Bid_Tabulation_RFP_16-21.pdf
PDF 102 KB Posted
- Attached to
- RFP 15-25 Annual Underground Utility Contractor
- Solicitation number
- RFP 15-25
- Issued by
- Volusia County, Orlando City, Florida
About this file
The document is a Request for Proposal (RFP) 16-21 Bid Tabulation for construction services, featuring four bidding contractors: Affordable Development (Driveways Inc), JD Weber Construction Co., Hazen Construction, and Thad Con LLC. The bid tabulation includes detailed labor and equipment rates for various construction roles such as supervisors, foremen, operators, and laborers, with pricing for both regular and overtime hours. The bid also includes pricing for dewatering services, specifically covering installation and removal, operation and maintenance for different time periods (less than 6 hours, 6-12 hours, and over 12 hours within a 24-hour period).
The pricing structure reveals significant variations among bidders. Labor rates range from $43-$392.07 per hour for regular time and $64.50-$527.07 for overtime, depending on the worker's role. Equipment rates for heavy and miscellaneous equipment also show considerable differences, with regular hourly rates between $75-$360.42 and overtime rates from $120-$540.63. Dewatering service costs vary substantially, with installation and removal lump sum prices ranging from $2,400 to $8,000, and operation and maintenance costs differing across the four contractors based on duration and specific service requirements.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP 16-21 BID TABULATION
REGULAR OVERTIME REGULAR OVERTIME REGULAR OVERTIME REGULAR OVERTIME
A.1. SUPERVISOR HOUR
110.00 $165.00 $145.00 $217.50 $392.07 $527.07 $127.00 $190.50
A.2. FOREMAN HOUR
95.00 $142.50 $100.00 $150.00 $152.47 $204.97 $67.00 $100.50
A.3. OPERATOR HOUR
75.00 $112.50 $70.00 $105.00 $99.76 $134.11 $58.00 $87.00
A.4. LABORER HOUR
50.00 $75.00 $55.00 $82.50 $74.06 $99.56 $43.00 $64.50
OUM REGULAR OVERTIME REGULAR OVERTIME REGULAR OVERTIME REGULAR OVERTIME
B.1. HEAVY EQUIPMENT HOUR
$120.00 $120.00 $250.00 $375.00 $360.42 $540.63 $130.00 $195.00
B.2. MISC EQUIPMENT HOUR
$75.00 $75.00 $180.00 $270.00 $200.13 $300.20 $85.00 $127.50
UOM
C.1. INSTALLATION & REMOVAL LUMP SUM PER LOCATION LS
C.2. OPERATION & MAINTENANCE LUMP SUM < 6 HOURS LS
C.3.
OPERATION & MAINTENANCE LUMP SUM FOR 6 TO 12
HOURS
LS
C.4.
OPERATION & MAINTENANCE PER DAY > 12 HOURS WITHIN A
24 HOUR PERIOD
LS
$8,000.00
$443.70
$887.40
$1,774.80
$6,200.00
$800.00
$800.00
$2,450.00
2,400.00
75.00
180.00
225.00
$2,600.00
$4,500.00
$5,400.00
$6,000.00
Unit Price Unit Price Unit Price Unit Price
AFFORDABLE DEVELOPMENT
(DRIVEWAYS INC)
JD WEBER CONSTRUCTION CO. HAZEN CONSTRUCTION THAD CON LLC
UOMLABOR RATES
EQUIPMENT RATES
DEWATERING
Sheet1