Bid Submission Drawings.pdf

PDF 19 MB Posted

Attached to
Ice Storage and Chiller Replacement Federal contract opportunity
Solicitation number
47PD0123R0002
Issued by
General Services Administration Public Buildings Service Region 3

About this file

This government file provides details on a federal contract opportunity for ice storage and chiller replacement services. The General Services Administration Public Buildings Service Region 3 is soliciting proposals under solicitation number 47PD0123R0002 to replace existing ice storage and chiller systems. Bidders should review the attached solicitation and bid submission drawings documents for requirements, specifications, response date, and award timing. The opportunity is for non-personal services related to mechanical system upgrades at one or more GSA facilities.

View the file

Other files for this federal contract opportunity

Other files attached to Ice Storage and Chiller Replacement, newest first.
File Type Posted
Solicitation Amendment 47PD0123R0002_0006.pdf PDF
Short Circuit and Protective Device Coordination Study - Volume 3.pdf PDF
Solicitation Amendment 47PD0123R0002_0005.pdf PDF
Short Circuit and Protective Device Coordination Study - Volume 2.pdf PDF
Annex Partial Utility Drawing.pdf PDF
Solicitation Amendment 47PD0123R0002_0004.pdf PDF
230593 FL Testing Adjusting and Balancing for HVAC.pdf PDF
Glycol product info from onsite drum.JPG JPG image
Solicitation Amendment 47PD0123R0002_0003.pdf PDF
SSA Woodlawn Annex Chiller 2nd Pre-Bid Sign-in Sheet 11-01-22.pdf PDF
Site Visit Sign in Sheet 10-25-2022.pdf PDF
Solicitation Amendment 47PD0123R0002_0002.pdf PDF
Prepropsal Meeting Site Visit Agenda SSA Annex Ice Storage and Chiller Replacement.pdf PDF
Solicitation Amendment 47PD0123R0002_0001.pdf PDF
Pre-Bid Meeting Map (1).pdf PDF
Pre-Bid Meeting Map.pdf PDF
SSA Chiller Replacement Bid Sheet.docx DOCX document
47PD0123R0002 Form.pdf PDF
Pre-Bid Meeting Map.pdf PDF
47PD0123R0002 Reps and Certs.docx DOCX document
47PD0123R0002 SSA Annex Chiller Replacement Agreement.pdf PDF
SSA Annex Chiller Past Performance Questionnaire.pdf PDF
Bid Submission Specifications.pdf PDF
47PD0123R0002 SSA Chiller Replacement RFP.pdf PDF
Wage Determination MD20220030 07OCT2022.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. GENERAL SERVICES ADMINISTRATION

PUBLIC BUILDINGS SERVICE

MID - ATLANTIC REGION

ANNEX BUILDING

6401 SECURITY BOULEVARD - BALTIMORE, MARYLAND 21235

BID SUBMISSION - AUGUST 12, 2020

ICE STORAGE REMOVAL

AND CHILLER REPLACEMENT

VICINITY MAPLOCATION MAP

SCALE: 1" = 2000'

NNNN

PROJECT

LOCATION

SITE

© COPYRIGHT ADC THE MAP PEOPLE

PERMITTED USE NUMBER 21002216

© COPYRIGHT ADC THE MAP PEOPLE

PERMITTED USE NUMBER 21002216

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

22089 09/01/2024

GENERAL:

1. PACKAGED, SELF-CONTAINED UNIT CONSISTING OF COMPRESSOR,

AIR-COOLED CONDENSER, RECOVERY SYSTEM, TANK PRESSURE GAGES,

FILTER DRYER, AND VALVING THAT ALLOWS FOR SWITCHING BETWEEN

LIQUID- AND VAPOR-RECOVERY MODE.

2. RRS-1 & RRS-2 WILL OPERATE UNDER MANUAL CONTROL, AS NEEDED, FOR

CHILLER MAINTENANCE. MONITORING THROUGH BAS IS NOT REQUIRED.

REFRIGERANT RECOVERY SYSTEM -

SEQUENCE OF OPERATION

GENERAL:

1. THE CONDENSER WATER SYSTEM IS AN EXISTING SYSTEM COMPRISED

OF THREE COOLING TOWERS AND CONDENSER WATER PUMPS. SYSTEM

PUMPS P-2.1, P-2.2, AND P-2.3 ARE REPLACED AS PART OF THIS PROJECT

AND ARE ARRANGED IN LEAD/LAG/STANDBY CONFIGURATION. COOLING

TOWERS CT-1, CT-2 AND CT-3 ARE EXISTING TO REMAIN AND ARE

ARRANGED BY LEAD/LAG STANDBY. ROTATE DESIGNATIONS ON A

WEEKLY BASIS. PROVIDE NEW SEQUENCE OF OPERATION AS INDICATED

BELOW EXCEPT WHERE INDICATED TO BE EXISTING SEQUENCE TO

REMAIN IN SECTION 8 OF COOLING TOWER SEQUENCE OF OPERATION.

2. THE SYSTEM INCLUDES EXISTING TO REMAIN TOWER SUMP SWEEPER

AND FILTRATION SYSTEMS, METERED MAKEUP WATER CONNECTION,

LOW PRESSURE STEAM FOR FREEZE PROTECTION, AND WATER

TREATMENT. EXISTING CONTROL LOGIC FOR THESE ELEMENTS IS

EXISTING TO REMAIN.

3. UNDER NORMAL CONDITIONS, THE CENTRAL PLANT OPTIMIZATION (CPO)

PROGRAM WILL DETERMINE NUMBER OF PUMPS AND COOLING TOWERS

TO OPERATE, CONDENSER WATER TEMPERATURE SETPOINTS, AND

VARIABLE FREQUENCY DRIVE SPEED FOR COOLING TOWER FANS AND

PUMPS. WHEN CPO PROGRAM IS NOT ACTIVE, BAS SHALL CONTROL

CONDENSER WATER SYSTEM AS DESCRIBED BELOW. EXISTING

CONTROLS FOR THE BASIN HEATER, SWEEPING AND FILTRATION

SYSTEM, LOW TEMPERATURE TOWER BYPASS, CHEMICAL TREATMENT

SYSTEM, AND SYSTEM FILL SHALL REMAIN AND BE INTEGRATED INTO

CONTROLS PROVIDED ON THIS PROJECT.

4. THE CONDENSER WATER TEMPERATURES SHALL BE MAINTAINED AS

FOLLOWS:

CONDENSER WATER SUPPLY 85 DEG F MAXIMUM

CONDENSER WATER RETURN 96 DEG F

DESIGN AMBIENT CONDITIONS 95 DEG F DB / 78 DEG F WB

5. SYSTEM OPERATION OPERATES FULLY AUTOMATIC WITH MANUAL

OVERRIDES.

6. SYSTEM OPERATING STATUS AND SCHEDULES, TEMPERATURE

SETPOINTS, AND EQUIPMENT ALARM CONDITIONS SHALL BE MONITORED

AND ADJUSTED THROUGH DDC SYSTEM GRAPHICAL USER INTERFACE.

OPERATOR SHALL ALSO BE ABLE TO PERFORM ALL MONITORING AND

CONTROL OF THE CONDENSER WATER SYSTEM DIRECTLY FROM DDC

PANEL THROUGH FIELD INTERFACE.

EXISTING COOLING TOWERS (CT-1; CT-2; CT-3)

1. UNDER NORMAL CONDITIONS, COOLING TOWERS SHALL OPERATE ON A

LEAD/LAG/STANDBY BASIS. ROTATE LEAD/LAG/STANDBY ON A WEEKLY

BASIS WHEN CH-1 AND CH-2 ARE OPERATING TOGETHER, ONLY A SINGLE

COOLING TOWER AND CONDENSER WATER PUMP IS REQUIRED TO

OPERATE. ENERGIZE SECOND COOLING TOWER WHEN CH-3 OR CH-4 IS

ENERGIZED.

