This solicitation is for rehabilitation and resurfacing work on approximately 8.62 miles of roadway within the Great Smoky Mountains National Park. The project will be split into multiple schedules with the total cost expected to fall between $5 million and $10 million. Sealed bids from certified Small Business Concerns will be accepted for projects NP-GRSM 10N(2) and NP-GRSM 10N(1) by the specified due date. The work includes asphalt patching, milling and overlay, ultra-thin bonded wearing course, crack sealing, markings and other miscellaneous work. Annual Representations and Certifications must be completed on SAM.gov along with Form Vets-4212. Questions should be directed to the specified email address. SAM registration is required for payment. Security screening is necessary for facility access.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5460-003P
CHIMNEY TOPS TUNNEL INSPECTION DATE: 6/21/18
TUNNEL IDENTIFICATION AND DESCRIPTION
LINING MATERIAL: ............... CONCRETE MINIMUM VERTICAL CLR: .... 16.2 FT (4.9 M)
SPRINGLINE LENGTH: ........ 253.0 FT (77.1 M) STRUCT. TOTAL LENGTH: ... 253.0 FT (77.1 M)
CURB TO CURB WIDTH: ..... 26.4 FT (8.0 M) YEAR BUILT:
PROJ./PLAN REF. NO: ......... 1A23,B16 / YEAR RECONSTRUCTED:
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD
STRUCTURE HISTORY: ...... 2001 -LINING REPAIRS, GRADE THROUGH TUNNEL LOWERED, APPROACH GUARDWALLS
CONSTRUCTED. 2012 (EST) - ROADWAY REPAVED.
LOCATION
GREAT SMOKY MOUNTAINS NATIONAL PARK MILE POINT: ..................... 8.46 (KM PT 13.62)
STATE: .................................. TENNESSEE LOCATION: 6.6 MILES SOUTH OF SUGARLANDS VISITOR CENTER OR 6.3 MILES NORTHWEST FACILITY CARRIED: ............. NEWFOUND GAP ROAD
FROM NEWFOUND GAP.
FEATURE INTERSECTED: ... CHIMNEY TOPS MOUNTAIN
STRUCTURE EVALUATION SUMMARY
This concrete lined tunnel is in fair condition overall. Problems include cracking, spalling, and delamination along the lining construction joints; and cracking with efflorescence and rust staining on the lining elsewhere, particularly near the south portal. Other problems include cracking of the barrier walls; vegetation growth on the portals; and debris accumulation along the east masonry wall at the south approach.
Corrective action should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: B. BUMPERS, T. POWELL (VOLKERT, INC.)
CONDITION ASSESSMENT:
BRITT BUMPERS, P.E., FIELD TEAM LEADER
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 11/8/18
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460-003P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
59.2 TRIM/REMOVE VEGETATION GROWTH ON PORTALS AS NECESSARY. 1 LS
222.9 REMOVE DEBRIS ACCUMULATION ALONG EAST MASONRY WALL AT SOUTH
APPROACH.
1 LS
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5460-003P
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
N
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
3 SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
2 CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
1 “IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
0 FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
59. TUNNEL 6
F1. LINING
F2. PORTALS
G3. CURBS AND SIDEWALKS
G4. DRAINS AND DRAINAGE
G5. WEARING SURFACE
G6. RIDEABILITY
N7. LIGHTING
N8. OTHER
9. ADEQUACY OF OPENING SUFF
222. APPROACHES 7
N1. APPROACH SLABS
N2. RELIEF JOINTS
G3. APPROACH GUARDRAIL
G4. SURFACING
G5. EROSION
G6. SETTLEMENT
G7. SIGNS
F8. ALIGNMENT
F9. OTHER (DRAINAGE SYSTEM)
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
NA. BRIDGE RAILINGS
NB. TRANSITIONS
NC. APPROACH GUARDRAILS
ND. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
0 - Does not meet standards or a safety feature is required and none is provided.
1 - Meets currently acceptable standards.
N - Not applicable or a safety feature is not required.
