Attch_8_Limitations_on_Subcontracting_0001.xlsx
XLSX spreadsheet 93 KB Posted
- Attached to
- LABARGE WATERSHED Federal contract opportunity
- Solicitation number
- 140L6222R0009
About this file
This document contains a template for tracking limitations on subcontracting compliance on a federal contract. The template includes fields for total contract value, total material costs, self-performed labor costs, amounts paid to small business subcontractors, amounts paid to large business subcontractors, and a calculation of the limitation on subcontracting percentage.
The related federal contract opportunity is for the LaBarge Watershed Restoration Project being conducted by the Bureau of Land Management Wyoming Region. The solicitation number is 140L6222R0009 and it is set aside as a total small business opportunity with a 180 calendar day period of performance. The template provides guidance on tracking compliance with limitations on subcontracting requirements for the awarded small business contractor.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L6222R0009_Amd_0002.pdf | ||
| Attch_13_Bid_Schedule_Revised_0002.xlsx | XLSX spreadsheet | |
| Attch_10_Site_Visit_Roster_0001.pdf | ||
| Attch_12_140L6222R0009_Solicitation_Revised_0001.pdf | ||
| Attch_7_Bid_Schedule_0001.pdf | ||
| Attch_11_SF1442_Directions_0001.pdf | ||
| Sol_140L6222R0009_Amd_0001.pdf | ||
| Attch_9_Contractor_Q_A_0001.pdf | ||
| BLM_38_39_Bid_Schedule.pdf | ||
| BLM_38_39_Appendix_B_Stipulations.pdf | ||
| BLM_39_Upper_Bird_Draw_Culvert_Construction_Drawings.pdf | ||
| BLM_38_39_Statement_of_Work.pdf | ||
| Sol_140L6222R0009.pdf | ||
| BLM_38_Wildcat_Canyon_Culvert_Construction_Drawings.pdf | ||
| Appendix5_ProjectDocuments.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)
| Solicitation Number | 140L6222R0009 |
| Type of Set Aside | Total Small Business |
| Performance Period | 180 Calendar Days |
| Required Self-Performance | 15% |
(A) Total Amount Proposed*
(B) Total Material Cost
(C) Self Performed Labor
| (D) Small Business Subcontractor (SSS) Labor | ||
| Total Amount Paid to [Insert First SSS Name] | ||
| Total Amount Paid to [Insert Second SSS Name] | ||
| Total Amount Paid to [Insert Third SSS Name] | ||
| Total Amount Paid to [Insert Fourth SSS Name] | ||
| Total Amount Paid to [Insert Fifth SSS Name] | ||
| Total Amount Paid to [Insert Sixth SSS Name] | ||
| Total Amount Paid to SSS Companies | $0.00 |
| (E) Large Business Subcontractor (LBS) Labor | ||
| Total Amount Paid to [Insert First LBS Name] | ||
| Total Amount Paid to [Insert Second LBS Name] | ||
| Total Amount Paid to [Insert Third LBS Name] | ||
| Total Amount Paid to [Insert Fourth LBS Name] | ||
| Total Amount Paid to [Insert Fifth LBS Name] | ||
| Total Amount Paid to [Insert Sixth LBS Name] | ||
| Total Amount Paid to LBS Companies | $0.00 |
(F) Total Labor Cost $0.00
| (G) Limitation on Subcontracting Percentage* | ||
| (Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor Cost | ERROR:#DIV/0! |
| *Note 1: (A) = (B) + (F) |
| *Note 2: To be compliant, limitation percentage must be greater than the required self-performance percentage. |
Sheet2
| Services (except construction) |
| General construction |
| Construction by special trade contractors |
File details come from the government source that posted it. Updated .