This document is a Schedule of Items (SOI) for two federal contract opportunities related to the Prescott National Forest in Arizona.

The first opportunity is for the NFSR 374 (Granite Basin Road) Improvements, which includes repairs and maintenance to the Playa Day Use and Wekuvde Picnic Site areas, as well as full-depth asphalt reclamation and repaving on the main road. The second opportunity is for the NFSR 104 (Mingus Mountain Road) Drainage Improvements, which involves repairing damage to culverts, ditches, and road edges caused by heavy runoff. Both projects require temporary traffic control. The contract will be awarded as a Firm Fixed-Price contract using the Lowest Price/Technically Acceptable (LPTA) evaluation method. The solicitation is a 100% Small Business Set-Aside with a project magnitude between $1-5 million. Offers are due by September 12, 2024 at 1:00 pm PT. A site visit is scheduled for August 14, 2024. The contracting agency is the USDA Forest Service, Region 3 - Southwestern Region.

View the file

Other files

File Type Posted
B08 127EAX23Q0045 Granite Basin and Mingus Mnt. Road NFSR 374 and 104 Notice of Award - Earth Resources Corp. revised.pdf PDF
A1_AttachmentB_NFSR374_ConstructionDrawings_240822e.pdf PDF
A1_AttachmentB_NFSR374_ConstructionDrawings_240822d.pdf PDF
A1_AttachmentB_NFSR374_ConstructionDrawings_240822c.pdf PDF
A1 AttachmentD_PrescottFirePlan.pdf PDF
A1_AttachmentA_NFSR104_ConstructionDrawings_240821b.pdf PDF
A1_AttachmentA_NFSR104_ConstructionDrawings_240821e.pdf PDF
A1_AttachmentB_NFSR374_ConstructionDrawings_240822b.pdf PDF
A1_AttachmentA_NFSR104_ConstructionDrawings_240821c.pdf PDF
A1_AttachmentB_NFSR374_ConstructionDrawings_240822a.pdf PDF
A1_AttachmentA_NFSR104_ConstructionDrawings_240821d.pdf PDF
A1_AttachmentA_NFSR104_ConstructionDrawings_240821a.pdf PDF
A1 2024.08.22_ScheduleOfItems.xlsx XLSX spreadsheet
A1 2024.08.14_SignInSheet.pdf PDF
A1 AttachmentC_SpecificationPackage.pdf PDF
A1 2024.08.22_StatementOfWork.pdf PDF
A1 127EAX24Q0045 - Amendment I.pdf PDF
127EAX24Q0045 - Granite Basin and Mingus Mountain Road NFSR 374 and 104 - Solicitation.pdf PDF
Statement of Work rev 07.16.2024.pdf PDF
Statement of Work Attachment A2.pdf PDF
Statement of Work Attachment B.pdf PDF
Statement of Work Attachment D.pdf PDF
Statement of Work Attachment C.pdf PDF
General Decision Number AZ02240008 1.19.2024.docx DOCX document
BioPreferred.pdf PDF
Statement of Work Attachment A1.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOI-NFSR374

SCHEDULE OF ITEMS
