BioPreferred.pdf

PDF 681 KB Posted

Attached to
127EAX24Q0045 – Granite Basin & Mingus Mountain Road NFSR 374 & 104
Solicitation number
127EAX24Q0045
Issued by

About this file

This document is a Solicitation (RFQ) for a Firm Fixed-Price construction contract from the U.S. Department of Agriculture Forest Service Region 3 - Southwestern Region. The project involves repairs and improvements to National Forest Service Roads (NFSR) 104 ("Mingus Mountain Road") and 374 ("Granite Basin Road") in the Bradshaw Ranger District in Arizona. The work includes adding culverts, reconditioning and repairing ditches, replacing paved road edges, and installing erosion protection measures along NFSR 104. For NFSR 374 and the Granite Basin Recreation Area, the work includes slurry seal and restriping of Playa Day Use, full-depth asphalt reclamation and repaving at Wekuvde Picnic Site, and full-depth asphalt reclamation, reshaping, and repaving of the main road. A new fee lane will also be constructed near the Cayuse Equestrian recreation site. The solicitation has a Lowest Price/Technically Acceptable basis for award, a Small Business Set-Aside, and a magnitude between $1,000,000 and $5,000,000. Offers are due by September 12, 2024, at 1:00 pm PT.

View the file

Other files

File Type Posted
B08 127EAX23Q0045 Granite Basin and Mingus Mnt. Road NFSR 374 and 104 Notice of Award - Earth Resources Corp. revised.pdf PDF
A1_AttachmentB_NFSR374_ConstructionDrawings_240822e.pdf PDF
A1_AttachmentB_NFSR374_ConstructionDrawings_240822d.pdf PDF
A1_AttachmentB_NFSR374_ConstructionDrawings_240822c.pdf PDF
A1 AttachmentD_PrescottFirePlan.pdf PDF
A1_AttachmentA_NFSR104_ConstructionDrawings_240821b.pdf PDF
A1_AttachmentA_NFSR104_ConstructionDrawings_240821e.pdf PDF
A1_AttachmentB_NFSR374_ConstructionDrawings_240822b.pdf PDF
A1_AttachmentA_NFSR104_ConstructionDrawings_240821c.pdf PDF
A1_AttachmentB_NFSR374_ConstructionDrawings_240822a.pdf PDF
A1_AttachmentA_NFSR104_ConstructionDrawings_240821d.pdf PDF
A1_AttachmentA_NFSR104_ConstructionDrawings_240821a.pdf PDF
A1 2024.08.22_ScheduleOfItems.xlsx XLSX spreadsheet
A1 2024.08.14_SignInSheet.pdf PDF
A1 AttachmentC_SpecificationPackage.pdf PDF
A1 2024.08.22_StatementOfWork.pdf PDF
A1 127EAX24Q0045 - Amendment I.pdf PDF
127EAX24Q0045 - Granite Basin and Mingus Mountain Road NFSR 374 and 104 - Solicitation.pdf PDF
Statement of Work rev 07.16.2024.pdf PDF
Statement of Work Attachment A2.pdf PDF
Statement of Work Attachment B.pdf PDF
Statement of Work Attachment D.pdf PDF
2024.07.01_ScheduleOfItems.xlsx XLSX spreadsheet
Statement of Work Attachment C.pdf PDF
General Decision Number AZ02240008 1.19.2024.docx DOCX document
Statement of Work Attachment A1.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .