BLM_38_39_Bid_Schedule.pdf
PDF 530 KB Posted
- Attached to
- LABARGE WATERSHED Federal contract opportunity
- Solicitation number
- 140L6222R0009
About this file
This document contains two bid schedules for federal construction projects. Schedule A is for the Wildcat Canyon Culvert project and includes 17 line items with estimated quantities and spaces for unit costs and totals. Major items include general conditions, earthwork, removal of an existing culvert, installation of new culverts ranging from 12 to 66 inches in diameter, concrete block mat, energy dissipation units, roughness treatment, reclamation seeding, and construction oversight. Schedule B is for the Upper Bird Draw Culvert project and includes 16 line items such as mobilization, bonds and insurance, clearing and grubbing, storm water control, construction staking, materials testing, removal of an existing pipe, installation of 60-inch CMP arch pipe and flared end section, crushed base, seeding, concrete block mat, concrete dissipation units, erosion control blanket, excavation and grading for erosion repair, and bonding. Bidders are to provide unit pricing for each item and the schedules will be used to determine the total project costs. The related federal contract opportunity is for the Labarge Watershed Restoration Project issued by the Bureau of Land Management Wyoming Region with solicitation number 140L6222R0009.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch_13_Bid_Schedule_Revised_0002.xlsx | XLSX spreadsheet | |
| Sol_140L6222R0009_Amd_0002.pdf | ||
| Attch_12_140L6222R0009_Solicitation_Revised_0001.pdf | ||
| Attch_7_Bid_Schedule_0001.pdf | ||
| Attch_11_SF1442_Directions_0001.pdf | ||
| Sol_140L6222R0009_Amd_0001.pdf | ||
| Attch_10_Site_Visit_Roster_0001.pdf | ||
| Attch_9_Contractor_Q_A_0001.pdf | ||
| Attch_8_Limitations_on_Subcontracting_0001.xlsx | XLSX spreadsheet | |
| BLM_38_39_Appendix_B_Stipulations.pdf | ||
| BLM_38_Wildcat_Canyon_Culvert_Construction_Drawings.pdf | ||
| Appendix5_ProjectDocuments.pdf | ||
| BLM_39_Upper_Bird_Draw_Culvert_Construction_Drawings.pdf | ||
| BLM_38_39_Statement_of_Work.pdf | ||
| Sol_140L6222R0009.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SCHEDULE
BLM-38 Wildcat Canyon Culvert BLM-39 Upper Brid Draw Culvert
BLM-38 Wildcat Canyon Culvert-Bid Schedule A
Item No.
Description
Estimated Quantity
Unit Unit Cost
Total Cost
1 General Conditions 1 LS $ $
2 Mobilization/Demobilization 1 LS $ $
3 Earthwork 8,070 CY $ $
4 Remove/Dispose Existing Culvert 1 LS $ $
5 Crushed Base Purchase/Install 7 CY $ $
6 12-inch Culvert Material & Installation 60 LF $ $
7 18-inch Culvert Materials & Installation 40 LF $ $
8 66-inch Culvert Materials & Installation 60 LF $ $
9 CMP Flared End Section 1 EA $ $
10 Concrete Block Mat Purchase & Install 3,200 SF $ $
11 Energy Dissipation Unit Purchase & Install 18 Unit $ $
12 Roughness Treatment 3.34 Acres $ $
13 Reclamation Seeding 3.34 Acres $ $
14 Construction Oversight (Staking, Oversight, and As-Builts) 1.00 LS $ $
15 Monitoring and Maintenance 1.00 LS $ $
16 Contingency 1.00 LS $ $
17 Bonding Requirement 1.00 LS $ $
Total Schedule A $
BLM-39 Upper Bird Draw Culvert-Bid Schedule B Item No.
Description
Estimated Quantity
Unit Unit Cost
Total Cost
1 Mobilization/Demobilization 1 LS $ $
2 Bonds and Insurance 1 LS $ $
3 Clearing and Grubbing 1 LS $ $
4 Storm Water Control 1 LS $ $
5 Construction Staking 1 LS $ $
BID SCHEDULE
BLM-38 Wildcat Canyon Culvert BLM-39 Upper Brid Draw Culvert
6 Materials Testing 1 LS $ $
7 Removal of Existing Pipe 1 LS $ $
8 CMP Arch Pipe 60" x 46" 48 LF $ $
9 CMP Flared End Section 1 EA $ $
10 Crushed Base 10 CY $ $
11 Seeding 1,130 SY $ $
12 Concrete Block Mat 1,725 SF $ $
13 Concrete Dissipation Units 300 EA $ $
14 Erosion Control Blanket 310 SY $ $
15 Excavation and Grading (Erosion Repair) 396 CY $ $
16 Bonding Requirement 1.00 LS $ $
Total Schedule B $
Total Cost Schedule A + B $