2. OPEN COOLING TOWER ISOLATION VALVE V-1E AND V-4E WHEN COOLING

TOWER IS ENABLED THROUGH BAS. OPEN V-3E AND CLOSE LINKED

VALVE V-2E TO DIRECT WATER THROUGH SPRAY NOZZLES. ONCE

ISOLATION VALVE IS PROVEN OPEN, START ASSOCIATED CONDENSER

WATER PUMP.

3. EXISTING CONTROLS FOR EACH TOWER INCLUDE A BASIN WATER

TEMPERATURE SENSOR. WHEN BASIN WATER TEMPERATURE EXCEEDS

75F FOR AN OPERATING COOLING TOWER, THE COOLING TOWER VFD

SHALL ENERGIZE AND MODULATE AS REQUIRED TO MAINTAIN SUPPLY

WATER TEMPERATURE OF 75F. WHEN VFD REACHES FULL SPEED, BASIN

WATER TEMPERATURE IS PERMITTED TO RISE TO 85F DESIGN SET

POINT. MINIMUM VFD SET POINT IS 18 HZ (ADJ).

4. ON A DROP IN SUPPLY WATER TEMPERATURE BELOW 75F (TS-23

ADJUSTABLE), DE-ENERGIZE THE COOLING TOWER FAN AND MODULATE

CHILLER BYPASS CONTROL VALVES V-9, V-10, AND V-11 TO MAINTAIN 65F

MINIMUM SUPPLY WATER TEMPERATURE AS SENSED BY CONDENSER

WATER SUPPLY TEMPERATURE SENSORS TS-16, TS-18, TS-20, AND TS-22.

CPO CONTROLS MAY OVERRIDE 65 F SET POINT AND ALLOW LOWER

CONDENSER WATER TEMPERATURES BASED ON CHILLER OPERATING

PERFORMANCE.

5. WHEN A TOWER IS OFF, CLOSE VALVE V-1E AND V-4E AND OPEN LINKED

VALVES V-2E AND V-3E TO 50% TO ALLOW WATER TO DRAIN FROM THE

RISER TO SPRAY HEADS.

6. ANY COOLING TOWER MAY BE COMMANDED OFF THROUGH BAS. WHEN

COMMANDED OFF, EXISTING TO REMAIN BAS CONTROL LOGIC SHALL

SIGNAL PACKAGED COOLING TOWER CONTROLS DE-ENERGIZE FAN.

EXISTING WATER LEVEL CONTROLS AND BASIN FREEZE PROTECTION

MUST REMAIN OPERATIONAL. CLOSE TOWER ISOLATION CONTROL

VALVES V-1E AT THE CWS CONNECTION TO EACH COOLING TOWER.

7. DDC WILL MONITOR AND ANNUNCIATE A GENERAL COOLING TOWER

PACKAGED CONTROL ALARM.

8. FILTRATION SYSTEM, COOLING TOWER WATER MAKE-UP, AND BASIN

HEATERS SHALL OPERATE IN ACCORDANCE WITH EXISTING BAS LOGIC

AS DESCRIBED BELOW.

A.FILTRATION SYSTEM SHALL RUN CONTINUOUSLY AND BE MONITORED

BY BAS SYSTEM. WHEN ACTIVATED, PUMP TFP-1 SHALL OPERATE AND

VALVE V-5E AND VALVE V-6E SHALL OPEN TO ONE TOWER BASIN

WHILE THE VALVES V-5E AND V-6E TO THE OTHER BASINS SHALL

REMAIN CLOSED. BASIN SERVED BY FILTRATION SYSTEM SHALL

ROTATE EVERY 24 HOURS.

B.STEAM CONTROL VALVE V-7E SHALL OPEN WHEN SUMP

TEMPERATURE FALLS BELOW 45F AND SHALL CLOSE WHEN SUMP

TEMPERATURE RISES ABOVE 50F.

C.CONDENSER WATER MAKE UP VALVE V-8E SHALL OPEN WHEN SUMP

WATER LEVEL DROPS BELOW LOW LEVEL SET POINT AND CLOSE

WHEN WATER LEVEL RISES TO HIGH LEVEL SET POINT.

D.CONDENSER WATER BLOWDOWN VALVE V-9E SHALL OPERATE

THROUGH EXISTING BAS WATER TREATMENT CONTROLS TO MAINTAIN

WATER QUALITY AS DETERMINED BY WATER TREATMENT EQUIPMENT.

9. UPON A COOLING TOWER FAILURE, AS SENSED BY COOLING TOWER

VFD, EACH REMAINING COOLING TOWER SHALL BE ADVANCED ONE

POSITION AND SIGNAL ALARM TO BAS.

CONDENSER WATER PUMPS (P-2.1; P-2.2; P-2.3)

1. PUMPS SHALL OPERATE IN A LEAD/LAG/STANDBY CONFIGURATION.

ROTATE PUMP DESIGNATIONS ON AN WEEKLY BASIS. PUMPS MUST BE

CONTROLLED TO OPERATE WITH CHILLERS AS ASSIGNED THROUGH THE

BAS. THE PIPING AND VALVING PERMITS ANY PUMP TO OPERATE WITH

ANY CHILLER. SYSTEM WILL BE VARIABLE FLOW UNDER CONTROL OF

CPO PROGRAM AND CONSTANT FLOW WHEN CPO PROGRAM IS

DISABLED.

2. START LEAD CONDENSER WATER PUMP WHEN LEAD CHILLER ISOLATION

VALVE LIMIT SWITCH IS PROVEN OPEN.

3. MODULATE LEAD PUMP UNDER VFD CONTROL TO MAINTAIN ASSOCIATED

CHILLER DESIGN FLOW RATE BASED ON PRESSURE DIFFERENCE

ACROSS CHILLER.

4. START LAG CONDENSER WATER PUMP WHEN BAS CALLS FOR

ADDITIONAL FLOW AS DESCRIBED IN CHILLER SECTION ABOVE. LEAD

PUMP IS DESIGNED TO PROVIDE ADEQUATE COMBINED FLOW FOR CH-1

AND CH-2.

5. WHEN OPERATING CONDENSER WATER PUMP FAILS AS SENSED BY

PUMP VFD, ANNUNCIATE ALARM TO CENTRAL BAS SYSTEM GRAPHICAL

USER INTERFACE AND ACTIVATE STANDBY PUMP. IF STANDBY PUMP

FAILS, DEACTIVATE THE ASSOCIATED CHILLER AND COOLING TOWER

AND ANNUNCIATE AN ALARM AT CENTRAL WORKSTATION GRAPHICAL

INTERFACE.

6. CONDENSER WATER SYSTEM SHALL BE BALANCED FOR TAB WITH CH-1,

CH-2, AND CH-4 OPERATIONAL AT DESIGN FLOW.

7. VFD TURNDOWN UNDER CPO CONTROL SHALL BE LIMITED BY MINIMUM

ALLOWABLE FLOW THROUGH THE CHILLER AS MEASURED BY EACH

CHILLER FLOW METER. MINIMUM FLOW SETPOINT SHALL BE

COORDINATED WITH PROVIDED CHILLER. BASIS OF DESIGN SETPOINT

FOR CHILLERS CH-1 AND CH-2 MINIMUM FLOW IS 390 GPM, AND FOR

CHILLERS CH-3 AND CH-4 MINIMUM FLOW IS 720 GPM.

8. CONDENSER WATER PUMP MUST BE ENERGIZED PRIOR TO COOLING

TOWER FAN AND CHILLER START. CONDENSER PUMP MUST NOT START

UNTIL CONDENSER WATER SUPPLY CONTROL VALVE FOR ASSOCIATED

TOWER (V-1E) AND CHILLER (V-2, V-4, V-6, V-8) IS PROVEN OPEN.