Project:NFSR 374 ImprovementsRegion:Southwestern Region 3
Forest:Prescott National ForestDistrict:Bradshaw Ranger District
Base Bid Line Items
Item NumberSchedule of Item DesciptionMethod of MeasureEstimated QuantityPay UnitUnit PriceTotal Cost
PLAYA DAY USE
151 (01)Mobilization and Bonding (Covers all NFSR 374 work)LSQ1LS$$
203 (01)Existing Sign RemovalLSQ1LS$$
203 (02)Damaged Curb and Stair RemovalLSQ1LS$$
204 (01)Curb Erosion Control, Select BorrowEQ10LCY$$
251 (01)Curb Erosion Control, Riprap, Class 1EQ45LCY$$
301 (01)Aggregate Base, Veg. IslandEQ3LCY$$
301 (02)Aggregate Base, Trail Repair AreasEQ7LCY$$
410 (01)Slurry SealEQ1632SY$$
414 (01)Crack Sealing, 1"-2" WideLSQ1LS$$
418 (01)Asphalt Patch, Damaged Curb SectionLSQ1LS$$
418 (02)Asphalt Patch, Veg. IslandLSQ1LS$$
609 (01)Replace CurbEQ100LF$$
609 (02)Remove and Re-Insall Wheel StopsAQ16EA$$
634 (01)Pavement Markings and Striping, Type BLSQ1LS$$
718 (01)Sign and Post, by LocationAQ4EA$$
PLAYA DAY USE BID TOTAL$
WEKUVDE PICNIC SITE
203 (01)Existing Sign RemovalLSQ1LS$$
301 (01)Aggregate Base, Parking AreaEQ372LCY$$
301 (02)ABC, Spread, Grade, and CompactEQ2523SY$$
301 (03)Sampling and TestingLSQ1LS$$
304 (01)Full Depth Reclamation (FDR), Parking AreaEQ2523SY$$
304 (02)FDR, Grading and Reshaping, Parking AreaEQ2523SY$$
304 (03)FDR, Compaction, Method 2, Parking AreaEQ2523SY$$
403 (01)Asphalt, 1/2" ADOT 416, PG 64-22, Parking AreaEQ455TN$$
403 (02)Asphalt, 1/2" ADOT 416, PG 64-22, Foot PathsEQ9TN$$
403 (03)Sampling and TestingLSQ1LS$$
413 (01)Asphalt Milling, Foot PathsEQ50SY$$
609 (01)Remove and Re-Insall Wheel StopAQ11EA$$
609 (02)New Wheel Stop, CompositeAQ7EA$$
634 (01)Pavement Markings and Striping, Type BLSQ1LS$$
718 (01)Sign And Post, Accessible, with PlaqueAQ1EA$$
WEKUVDE PICNIC SITE BID TOTAL$
NFSR 374 (600 LF)
156 (01)Temporary Traffic ControlLSQ1LS$$
301 (01)Aggregate BaseEQ212LCY$$
301 (02)ABC, Spread, Grade, and CompactEQ1470SY$$
301 (03)Sampling and TestingLSQ1LS$$
304 (01)Full Depth Reclamation (FDR)EQ1470SY$$
304 (02)FDR, Grading and ReshapingEQ1470SY$$
304 (03)FDR, Compaction, Method 2EQ1470SY$$
403 (01)Asphalt, 3/4" ADOT 416, PG 64-22EQ264TN$$
403 (02)Sampling and TestingLSQ1LS$$
604 (01)Valve Cover RiserAQ3EA$$
634 (01)Pavement Markings and Striping, Type BLSQ1LS$$
NFSR 374 BID TOTAL$
Base Bid Line Items (CONTINUED)
Item NumberSchedule of Item DesciptionMethod of MeasureEstimated QuantityPay UnitUnit PriceTotal Cost
FEE LANE
152 (01)Construction Survey and StakingLSQ1LS$$
201 (01)Clearing and GrubbingEQ400SY$$