ITEM REFERENCE AND REMARKS
59.1 MINOR TO MODERATE CRACKING WITH EFFLORESCENCE AND
RUST STAINING, OF LINING THROUGHOUT; CRACKING MORE
PREVALENT NEAR SOUTH PORTAL. MINOR TO MODERATE
SPALLING, DELAMINATION, AND CRACKING ALONG CONSTRUCTION
JOINTS. MINOR RUST STAINING ALONG CONSTRUCTION JOINT ON
EAST LINING APPROXIMATELY 75' FROM SOUTH PORTAL. MINOR TO
MODERATE LONGITUDINAL CRACKING WITH EFFLORESCENCE
ALONG CROWN BEGINNING NEAR NORTH PORTAL EXTENDING TO
MID-LENGTH OF TUNNEL. MINOR TO MODERATE AREAS OF PAINT
FAILURE ON TUNNEL LINING.
59.2 MINOR EFFLORESCENCE ON RING STONES AT BOTH PORTALS;
MINOR TO MODERATE DETERIORATION OF MORTAR JOINTS.
MODERATE TO HEAVY VEGETATION ON AND ABOVE PORTALS.
59.3 MINOR VERTICAL CRACKING WITH EFFLORESCENCE ON BARRIER
WALLS.
59.4 FIBERGLASS PLATES INSTALLED OVER DRAIN CHASES; FOURTEEN
PLATES INSTALLED THROUGHOUT TUNNEL.
59.5, 222.4 ROADWAY STRIPING BEGINNING TO FADE IN AREAS.
222.3 ISOLATED AREAS OF MODERATE TO SEVERE DETERIORATION OF
MANSONRY MORTAR JOINTS IN APPROACH GUARDWALLS.
222.7 "TUNNEL - USE LIGHTS - 25 MPH" SIGNS LOCATED AT BOTH
APPROACHES.
222.8 TUNNEL IN SHARP HORIZONTAL CURVE.
222.9 FILTER FABRIC EXPOSED AT DRAINAGE OUTLET ON SOUTHWEST
EMBANKMENT SLOPE DUE TO MODERATE EROSION. MINOR TO
MODERATE DEBRIS ACCUMULATION ALONG EAST MASONRY WALL
AT SOUTH APPROACH.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-003P
STRUCTURE IDENTIFICATION
(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK (1) STATE: ....................................... 474 - TENNESSEE (TN)
(202) STRUCTURE NAME: .......... CHIMNEY TOPS TUNNEL (2) STATE HWY. AGENCY DIST:
(203) STRUCTURE KIND: ............3 - TUNNEL (3) COUNTY CODE: ........................ 155 - SEVIER
(204) STRUCTURE NUMBER: ..... 5460-003P (4) CITY/PLACE CODE:
(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:
(206) ROUTE CODE NUMBER: ... 10 (6) FEATURES INTERSECTED:....... CHIMNEY TOPS MOUNTAIN
(207) ROAD SECTION NO: ..........003P (7) FACILITY CARRIED: .................. NEWFOUND GAP ROAD
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5460003P0000000
(209) WITHIN NPS BNDRY?: .......YES (9) LOCATION: ................................ 6.6 MILES SOUTH OF SUGAR
(210) OPERATING UNIT: ............. N. DIST. (10) INV. RTE. - MIN. VERT. CLR: .. 16.00 FT (4.88 M)
(211) PROJECT NO(S): ................1A23,B16 (11) MILE POINT: .............................8.46 (KM PT 13.62)
(212) DRAWING NUMBERS: ....... (27) YEAR BUILT:
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED:
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................3 - FREE ROAD
(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
18 - TUNNEL
253.0 FT (77.1 M)
253.0 FT (77.1 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. 6 - BITUMINOUS
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 0.0 TONS (0.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 0.0 TONS (0.0 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 6/18 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-003P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°38'11.00"
(17) LONGITUDE: ......................... 83°28'20.70"
(19) DETOUR LENGTH: ............... 80 MI (129 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 0 - OTHER
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 1.8 FT (0.5 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
26.4 FT (8.0 M)
26.4 FT (8.0 M)
32.0 FT (9.8 M)
24.0 FT (7.3 M)
5.0 FT (1.5 M)
3.0 FT (0.9 M)
0 - NO MEDIAN
0 °
NO
26.4 FT (8.0 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
0 - N/A
0 - N/A
0 - N/A
3.67 FT (1.12 M)
16.17 FT (4.93 M)
0.00 FT (0.00 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE: .........N
(60) SUBSTRUCTURE: ..............N
(61) CHANNEL: .......................... N
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... NNNN
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N
N
N - Not over waterway.
