This is a Request for Bid (RFB) package issued by Birmingham Public Schools for the 2020 Bond Bid Package No. 8, which involves gymnasium scoreboard and sound system replacement at two high school facilities: Groves High School and Seaholm High School. The project scope includes furnishing and installing LED video scoreboards, static scoreboards, center-hung sound systems, and related electrical and data infrastructure at both gymnasiums. Bidders were required to submit proposals by June 24, 2020, at 1:00 PM EST, with a pre-bid meeting held on June 11, 2020, via Zoom. The anticipated board award date was July 14, 2020, with construction scheduled to commence September 11, 2020, and be substantially complete by October 31, 2020. The contract period does not exceed twelve months. The project includes a base bid for the scoreboard and sound system installation and an alternate bid (Alternate No. 1) for the installation of LED display ribbon at both sites.

Bidders were required to submit bid security in the form of a bid bond, cashier check, or certified check in the amount of five percent (5%) of the bid amount. Successful bidders with proposals of $50,000 or more must furnish a Performance and Payment Bond in the amount of 100% of their bid, with bond costs included in the proposal. The project is taxable and does not qualify as a prevailing wage bid. All applicable state and local taxes must be included in the bid price. Bids were to be submitted electronically in PDF format to the Birmingham Public Schools Purchasing Department. The district reserves the right to reject any or all bids and to award by line item. A two-year warranty period is required for all work and materials, beginning from the date of substantial completion, with contractor responsibility for all warranty work regardless of manufacturer coverage.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

3269 Coolidge Highway Berkley, Michigan 48072

Phone 248-547-7757 Fax 248-547-0218

Website: www.foresitedesign.com

Athletic Facility Planning Site Planning Consulting Landscape Architecture

ADDENDUM

ADDENDUM No: #1 PAGES: 110

PROJECT: Birmingham Public Schools 2020 Bond Bid No. 8: High School Gymnasium Scoreboard and Sound

DATE: June 22, 2020

TO: All Bidders

This Addendum is issued prior to the Bid Opening to clarify or change the Bid Documents. This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents issued June 8, 2020. All requirements contained in the Contract Documents shall apply to this Addendum. All incidental work necessary to complete the work shall be included in the Contractor’s Proposal even though not particularly mentioned. Parts of the Specifications and Drawings referred to herein supersede previously issued data and shall form a part of the Bid Documents.

Receipt of this Addendum should be noted on the proposal form; failure to do so may subject Bidder to disqualification.

General Changes:

GN-1 Pre-Bid Meeting

A. Pre-Bid Meeting

1. The Pre-Bid Meeting was held on Monday June 11, 2020, 11am via Zoom Virtual Meeting.

i. The Meeting Agenda and screenshot of Meeting Attendees is included herein.

ii. A copy of Remote Notary Instructions has been included for record.

GN-2 Questions and Answers

A. The following questions have been received to date. The responses to these questions are posted in “red” below the question.

Question #1:

Is ETL Certification acceptable for the video screens, or must all components be UL Certified?

Yes, ETL Certification is acceptable.

Specification Changes:

SC-1 Refer to Request for Bid Form (Re-issued)

A. Insert: Affadavidt of Compliance – Criminal Background Check Form.

B. Revise Warranty Work Section: Added additional language for warranty requirements.

ADDENDUM NO. 1

Birmingham Public Schools 2020 Bond Bid Package No. 8 – HS Gymnasium Scoreboard and Sound

June 22, 2020 P a g e | 2

SC-2 Refer to Specification Section 00 1000 Table of Contents (Re-issued)

C. Insert: New specifications shown in “red”.

SC-3 Refer to Specification Section 11 6845 Scoreboard – Indoor Video, Part 2 Products, 2.4 Communication Type, Item A: (Re-issued)

A. Insert: Clarify requirements for conduit.

SC-4 Refer to Specification Section 27 5117 PA System – Center Hung (Re-issued)

B. Revise Part 2 Products, Item 2.02: General language to clarify components required per site C. Insert Part 2 Products, Item 2.05: Insert requirements for Bluetooth Rack Insert

Drawing Changes:

DC-1 Refer to Drawing L1.02 Groves Site Plan (Re-issued)

A. Clarified notes 9, 10, 11.

DC-2 Refer to Drawing L2.02 Seaholm Site Plan (Re-issued)

A. Clarified notes 9, 10, 11.

DC-3 Refer to Drawing E0.02 (Re-issued)

A. Added note in reference to existing panel RP3-A as indicated.

DC-4 Refer to Drawing E1.01 (Re-issued)

A. Revised construction key notes as indicated

DC-5 Refer to Drawing E2.01 (Re-issued)

A. Revised construction key notes as indicated

END OF ADDENDUM #1

3269 Coolidge Highway Berkley, Michigan 48072

Phone 248-547-7757 Fax 248-547-0218

Website: www.foresitedesign.com Email: mike@foresitedesign.com

Athletic Facility Planning Site Planning Consulting Landscape Architecture

BIRMINGHAM PUBLIC SCHOOLS

2020 BOND BID PACKAGE NO. 8

HS Gymnasium Scoreboard & Sound Replacement

PRE-BID MEETING AGENDA

June 11, 2020 at 11:00 A.M.