204 (01)ExcavationEQ91LCY$$
204 (02)Embankment, Road Subgrade Grading and CompactionEQ371SY$$
204 (03)Embankment, Ditch Island, RegradingLSQ1LS$$
204 (04)Embankment, Road Subgrade Sampling and TestingLSQ1LS$$
301 (01)Aggregate BaseEQ81LCY$$
301 (02)Aggregate Base, Spreading and CompactionEQ371SY$$
301 (03)Sampling and TestingLSQ1LS$$
403 (01)Asphalt, 3/4" ADOT 416, PG 64-22EQ67TN$$
403 (02)Sampling and TestingLSQ1LS$$
602 (01)Culvert, CMP, 18", Full Install, RiprapLSQ1LS$$
615 (01)Fee Station, Concrete PadLSQ1LS$$
619 (01)Bollards, w/ FootingAQ2EA$$
634 (01)Pavement Markings and StripingLSQ1LS$$
636 (01)Fee Station and Concrete PadLSQ1LS$$
718 (01)New Signs and Posts, by LocationAQ7EA$$
FEE LANE BID TOTAL$
Option Bid Line Items
Item NumberCLIN DescriptionMethod of MeasureEsitmated QuantityPay UnitUnit PriceTotal Cost
GEOTEXTILE FABRIC, FOR SOFT SPOTS
207 (01)Geoxtile Type 2, 1 Roll, 341 SY, Furnished and InstalledLSQ1LS$$
DRAINAGE CROSSING 1
204 (01)Embankment, Bank Shaping / RegradingLSQ1LS$$
204 (02)Embankment, Native Fill, BackfillEQ4CY$$
251 (01)Embankment, Riprap, Class 1, Slope ProtectionEQ20CY$$
251 (02)Embankment, Riprap, Class 3, Jersey BarrierEQ8CY$$
618 (01)Jersey Barrier, Delivery and InstallLSQ1LS$$
DRAINAGE CROSSING 1 OPTION TOTAL$
DRAINAGE CROSSING 2
204 (01)Embankment, Bank Shaping / RegradingLSQ1LS$$
251 (01)Embankment, Riprap, Class 1, Slope ProtectionEQ10CY$$
251 (02)Embankment, Riprap, Class 3, Jersey BarrierEQ6CY$$
251 (03)Embedded Riprap, Class 1EQ3CY$$
614 (01)Lean Concrete BackfillEQ6CY$$
618 (01)Jersey Barrier, Delivery and InstallLSQ1LS$$
DRAINAGE CROSSING 2 OPTION TOTAL$
NFSR 374 (TO BE AWARDED IN 100 LF INCREMEMBENTS)
156 (01)Temporary Traffic ControlLSQ1LS$$
301 (01)Aggregate BaseEQ53LCY$$
301 (02)ABC, Spread, Grade, and CompactEQ245SY$$
301 (03)Sampling and TestingLSQ1LS$$
304 (01)Full Depth Reclamation (FDR)EQ245SY$$
304 (02)FDR, Grading and ReshapingEQ245SY$$
304 (03)FDR, Compaction, Method 2EQ245SY$$
403 (01)Asphalt, 3/4" ADOT 416, PG 64-22EQ44TN$$
403 (03)Sampling and TestingLSQ1LS$$
634 (01)Pavement Markings and Striping, Type BLSQ1LS$$
NFSR 374 (PER 100 LF) OPTION TOTAL$

SOI-NFSR104_FLTP

SCHEDULE OF ITEMS
Project:NFSR 104 DRAINAGE IMPROVEMENTSRegion:Southwestern Region 3
Forest:Prescott National ForestDistrict:Verde Ranger District
Base Bid Line Items
Item NumberSchedule of Item DesciptionMethod of MeasureEstimated QuantityPay UnitUnit PriceTotal Cost
SITE 1.1, STA. 8+00, NEW CULVERT, 24", 40'
204 (01)DITCH BLOCK, DITCH RELIEFLSQ1LS$$
209 (01)STRUCTURE EXCAVATIONEQ22CY$$