1 - MAINTENANCE
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2001 -LINING REPAIRS, GRADE THROUGH TUNNEL LOWERED, APPROACH GUARDWALLS CONSTRUCTED. 2012 (EST) - ROADWAY
REPAVED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
https://83�28'20.70 https://35�38'11.00
APPENDIX STRUCTURE NO. 5460-003P
PHOTOGRAPHS STRUCTURE NO. 5460-003P
PHOTO #1 - NORTH PORTAL
PHOTO #2 - SOUTH PORTAL
PHOTO #3 - GENERAL UNDERSIDE VIEW OF LINING LOOKING NORTH
PHOTO #4 - GENERAL VIEW OF ROADWAY INSIDE TUNNEL LOOKING
NORTH
PHOTO #5 - DRAIN INLET AT EAST SIDE OF SOUTH APPROACH; NOTE
DEBRIS ACCUMULATION
PHOTO #6 - DRAINAGE OUTLET LOCATED AT WEST SIDE OF SOUTH
APPROACH SHOULDER
PHOTO #7 - EXPOSED FILTER FABRIC NEAR DRAINAGE OUTLET
LOCATED AT SOUTHWEST APPROACH SHOULDER
PHOTO #8 - TYPICAL DETERIORATION OF MASONRY MORTAR JOINTS
IN APPROACH GUARDWALLS, EAST WALL AT SOUTH APPROACH
SHOWN
PHOTO #9 - VEGETATION GROWTH AT TOP OF SOUTH PORTAL; NOTE
MOSS GROWTH
PHOTO #10 - EFFLORESCENCE AND LEAKAGE ON SOUTH PORTAL
MASONRY
PHOTO #11 - DETERIORATION OF WEST LINING NEAR SOUTH PORTAL
PHOTO #12 - CRACKING, EFFLORESCENCE, LEAKAGE, AND RUST
STAINING ON EAST LINING NEAR SOUTH PORTAL, NOTE TYPICAL PAINT
FAILURE
PHOTO #13 - CRACKING WITH EFFLORESCENCE ON TUNNEL LINING
NEAR SOUTH PORTAL
PHOTO #14 - TYPICAL CRACKING WITH EFFLORESCENCE ON LINING,
WEST LINING NEAR SOUTH PORTAL SHOWN
PHOTO #15 - TYPICAL VERTICAL CRACKING WITH EFFLORESCENCE
ON BARRIER WALLS, WEST BARRIER WALL NEAR SOUTH PORTAL
SHOWN
PHOTO #16 - TYPICAL LEAKAGE ALONG CONSTRUCTION JOINTS, JOINT
IN WEST LINING APPROXIMATELY 120' FROM SOUTH PORTAL SHOWN
PHOTO #17 - SPALLING OF CROWN ALONG CONSTRUCTION JOINT
NEAR MID-LENGTH
PHOTO #18 - LONGITUDINAL CRACKING WITH EFFLORESCENCE
ALONG CROWN BEGINNING NEAR NORTH PORTAL EXTENDING TO
MID-LENGTH OF TUNNEL
PHOTO #19 - TYPICAL AREAS OF PAINT FAILURE ON TUNNEL LINING,
EAST LINING NEAR NORTH PORTAL SHOWN
PHOTO #20 - EFFLORESCENCE ON NORTH PORTAL MASONRY
PHOTO #21 - DRAINAGE INLET AT END OF EAST WALL AT NORTH
APPROACH