PROVIDE FLOW SWITCHES AS INDICATED TO ASSURE FLOW PRIOR TO

CHILLER OPERATION.

CONDENSER WATER - SEQUENCE OF OPERATION

GENERAL:

1. WHEN THERE IS A "HIGH REFRIGERANT LEVEL" ALARM IN EITHER ROOM A-123 OR D-129, OPEN EXHAUST AND OUTSIDE AIR DAMPERS SERVING ROOM AND RUN FAN CONTINUOUSLY AND ENERGIZE STROBES LOCATED AT EACH ROOM ENTRANCE. OPERATE IN THIS MANNER UNTIL OPERATOR STOPS FAN AND STROBES DE-ENERGIZE WHILE DAMPERS IN THE OTHER ROOM REMAIN CLOSED. (D-1 AND D-2 FOR A-123 AND D-3, 4, AND 5 FOR ROOM D-129).

2. WHEN THE "HIGH REFRIGERANT LEVEL" ALARM OCCURS IN ROOM D-129, DE-ENERGIZE EXISTING TRANSFER FAN AND EXISTING EXHAUST FAN. SEE MD400s AND M400 DRAWINGS FOR LOCATION OF EXISTING FANS. FANS MUST

BE MANUALLY RESET BY OPERATOR.

3. SIGNAL "FAN FAILURE" ALARM TO BAS WHEN FAN FAILS AS SENSED BY CURRENT SENSOR.

4. SIGNAL "DAMPER FAILURE" ALARM TO BAS WHEN DAMPER FAILS TO OPEN AS SENSED BY LIMIT SWITCH.

5. SIGNAL "HIGH REFRIGERANT LEVEL" ALARM TO BAS WHEN REFRIGERANT LEVEL IN EITHER ROOM A-123 OR ROOM

D-129 EXCEEDS ALARM SET POINT OF 1000 PPM (ADJUSTABLE).

EXHAUST FAN EF-1 - SEQUENCE OF OPERATION

REF:

SCALE: NONE

REFRIGERANT EXHAUST CONTROL SCHEMATIC

M-605

LS

OUTSIDE

AIR

LS

D-4, ROOM

SUPPLY DAMPER

ROOM

D-129

LS D-5

LS

OUTSIDE

AIR

ROOM

A-123

LS

D-2D-1

D-3

OA

DAMPER

EA DAMPER

CS

EF-1OA

DAMPER

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

ELECTRICAL PANELBOARD (208Y/120V, 3Ø, 4W+G), UON

ELECTRICAL PANELBOARD (480Y/277V, 3Ø, 4W+G), UON

NON-FUSED DISCONNECT SWITCH, SUBSCRIPT INDICATES

AMPACITY AND NUMBER OF POLES.

MOTOR

HEATER

JUNCTION BOX

SPECIFIC NOTE NUMBER

DEMOLITION NOTE NUMBER

SECTION NUMBER

DRAWING NUMBER WHERE SHOWN

DETAIL NUMBER

DRAWING NUMBER WHERE SHOWN

CONDUIT TURNED UP

CONDUIT TURNED DOWN

CONDUIT WITH WIRES, 2#12AWG+1#12G IN 3/4"C. UNLESS

OTHERWISE NOTED, NUMBER OF CONDUCTORS AS REQUIRED.

FOR 3 PHASE, 208/120V OR 480/277V CIRCUITS IN ONE

HOMERUN, PROVIDE 4 WIRES AND GROUND FOR EACH CIRCUIT.

PROVIDE DEDICATED NEUTRALS FOR ALL MULTIPLE SINGLE

PHASE CIRCUITS IN ONE HOMERUN.

RP-31:1,3,5

M

MOTOR RATED MANUAL STARTER, SINGLE POLE, 20A, 120V

WITH HOA SWITCH AND PILOT LIGHT.

SM

PANELBOARDS

SAFETY SWITCHES/STARTERS/SWITCHES

EQUIPMENT CONNECTIONS

MISCELLANEOUS

WIRING

H

JJ

ELECTRICAL LEGEND

FEEDER SIZE

TRANSFORMER, AS SHOWN ON PLANST

TRANSFORMER, AS SHOWN ON SINGLE LINE DIAGRAMS

SWITCH AND FUSE

NEW WORK

EXISTING WORK

DEMOLITION WORK

LIGHTING SYSTEM

PM DIGITAL POWER METER

RECEPTACLES

DUPLEX CONVENIENCE RECEPTACLE, 20A, 125VAC, NEMA

5-20R CONFIGURATION. MOUNT 18" AFF, UON.

GROUNDING

GB COPPER GROUND BUS

DRAWOUT CIRCUIT BREAKER

F FUSED SAFETY DISCONNECT SWITCH. SUBSCRIPT

INDICATES AMPACITY OF FUSE AND NUMBER OF POLES.

MOLDED CASE CIRCUIT BREAKER

FUSE

GROUND

GROUND FAULT RELAYGF

DUPLEX GFCI RECEPTACLE, 20A, 125VAC, NEMA

5-20R CONFIGURATION. MOUNT 18" AFF, UON.

G

FIRE SMOKE DAMPERF/S

B ENCLOSED CIRCUIT BREAKER, UPPER NUMERAL INDICATES

TRIP SIZE, LOWER NUMERAL INDICATES FRAME SIZE100

SPD SURGE PROTECTION DEVICE

BRANCH CIRCUIT HOMERUN TO PANELBOARD, RP-31 DENOTES

TO PANEL RP-31 AND NUMERALS IDENTIFY CIRCUIT NUMBERS.

ARROWS DENOTE NO. OF CIRCUITS. PROVIDE DEDICATE PHASE

AND NEUTRALS AND COMMON GROUND FOR EACH CIRCUITS.

MAXIMUM OF 3 CIRCUITS PER HOMERUN (i.e.

6#12AWG+1#12G-3/4"C), UON.

1'X4' FLUORESCENT SURFACE, WALL OR PENDANT LIGHTING

FIXTURE

FLUORESCENT ROUND PENDANT FIXTURE

VFD VARIABLE FREQUENCY DEVICE

BPM BUILDING PHASE MONITOR

LR LINE REACTOR

VFD VARIABLE FREQUENCY DEVICE, SUBSCRIPT INDICATES SIZE.

PULL BOXPB

COMBINATION DISCONNECT SWITCH/ STARTER.

5HP

4'-0" FLUORESCENT INDUSTRIAL FIXTURE

ELECTRICAL SCOPE

THE OVERALL SCOPE OF THIS PROJECT IS:

1. DISCONNECTION AND REMOVAL OF BRANCH CIRCUITS AND CONTROLS SERVING EXISTING CHILLED WATER

PUMPS AND CONDENSER WATER PUMPS. NEW CONDENSER WATER PUMPS FED FROM EXISTING MOTOR CONTROL CENTER WITH NEW BRANCH CIRCUITS. NEW VFD'S AND STARTERS ARE PROVIDED AS REQUIRED.

2. DISCONNECTION AND REMOVAL OF EXISTING CHILLERS FROM EXISTING SWITCHGEAR. FOUR NEW CHILLERS

PROVIDED AND FED FROM EXISTING SWITCHGEAR.

3. REMOVAL AND INSTALLATION OF NEW EQUIPMENT IS PHASED WITH MECHANICAL EQUIPMENT PHASING.

1. DEMOLISH ALL EXISTING ELECTRICAL WORK UNLESS SHOWN OTHERWISE OR INDICATED AS

EXISTING TO REMAIN.

2. DEMOLISH ALL INDICATED LIGHTING FIXTURES, SWITCHES, ASSOCIATED JUNCTION BOXES, CONDUITS AND WIRES BACK TO PANEL BOARD.

3. DEMOLISH ALL MOTOR STARTERS, DISCONNECT SWITCHES AND CONTROL FROM ALL

MECHANICAL EQUIPMENT INDICATED OR NOTED TO BE DEMOLISHED. DEMOLISH ALL

ASSOCIATED CONDUITS AND WIRES BACK TO SOURCE.