209 (02)PIPE BEDDINGEQ2LCY$$
209 (03)STRUCTURE BACKFILLLSQ1LS$$
209 (04)SAMPLING AND TESTINGLSQ1LS$$
251 (01)ONEQ1CY$$
301 (01)AGGREGATE BASEEQ2LCY$$
401 (01)ASPHALTEQ1.4TON$$
602 (01)CULVERT, CMP, 24", 40'AQ1EA$$
634 (01)PERMANENT PAVEMENT MARKINGLSQ1LS$$
SITE 1.1 BASE BID TOTAL$
SITE 6.1, STA. 29+00, NEW CULVERT, 24", 65'
204 (01)DITCH BLOCK, DITCH RELIEFLSQ1LS$$
209 (01)STRUCTURE EXCAVATIONEQ36CY$$
209 (02)PIPE BEDDINGEQ3LCY$$
209 (03)STRUCTURE BACKFILLLSQ1LS$$
209 (04)SAMPLING AND TESTINGLSQ1LS$$
251 (01)RIPRAP, CLASS 1, OUTLET PROTECTIONEQ1CY$$
301 (01)AGGREGATE BASEEQ2LCY$$
401 (01)ASPHALTEQ1.4TON$$
602 (01)CULVERT, CMP, 24", 65'AQ1EA$$
634 (01)PERMANENT PAVEMENT MARKINGLSQ1LS$$
SITE 6.1 BASE BID TOTAL$
SITE 7.1, STA. 35+25, NEW CULVERT, 24", 40'
204 (01)DITCH BLOCK, DITCH RELIEFLSQ1LS$$
209 (01)STRUCTURE EXCAVATIONEQ36CY$$
209 (02)PIPE BEDDINGEQ3LCY$$
209 (03)STRUCTURE BACKFILLLSQ1LS$$
209 (04)SAMPLING AND TESTINGLSQ1LS$$
251 (01)RIPRAP, CLASS 1, OUTLET PROTECTIONEQ1CY$$
301 (01)AGGREGATE BASEEQ2LCY$$
401 (01)ASPHALTEQ1.4TON$$
602 (01)CULVERT, CMP, 24", 65'AQ1EA$$
634 (01)PERMANENT PAVEMENT MARKINGLSQ1LS$$
SITE 7.1 BASE BID TOTAL$
SITE DR1, STA. 41+33, NEW CULVERT, 24", 40'
204 (01)DITCH BLOCK, DITCH RELIEFLSQ1LS$$
209 (01)STRUCTURE EXCAVATIONEQ22CY$$
209 (02)PIPE BEDDINGEQ2LCY$$
209 (03)STRUCTURE BACKFILLLSQ1LS$$
209 (04)SAMPLING AND TESTINGLSQ1LS$$
251 (01)RIPRAP, CLASS 1, OUTLET PROTECTIONEQ1CY$$
301 (01)AGGREGATE BASEEQ2LCY$$
401 (01)ASPHALTEQ1.4TON$$
602 (01)CULVERT, CMP, 24", 40'AQ1EA$$
634 (01)PERMANENT PAVEMENT MARKINGLSQ1LS$$
SITE DR1 BASE BID TOTAL$
Base Bid Line Items (CONTINUED)
Item NumberSchedule of Item DesciptionMethod of MeasureEstimated QuantityPay UnitUnit PriceTotal Cost
SITE 8.1, STA. 44+00, NEW CULVERT, 24", 40'
204 (01)DITCH BLOCK, DITCH RELIEFLSQ1LS$$
209 (01)STRUCTURE EXCAVATIONEQ22CY$$
209 (02)PIPE BEDDINGEQ2LCY$$
209 (03)STRUCTURE BACKFILLLSQ1LS$$
209 (04)SAMPLING AND TESTINGLSQ1LS$$
251 (01)RIPRAP, CLASS 1, OUTLET PROTECTIONEQ1CY$$
301 (01)AGGREGATE BASEEQ2LCY$$
401 (01)ASPHALTEQ1.4TON$$
602 (01)CULVERT, CMP, 24". 40'AQ1EA$$
634 (01)PERMANENT PAVEMENT MARKINGLSQ1LS$$
SITE 8.1 BASE BID TOTAL$
SITE 11, STA. 52+62, REPLACE CULVERTS, 36", 70'
204 (01)DITCH BLOCK, DITCH RELIEFLSQ1LS$$
209 (01)STRUCTURE EXCAVATIONEQ181CY$$
209 (02)PIPE BEDDINGEQ12LCY$$
209 (03)STRUCTURE BACKFILLLSQ1LS$$
209 (04)SAMPLING AND TESTINGLSQ1LS$$
251 (01)RIPRAP, CLASS 1, OUTLET PROTECTIONEQ3CY$$
301 (01)AGGREGATE BASEEQ7LCY$$
401 (01)ASPHALTEQ5TON$$
602 (01)CULVERT, CMP, 36", 70'AQ2EA$$
