Bridge Inspection Rpt_STR 5460-004P.pdf
PDF 3 MB Posted
- Attached to
- Great Smoky Mountains National Park
- Solicitation number
- 693C73-21-B-000003
About this file
This solicitation is for rehabilitation and resurfacing work on approximately 8.62 miles of Newfound Gap Road within Great Smoky Mountains National Park. Certified small business concerns may bid on the project, which includes asphalt patching, milling, overlay, wearing surface placement, crack sealing, markings and other miscellaneous work split into multiple schedules. The total cost is expected to be between $5-10 million. Questions are due by email to eflhd.contracts@dot.gov by the bid due date specified in block 13a of the SF1442 form. Bids must be submitted through beta.sam.gov where offerors must also complete annual representations and certifications. The work is to be completed for the Department of Transportation Federal Highway Administration as part of projects NP-GRSM 10N(2) and NP-GRSM 10N(1) in Sevier County, Tennessee.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STRUCTURE SUMMARY STRUCTURE NO. 5460-004P
NEWFOUND GAP ROAD LOOP BRIDGE INSPECTION DATE: 5/16/18
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL: ....... CONCRETE NO. OF MAIN SPANS:
MAIN SPAN TYPE: ............... ARCH - DECK NO. OF APPR. SPANS:
# OF BEAMS, MAIN SPAN: .. 1 STRUCT. TOTAL LENGTH: .. 42.7 FT (13.0 M)
DECK TYPE: ......................... NOT APPLICABLE MAX. SPAN LENGTH: .......... 42.7 FT (13.0 M)
WEARING SURFACE: .......... NOT APPLICABLE DECK WIDTH: ...................... 73.5 FT (22.4 M)
ABUT. FOUNDATIONS: ........ SPREAD FTG ON BEARING MAT'L CURB TO CURB WIDTH: ..... 0.0 FT (0.0 M)
PIER FOUNDATION(S): ........ N/A YEAR BUILT:
ABUTMENT / PIER MAT'L: ... MASONRY YEAR RECONSTRUCTED: .. N/A
PROJ./PLAN REF. NO: ......... 1A2 / 1016C SKEW ANGLE: ..................... 0 °
NPS ROAD CLASS: .............. 1 - PRINCIPAL PARK ROAD FRACTURE CRITICAL: ........ NO
STRUCTURE HISTORY: ...... 2002 - STEEL-BACKED TIMBER RAIL SYSTEM INSTALLED. 2013 - ROADWAY REPAVED.
LOCATION
GREAT SMOKY MOUNTAINS NATIONAL PARK MILE POINT: ..................... 9.05 (KM PT 14.56)
STATE: ................................. TENNESSEE LOCATION: 7.1 MILES SOUTH OF SUGARLANDS VISITOR CENTER OR 5.9 MILES NORTHWEST FACILITY CARRIED: ............ NEWFOUND GAP ROAD
FROM NEWFOUND GAP.
FEATURE INTERSECTED: .. NEWFOUND GAP ROAD
STRUCTURE EVALUATION SUMMARY
This concrete arch bridge is in good condition overall with only minor problems at this time. Problems include minor to moderate deterioration of the vertical expansion joints; excessive vegetation growth on the spandrel walls and wingwalls; a lack of object markers along the underpass roadway; and missing reflectors from the north abutment.
Corrective measures should be taken as outlined in this report to prevent the possible development of more serious or costly problems in the future.
INSPECTION TEAM: R. SILVESTRY, E. JOHNSON
CONDITION ASSESSMENT:
REINALDO SILVESTRY, P.E., FIELD TEAM LEADER 703-404-6251
REPORT REVIEW:
MARCUS MILLER, P.E., BRIDGE INSPECTION ENGINEER 703-404-6252
REPORT APPROVAL: DATE: 11/8/18
JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5460-004P
A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.
