Attch_7_Bid_Schedule_0001.pdf

PDF 530 KB Posted

Attached to
LABARGE WATERSHED Federal contract opportunity
Solicitation number
140L6222R0009
Issued by
Department of the Interior Bureau of Land Management Wyoming Region

About this file

This document contains two bid schedules for a federal construction project to restore watershed culverts on Bureau of Land Management land in Wyoming. Schedule A includes estimated quantities and unit pricing for earthwork, culvert installation, erosion control materials, construction oversight, monitoring and maintenance related to repairing the Wildcat Canyon culvert. Schedule B covers mobilization, insurance, clearing, grading and pipe installation for replacing the Upper Bird Draw culvert. Contractors are invited to provide lump sum pricing for general conditions, mobilization, removal of existing structures, and bond and insurance costs. The total awarded contract value will be determined based on the combined lowest bid amounts from the two schedules.

The solicitation number and opportunity details indicate this procurement supports the LaBarge Watershed Restoration Project issued by the Bureau of Land Management's Wyoming office. Products, services, and quantities listed in the bid schedules suggest the work involves repairing and replacing damaged watershed culverts to address erosion issues across unidentified acres of BLM land in the LaBarge area.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID SCHEDULE

BLM-38 Wildcat Canyon Culvert BLM-39 Upper Brid Draw Culvert

BLM-38 Wildcat Canyon Culvert-Bid Schedule A

Item No.

Description

Estimated Quantity

Unit Unit Cost

Total Cost

1 General Conditions 1 LS $ $

2 Mobilization/Demobilization 1 LS $ $

3 Earthwork 8,070 CY $ $

4 Remove/Dispose Existing Culvert 1 LS $ $

5 Crushed Base Purchase/Install 7 CY $ $

6 12-inch Culvert Material & Installation 60 LF $ $

7 18-inch Culvert Materials & Installation 40 LF $ $

8 66-inch Culvert Materials & Installation 60 LF $ $

9 CMP Flared End Section 1 EA $ $

10 Concrete Block Mat Purchase & Install 3,200 SF $ $

11 Energy Dissipation Unit Purchase & Install 18 Unit $ $

12 Roughness Treatment 3.34 Acres $ $

13 Reclamation Seeding 3.34 Acres $ $

14 Construction Oversight (Staking, Oversight, and As-Builts) 1.00 LS $ $

15 Monitoring and Maintenance 1.00 LS $ $

16 Contingency 1.00 LS $ $

17 Bonding Requirement 1.00 LS $ $

Total Schedule A $

BLM-39 Upper Bird Draw Culvert-Bid Schedule B Item No.

Description

Estimated Quantity

Unit Unit Cost

Total Cost

1 Mobilization/Demobilization 1 LS $ $

2 Bonds and Insurance 1 LS $ $

3 Clearing and Grubbing 1 LS $ $

4 Storm Water Control 1 LS $ $

5 Construction Staking 1 LS $ $

BID SCHEDULE

BLM-38 Wildcat Canyon Culvert BLM-39 Upper Brid Draw Culvert

6 Materials Testing 1 LS $ $

7 Removal of Existing Pipe 1 LS $ $

8 CMP Arch Pipe 60" x 46" 48 LF $ $

9 CMP Flared End Section 1 EA $ $

10 Crushed Base 10 CY $ $

11 Seeding 1,130 SY $ $

12 Concrete Block Mat 1,725 SF $ $

13 Concrete Dissipation Units 300 EA $ $

14 Erosion Control Blanket 310 SY $ $

15 Excavation and Grading (Erosion Repair) 396 CY $ $

16 Bonding Requirement 1.00 LS $ $

Total Schedule B $

Total Cost Schedule A + B $

File details come from the government source that posted it. Updated .