634 (01)PERMANENT PAVEMENT MARKINGLSQ1LS$$
SITE 11 BASE BID TOTAL$
SITE 12, STA. 56+95, REPLACE CULVERT, 24", 55'
204 (01)DITCH BLOCK, DITCH RELIEFLSQ1LS$$
209 (01)STRUCTURE EXCAVATIONEQ31CY$$
209 (02)PIPE BEDDINGEQ2LCY$$
209 (03)STRUCTURE BACKFILLLSQ1LS$$
209 (04)SAMPLING AND TESTINGLSQ1LS$$
251 (01)RIPRAP, CLASS 1, OUTLET PROTECTIONEQ1CY$$
301 (01)AGGREGATE BASEEQ2LCY$$
401 (01)ASPHALTEQ1.4TON$$
602 (01)CULVERT, CMP, 24", 55'AQ1EA$$
634 (01)PERMANENT PAVEMENT MARKINGLSQ1LS$$
SITE 12 BASE BID TOTAL$
SITE 12.1, STA. 59+74, NEW CULVERT, 30", 60'
204 (01)DITCH BLOCK, DITCH RELIEFLSQ1LS$$
209 (01)STRUCTURE EXCAVATIONEQ44CY$$
209 (02)PIPE BEDDINGEQ4LCY$$
209 (03)STRUCTURE BACKFILLLSQ1LS$$
209 (04)SAMPLING AND TESTINGLSQ1LS$$
251 (01)RIPRAP, CLASS 1, OUTLET PROTECTIONEQ1CY$$
301 (01)AGGREGATE BASEEQ2LCY$$
401 (01)ASPHALTEQ2TON$$
602 (01)CULVERT, CMP, 30", 60'AQ1EA$$
634 (01)PERMANENT PAVEMENT MARKINGLSQ1LS$$
SITE 12.1 BASE BID TOTAL$
Base Bid Line Items (CONTINUED)
Item NumberSchedule of Item DesciptionMethod of MeasureEstimated QuantityPay UnitUnit PriceTotal Cost
SITE 12.2, STA. 62+49, NEW CULVERT, 24", 45'
204 (01)DITCH BLOCK, DITCH RELIEFLSQ1LS$$
209 (01)STRUCTURE EXCAVATIONEQ25CY$$
209 (02)PIPE BEDDINGEQ2LCY$$
209 (03)STRUCTURE BACKFILLLSQ1LS$$
209 (04)SAMPLING AND TESTINGLSQ1LS$$
251 (01)RIPRAP, CLASS 1, OUTLET PROTECTIONEQ1CY$$
301 (01)AGGREGATE BASEEQ2LCY$$
401 (01)ASPHALTEQ1.6TON$$
602 (01)CULVERT, CMP, 24", 45'AQ1EA$$
634 (01)PERMANENT PAVEMENT MARKINGLSQ1LS$$
SITE 12.2 BASE BID TOTAL$
SITE 13.1, STA. 67+49, NEW CULVERT, 24", 55'
204 (01)DITCH BLOCK, DITCH RELIEFLSQ1LS$$
209 (01)STRUCTURE EXCAVATIONEQ31CY$$
209 (02)PIPE BEDDINGEQ2LCY$$
209 (03)STRUCTURE BACKFILLLSQ1LS$$
209 (04)SAMPLING AND TESTINGLSQ1LS$$
251 (01)RIPRAP, CLASS 1, OUTLET PROTECTIONEQ1CY$$
301 (01)AGGREGATE BASEEQ2LCY$$
401 (01)ASPHALTEQ1.4TON$$
602 (01)CULVERT, CMP, 24", 55'AQ1EA$$
634 (01)PERMANENT PAVEMENT MARKINGLSQ1LS$$
SITE 13.1 BASE BID TOTAL$
SITE 14.1, STA. 73+99, NEW CULVERT, 24", 40'
204 (01)DITCH BLOCK, DITCH RELIEFLSQ1LS$$
209 (01)STRUCTURE EXCAVATIONEQ22CY$$
209 (02)PIPE BEDDINGEQ2LCY$$
209 (03)STRUCTURE BACKFILLLSQ1LS$$
209 (04)SAMPLING AND TESTINGLSQ1LS$$
251 (01)RIPRAP, CLASS 1, OUTLET PROTECTIONEQ1CY$$
301 (01)AGGREGATE BASEEQ2LCY$$
401 (01)ASPHALTEQ1.4TON$$
602 (01)CULVERT, CMP, 24", 40'AQ1EA$$
634 (01)PERMANENT PAVEMENT MARKINGLSQ1LS$$
SITE 14.1 BASE BID TOTAL$
Option Bid Line Items
Item NumberCLIN DescriptionMethod of MeasureEsitmated QuantityPay UnitUnit PriceTotal Cost