I. INTRODUCTIONS

II. PURPOSE OF PRE-BID MEETING

A. Bidding Documents available electronically through www.bpsecatalog.net/bids OR https://milogintp.michigan.gov/eai/tplogin/authenticate?URL=/uisecure/tpSelfService. Bidders are responsible for registering as a vendor in order to access bidding documents. Bidders are responsible for their own printing and shipping costs.

B. Review of Pricing Requests

1) Base Bid Proposal

2) Alternate: No. 1- Install Video Display Ribbon, both Sites

III. BIDDING REQUIREMENTS

A. Bid security by a quality surety in the form of a bid bond, cashier check, or certified check in the amount of five percent (5%) of the Bid amount shall be submitted with the Bid. Proposals that do not have the proper bid security will not be read or considered.

B. Successful bidders whose proposals are $50,000 or more will be required to furnish a Performance and Payment Bond (US Treasury listed) in the amount of 100% of their bid. Cost of this bond shall be included with your bid.

C. The Project is taxable, will comply with the Equal Opportunity Laws of Michigan and is not a Prevailing Wage Bid.

D. Bids shall be on forms furnished by Birmingham Public Schools. Any submission of Bids on forms other than furnished by Birmingham Public Schools will be considered a non-responsive Bid.

E. Electronic bids marked 2020 BOND Bid Package 8: will be received until 1:00 p.m. on the 24th day of June 2020 and read aloud via Zoom Video Conference.

1) Bids shall be addressed to the attention of Lauren Mbereko, Purchasing Coordinator Birmingham Public Schools is not liable for any delivery or postal delays.

2) Any bid submitted will be binding for ninety (90) days subsequent to the date of bid submission.

3) The Birmingham Public Schools Board of Education reserves the right to accept or reject any or all bids; to waive any irregularities and/or informalities; and in general, to make awards in any manner deemed to be in the best interests of the District, including awarding by line item, with rationale to support such a decision.

4) All questions or clarifications regarding bid specifications and/or drawings should be referred to Michael Sims, Project Manager mike@foresitedesign.com, prior to Thursday June 18, 2020 at 1:00PM (local time).

http://www.bpsecatalog.net/bids https://milogintp.michigan.gov/eai/tplogin/authenticate?URL=/uisecure/tpSelfService mailto:mike@foresitedesign.com

Athletic Facility Planning Site Planning Consulting Landscape Architecture

IV. MILESTONE SCHEDULE

PRE CONTRACT COMPLETION DATES

Bids Due June 24, 2020 Post-Bid Interviews Jun 26 – June 28, 2020 Anticipated Board Award July 14, 2020

CONSTRUCTION MILESTONE DATES

Proposal A – Scoreboard & Sound -Start September 11, 2020 -Complete October 31, 2020

V. BID DOCUMENT REVIEW

A. Address any questions regarding clarification of scope

B. Forthcoming Addendum Items:

1) Clarifications on electrical conduits

2) Changes to Warranty Period

3) Clarifications on Components

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025

Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpscatalog.net Phone: 248-203-3050

Overview Michigan amended its notary law in 2018 to be in line with other states that have authorized electronic and remote notarizations (primarily intended for real estate purposes). To do this, the Secretary of State was authorized with the assistance of the Department of Management and Budget to allow vendor systems to be used in Michigan to conduct electronic and remote notarizations.

Additionally, on April 8, 2020, Governor Whitmer instituted Executive Order (EO) 2020-41 and on May 5, 2020 she replaced that order with EO 2020-74, further temporarily encouraging the use of electronic signatures and remote notarization, witnessing, and visitation during the COVID-19 pandemic. EO 2020-74 is currently in effect until June 30, 2020 at 11:59 p.m.

During this time, Birmingham Public Schools will accept a Remote Electronic Notary submission of required documents with all Bids and Proposals. The Remote Electronic Notary must comply with the requirements of Michigan Law on Notarial Acts, Act 238, Public Acts of Michigan, 2003, as amended (MCL §55.261 et. seq.) as modified by Executive Order 2020-74. If you need to locate a Remote Electronic Notary vendor, please see SOS Notary Search instructions below. For further explanation, read on.

Notary Basics

What is a traditional/pen and paper notarization?

A traditional/pen and paper notarization is conducted without the aid of electronic or remote notarization software.

This is the way all notarizations took place prior to the implementation of electronic and remote notarization methods.

The requirements for performing traditional/pen and paper notarizations have not changed.

What is an electronic or e-signature?

While the definition of an electronic or e- signature is quite broad as provided in the Michigan Law on Notarial Acts (MiLONA), for our purposes an e-signatures is a process that is attached to or logically associated with a digital representation of one’s actual handwritten signature executed by the individual with the intent to sign the record.

How is an electronic signature affixed to a document?

Signatures are attached to the document through the use of a digital certificate also known as a digital signature. The digital signature is attached to the document in a way that is tamper evident (is easily apparent if changes are made to the document).

What is an e-notarization?

An e- notarization is similar to a traditional/pen and paper notarization inasmuch as the signer appears before the notary, except in an electronic notarization the document being notarized is digital and the notary uses electronic signatures. An example of this is signing and initialing at the bank or doctor’s office using a stylus and pad.

What is a remote notarization?

