This document contains a bid schedule for a federal contract solicitation to perform watershed restoration work for two sites within the LaBarge Watershed. The bid schedule outlines estimated quantities and unit costs for various work items including general conditions, earthwork, culvert installation in various sizes, crushed base material, concrete block mats, erosion control measures, reclamation seeding, and construction oversight. It requests unit pricing and extended totals for both the Wildcat Canyon and Upper Bird Draw culvert replacement projects. Additional line items cover bonds, insurance, profit, overhead, and contingencies. Upon award, the contractor will perform restoration at the two locations which include installing new culverts, addressing erosion issues, and re-establishing native vegetation. The associated federal contract opportunity provides further details, identifying the solicitation number, name of the watershed project, that it is a solicitation type, and that the contracting agency is the Bureau of Land Management Wyoming Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L6222R0009_Amd_0002.pdf | ||
| Attch_12_140L6222R0009_Solicitation_Revised_0001.pdf | ||
| Attch_7_Bid_Schedule_0001.pdf | ||
| Attch_11_SF1442_Directions_0001.pdf | ||
| Sol_140L6222R0009_Amd_0001.pdf | ||
| Attch_10_Site_Visit_Roster_0001.pdf | ||
| Attch_9_Contractor_Q_A_0001.pdf | ||
| Attch_8_Limitations_on_Subcontracting_0001.xlsx | XLSX spreadsheet | |
| BLM_38_39_Bid_Schedule.pdf | ||
| BLM_38_39_Appendix_B_Stipulations.pdf | ||
| BLM_38_Wildcat_Canyon_Culvert_Construction_Drawings.pdf | ||
| Appendix5_ProjectDocuments.pdf | ||
| BLM_39_Upper_Bird_Draw_Culvert_Construction_Drawings.pdf | ||
| BLM_38_39_Statement_of_Work.pdf | ||
| Sol_140L6222R0009.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Solicitation 140L6222R0009 LaBarge Watershed Restoration | ||||||
| Bid Schedule Revised | ||||||
| BLM-38 Wildcat Canyon Culvert | ||||||
| Item Number | Description | Estimated Quantity* | Unit | Unit Cost | Total Cost | *Quantities provided are purely estimates and equitable adjustments will only be considered |
| 1 | General Conditions | 1 | Lump Sum | in accordance with FAR clause 52.211-18 Variation in Estimated Quantity | ||
| 2 | Mobilization/Demobilization* | 1 | Lump Sum | |||
| 3 | Earthwork | 8070 | Cubic Yards | *Both sites are located close to each other, so there is only expected to be one mobilization/demobilization | ||
| 4 | Remove and Dispose Exisitng Culvert | 1 | Lump Sum | |||
| 5 | Crushed Base Purchase/Install | 7 | Cubic Yards | |||
| 6 | 12-inch Culvert Materials and Installation | 60 | Linear Feet | |||
| 7 | 18-inch Culvert Materials and Installation | 40 | Linear Feet | |||
| 8 | 66-inch Culvert Materials and Installation | 60 | Linear Feet | |||
| 9 | CMP Flared End Section | 1 | Lump Sum | |||
| 10 | Concrete Block Mat Materials and Installation | 3200 | Square Feet | |||
| 11 | Energy Dissipation Unit Materials and Installation | 18 | Each | |||
| 12 | Roughness Treatment | 3.34 | Acres | |||
| 13 | Reclamation Seeding | 3.34 | Acres | |||
| 14 | Construction Oversight (Staking, Oversight, As-Builts, etc.) | 1 | Lump Sum | |||
| 15 | Monitoring and Maintenance | 1 | Lump Sum | |||
| Wildcat Canyon Subtotal: | ||||||
| BLM-39 Upper Bird Draw Culvert | ||||||
| Item Number | Description | Estimated Quantity* | Unit | Unit Cost | Total Cost | |
| 1 | General Conditions | 1 | Lump Sum | |||
| 2 | Clearing and Grubbing | 1 | Lump Sum | |||
| 3 | Storm Water Control | 1 | Lump Sum | |||
| 4 | Construction Staking | 1 | Lump Sum | |||
| 5 | Materials Testing | 1 | Lump Sum | |||
| 6 | Remove and Dispose Existing Pipe | 1 | Lump Sum | |||
| 7 | CMP Arch Pipe 60" x 46" | 48 | Linear Feet | |||
| 8 | CMP Flared End Section | 1 | Lump Sum | |||
| 9 | Crushed Base Purchase/Install | 10 | Cubic Yards | |||
| 10 | Seeding | 1,130 | Square Yards | |||
| 11 | Concrete Block Mat Materials and Installation | 1,725 | Square Feet | |||
| 12 | Energy Dissipation Unit Materials and Installation | 300 | Each | |||
| 13 | Erosion Control Blanket | 310 | Square Yards | |||
| 14 | Excavation and Grading for Erosion Repair | 396 | Cubic Yards | |||
| Upper Bird Draw Subtotal: | ||||||
| Contractor Fees | ||||||
| Item Number | Description | Estimated Quantity* | Unit | Unit Cost | Total Cost | |
| 1 | Bonds | 1 | Lump Sum | |||
| 2 | Insurance | 1 | Lump Sum | |||
| 3 | Profit | 1 | Lump Sum | |||
| 4 | Overhead | 1 | Lump Sum | |||
| 5 | Contingency Costs | 1 | Lump Sum | |||
| Fees Subtotal: | ||||||
| Project Grand Total: |