B (Major) - Structure exhibits severe deterioration, presents a safety hazard, or is designated a high priority due to age and/or condition.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
D226 PRIORITY OF IMPROVEMENT
ITEM
NO.
ROUTINE MAINTENANCE QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
222.7 REPLACE MISSING REFLECTORS ALONG NORTH ABUTMENT. INSTALL TYPE 3
OBJECT MARKERS FOR UNDERPASS ROADWAY AT ABUTMENT CORNERS.
6 EA
PRELIM. MAINTENANCE TOTAL :
ITEM
NO.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST
ESTIMATES
REHAB. RECONSTR.
60.8 CLEAN AND RESEAL VERTICAL EXPANSION JOINTS AS NEEDED. 1 LS
59.3,8, 60.6 REMOVE VEGETATION FROM AROUND STRUCTURE AS
NECESSARY.
1 LS
CONTRACT COSTS FOR MOBILIZATION, TRAFFIC CONTROL,
DESIGN, AND CONSTRUCTION ENGINEERING.
1 LS
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL :
PRELIMINARY ESTIMATE TOTAL* :
(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)
REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.
FIELD INSPECTION REPORT STRUCTURE NO. 5460-004P
G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)
CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.
Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
“IMMINENT” FAILURE CONDITION - major deterioration or sec ion loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.
FAILED CONDITION - out of service; beyond corrective action.
CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223
NOT APPLICABLE
EXCELLENT CONDITION
VERY GOOD CONDITION - no problems noted.
GOOD CONDITION - some minor problems.
SATISFACTORY CONDITION - structural elements show some minor deterioration.
FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.
N
58. DECK ITEM REFERENCE AND REMARKS
OTHER
ALIGNMENT
DEFLECTION AND/OR VIBRATION
FASCIA(E)
DIAPHRAGMS AND BRACING
TRUSSES
FLOOR BEAMS AND STRINGERS
ARCH(ES) OR SLAB(S)
GIRDERS OR BEAMS
BEARING DEVICES
59. SUPERSTRUCTURE
OTHER
DEFLECTION AND/OR VIBRATION
UTILITIES
DRAINS AND DRAINAGE
PARAPETS AND/OR RAILINGS
CURBS, SIDEWALKS, AND MEDIAN
RIDEABILITY
WEARING SURFACE
EXPANSION JOINTS
DECK SLAB
ABUTMENTS
60. SUBSTRUCTURE
1.
10.
2.
3.
4.
5.
6.
7.
8.
9.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.
PAINT
11.
N
N N G N N N N G G
N G
G G N G G G
N
N
N
N
58.3, 222.4 WEARING SURFACE OVER STRUCTURE AND APPROACHES IN GOOD
CONDITION.
58.6, 222.3, MINOR CHECKING OF STEEL-BACKED TIMBER GUARDRAIL SYSTEM.
LOOSE STEEL PLATE AT EAST RAILING NEAR NORTH END.
59.3,8 AREA OF DELAMINATION, UP TO 3 SF AT JUNCTION BETWEEN THIRD
AND FOURTH SLAB UNIT FROM EAST ON NORTH ABUTMENT. AREA
OF CRACKING WITH EFFLORESCENCE AND DELAMINATION, UP TO 3
SF, AT WEST END OF NORTH ABUTMENT.
MINOR CRACKING WITH EFFLORESCENCE ON ARCH UNDERSIDE IN
SEVERAL LOCATIONS, ESPECIALLY NEAR FASCIA RING STONES;
MODERATE EFFLORESCENCE FROM RING STONES.
EXCESSIVE VINE GROWTH ON WEST SPANDREL WALL. MINOR VINE
GROWTH ALONG EAST SPANDREL WALL, AND UNDERSIDE OF ARCH
AT WEST SIDE. SEVERAL POPOUTS ON UNDERSIDE OF ARCH.
60.6 MINOR TO MODERATE EFFLORESCENCE ON ALL WINGWALLS;
MODERATE VINE GROWTH ON WEST SIDE WINGWALLS.