**OPTION** SIGN AND OBJECT MARKER INSTALLATION
718 (01)SIGN POST, U-CHANNEL, INSTALLTION HARDWARE, ETC.AQ1EA$$-------------------------
718 (02)SIGN, OBJECT MARKER, OM2-2VAQ1EA$$-------------------------
718 (03)SIGN POST AND OBJECT MARKER (2), INSTALL ONLYAQ1EA$$-------------------------
**OPTION** ROCK EXCAVATION, FOR CULVERTS, NON-BLASTING (HAMMERING), AS NEEDED
209 (1)ROCK EXCAVATIONAQ1CY$$-------------------------
SITE 9, **OPTION** STA. 46+54, ARCH CULVERT, 63'-3", PURCHASE / DELIVERY ONLY, TO WILLOW WORK CENTER OR PROJECT SITE
602 (01)SOIL REPORT, BEARING CAPACITYLSQ1LS$$
602 (02)SHOPS DRAWINGS, ARCH CULVERTLSQ1LS$$
602 (03)ARCH CULVERT AND HEADWALLSLSQ1LS$$
602 (04)DELIVERY, TO JOBSITE OR WILLOW WORK CENTERLSQ1LS$$
SITE 9, PURCHASE AND DELIVERY, OPTION BID TOTAL$
SITE 9, **OPTION** STA. 46+54, ARCH CULVERT, 60', INSTALL ONLY
204 (01)CHANNEL CLEANING, RESHAPINGLSQ1LS$$
209 (01)STRUCTURE EXCAVATIONEQ253CY$$
209 (02)STRUCTURE FOUNDATIONLSQ1LS$$
209 (03)STRUCTURE BACKFILLLSQ1LS$$
209 (04)SAMPLING AND TESTINGLSQ1LS$$
251 (01)RIPRAP, CLASS 1, OUTLET PROTECTIONAQ10CY$$
251 (02)RIPRAP, CLASS 1, CHANNEL SLOPEEQ10CY$$
301 (01)AGGREGATE BASEEQ9LCY$$
401 (01)ASPHALTEQ6TON$$
401 (02)SAMPLING AND TESTINGLSQ1LS$$
602 (01)CULVERT / FOUNDATION COMPLETE INSTALLLSQ1LS$$
634 (01)PERMANENT PAVEMENT MARKINGLSQ1LS$$
SITE 9, INSTALLATION, OPTION BID TOTAL$

SOI-NFSR104_ERFO

SCHEDULE OF ITEMS
Project:NFSR 104 EMERGENCY ROAD REPAIRSRegion:Southwestern Region 3
Forest:Prescott National ForestDistrict:Verde Ranger District
Base Bid Line Items
Item NumberSchedule of Item DesciptionMethod of MeasureEstimated QuantityPay UnitUnit PriceTotal Cost
ROAD, DITCH, AND OUTLET REPAIRS
151 (01)MOBILIZATIONLSQ1LS$$
156 (01)TEMPORARY TRAFFIC CONTROLLSQ1LS$$
SITES 1, 2, 3, 4, 5, 6, 7, 8, 10, 13, 14 DITCH BLOCK AND DITCH RELIEF REPAIRS
251 (01)RIPRAP, CLASS 1, DITCH BLOCK FACEAQ11CY$$
303 (01)DITCH BLOCK, REPAIR AND RESHAPEAQ11EA$$
303 (02)DITCH RELIEF, REPIAR AND RESHAPELSQ1LS$$
SITE 3, STA. 17+35, OUTLET EROSION REPAIR
204 (01)UNCLASSIFIED BORROWAQ20CY$$
251 (01)RIPRAP, CLASS 2, OUTLET PROTECTIONAQ20CY$$
SITE 4, STA. 20+90, OUTLET EROSION REPAIR
204 (01)UNCLASSIFIED BORROWAQ20CY$$
251 (01)RIPRAP, CLASS 2, OUTLET PROTECTIONAQ20CY$$
SITE D1STA. 5+45 TO STA. 6+80, ROAD AND DITCH REPAIRS
251 (01)RIPRAP, CLASS 1, DITCH ARMORINGEQ15CY$$
303 (01)DITCH CLEANING, RECONDITIONINGEQ135LF$$
303 (02)ROAD BASE, SHOULDEREQ4LCY$$
418 (01)ASPHALT PATCH AND SAFETY EDGEEQ6TN$$
SITE D2STA. 12+30 TO STA. 13+40, ROAD AND DITCH REPAIRS
