICAL DETERIORATION OF MASONRY MORTAR JOINTS
ON SPANDREL WALLS, EAST SPANDREL WALL SHOWN
PHOTO #19 - SEDIMENT AND BOULDER ACCUMULATION UPSTREAM OF
SOUTH SPAN BLOCKING FLOW INTO SOUTH BARREL
PHOTO #20 - VEGETATION GROWTH OUT OF SPANDREL WALLS AND
VEGETATIVE ISLAND ON WEST SIDE OF PIER
PHOTO #21 - LOOKING UPSTREAM FROM DECK
PHOTO #22 - LOOKING DOWNSTREAM FROM DECK