4. DEMOLISH ALL EXISTING RECEPTACLES, ALL ASSOCIATED JUNCTION BOXES, CONDUITS AND

WIRES BACK TO PANEL.

5. ALL EXISTING ELECTRICAL EQUIPMENT, DEVICES AND WIRES SHALL BE DISPOSED AS DIRECTED

BY THE CONTRACTING OFFICER'S REPRESENTATIVE.

6. AFTER REMOVAL OF ALL CONDUITS, SEAL OFF ALL FLOOR AND WALL PENETRATIONS WITH

APPROPRIATE FIRE RATED SEALANT.

7. DEMOLISH ALL EXPOSED CONDUITS UNLESS OTHERWISE NOTED.

8. ABANDON ALL CONDUITS CONCEALED IN SLAB OR WALL. CUT CONDUITS FLUSH WITH WALL OR

SLAB. IDENTIFY CONDUITS AS EMPTY IN CONSPICUOUS PLACE.

9. COORDINATE DEMOLITION OF ALL ELECTRICAL DEVICES AND WIRING RELATED TO MECHANICAL

EQUIPMENT WITH PHASING OF MECHANICAL EQUIPMENT DEMOLITION.

10. COORDINATE WITH SEQUENCE OF CONSTRUCTION AND MECHANICAL EQUIPMENT FOR

TEMPORARY WORK AS WELL AS CONNECTION TO PERMANENT POWER SOURCE.

DEMOLITION NOTES

GENERAL:

1. THE ENERGY POWER METER SYSTEM (EPMS) IS AN EXISTING TO REMAIN SYSTEM

CENTRALLY LOCATED AT THE RMB BUILDING AND CURRENTLY SUPPORTED BY

SCHNEIDER ELECTRIC.

2. MAKE ENERGY CONSUMPTION (REAL TIME KW AND TOTAL KW) FROM EACH

CHILLER AND PUMP VFD AVAILABLE TO THE EPMS THROUGH THE BAS. PROVIDE

WIRING, GATEWAY, AND ANY NECESSARY SOFTWARE AND HARDWARE

UPGRADES FOR DATA EXCHANGE BETWEEN BAS AND SCHNEIDER ELECTRIC

SYSTEMS.

ENERGY POWER METER SYSTEM (EPMS)

AND BAS COORDINATION

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

34708 07/24/2023

AMPERESA

AC ALTERNATING CURRENT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU

AIC

AIR HANDLING UNIT

MCB MAIN CIRCUIT BREAKER

MOLDED CASE CIRCUIT BREAKER

MOUNTING HEIGHT

MINIMUM

MAIN LUGS ONLY

MCCB

MH

MIN

MLO

MTD

MTG MOUNTING

MOUNTED

NEUTRAL

NATIONAL ELECTRICAL CODE

N

NEC

NEMA

NFSS

NIC

NATIONAL ELECTRICAL

MANUFACTURER'S ASSOCIATION

NON FUSED SAFETY SWITCH

NOT IN CONTRACT

NOT TO SCALE

AMPERES INTERRUPTING CAPACITY,

(SYM, RMS AMPS)

AUTO

AUX

AWG

AUTOMATIC

AUXILIARY

AMERICAN WIRE GAUGE

BREAKER

BUILDINGBLDG

BKR

C

CB

CKT

CP

CU

DISC

DN

CONDUIT

CIRCUIT BREAKER

CIRCUIT

CONTROL PANEL

COPPER

DISCONNECT

DOWN

DP

DWG

EF

EH

ELEV

EMT

ENCL

EQUIP

ETR

EXHAUST FAN

ELECTRIC HEATER

ELEVATION

ELECTRIC METALLIC TUBING

ENCLOSURE

EQUIPMENT

EXISTING TO REMAIN

EX, EXIST

FA

FDR

FL

FMC

FT FOOT OR FEET

FLEXIBLE METAL CONDUIT

FLOOR

FEEDER

FRAME AMPS

EXISTING

G

GFI

GFP

HP

HVAC

HZ

JB

KAIC

KV

KVA KILOVOLT AMPERE

KILOVOLT

THOUSAND AMPERES INTERRUPTING

CAPACITY

JUNCTION BOX

HERTZ

HEATING, VENTILATION AIR CONDITIONING

HORSEPOWER

GROUND FAULT PROTECTION

GROUND FAULT INTERRUPTER

GROUND

LIQUID TIGHT FLEXIBLE METAL

CONDUIT

NTS

P

PH

PNL

RGS

RM

RMS

RX

POLE OR POLES

PHASE

REMOVE EXISTING

ROOT MEAN SQUARE

RIGID GALVANIZED STEEL

PANELBOARD

SIC

SS

S/N

SW

SWBD

SWGR

SYM

SYS SYSTEM

SYMMETRICAL

SWITCHGEAR

SWITCHBOARD

SWITCH

SOLID NEUTRAL

STAINLESS STEEL

SYMMETRICAL INTERRUPTING

CURRENT

TYP

UH

UON

V

VFD

W W W/

WP

XFMR

Ø

NUMBER

PHASE

TRANSFORMER

WEATHERPROOF

WITH

WIRE

WATTS

VARIABLE FREQUENCY DRIVE

VOLTS OR VOLTAGE

UNLESS OTHERWISE NOTED

UNIT HEATER

TYPICAL

ABBREV. DESCRIPTION

ROOM

CT COOLING TOWER

DISTRIBUTION PANELBOARD

DRAWING

LFMC

GENERAL NOTES

RECPT RECEPTACLE

LTG LIGHTING

HTR HEATER

ABBREVIATIONS

CHP CHILLED WATER PUMP

CWP CONDENSER WATER PUMP

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

SF SUPPLY FAN

UL UNDERWRITERS LABORATORIES

PM POWER METER

SPD SURGE PROTECTION DEVICE

MAIN DISTRIBUTION PANELMDP

UPS UNINTERRUPTIBLE POWER SUPPLY

EPO EMERGENCY POWER OFF

AT AMP TRIP

ARF ABOVE RAISED FLOOR

AF AMP FRAME

HV HIGH VOLTAGE

1. ELECTRICAL WORK SHALL BE PERFORMED IN

ACCORDANCE WITH THE LATEST EDITION OF THE

NATIONAL ELECTRICAL CODE (NFPA 70) AND ALL

APPLICABLE LOCAL CODES.

2. CONDUIT RUNS ARE SHOWN DIAGRAMMATICALLY ONLY

AND SHALL BE INSTALLED IN A MANNER TO PREVENT

CONFLICTS WITH EQUIPMENT AND STRUCTURAL

CONDITIONS. ALL ABOVE CEILING, CONCEALED, AND

EXPOSED CONDUITS SHALL BE INSTALLED PARALLEL TO

THE BEAMS AND WALLS.

3. PROVIDE ALL REQUIRED PULL BOXES AND JUNCTION

BOXES FOR INSTALLATION OF THE WIRING IN

ACCORDANCE WITH THE CONTRACT SPECIFICATIONS,

THOUGH THE BOXES MAY NOT BE INDICATED ON THE

DRAWINGS.

4. FINAL LOCATIONS FOR ALL ELECTRICAL EQUIPMENT,

INCLUDING RECEPTACLES, JUNCTION BOXES FOR

SPECIFIED EQUIPMENT, LIGHTING FIXTURES, SWITCHES,

ETC. SHALL BE APPROVED BY THE ENGINEER PRIOR TO

INSTALLATION.

5. THE WIRING DIAGRAMS, QUANTITY AND SIZE OF WIRES

AND CONDUITS ARE BASED UPON SELECTED STANDARD

COMPONENTS OF ELECTRICAL EQUIPMENT.