A remote notarization is conducted through audio and visual equipment; the signer is not in the physical presence of the notary public. The notarization itself is considered an e-notarization as the document being notarized is digital and the notary uses electronic signatures.

REMOTE NOTARIZATION

mailto:lmbereko@birmingham.k12.mi.us https://bids.bpscatalog.net/

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025

Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpscatalog.net Phone: 248-203-3050

What is the difference between an e-notarization and a remote notarization?

There are a few differences, but the main difference is how the documents are notarized and signed.

In e- notarization, the notarization uses digital signatures but must occur in the physical presence of the notary, similarly to a traditional/pen and paper notarization.

In remote notarization, the person is not in the physical presence of the notary but is present through audio and visual equipment such as a webcam. Electronic signatures are used to complete this process as well.

Do I have to verify my identity as the signee(s)?

Yes, through satisfactory evidence which meets one or more of the conditions below:

1) Personally known to the notary public;

2) Identified upon the oath or affirmation of a credible witness personally known by the notary public and who personally knows the individual; and/or

3) Identified on the basis of a current license, identification card, or record issued by a federal or state government that contains the individual’s photograph and signature.

The system/platform used by the notary will also provide an identity proofing and credential analysis process to confirm the identity of the signee(s)

Approved Vendors used by Electronic/Remote Notary Providers:

Because only approved vendor systems can be used in Michigan. A Notary wishing to provide these services must use the vendors below.

• E-Mortgage Law – Offers electronic notarizations services

• Nexsys – Offers both electronic and remote notarization services

• Pavaso – Offers both electronic and remote notarization services

• NotaryCam - Offers both electronic and remote notarization services

• Notarize - Offers electronic and remote notarization services

Note: The Department of State does not provide access, training or dictate costs of these newly approved systems.

SOS Notary Search To search for a Remote Notary provider, go to https://services2.sos.state.mi.us/notarysearch/ and input your search criteria.

https://bids.bpscatalog.net/ http://emortgagelaw.com/ https://www.nexsystech.com/clear-sign/ https://pavaso.com/ron/ https://www.notarycam.com/ http://www.notarize.com/ https://services2.sos.state.mi.us/notarysearch/ https://services2.sos.state.mi.us/notarysearch/

2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 1 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050

DATE: Monday, June 8, 2020 TIME: 1:00 PM (EST)

PROJECT: Groves & Seaholm High Schools Gymnasium Scoreboard and Sound

JOB NUMBER: 2020 Bond, BP 8

Proposal Due Date and Time: Wednesday, June 24, 2020 at 1:00 P.M. EST Submit Proposal to: Lauren Mbereko, Purchasing Coordinator

Birmingham Public Schools 31301 Evergreen Road Beverly Hills, MI 48025

Submit Questions to: Mike Sims Foresite Design, Inc.

248-547-7757 mike@foresitedesign.com

Post-Bid Review: June 26 – Time TBD

Tentative Bid Time Line:

June 1, 2020 Notice of Advertisement for Bid in local newspaper June 8, 2020 Issuance of this RFB June 11, 2020 Pre-Bid Meeting at 11:00 AM, local time via Zoom Meeting. To join meeting go to:

https://us02web.zoom.us/j/82733642353?pwd=RjhEaEg1WmtvWkpkW UpaanRuWm5Cdz09 Meeting ID: 827 3364 2353, Password: 5dJ8Fr

June 18, 2020 Deadline for Requests for Clarification – 1:00 PM, local time June 24, 2020 Bid Due Date/Time 1:00 PM June 24, 2020 Bid Opening at 1:00 PM, local time via Zoom Meeting. To join meeting go to:

https://us02web.zoom.us/j/81261357724?pwd=S3B4ZEMrSTZJbCtCRTk vcmtBUHNkZz09 Meeting ID: 812 6135 7724, Password: 4mg3Wp

July 14, 2020 Bid Award

PLEASE NOTE: The Owner reserves the right, in its sole and absolute discretion, to make modifications to the RFB timeline as it determines to be in its best interest.

Objective:

Birmingham Public Schools, hereby referred to as Owner, seeks proposals from qualified firms with which to establish a requirements contract for construction services related to new gymnasium scoreboards and center hung sound system at the main Groves and Seaholm High Schools gymnasiums.

REQUEST FOR BID (RFB)

https://bids.bpsecatalog.net/ https://us02web.zoom.us/j/82733642353?pwd=RjhEaEg1WmtvWkpkWUpaanRuWm5Cdz09 https://us02web.zoom.us/j/82733642353?pwd=RjhEaEg1WmtvWkpkWUpaanRuWm5Cdz09 https://us02web.zoom.us/j/81261357724?pwd=S3B4ZEMrSTZJbCtCRTkvcmtBUHNkZz09

2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 2 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050

Table of Contents Tentative Bid Time Line:

Objective:

Information to Bidders

Bid Due Date and Proposal Forms:

Definitions:

Qualification of Bidder

Sole Bidder

Method of Bidding

Discrepancies, Omissions or Interpretations

Addenda

Unit Prices

Bid, Performance and Payment Bond

Sales Tax

Scope of Services

Contract Period

Method of Ordering

Payment

Hours of Work

Safety

Workmanship/Inspection

Warranty Work

Certificate of Insurance

Familial Relationship Disclosure

Iran Economic Sanctions Act

Bid Submission Instructions

Specifications of Bid

Withdrawal or Revision of Bid Proposals

Acceptance and Rejection of Bid Proposals

Affirmative Action

Indemnify and Hold Harmless Agreement

Termination of Contract to Purchase

Post-Bid Information

Specification of Materials/Supplies

BID PROPOSAL FORM

https://bids.bpsecatalog.net/

2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 3 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050