NUMEROUS TREES GROWING ALONG WINGWALLS
60.8 MODERATE DETERIORATION OF VERTICAL EXPANSION JOINT
FILLER WITH MINOR VINE GROWTH IN NORTHWEST JOINT; MINOR
VINE GROWTH IN SOUTHWEST JOINT.
60.9 MINOR EROSION ALONG NORTH ABUTMENT BREASTWALL.
1. BREASTWALLS OR COLUMNS G
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS N
4. BACKWALLS AND/OR BULKHEADS N
5. FOUNDATIONS N
6. WINGWALLS G
7. WEEP HOLES N
8. EXPANSION JOINTS F
9. EROSION AND/OR SCOUR G
10. SETTLEMENT OR DEFLECTION G
11. SLOPE PROTECTION N
12. OTHER N
PIER(S)
13. WALLS AND/OR COLUMNS N
14. PILE BENTS N
15. CAPS AND/OR BEARING SEATS N
16. FOUNDATIONS N
17. EROSION AND/OR SCOUR N
18. SETTLEMENT OR DEFLECTION N
19. OTHER N
222.5 NEW PAVED DITCH ALONG NORTH ABUTMENT.
222.7 NO OBJECT MARKERS PROVIDED AT BRIDGE CORNERS.
9. STREAM BED COMPOSITION :
222. APPROACHES 7
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
N N G G G G P G N
223. RETAINING WALL N
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
36. TRAFFIC AND SAFETY FEATURES
A. BRIDGE RAILINGS
B. TRANSITIONS
C. APPROACH GUARDRAILS
D. APPROACH GUARDRAIL ENDS
TRAFFIC SAFETY RATING CODES
N
Does not meet standards or a safety feature is required and none is provided.
Meets currently acceptable standards.
Not applicable or a safety feature is not required.
FIELD INSPECTION REPORT STRUCTURE NO. 5460-004P
NEWFOUND GAP ROAD LOOP BRIDGE INSPECTION DATE: 5/16/18
ITEM REFERENCE AND REMARKS
61. CHANNEL N
1. ALIGNMENT
2. EROSION AND/OR SCOUR
3. CHANNEL PROTECTION
4. WATERWAY OBSTRUCTIONS
5. OTHER
6. ADEQUACY OF OPENING
7. NORMAL VELOCITY
8. AVERAGE CLEAR OPENING
STRUCTURE LOAD RATING STRUCTURE NO. 5460-004P
TRUCK TYPE
INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)
TONS METRIC TONS TONS METRIC TONS
H 15 14 25 23
HS 20 18 33 30
TYPE 3 18 16 30 27
TYPE 3S2 28 25 47 43
TYPE 3-3 35 32 58 53
DESIGN LOADING: UNKNOWN
X CAPACITY MEETS OR EXCEEDS DESIGN LOAD
CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
DATE OF LOAD RATING CALCULATION:
LOAD RATING CONTROLLED BY:
REMARKS: LOAD RATING IS BASED ON ENGINEERING JUDGEMENT IN ACCORDANCE WITH AASHTO MANUAL FOR
BRIDGE EVALUATION (MBE). SEE BRIDGE FILE FOR MORE INFORMATION.
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-004P
STRUCTURE IDENTIFICATION
(201) PARK: GREAT SMOKY MOUNTAINS NATIONAL PARK
(202) STRUCTURE NAME: .......... NEWFOUND GAP ROAD LOOP BRIDGE
(203) STRUCTURE KIND: ............1 - BRIDGE
(204) STRUCTURE NUMBER: ..... 5460-004P
(205) NPS REGION: .................... 4 - SOUTHEAST
(206) ROUTE CODE NUMBER: ... 10
(207) ROAD SECTION NO: ..........004P
(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD
(209) WITHIN NPS BNDRY?: .......YES
(210) OPERATING UNIT: ............. N. DIST.