251 (01)RIPRAP, CLASS 1, DITCH ARMORINGEQ12CY$$
303 (01)DITCH CLEANING, RECONDITIONINGEQ110LF$$
303 (02)ROAD BASE, SHOULDEREQ4LCY$$
418 (01)ASPHALT PATCH AND SAFETY EDGEEQ5TN$$
SITE D3STA. 19+60 TO STA. 20+45, ROAD AND DITCH REPAIRS
251 (01)RIPRAP, CLASS 1, DITCH ARMORINGEQ10CY$$
303 (01)DITCH CLEANING, RECONDITIONINGEQ85LF$$
303 (02)ROAD BASE, SHOULDEREQ3LCY$$
418 (01)ASPHALT PATCH AND SAFETY EDGEEQ4TN$$
SITE D4STA. 21+00 TO STA. 21+75, ROAD AND DITCH REPAIRS
251 (01)RIPRAP, CLASS 1, DITCH ARMORINGEQ8CY$$
303 (01)DITCH CLEANING, RECONDITIONINGEQ75LF$$
303 (02)ROAD BASE, SHOULDEREQ3LCY$$
418 (01)ASPHALT PATCH AND SAFETY EDGEEQ3TN$$
SITE D5STA. 30+70 TO STA. 31+40, ROAD AND DITCH REPAIRS
251 (01)RIPRAP, CLASS 1, DITCH ARMORINGEQ8CY$$
303 (01)DITCH CLEANING, RECONDITIONINGEQ70LF$$
303 (02)ROAD BASE, SHOULDEREQ3LCY$$
418 (01)ASPHALT PATCH AND SAFETY EDGEEQ3TN$$
Base Bid Line Items (CONTINUED)
Item NumberSchedule of Item DesciptionMethod of MeasureEstimated QuantityPay UnitUnit PriceTotal Cost
SITE D6STA. 32+00 TO STA. 32+20, ROAD AND DITCH REPAIRS
251 (01)RIPRAP, CLASS 1, DITCH ARMORINGEQ2CY$$
303 (01)DITCH CLEANING, RECONDITIONINGEQ20LF$$
303 (02)ROAD BASE, SHOULDEREQ1LCY$$
418 (01)ASPHALT PATCH AND SAFETY EDGEEQ1TN$$
SITE D7STA. 32+80 TO STA. 34+60, ROAD AND DITCH REPAIRS
251 (01)RIPRAP, CLASS 1, DITCH ARMORINGEQ20CY$$
303 (01)DITCH CLEANING, RECONDITIONINGEQ180LF$$
303 (02)ROAD BASE, SHOULDEREQ7LCY$$
418 (01)ASPHALT PATCH AND SAFETY EDGEEQ7TN$$
SITE D8STA. 35+20 TO STA. 38+20, ROAD AND DITCH REPAIRS
251 (01)RIPRAP, CLASS 1, DITCH ARMORINGEQ33CY$$
303 (01)DITCH CLEANING, RECONDITIONINGEQ300LF$$
303 (02)ROAD BASE, SHOULDEREQ11LCY$$
418 (01)ASPHALT PATCH AND SAFETY EDGEEQ12TN$$
SITE D9STA. 42+30 TO STA. 43+30, ROAD AND DITCH REPAIRS
251 (01)RIPRAP, CLASS 1, DITCH ARMORINGEQ11CY$$
303 (01)DITCH CLEANING, RECONDITIONINGEQ100LF$$
303 (02)ROAD BASE, SHOULDEREQ4LCY$$
418 (01)ASPHALT PATCH AND SAFETY EDGEEQ4TN$$
SITE D10STA. 50+00 TO STA. 51+72, ROAD AND DITCH REPAIRS
251 (01)RIPRAP, CLASS 1, DITCH ARMORINGEQ19CY$$
303 (01)DITCH CLEANING, RECONDITIONINGEQ172LF$$
303 (02)ROAD BASE, SHOULDEREQ6LCY$$
418 (01)ASPHALT PATCH AND SAFETY EDGEEQ7TN$$
SITE D11STA. 55+75, ASPHALT REPAIR AND PATCH
418 (01)ASPHALT PATCHEQ1TN$$
ROAD, DITCH, AND OUTLET REPAIRS BASE BID TOTAL$

Lists

Method Of MeasurePay Unit
AQActual QuantityACAcre
EQEstimated QuantityCFCubic Feet
LSQLump Sum QuantityCYCubic Yard
DYDay
EAEach
GLGallon
HRHour
LBPound
LFLinear Foot
LSLump Sum
LCYLoose Cubic Yards
MIMile
MOMonth
SFSquare Feet
SYSquare Yard
TNTon
YDYard