Name of Bidder

Agreements

Licenses

Addenda

Legal Status of Bidder

References

BID FORM (Con’t)

BASE BID:

BID FORM (Con’t)

Additional Labor Charges

Company Profile

AFFIDAVIT OF BIDDER

(FAMILIAL DISCLOSURE FORM)

AFFIDAVIT OF BIDDER

(COMPLIANCE WITH SCHOOL SAFETY INITIATIVE LEGISLATION)

AFFIDAVIT OF COMPLIANCE - IRAN ECONOMIC SANCTIONS ACT

(MICHIGAN PUBLIC ACT NO. 517 OF 2012)

AFFIDAVIT OF COMPLIANCE – CRIMINAL BACKGROUND CHECK

DISTRICT MAP

Information to Bidders Bid Due Date and Proposal Forms:

A. Each bid shall be submitted (including the Familial Disclosure form, Iran Sanctions affidavit, School Safety affidavit, and other attachments), on the bid proposal form furnished by the Owner in the bid documents with all blank spaces filled in.

B. Submitted bid forms shall be signed by a responsible company official.

C. Sealed bids will be received electronically, due to the COVID-19 public health emergency, by

Birmingham Public Schools, by emailing bid, in an electronic (PDF preferable) attachment format to: purch@birmingham.k12.mi.us, with the following subject line: 2020 BOND Bid Package 8: Groves and Seaholm High Schools – Gymnasium Scoreboard and Sound.

D. Sealed bids are due on Wednesday, June 24, 2020 no later than 1:00 PM., local time. ONLY emailed Bids will be accepted. Bid Proposals received after the due date/time will not be considered or accepted. Faxed bids will not be accepted. No exceptions. No allowance will be made for late delivery for any reason.

mailto:purch@birmingham.k12.mi.us

2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 4 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050

E. Bids will be publicly opened and read aloud on a Zoom Video Conference Meeting call on Wednesday June 24, 2020, at 1:00 p.m., EST, by Birmingham Public Schools, evaluated, with awards subsequently to be made by Birmingham Public Schools. No immediate decision will be rendered. To join the meeting go to:

https://us02web.zoom.us/j/81261357724?pwd=S3B4ZEMrSTZJbCtCRTkvcmtBUHNkZz09

Meeting ID: 812 6135 7724, Password: 4mg3Wp It is highly suggested that you create and test a Zoom account before the meeting. If any persons with a disability need further accommodations, contact Lauren Mbereko, Purchasing Coordinator, at lmbereko@birmingham.k12.mi.us in advance of the meeting.

Definitions:

A. The bid documents consist of the Bid Scope Document, the conditions of the contract

(General, Supplementary General and Special Conditions), the drawings, the specifications, appropriate performance and payment bonds, all addenda issued prior to receipt of bids.

B. The contract documents consist of the agreement, the conditions of the contract (General, Supplementary General and Special Conditions), the Schedule Narrative, Description of the Work, the drawings, the specifications, appropriate performance and payment bonds, all addenda issued prior to execution of the contract, and all modifications issued after execution of the contract.

C. The Bid Scope Documents contain the ADVERTISEMENT FOR REQUEST FOR BID, Information to Bidders, Schedule Narrative, Description of the Work, Special Conditions, and other sample bidding and contract forms.

D. A bidder is a legal entity in the outdoor sound / electrical industry capable of performing the work of the bid category (ies) for which he/she is submitting a bid. After award of a contract, the bidder will be known as a Contractor.

E. Base bid is the sum stated for which the bidder offer to perform the complete work of a bid category to which work may be added or deducted. The base bid shall be in strict accordance with the bid category work description, plans and specifications.

F. An alternate bid (or alternate) is an amount stated in the bid to be added to or deducted from the amount of the base bid if the corresponding change in project scope, materials or methods of construction described in the contract documents is accepted.

G. A unit price is an amount stated in the bid as a price per unit of measurement for materials or services as described in the contract documents.

H. Bid categories are units of work performed by a Contractor and their Subcontractors which form part of the total project. The term “bid category” should not be confused with the term “technical section”. Technical sections of the specification establish quality and performance criteria, and the bid categories designate work scope and assignment.

2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 5 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050

I. A Bid category work description is a written description of the scope of work to be performed by a bidder for a bid category. A description of the work is provided in the Description of Work section of the Bid Scope Document for each bid category.

J. The term day is defined as calendar days unless otherwise specified.

K. Contractor is defined as One, who contracts to perform work, or supply articles at a certain price or rate; One who is party to a contract.

Qualification of Bidder

A. The Owner reserves the right to request qualification information from any bidder before issuing documents, receiving bids or awarding a contract. The Owner may, at its sole discretion, accept or reject bidders as qualified. The right to waive any informalities in qualification materials is reserved by the Owner. The Bidder, in submitting his/her bid, agrees to accept the decision of the Owner as final.