MODIFICATIONS APPROVED BY ENGINEER MAY BE MADE

BY THE CONTRACTOR AT THEIR EXPENSE TO

ACCOMMODATE EQUIPMENT ACTUALLY PURCHASED.

6. PROVIDE ALL NECESSARY COMPONENTS REQUIRED FOR

MAKING FINAL CONNECTION OF ALL EQUIPMENT

INSTALLED OR MODIFIED AS PART OF THIS CONTRACT.

7. ALARM INDICATION AND CONTROL WIRING SHALL BE

WIRED TO NUMBERED TERMINAL STRIPS AND IDENTIFIED

WITH ADHESIVE LABELS AS TO START AND END OF RUN.

8. ELECTRICAL EQUIPMENT INSTALLED AGAINST CONCRETE

OR MASONRY WALLS SHALL BE INSTALLED WITH A 1/4"

SPACER BETWEEN THE EQUIPMENT AND THE MOUNTING

SURFACE. SPACERS SHALL BE STAINLESS STEEL.

9. DRAWINGS ARE DIAGRAMMATIC. ACTUAL LOCATION OF

EQUIPMENT TO BE DETERMINED IN THE FIELD. NEW

EQUIPMENT SHALL FIT INTO EXISTING AVAILABLE SPACE.

PROVIDE EQUIPMENT WHICH MEETS THE SPACE

REQUIREMENT. RELOCATION OF EQUIPMENT TO FIT INTO

EXISTING AVAILABLE SPACE SHALL BE ACCOMPLISHED AT

NO ADDITIONAL COST TO THE OWNER. PROVIDE REVISED

LAYOUT FOR REVIEW AND APPROVAL PRIOR TO

EQUIPMENT PURCHASED.

10. CONTRACTOR SHALL SUBMIT A LIST OF ALL MAJOR

EQUIPMENT AS SPECIFIED TO THE ENGINEER FOR REVIEW

AND APPROVAL. ALL EQUIPMENT SHALL BE NEW AND BEAR

THE MANUFACTURER'S NAME AND TRADE NAME. ALL

EQUIPMENT SHALL BE UL LISTED.

11. DRAWINGS ARE PREPARED IN ENGLISH UNITS. WIRE SIZE

IS INDICATED IN THE AMERICAN WIRE GAUGE. ALL

CONDUIT SIZES ARE INDUSTRY STANDARD.

12. THE CIRCUIT NUMBERS ARE FOR IDENTIFICATION

PURPOSE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR

BALANCING LOADS WITHIN 10% OF EACH PHASE AND

CORRECTLY PHASING THE CIRCUITS IN PANELBOARD.

13. ELECTRICAL REQUIREMENTS FOR MECHANICAL

EQUIPMENT ARE BASED ON EQUIPMENT SPECIFIED.

COORDINATE EXACT REQUIREMENTS WITH MECHANICAL

SHOP DRAWINGS PRIOR TO ORDERING AND INSTALLING

EQUIPMENT.

14. WHERE ELECTRICAL INSTALLATIONS DEPEND UPON WORK

OF OTHER TRADES, THE ELECTRICAL CONTRACTOR SHALL

ENSURE THAT NECESSARY INSTRUCTIONS, TEMPLATES,

MATERIALS, ETC. ARE PROVIDED AND SUPERVISE THE

WORK OF THE OTHER TRADES FOR QUALITY AND CODE

COMPLIANCE.

15. THE CONTRACTOR SHALL VISIT THE JOB SITE AND

EXAMINE THE EXISTING CONDITIONS THAT MAY AFFECT

HIS WORK BEFORE STARTING WORK PRIOR TO BIDDING.

16. OPENINGS AND PASSAGE OF CONDUITS OR WIREWAYS

THROUGH FLOOR SLABS FIRE RATED WALLS OR

PARTITIONS SHALL BE PROVIDED WITH UL LISTED FIRE

RATED SLEEVING SYSTEMS AS MANUFACTURED BY

PROSET SYSTEMS INC., OR APPROVED EQUAL. MATCH THE

FIRE RATING THAT HAS BEEN PENETRATED.

17. ALL DEVICE BOXES, JUNCTION AND PULL BOXES SHALL BE

LABELED WITH ASSOCIATED PANEL NAME, CIRCUIT

NUMBER(S), SYSTEM VOLTAGE, AND SYSTEM TYPE, USING

ADHESIVE VINYL LABELS. ALL BOXES, JUNCTION AND PULL

BOXES SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION.

18. CUT AND PATCH SLABS, CEILING, ROOF, FLOOR, WALL AND

OTHER SURFACES AS NECESSARY TO ACCOMPLISH

CONSTRUCTION WORK UNDER THIS CONTRACT.

19. COORDINATE, SCHEDULE OUTAGE AND OBTAIN WRITTEN

APPROVAL OF ALL WORK RELATED TO ELECTRICAL

SERVICE FROM COR. CONTRACTOR SHALL PROVIDE A

MINIMUM OF 5 WEEKS IN ADVANCE NOTICE PRIOR TO

OUTAGE OF BUILDING EQUIPMENT, DEVICES AND

ASSOCIATED POWER CONNECTIONS.

20. SERIES RATED CIRCUIT BREAKERS SHALL NOT BE

ALLOWED.

21. ALL CONDUIT SHALL BE 3/4" MINIMUM UON. ALL

CONDUCTOR SHALL BE A MINIMUM SIZE OF #12AWG

COPPER, UON. SHARED NEUTRAL WIRES ARE PROHIBITED.

22. WIRE AND CABLE SHALL BE CONTINUOUS FROM SOURCE

TO LOAD. SPLICES ARE NOT PERMITTED UNLESS

APPROVED IN WRITING BY ENGINEER.

23. PROVIDE SEPARATE PHASE AND NEUTRAL CONDUCTORS

FOR ALL SINGLE PHASE CIRCUITS, UON.

24. ALL WORK SHOWN ON THE DRAWINGS ARE EXISTING TO

REMAIN, UON.

25. PROVIDE AS-BUILT WITH "RED LINES" INCLUDING REVISED

SWITCHGEAR, SWITCHBOARD, MCC AND PANELBOARD

SCHEDULES TO COR UPON COMPLETION OF THE PROJECT.

CONTRACTOR TO MARK-UP ALL CHANGES FROM

DRAWINGS, ALL FEEDER CONDUIT ROUTES 2" AND

LARGER, PULLBOXES, JUNCTION BOXES AND CORRECTED

CIRCUIT NUMBERS AS A MINIMUM.

26. ALL EXISTING TO REMAIN STRUCTURES SHALL BE

PROTECTED AGAINST DAMAGE. IF DAMAGED SHALL BE

RESTORED TO ORIGINAL CONDITION AT NO ADDITIONAL

COST TO COR.

27. CONDUITS IN FINISHED AREAS SHALL BE INSTALLED

CONCEALED ABOVE CEILINGS, AND IN WALLS. NO CONDUIT

SHALL BE EXPOSED.

28. DEVICE BOXES, JUNCTION BOXES AND PULLBOXES IN

FINISHED AREAS SHALL BE INSTALLED CONCEALED ABOVE

CEILINGS, AND IN WALLS. NO BOXES SHALL BE EXPOSED.

PROVIDE BOX IN ACCESSIBLE LOCATIONS.

29. ALL DEVICES, WIRING DEVICES, RECEPTACLES, SWITCHES,

LIGHT FIXTURES, CONTROLS SHALL BE LABELED ON FACE

PLATE / COVER WITH PANELBOARD AND CIRCUIT NUMBER

ACCORDING TO NEC.

30. ALL PANELBOARDS ARE SHOWN WITH MINIMUM AIC

RATINGS. PROVIDE PANELBOARDS WITH NEXT HIGHER

RATING IF NEEDED. ALL PANELBOARD BUSES SHALL BE

COPPER.

