Results of Bid Opening - Project NP-GRSM 10N(1) and 10N(2).pdf

PDF 108 KB Posted

Attached to
Great Smoky Mountains National Park
Solicitation number
693C73-21-B-000003
Issued by

About this file

This document summarizes a bid opening for a federal construction project. The bid opening was held on November 17, 2020 for Solicitation Number 693C73-21-B-000003 issued by the Federal Highway Administration Eastern Federal Lands Highway Division. The project involves rehabilitating approximately 2.44 miles and resurfacing approximately 6.18 miles of Newfound Gap Road within the Great Smoky Mountains National Park in Sevier County, Tennessee. The work includes asphalt pavement patching, milling, overlay, crack sealing, markings, and other miscellaneous tasks. The project will be split into multiple schedules with a total cost expected between $5 million and $10 million. Two bids were received with Bryant's Land and Development Industries, Inc. bidding $5,887,686.13 for Schedule A and $2,462,399.85 for Option 1. Estes Bros. Const., Inc. bid $7,575,817.93 for Schedule A and $2,986,807.58 for Option 1. The engineer's estimate was $5,930,000 for Schedule A and $2,430,000 for Option 1.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Highway Administration Eastern Federal Lands Highway Division

Bid Opening for

Great Smoky Mountains National Park

PROJECT: NP-GRSM 10N(2) and NP-GRSM 10N(1)

SOLICITATION NO. 693C73-21-B-000003

November 17, 2020 at 2:00 p.m.

Ashburn, Virginia

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

BID OPENING for SOLICITATION NO. 693C73-21-B-000003 Project: NP-GRSM 10N(2) and NP-GRSM 10N(1)

November 17, 2020, 2:00 p.m. EST

BIDDER’S BID TOTALS DAYS TOTAL PRICE

Bryant’s Land and Development Industries, Inc.

SCHEDULE A

$5,887,686.13

SCHEDULE B (GOVERNMENT OPTION 1)

$2,462,399.85

SCHEDULE A + OPTION 1 =

$8,350,085.98

Estes Bros. Const., Inc. SCHEDULE A $7,575,817.93

SCHEDULE B (GOVERNMENT OPTION 1)

$2,986,807.58

SCHEDULE A + OPTION 1 =

$10,562,625.50

ENGINEER’S ESTIMATE SCHEDULE A

$5,930,000.00

SCHEDULE B (GOVERNMENT OPTION 1)

$2,430,000.00

SCHEDULE A + OPTION 1 =

$8,360,000.00

If the Government awards the contract as Schedules A + B, then all construction activities at the project site must be completed by no later than November 30, 2021. If separate: Schedule A will be 215 calendar days; Schedule B will be 90 calendar days.

Slide Number 1
�FEDERAL HIGHWAY ADMINISTRATION�EASTERN FEDERAL LANDS HIGHWAY DIVISION�BID OPENING for SOLICITATION NO. 693C73-21-B-000003� Project: NP-GRSM 10N(2) and NP-GRSM 10N(1)�November 17, 2020, 2:00 p.m. EST