B. The submitters shall provide full disclosure of all existing client relationships that currently or prospectively may give rise to conflicts of interest and disqualification as governed by the codes of rules of professional responsibility and conduct.

C. Contractor shall require all subcontractors, insurance agents, and materials suppliers

(payees) to comply with the provisions of this article by insertion of the requirements hereof in a written contract agreement between Contractor and payee. Failure to obtain such provisions in written contracts shall be reason to exclude some or all of the related payees' costs from amount payable to Contractor pursuant to this contract.

D. The Owner shall have access to Contractor’s facilities, shall have access to all necessary records, and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with this article. The Owner shall give Contractor reasonable advance notice of intended audits.

E. If an audit inspection or examination in accordance with the article, discloses overcharges

(of any nature) by Contractor to the Owner in excess of five percent (5%) of the total contract billings, the actual cost of the Owner's audit shall be paid by Contractor.

F. Right To Audit: Contractor's records shall be open to inspection and subject to audit and/or reproduction, during normal working hours, by the Owner to the extent necessary to adequately permit evaluation and verification of any invoices, payments or claims submitted by Contractor of any of its payees pursuant to execution of the contract. Such records subject to examination shall also include, but not be limited to, those records necessary to evaluate and verify direct and indirect costs (including overhead allocations) as they may apply to costs associated with this contract.

G. For the purpose of such audits, inspections, examinations and evaluations, the Owner shall have access to said records from the effective date of this contract, for the duration of the work, and until two (2) years after the date of final payment by the Owner to Contractor pursuant to this contract.

2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 6 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050

Sole Bidder

A. It is the Owner’s intent that this Request for Bid permit competition. It shall be the bidder’s responsibility to advise the Owner in writing, if any language, requirements, scope specifications, etc., or any combinations thereof, inadvertently restricts or limits the requirements stated in this RFB to a single source. Owner shall receive such notification no later than five (5) days prior to the date set for acceptance of bids.

B. If only one bid is received in response to the Invitation to Bid, and the District elects to open the bid, a detailed cost proposal will be requested of the single seller. A cost/price analysis and evaluation and/or audit shall be performed of the cost proposal in order to determine if the price is fair and reasonable.

C. The Owner reserves the right to cancel the bid, or reschedule the bid opening, if there is only one bid received. The Owner’s decision will be final.

Method of Bidding

A. Proposals will only be accepted for individual bid categories where multiple categories exist.

Bidders are required to bid an entire bid category. Bidders may bid more than one bid category. Combined bids covering several bid categories will not be accepted unless separate bid amounts are listed for each bid category making up the combined bid amount.

The amount for a combined bid, however, need not be equal in amount to the total of the individual category bids.

B. The work of an individual bid category described in these contract documents is the sole responsibility of the trade Contractor known herein as “Contractor”. The work of each bid category is described in the Scope of Services section of the Bid Scope Document.

Discrepancies, Omissions or Interpretations

A. Bidder shall promptly notify the Owner of any ambiguity, inconsistency, or errors that they may discover upon examination of the contract documents or of the site and local conditions. Bidders requesting clarification or interpretation of the bid documents shall make a written request to the Owner to reach him at least seven (7) calendar days prior to the date for receipt of bids for transmittal to the Owner. Direct all questions to the Project Manager:

Michael Sims, Project Manager Foresite Design, Inc.

Phone: (248) 547-7757 Email: mike@foresitedesign.com

B. Any interpretation, correction, or change of the contract documents will be made by written addendum by the Owner and issued by the Owner. Interpretations, corrections, or changes mailto:lmbereko@birmingham.k12.mi.us mailto:mike@foresitedesign.com

2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 7 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050 of the document made in any other manner will not be binding. Addenda will be mailed or delivered to all who are known by the Owner to have received contract documents.

C. It should be understood that specifying a brand name, component and/or equipment in these specifications shall not relieve the seller from full responsibility in accordance with the performance warranty and contractual requirements. The seller is responsible for notifying the Owner of any inappropriate brand name, component, and/or equipment that may be called for in the specifications, and to propose a suitable substitute for consideration.

D. If any provisions of this Invitation to Bid shall be held to be invalid, illegal, or unenforceable, the validity, legality and enforceability of the remaining provisions shall not in any way be affected or impaired thereby.

E. Any agreement entered into with the Contractor shall not be construed as granting “any exclusive rights thereunder”. The Owner retains the right to contract with other parties for such services or supplies as it deems necessary.

Addenda

A. Addenda issued during the time of bidding shall become part of the contract documents and receipt thereof shall be acknowledged on the bid proposal.

B. Each bidder shall ascertain prior to submitting their bid that they have received all addenda issued.

C. Addenda notices will be e-mailed to all who are known by the Owner to have a set of contract documents. Copies of addenda will be made available for inspection wherever contract documents are on file for that purpose.

Unit Prices

A. Each bidder must bid on all unit prices listed in the bid proposal that are applicable to their bid category. They will be fully considered in awarding the contract.

B. Bids are considered irregular and may be rejected if unit prices contained in the bid proposal are obviously unbalanced either in excess of, or below, reasonable cost analysis values.

C. Any unit price that, in the sole opinion of the Owner, is unbalanced or excessive may be rejected without affecting the validity of the bid or other unit prices. An entire bid may be rejected if, in the sole opinion of the Owner, rejection of individual unit prices materially affects the bid.

D. Bid prices shall be firm through the completion of work. Pricing shall be delivered, unloaded and installed, and inclusive of all overhead, profit, insurance, and bonds costs.

Bid, Performance and Payment Bond

2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 8 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050

A. Bid Bond: Bidders must submit with its Bid, bid security in the form of a Bid Bond issued by a qualified surety or certified check in an amount of five percent (5%) of the Bid (“Bid Security”) either as part of the same document or in the form of a separate electronic (PDF preferable) attachment. Failure to include this Bid Security with Bidder’s Bid will result in the rejection of your Bid. If a Bid Bond is posted by a Bidder, it shall be from a Treasury Surety licensed to do business in the State of Michigan, and the attorney‐in‐fact who executes the Bid Bond on behalf of the Bidder shall attach a certified, current copy of its power of attorney. In the event a certified check is submitted, it shall be made payable to “Birmingham Public Schools”. If submitting a cashier or certified check, a copy shall be provided with submitted Bid and original mailed to Birmingham Public Schools (31301 Evergreen Road, Beverly Hills, MI 48025), Attention Lauren Mbereko. The School District shall not be liable for any interest earned thereon. The Bid Security shall be forfeited as liquidated damages, and not as a penalty, if the Bidder withdraws its Bid after the Due Date for submission of Bids or, upon acceptance of its Bid by the School District, Bidder fails to execute the form of Contract acceptable to the School District, substantially evidencing and incorporating this RFB and its Bid and fails to provide the required Performance Bond and/or Payment Bond, if any, and the required insurance certificates, within fifteen (15) days of an award of a Contract to the Bidder. Bid Bonds shall be duly executed by the Bidder, as principal and by a surety that is properly licensed and authorized to do business in the state in which the Work is to be performed. All sureties providing bonds for this Project must be listed in the latest version of the Department of Treasury’s Circular 570, entitled “Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies”, with the bond amount less than or equal to the underwriting limitation, and/or have an A.M. best rating of A‐ or better. Bid Security shall be returned to all non‐successful Bidders within a reasonable time after the award of a Contract and execution of a Contract by the successful Bidder.

B. For those contracts of $50,000.00 or greater, acceptable bidders shall be required, as a condition precedent to award of contract, to furnish in the amount of 100% of the contract price, satisfactory Performance Bond and Labor and Material Payment Bond on contract, by a quality surety licensed to do business in the State of Michigan with cost of bond listed as a separate line item in the bid proposal.

C. The bidder shall deliver the required bonds to the Owner within 15 days after award of the contract, but in any event before work commences.

D. The proposed bonding company of the bidder shall be acceptable to the Owner. The Owner shall be listed as obligee on the bond.

E. Form of Contract: This is a Request for Bids only. Bids will be treated as offers to enter into the

Contract with the School District. The School District and successful Contractor shall memorialize their contractual relationship and obligations using the form of a Contract, a sample of which is included in these documents. The Contract contains many details relative to the Work required under this RFB, as well as the terms and conditions under which the Work shall be provided by the successful Contractor. The Contract should be reviewed carefully by each Contractor prior to submitting a Bid. Any exceptions to the terms and conditions contained in the Contract, or any other special considerations or conditions requested or required by the bidder relative to this RFB or the form of Contract shall be expressly/specifically enumerated by the bidder and be submitted as part of its Bid, together with an explanation as to the reason such terms and

2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 9 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050 conditions cannot be met by, or, in the bidder’s opinion are not applicable to, the bidder, provided however, that exceptions or special conditions of the bidder will not be binding upon the School District unless those exceptions or special conditions are expressly accepted by the School District, and incorporated into the final Contract. Following the selection of the successful bidder by the School District, the Contract will be finalized by the parties.

Sales Tax

A. All applicable State and Local taxes shall be included with Bid.

Scope of Services

A. Overview:

a) Provide all site demolition as noted on drawings.

b) Provide components, associated data wiring, and associated electrical related to the installation of an LED video scoreboard, large secondary fixed digit scoreboards, and small side-court scoreboards as a complete installation at Groves and Seaholm High Schools.

c) Provide components and associated data wiring to install center-hung sound system, microphones, and sound rack components as a complete installation at Groves and Seaholm High School. Work should include installation of new cabling from sound system to sound rack and from sound rack to floor box.

d) Provide an Alternate Price to install new LED Ribbon and Sound Rack components.

Work as part of Alternate shall also include data and electrical wiring as necessary.

B. Detail:

a) See detailed Specification Section 00 1115 for detailed Scope of Work.

C. Auxiliary Services:

a) The specifications associated with this bid are intended to generally describe a complete installation. Any additional materials or labor required for the complete project as intended shall be included in the bid price and provided by the Contractor, whether or not it has been detailed in these documents.

Contract Period

A. The contract award resulting from this Request for Bid shall not exceed twelve (12) months.

B. Project Schedule: It is intended for project to commence work as early as September 11, 2020. Work under this RFB as noted herein shall be substantial complete by no later than

2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 10 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050

October 31, 2020. A pre-construction meeting will be held prior to commencement of all work to ensure trades have a firm understanding of project schedule.