31. PANELBOARDS SHALL HAVE MOUNTING BRACKETS, BUS

CONNECTIONS, FILLER PLATES AND NECESSARY

APPURTENANCES REQUIRED FOR 20% FUTURE SPACE

CAPACITY FOR INSTALLATION OF FUTURE DEVICES.

32. PROVIDE PULL CORD IN ALL EMPTY CONDUITS AND CAP

BOTH ENDS FOR FUTURE USE.

33. PROVIDE CONDUIT BUSHINGS IN ALL CONDUITS, JUNCTION

BOXES, PULL BOXES AND ENCLOSURES.

34. GALVANIZED SHEET SLOTTED SUPPORT CHANNELS SHALL

BE ANODIZED FINISH.

35. PROVIDE REVISED MACHINE TYPED PANELBOARD

DIRECTORIES TO REFLECT FINAL INSTALLATION

CONDITIONS.

36. MOUNT DEVICE BOXES SO THAT NONE OCCUR BACK TO

BACK IN WALLS.

37. MOUNTING HEIGHTS, UNLESS OTHERWISE NOTED IS TO

CENTER LINE OF EQUIPMENT, EXCEPT MOUNTING HEIGHT

OF LIGHTING FIXTURES WHICH IS TO BOTTOM OF FIXTURE.

38. TRANSFORMER WINDINGS SHALL BE COPPER.

39. PROVIDE NAMEPLATES ON EXTERIOR TOP CENTER FOR

EXISTING PANELBOARD ENCLOSURES AS FOLLOWS:

LINE 1: EQUIPMENT ID

LINE 2: EQUIPMENT RATING

LINE 3: POWER SOURCE

LINE 4: COLUMN #

LINE 5: INSTALLATION DATE

40. PROVIDE NAMEPLATES ON EXTERIOR TOP CENTER FOR

EXISTING SWITCHBOARD AS FOLLOWS:

LINE 1: EQUIPMENT ID

LINE 2: EQUIPMENT RATING

LINE 3: POWER SOURCE

LINE 4: COLUMN #

LINE 5: INSTALLATION DATE

41. PROVIDE NAMEPLATES ON EXTERIOR TOP CENTER FOR

EXISTING ELECTRICAL EQUIPMENT ENCLOSURES AS

FOLLOWS:

LINE 1: EQUIPMENT ID

LINE 2: EQUIPMENT RATING

LINE 3: POWER SOURCE

LINE 4: COLUMN #

LINE 5: INSTALLATION DATE

FOR MOTOR STARTERS AND DISCONNECT SWITCHES THE

TOP LINE SHALL BE THE NAME/DESIGNATION OF THE

EQUIPMENT BEING FED BY THE STARTER/SWITCH.

42. PROVIDE NAMEPLATES AT EXISTING SWITCHGEAR.

LOCATE ONE NAMEPLATE AT EACH INCOMING MAIN

SECTION.

LINE 1: EQUIPMENT ID

LINE 2: EQUIPMENT RATING

LINE 3: POWER SOURCE

LINE 4: COLUMN #

LINE 5: INSTALLATION DATE

43. EXPOSED CONDUIT SHALL BE RIGID GALVANIZED STEEL

(RGS).

44. PROVIDE INSULATING BUSHINGS (ARLINGTON TYPE R6D

OR APPROVED EQUAL) IN ALL CONDUITS, JUNCTION AND

PULL BOXES AND ENCLOSURES TO PROTECT CABLES.

45. PROVIDE NAMEPLATES ON EXTERIOR TOP CENTER FOR

EXISTING MCC AS FOLLOWS:

LINE 1: EQUIPMENT ID

LINE 2: EQUIPMENT RATING

LINE 3: POWER SOURCE

LINE 4: COLUMN #

LINE 5: INSTALLATION DATE

46. PANELBOARD BUSES INCLUDING PHASE, NEUTRAL AND

GROUND SHALL BE COPPER. ALUMINUM BUSES ARE NOT

PERMITTED.

47. LOCATE ALL RACEWAYS TO AVOID INTERFERENCE WITH

DUCTS, PIPES, MECHANICAL EQUIPMENT, WITH REMOVAL

OR WITH ACCESS TO EQUIPMENT WHICH REQUIRES

PERIODIC ADJUSTMENT OR MAINTENANCE.

48. REFER TO MECHANICAL DRAWINGS FOR PHASING WORK

AND REQUIREMENTS. THE CONTRACTOR SHALL

COORDINATE ALL DEMOLITION AND NEW WORK WITH

MECHANICAL PHASING.

49. PROVIDE TEMPORARY POWER PROVISIONS DURING

COURSE OF DEMOLITION AND CONSTRUCTION.

RP RECEPTACLE PANELBOARD

COR CONTRACTING OFFICER'S

REPRESENTATIVE

PANELBOARD XXXX

225A, 120/208V-3Ø, 4W+G

FEED FROM PANEL XXXX

COLUMN 3K9

INSTALLED: MM/YYYY

SWITCHBOARD XXXX

2000A, 120/208V-3Ø, 4W+G

FEED FROM PANEL XXXX

COLUMN 3K9

INSTALLED: MM/YYYY

EQUIPMENT XXXX

30A, 480V-1Ø, 3W+G

FEED FROM PANEL XXXX

COLUMN 3K9

INSTALLED: MM/YYYY

ECB ENCLOSED CIRCUIT BREAKER

COMPUTER ROOM UNITCRU

TRANSFORMERT

W/W WIREWAY

ABBREV. DESCRIPTION

SWITCHGEAR XXXX

2400A, 120/208V-3Ø, 4W+G

FEED FROM PANEL XXXX

COLUMN 3K9

INSTALLED: MM/YYYY

MON MONITOR

HWP HEATING WATER PUMP

BUILDING PHASE MONITORBPM

LR LINE REACTOR

CHGP CHILLED GLYCOL PUMP

DWRP DOMESTIC WATER RECIRCULATING PUMP

CP CENTRIFUGAL PUMP

SP SPARE

MCC1 XXXX

800A, 120/208V-3Ø, 4W+G

FEED FROM PANEL XXXX

COLUMN 3K9

INSTALLED: MM/YYYY

FURNISH: SUPPLY AND DELIVER TO PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION, AND SIMILAR OPERATIONS.

INSTALL: UNLOAD, TEMPORARILY STORE, UNPACK, ASSEMBLE, ERECT, PLACE, ANCHOR, APPLY, WORK TO DIMENSION, FINISH, CURE, PROTECT, CLEAN AND SIMILAR OPERATIONS AT PROJECT SITE.

PROVIDE: FURNISH AND INSTALL, COMPLETE AND READY FOR INTENDED USE.

WIRING: INSTALL CONDUIT AND WIRES/CONDUCTORS

DEMOLISH/REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DISPOSE OF THEM OFF-SITE UNLESS

INDICATED TO BE SALVAGED OR REINSTALLED.

RELOCATE: DETACH FROM EXISTING CONSTRUCTION, IN A MANNER TO PREVENT DAMAGE, PREPARE FOR REUSE, AND REINSTALL WHERE INDICATED.

EXISTING TO REMAIN: LEAVE EXISTING ITEMS THAT ARE NOT TO BE REMOVED AND THAT ARE NOT OTHERWISE

INDICATED TO SALVAGED OR REINSTALLED.

INDICATED: REQUIREMENTS EXPRESSED BY GRAPHIC REPRESENTATIONS OR LN WRITTEN FORM ON DRAWINGS, IN SPECIFICATIONS AND IN CONTRACT DOCUMENTS. OTHER ITEMS INCLUDING SHOWN, "NOTED,' "SCHEDULED," AND

SPECIFIED" HAVE THE SAME MEANING AS INDICATED.