(211) PROJECT NO(S): ................1A2
(212) DRAWING NUMBERS: ....... 1016C
(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE
(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY/PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR: ..
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORICAL DESIGNATION: ..
474 - TENNESSEE (TN)
155 - SEVIER
167000100
NEWFOUND GAP ROAD
NEWFOUND GAP ROAD
5460004P0000000
7.1 MILES SOUTH OF SUGAR
99.99 FT (99.99 M)
9.05 (KM PT 14.56)
N/A
3 - FREE ROAD
3 - POSSIBLY ELIGIBLE
STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE
(43A) MAIN STR. MATERIAL: ..
(43B) MAIN STR. TYPE:
(45) NO. OF MAIN SPANS:
(48) MAX. SPAN LENGTH:
(49) STRUCTURE LENGTH:
(216A) ABUTMENT #1 FDN:
(216B) ABUTMENT #2 FDN:
(217A) PREDOM. PIER FDN.: ..
(217B) SECOND. PIER FDN: ...
(107) DECK TYPE:
1 - CONCRETE
11 - ARCH - DECK
42.7 FT (13.0 M)
42.7 FT (13.0 M)
2 - SPREAD FTG ON BEARING MAT'L
2 - SPREAD FTG ON BEARING MAT'L
6 - N/A
6 - N/A
N - NOT APPLICABLE
(44A) APPR. STR. MATERIAL: ........ 0 - OTHER
(44B) APPR. STR. TYPE: ................ 00 - OTHER
(46) NO. OF APPROACH SPANS: .. 0
(108) WEAR SURFACE/PROTECT SYSTEM:
A) TYPE WEARING SURFACE: .. N - NOT APPLICABLE
B) TYPE MEMBRANE: ................. 0 - NONE
C) TYPE PROTECTION: .............. 0 - NONE
(218) IS SALT USED?: ..................... YES
LOAD RATING AND POSTING
(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION
(66) INVENTORY RATING: ...... 20.0 TONS (18.1 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED
(64) OPERATING RATING: ...... 33.0 TONS (29.9 METRIC TONS)
INSPECTION DATES
(90) INSPECTION DATE: 5/18 (91) FREQ. OF INSP: 48 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO
INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE
(B) UNDERWATER: .............. NO
(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :
(C) SPECIAL INSPECTION: .. NO
INSP. EVERY: MONTHS - LAST INSP. :
STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5460-004P
GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA
(16) LATITUDE: ............................. 35°38'05.60"
(17) LONGITUDE: ......................... 83°27'58.70"
(19) DETOUR LENGTH: ............... 90 MI (145 KM)
(28A) LANES ON STRUCT:
(28B) LANES UNDER STRUCT: ... 02
(42A) SERVICE ON: ..................... 1 - HIGHWAY
(42B) SERVICE UNDER: .............. 1 - HIGHWAY
(29) AVG. DAILY TRAFFIC:
(30) YEAR OF ADT:
(114) FUTURE ADT:
(115) YEAR OF FUTURE ADT:
(101) PARALLEL STRUCTURE: ... N - NONE
(38) NAVIGATION CONTROL?: ... N
(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M)
(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M)
(111) ABUT. OR PIER PROT:
LATERAL UNDERCLEARANCE:
(55) RIGHT: ....................... 7.2 FT (2.2 M)
(56) LEFT: ......................... 0.0 FT (0.0 M)
(51) CURB TO CURB WIDTH:
(52) DECK WIDTH:
(32) APPR. ROADWAY WIDTH:
(213) APPR. PAVEMENT WIDTH:
LEFT SHOULDER:
RIGHT SHOULDER:
(33) BRIDGE MEDIAN:
(34) SKEW ANGLE:
(35) DECK FLARE?:
(47) TOTAL HORIZ. CLEARANCE:
(50) SIDEWALKS:
LEFT :
RIGHT :
(214) BRIDGE RAIL TYPE:
RAIL CONFIGURATION:
MATERIAL:
DESIGN TYPE:
(215) BRIDGE RAIL HEIGHT:
(53) MIN. VRT. CLEAR. OVER DECK:
(54) MIN. VRT. UNDERCLEARANCE:
0.0 FT (0.0 M)
73.5 FT (22.4 M)
35.0 FT (10.7 M)
27.0 FT (8.2 M)
3.0 FT (0.9 M)
5.0 FT (1.5 M)
0 - NO MEDIAN
0 °
NO
37.5 FT (11.4 M)
0.0 FT (0.0 M)
0.0 FT (0.0 M)
1 - FULL HEIGHT (NO PARAPE
7 - TIMBER
3 - SIMPLE RAIL (joints at each
1.00 FT (0.30 M)
99.99 FT (99.99 M)
14.75 FT (4.50 M)
CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST
(58) DECK: ................................. N
(59) SUPERSTRUCTURE:
(60) SUBSTRUCTURE:
(61) CHANNEL: .......................... N
(62) CULVERT: ...........................N
(222) APPROACHES:
(223) RETAINING WALL: ........... N
(36) TRAFFIC SAFETY FEAT: ... 1111
(75A) TYPE OF WORK:
(75B) WORK DONE BY:
(76) IMPROVEMENT LENGTH: ..
(67) STRUCTURAL EVALUATION:
(68) DECK GEOMETRY:
(69) UNDERCLEARANCES:
(71) WATERWAY ADEQUACY:
(72) APPROACH ALIGNMENT:
(113) SCOUR CRITICAL:
(225) PURPOSE OF IMPROVEMENT:
(226) PRIORITY OF IMPROVEMENT:
(227) MAINTENANCE COST:
(228) REHAB./RECONSTR. COST: ...
(229) CONSTRUCTION COST:
N
N - Not over waterway.
2 - REHAB/RECONSTRUCTION
D - MINOR
ADDITIONAL INFORMATION
(230) STRUCTURE HISTORY:
2002 - STEEL-BACKED TIMBER RAIL SYSTEM INSTALLED. 2013 - ROADWAY REPAVED.
(231) ADDITIONAL CONSIDERATIONS:
(330) ADDITIONAL CONFIG. INFO.:
https://83�27'58.70 https://35�38'05.60
APPENDIX STRUCTURE NO. 5460-004P
PHOTOGRAPHS STRUCTURE NO. 5460-004P
PHOTO #1 - GENERAL VIEW LOOKING NORTH
PHOTO #2 - WEST SIDE
PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING SOUTH; NOTE NEW
WEARING SURFACE AND ROADWAY STRIPPING
PHOTO #4 - GENERAL VIEW OF WEARING SURFACE FOR THE
UNDERPASS ROAD
PHOTO #5 - NEW PAVEMENT DITCH ALONG NORTH ABUTMENT
PHOTO #6 - MISALIGNMENT OF EAST RAILING NEAR SOUTH END
PHOTO #7 - GENERAL UNDERSIDE VIEW LOOKING SOUTH
PHOTO #8 - TYPICAL CRACKING WITH EFFLORESCENCE ALONG ARCH
RING STONES, SOUTHEAST CORNER SHOWN
PHOTO #9 - GENERAL UNDERSIDE VIEW LOOKING NORTH
PHOTO #10 - TYPICAL EFFLORESCENCE ALONG UNDERSIDE OF ARCH
RINGSTONES, NORTHWEST CORNER SHOWN
PHOTO #11 - EFFLORESCENCE FROM MASONRY JOINTS AND
VEGETATION GROWTH IN JOINT BETWEEN WINGWALL AND
ABUTMENT, SOUTHWEST RINGSTONES SHOWN
PHOTO #12 - AREA OF SPALL AND DELAMINATION AT THIRD SLAB UNIT
FROM EAST ON NORTH WALL NORTH WALL