C. In the event that performance on the part of any party hereto shall be delayed or suspended as a result of circumstances beyond the reasonable control and without the fault and negligence of said party, none of the parties shall incur any liability to the other parties as a result of such delay or suspension. Circumstances deemed to be beyond the control of the parties hereunder shall include, but not be limited to, acts of God or of the public enemy;

insurrection; acts of the Federal Government or any unit of State or Local Government in either sovereign or contractual capacity; fires, floods; epidemics; quarantine restrictions;

strikes, freight embargoes or delays in transportation, to the extent that they are not caused by the party’s willful or negligent acts or omissions, and to the extent that they are beyond the party’s reasonable control.

D. The Owner reserves the right to suspend work wholly or in part if deemed necessary for the best interest of the Owner. This suspension will be without compensation to the Contractor, other than to adjust the contract completion/delivery requirements.

Method of Ordering

In addition to an official Contract, the Purchasing Department may choose to issue a written purchase order as the method of ordering product or services. If this is the case, all Contractor invoices and packing/delivery tickets must include the purchase order number.

Payment

A. All Contractor payments shall be in the form of AIA G702 Application for Payment

B. Refer to AIA A201 – 2007 General Conditions of the Contract for Construction and AIA A101

– 2017 Standard Form of Agreement Between Owner and Contractor regarding requirements for payment.

Hours of Work

A. Projects for Owner shall be performed during the hours 7:00 a.m. to 6:00 p.m., Monday through Saturday. Any work on legal holidays shall be pre-approved by the Owner. Any changes to the established schedule must have prior approval of the Owner’s representative and scheduled at the least disruptive time possible.

B. The Contractor shall not interfere with or disrupt school operations.

Safety

A. All Prime Contractors and Subcontractors will be required to comply with current CDC Guidelines, OSHA, State of Michigan, and Birmingham Public School Guidelines in compliance with Covid-19 Preparedness. This shall include recommended social distancing, 2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 11 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050

Personal Protection Equipment (PPE), Employee Symptom Checks, and sanitizing stations for all personnel entering the facilities.

B. The Contractor shall be responsible for providing and for the placement of barricades, tarps, plastic, flag tape and other safety/traffic control equipment required to protect its employees, the public, surrounding areas, equipment and vehicles. The safety of the Contractor's employees and the public is of prime concern to the Owner, and the Contractor must take all necessary steps to assure proper safety during the performance of the Contractor. Any bidders that have a history of safety problems or a high incidence of accidents will not be considered for award of a Contract.

C. The Contractor shall keep the premises clean of all rubbish and debris generated by the work involved and shall leave the premises neat and clean. Contractor shall dispose of all surplus material, rubbish, and debris at the Contractor's expense.

D. The work area shall be cleaned at the end of each workday. All materials, tools, equipment, etc., shall be removed or safely stored. The Owner is not responsible for theft or damage to the Contractor's property. All possible safety hazards to workers or the public shall be corrected immediately and left in a safe condition at the end of each workday. If there is a question in this area, the Owner will be consulted.

E. The Owner does not assume any responsibility, at any time, for the protection of or for loss of materials, from the time that the contract operations have commenced until the final acceptance of the work by the Owner.

Workmanship/Inspection

A. Where not more specifically described in any of the various sections of these specifications, workmanship shall conform to all of the methods and operations of best standards and accepted practices of the trade or trades involved, and shall include all items of fabrication, construction or installation regularly furnished or required for completion of the services.

Personnel skilled in their respective lines of work shall execute all work.

B. The Contractor will request the Architect to conduct a site inspection after the project is complete. The Architect will prepare a “punch-list” during the inspection and will forward a copy of the “punch-list” to the Contractor.

C. After the “punch-list” items have been corrected, the Contractor will request a final inspection with the Owner and Architect. Final project approval is contingent upon the Owner’s final inspection and written approval.

Warranty Work

A. Bidder shall be responsible for any and all warranty work, regardless of whether or not manufacturers of the equipment and/or its component parts, provide the actual warranty coverage. Contractor shall respond to requests for warranty assistance within seventy-two

(72) hours.

2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 12 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050

B. A warranty will be available for a term of two (2) years from the date of substantial completion, unless noted otherwise. If, during the term of the warranty, Owner shall become dissatisfied with the performance of the work, Contractor shall be responsible to correct any deficiencies in work or materials at no additional cost to the Owner.

C. This warranty will not void specific warranties issued by manufacturers for greater periods of time nor will it void any rights guaranteed to the owner by law.

D. Refer to Specifications for complete Warranty items on specified materials.

Certificate of Insurance

A. Before commencement of any work, a Certificate of Insurance executed by bidder’s insurance agent or carrier showing required insurance coverage shall be submitted. A Thirty Day Cancellation Clause is required on all policies.

Failure to provide the Certificate may be considered material breach of the agreement and may be grounds for terminating the agreement.

The Contractor shall hold harmless from and indemnify the Birmingham Public Schools, Plante Moran Cresa, and Foresite Design, Inc. against all claims, suits, actions, costs, counsel fees, expenses, damages, judgments or decrees, by reason of any person or persons or property being damaged or by the Contractor, or any other employed under said Contractor, in any capacity during the progress of the work whether by negligence or otherwise.