DEFINITIONS

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

MECH ROOM

A023

SWITCH GEAR

ROOM

A029

EX PANEL RP

EX (3) 13.2KV, 3Ø, DELTA

PRIMARY FEEDERS AND

GROUNDING CONDUCTOR

EX GEN. BOX

EX SWITCHGEAR

POWER METER

M

M

M

M

M

M

M

M

EX MOTOR

CONTROL CENTER

MCC1 (ON

PLATFORM ABOVE)

EX

XFMR

T32

EX

SWGR

#2

(FRONT)

EX

SWGR

#1A

EX

XFMR

T33

EX

XFMR

T35

EX

XFMR

T31

EX

XFMR

T37

EX FEEDER

BUSWAY "C"

EX FEEDER

BUSWAY "A"

EX PANEL EDP

(FRONT)

(FRONT)

EX

CONTINUOUS

COPPER

GROUND

GRID BUS

EX

GROUND

ROD

(TYP. OF 8)

EX UTILITY

TUNNEL

CH-1.3

P-2.1

P-2.3

P-1.1

P-1.3

EX FEEDER

BUSWAY "D"

EX

FEEDER

BUSWAY

"B"

EX

SWGR

#1B

EX

XFMR

T38

M

(FRONT)(FRONT)

(FRONT) (FRONT)(FRONT)

EX XFMR

T34

(FRONT)

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EXEX

EX

EX XFMR

TE

(FRONT)

PB

EX

EX

EX

EX

EX

EX

(FRONT)EX

EX

P-2.2P-1.2

EX SW

BD

CH-1.1

CH-1.2

EX LC-6 ANNEX BLDG

SQ. D POWER METER EX PANEL DPE

EX

ATS-2

EX

T-PNL

GL12

EX PANEL EL

J

EX PNL

ER

EX MOTOR

CONTROL CENTER

MCC1 (ON

PLATFORM ABOVE)

PB

PB

PB

PB

PBPBPB

PB

PB

J

REF:

SCALE: 1/8" = 1'-0"

POWER BASEMENT PLAN - DEMOLITION

ED101

8' 16'4'0

SCALE:1/8"=1'

1. REFER TO DRAWINGS E-001 AND E-002 FOR LEGEND,

ABBREVIATIONS AND GENERAL NOTES.

2. CONTRACTOR SHALL PROVIDE A MINIMUM OF FIVE

WEEKS NOTICE FOR A SCHEDULED POWER OUTAGE

TO COR. REFER TO PHASING NOTES ON MECHANICAL

DRAWINGS.

3. ALL DEMOLITION WORK SHALL BE COORDINATED

WITH EXISTING FIELD CONDITIONS AND NEW WORK.

4. CONTRACTOR SHALL CIRCUIT TRACE ALL POWER

EQUIPMENT CIRCUITS PRIOR TO THE START OF

DEMOLITION.

5. EXISTING ELECTRICAL ROOM SHALL REMAIN

OPERATIONAL THROUGHOUT CONSTRUCTION. WORK

AND OUTAGES SHALL BE COORDINATED WITH COR

AND REQUIRE WRITTEN AUTHORIZATION PRIOR TO

SHUTTING DOWN ANY FEEDER OR EQUIPMENT.

6. DISPOSE ALL EQUIPMENT/DEVICES AND MATERIALS

AS DIRECTED BY COR.

7. AFTER REMOVAL OF CONDUCTORS, ABANDON ALL

CONDUITS CONCEALED WITHIN FLOOR SLAB, CUT

FLUSH WITH SLAB SURFACE AND FILL WITH

CONCRETE.

8. REFER TO DRAWING ED601 FOR DEMOLITION SINGLE

LINE DIAGRAM.

DRAWING NOTES

DEMOLITION KEYNOTES

DISCONNECT MECHANICAL EQUIPMENT. REMOVE

BRANCH CIRCUIT WIRING AND CONDUIT BACK TO

SOURCE. REMOVE ASSOCIATED

DISCONNECT/STARTER SWITCHES, STARTERS, ETC.

DISCONNECT AND REMOVE EX RECEPTACLE AND WALL

PLATE. RETAIN OUTLET BOX AND BRANCH CIRCUIT

WIRING FOR REUSE. REFER TO DRAWING E101.

DISCONNECT EX REFRIGERANT MONITORING SYSTEM.

RETAIN EXISTING BRANCH CIRCUIT WIRING AND

CONDUIT FOR REUSE. REFER TO DRAWING E101.

2 (TYP)

2 (TYP)

E-502

E-502

E-502

7 6 5 4 3 2

H

J

K

AREA OF WORK

1 1

1 1

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

LOADING

DOCK LOBBY

A111

SWITCH GEAR

A129

SERVICE

CORRIDOR

A119

ICE STORAGE

D129

MECHANICAL ROOM

A123

SERVICE

CORRIDOR

D119

SERVICE

CORRIDOR

D119

SERVICE

CORRIDOR

D118

REF:

SCALE: 1/8" = 1'-0"

LIGHTING FIRST FLOOR PART PLAN - DEMOLITION

ED102

8' 16'4'0

SCALE:1/8"=1'

1. REFER TO DRAWINGS E-001 AND E-002 FOR

LEGEND, ABBREVIATIONS AND GENERAL NOTES.

2. CONTRACTOR SHALL PROVIDE A MINIMUM OF FIVE

WEEKS NOTICE FOR A SCHEDULED POWER

OUTAGE TO COR. REFER TO PHASING NOTES ON

MECHANICAL DRAWINGS.

3. CONTRACTOR SHALL TRACE ALL LIGHTING FIXTURE

BRANCH CIRCUITS PRIOR TO THE START OF

DEMOLITION.

4. ALL DEMOLITION WORK SHALL BE COORDINATED

WITH EXISTING FIELD CONDITIONS AND NEW WORK.

5. DISPOSE ALL EQUIPMENT/DEVICES AND MATERIALS

AS DIRECTED BY COR.

6. AFTER REMOVAL OF CONDUCTORS, ABANDON ALL

CONDUITS CONCEALED WITHIN FLOOR SLAB AND

CUT FLUSH WITH SLAB SURFACE.

7. REFER TO DRAWING ED601 FOR DEMOLITION

SINGLE LINE DIAGRAM.

DRAWING NOTES

DISCONNECT EX LIGHTING FIXTURE AND RETAIN

FOR RELOCATION. RETAIN EXISTING LIGHTING

BRANCH CIRCUIT AND CONTROLS FOR REUSE.

REFER TO DRAWING E-102 FOR NEW LOCATION

(TYPICAL).

TEMPORARILY SUPPORT EXISTING LIGHTING

FIXTURES DURING CEILING GRID REMOVAL AND

UPGRADES. REFER TO DRAWING AD101 FOR

ADDITIONAL INFORMATION AND DRAWING E102

FOR NEW WORK.

EXISTING WALL MOUNTED LIGHTING IN CORRIDOR

SUPPORTED FROM WALL BRACKETS.

TEMPORARILY SUPPORT EXISTING LIGHTING

FIXTURES IN THESE AREAS AS REQUIRED DURING

CEILING GRID REMOVAL AND UPGRADES. REFER

TO DRAWING AD101 FOR ADDITIONAL

INFORMATION.

TEMPORARILY SUPPORT EXISTING LIGHTING

FIXTURES (TYP. OF 4) DURING CEILING GRID

REMOVAL AND UPGRADE. REFER TO DRAWING

AD102 FOR ADDITIONAL INFORMATION AND

DRAWING E103 FOR NEW WORK.

DEMOLITION KEYNOTES

F

G

25678 4 3

AREA OF WORK

FG

GH

H

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

SERVICE

CORRIDOR

D118

REF:

SCALE: 1/8" = 1'-0"

LIGHTING FIRST FLOOR PART PLAN - DEMOLITION

ED103

8' 16'4'0

SCALE:1/8"=1'

1. REFER TO DRAWINGS E-001 AND E-002 FOR

LEGEND, ABBREVIATIONS AND GENERAL NOTES.