The following language shall be indicated on all certificates of insurance from successful bidder: “Birmingham Public Schools, Plante Moran Cresa, and Foresite Design, Inc., as well as their elected or appointed officials, employees and volunteers, are included as insured with regards to damages and defense of claims arising from: (a) activities performed by or on behalf of the named insured, or (b) products and completed operations of the named insured, or (c) premises owned, leased, or used by the named insured"

B. Insurance Coverage

Refer to AIA Document A101-2017 Standard Form of Agreement Between Owner and Contractor, Section 8.5 Insurance and Bonds.

Familial Relationship Disclosure

All bidders shall provide familial disclosure in compliance with MCL 380.1267 and attach this information to the bid proposal. The bid proposal shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the bidder or any employee of the bidder, and any member of the Board of Education of the school district, or the Superintendent of the school district. The District will not consider a bid proposal that does not include this sworn and notarized statement.

Lauren Mbereko Last time we changed this section just to this sentence.

2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 13 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050

Iran Economic Sanctions Act Each bid must be accompanied by a sworn and notarized statement certifying that the Contractor is not an “Iran linked business” within the meaning of the Iran Economic Sanctions Act.

Bid Submission Instructions

A. The bidder, by making his/her bid, represents that he/she has read and understood the contract and bid documents, and that his/her bid is made in accordance therewith.

B. Each bidder, by making his bid, represents that he has visited the site and familiarized himself with the local conditions under which the work is to be performed. No claims for extra compensation shall be allowed due to failure of any Bidder to examine the conditions that exist at the building site nor for conditions or difficulties encountered in the execution of the work which may have been avoided by such examination.

C. Bids shall be completed on forms furnished by Birmingham Public Schools and submitted via email in electronic (PDF preferable) format. All blanks on the bid form shall be filled in electronically or manually in ink.

D. The bid signer shall initial all alterations or erasures.

E. Fill in all blank spaces for bid prices in both words and figures. In case of discrepancies, the amount in words will govern. Submit all copies of the bid and any other documents required to be submitted with the bid, in a sealed opaque envelope. Indicate on outside of envelope, name of bidder, address, name of project for which bid is submitted and description and address of the party to receive the bid. If forwarded by mail, enclose sealed envelope containing bid in another envelope addressed as indicated with the notation, “Sealed Bid Enclosed” on the envelope face.

F. All requested alternates shall be bid. Any alternates must be submitted with technical literature and/or detailed product brochures for the Owner’s use to evaluate the product(s) offered. Bids submitted without this product information may be considered as non-responsive and will be rejected. Prices will include all applicable taxes, bonds, overhead, profit and other pertinent costs.

G. Each copy of the bid shall include the legal name of the bidder and shall be signed by the person or persons legally authorized to bind the bidder to a contract. If an agent submitted the bid, provide satisfactory evidence of agency authority.

H. Unit pricing is to be based solely upon the materials, installation and equipment established by the contract documents.

I. Bids must be received at the designated location prior to the time and date for receipt of bids indicated in the ADVERTISEMENT FOR REQUEST FOR BID, or any extension thereof made by addendum. Bids received after designated bid receipt deadline will be returned unopened.

2020 Bond, BP #8, High Schools Gymnasium Scoreboard and Sound Page 14 of 28

Birmingham Public Schools - Purchasing Department 31301 Evergreen Road, Beverly Hills, MI 48025 Lauren Mbereko – Purchasing Coordinator lmbereko@birmingham.k12.mi.us https://bids.bpsecatalog.net Phone: 248-203-3050

J. Oral, telephone, facsimile or telegraphic bids are invalid and will not receive consideration.

K. The bid proposal form will be considered a portion of the contract document.

NOTE: Noncompliance with any one of the foregoing may justify rejection of the bid.

Specifications of Bid

A. Refer to attached product Specifications.

B. Bidders shall address all aspects of labor rates which would be incurred, including proposed labor rates for normal working hours, after hours, weekends, holidays, etc.

Withdrawal or Revision of Bid Proposals

A. Any bid may be withdrawn prior to the scheduled time for opening of bid proposals.

Written notices shall be received in the Purchasing Department, Birmingham Public Schools, 31301 Evergreen Rd, Beverly Hills, Michigan, 48025.

B. A bid may not be modified, withdrawn or cancelled by the bidder for ninety (90) calendar days following the time and date designated for the opening of bids, and bidder so agrees in submitting his/her bid.

C. Bids submitted early may be modified only by notice to the party receiving bids at the place, and prior to the time designated for opening of bids. Such notice shall be in writing over the signature of the bidder, or by telegram; if by telegram, written confirmation over the signature of bidder must have been mailed and postmarked on or before the date and time set for opening of bids. The revised bid shall be so worded as not to reveal the amount of the original bid.

Acceptance and Rejection of Bid Proposals

A. Low bid price is not always the determining factor in the awarding of the bid. Other factors considered may include, but not be limited to, the following: delivery and/or completion time, judged quality of product, past performance, inventory availability, financial stability, and references.

B. The contract shall be awarded in the form of an AIA Standard Form 101-2017 mailed to the vendor(s) selected.

C. Bids are considered irregular and may be rejected for any of the following reasons unless otherwise provided by law:

a) If bid proposal form furnished is not used or is altered.

b) If there are unauthorized additions, qualifications, conditions, or irregularities of any kind which may make the bid incomplete, indefinite, or ambiguous as to its…