2. CONTRACTOR SHALL PROVIDE A MINIMUM OF FIVE

WEEKS NOTICE FOR A SCHEDULED POWER

OUTAGE TO COR. REFER TO PHASING NOTES ON

MECHANICAL DRAWINGS.

3. CONTRACTOR SHALL TRACE ALL LIGHTING FIXTURE

BRANCH CIRCUITS PRIOR TO THE START OF

DEMOLITION.

4. ALL DEMOLITION WORK SHALL BE COORDINATED

WITH EXISTING FIELD CONDITIONS AND NEW WORK.

5. DISPOSE ALL EQUIPMENT/DEVICES AND MATERIALS

AS DIRECTED BY COR.

6. AFTER REMOVAL OF CONDUCTORS, ABANDON ALL

CONDUITS CONCEALED WITHIN FLOOR SLAB AND

CUT FLUSH WITH SLAB SURFACE.

7. REFER TO DRAWING ED601 FOR DEMOLITION

SINGLE LINE DIAGRAM.

DRAWING NOTES

TEMPORARILY SUPPORT EXISTING LIGHTING

FIXTURES DURING CEILING GRID REMOVAL AND

UPGRADES. REFER TO DRAWING AD102 FOR

ADDITIONAL INFORMATION AND DRAWING E103

FOR NEW WORK..

DEMOLITION KEYNOTES

DE

EF

AREA OF WORK

E

F

FG

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

PA

PA

ICE STORAGE

D129

SERVICE

CORRIDOR

D118

EX FEEDER

BUSWAY "D"

VFD

P-3.2

EX FEEDER

BUSWAY "C"

P-9.1

M M TT

P-3.1 P-3.2

M P-9.2

M

M P-8.1

M P-8.2

P-8.1 P-8.1

P-8.2

P-8.2

VFD

P-3.1

P-9.1

P-9.2

SERVICE

CORRIDOR

D119

SERVICE

CORRIDOR

A119

BL

PA

ET

R

TF

-1 x1

O

A x2

0A

EX

F

IL

TE

R R

AC

K

R X

1/

2" R

VR

X

1/

2" R

V 4"

R V

4" R

V

REF:

SCALE: 1/8" = 1'-0"

POWER FIRST FLOOR PLAN - DEMOLITION

ED104

8' 16'4'0

SCALE:1/8"=1'

1. REFER TO DRAWINGS E-001 AND E-002 FOR LEGEND,

ABBREVIATIONS AND GENERAL NOTES.

2. CONTRACTOR SHALL PROVIDE A MINIMUM OF FIVE

WEEKS NOTICE FOR A SCHEDULED POWER OUTAGE

TO COR. REFER TO PHASING NOTES ON MECHANICAL

DRAWINGS.

3. ALL DEMOLITION WORK SHALL BE COORDINATED

WITH EXISTING FIELD CONDITIONS AND NEW WORK.

4. CONTRACTOR SHALL CIRCUIT TRACE ALL POWER

EQUIPMENT CIRCUITS PRIOR TO THE START OF

DEMOLITION.

5. EXISTING ELECTRICAL ROOM SHALL REMAIN

OPERATIONAL THROUGHOUT CONSTRUCTION. WORK

AND OUTAGES SHALL BE COORDINATED WITH COR

AND REQUIRE WRITTEN AUTHORIZATION PRIOR TO

SHUTTING DOWN ANY FEEDER OR EQUIPMENT.

6. DISPOSE ALL EQUIPMENT/DEVICES AND MATERIALS

AS DIRECTED BY COR.

7. AFTER REMOVAL OF CONDUCTORS, ABANDON ALL

CONDUITS CONCEALED WITHIN FLOOR SLAB AND CUT

FLUSH WITH SLAB SURFACE.

8. REFER TO DRAWING ED601 FOR DEMOLITION SINGLE

LINE DIAGRAM.

9. TURN OVER VFD'S AND TRANSFORMER TO COR.

DRAWING NOTES

DEMOLITION KEYNOTES

DISCONNECT MECHANICAL EQUIPMENT. REMOVE

BRANCH CIRCUIT WIRING AND CONDUIT BACK TO EX

MCC1. REMOVE ASSOCIATED DISCONNECT SWITCHES,

STARTERS, ETC.

DISCONNECT AND REMOVE EX RECEPTACLE AND WALL

PLATE. RETAIN OUTLET BOX AND BRANCH CIRCUIT

WIRING FOR REUSE. REFER TO DRAWING E101.

DISCONNECT PUMP. REMOVE BRANCH CIRCUIT

WIRING AND CONDUIT BACK TO EX MCC1. REMOVE

ASSOCIATED VFD AND TRANSFORMER.

2(TYP)

AREA OF WORK

7 6 5 4 3 2

F

G

H

FG

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

52 #7 52 #11

52 #14

EXISTING SWITCHGEAR

(OPERATIONS BUILDING)

T-33

1500KVA

13.2KV-480Y/277V

3Ø

3200AF

2400AT

T-32

1500KVA

13.2KV-480Y/277V

3Ø

3200AF

2400AT

SPD

VFD

BPM

SPARE

M

3Ø

MON.

P-3.1

M

ETR

HWP

4.2

P-2.1 P-1.3 P-2.2 P-1.1 P-1.2 P-2.3

M

ETR

DWRP

#1

M

ETR

DWRP

#2

T-31

1500KVA

13.2KV-480Y/277V

3Ø

T-37

1500KVA

13.2KV-480Y/277V

3Ø

3200AF

2400AT

3200AF

2400AT

BUSWAY

D

BUSWAY

C

T-35

1000KVA

13.2KV-480Y/277V

3Ø

TIE

3200AF

2400AT

BUSWAY

A

1600AF

1600AT

1600AF

1600AT

SB

LC-6

#1A(4) BUSWAY

B

2000AF

2000AT

M

CH-

1.2

M

CH-

1.1

M

CH-

1.3

800AF

600AT

EX MCC1

600A, 480V, 3Ø, 3W

LOAD CENTER 6

(ANNEX)

250AF

100AT

TIE

M

ELEV.

SWBD #1

2000A, 480/277V, 3Ø, 4W

SWGR #1A

2400A, 480/277V, 3Ø, 4W

SWGR #1B

2400A, 480/277V, 3Ø, 4W

MAIN A MAIN B MAIN A 3200AF

2400AT MAIN B

A4 A5 A6

225AF

200AT

B1 B2

600AF

600AT

E8 E9

100AF

30AT

3A

MCP

3A

MCP

P-9.2P-9.1

J

P-8.2P-8.1

E7E6E5E4E3E1

SPACE SPACE SPACESPACE

E2

M M M M M M

D5D4D3D2D1

SPACE

100A

MCP

150A

MCP

100A

MCP

150A

MCP

150A

MCP

100A

MCP

C6B4 B6

SPACE

B3 B5 C5

SPACE

SPARE

C4C3C2

LR

C1

SPACE

LR

M

ETR

HWP

4.1

SPACE SPACE SPACE

M M

J

M M

100HP

100HP

40HP 40HP 40HP60HP 60HP 60HP

10HP

10HP

10HP

10HP

2HP

2HP

2HP

2HP

T-3.1

112.5KVA

480V-208/120 3Ø

VFD

M P-3.2

100HP

100HP

T-3.2

112.5KVA

480V-208/120 3Ø

100AF

20AT

P-2.3

100AF

20AT

100AF

30AT

LSIG

LSILSI

800AF

800AT

LSI

800AF

600AT

LSI

800AF

600AT

LSI

1600AF

1600AT

1600AF

1600AT

1600AF

1600AT

1600AF

1600AT

SB

LC-6

#1B(4)

LSIG

LSIG

LSIG

LSI LSI LSI LSI LSI LSI

LSIG

LSIG

LSIG

ETR

ETR

225AF

200AT

1. SEE E-001 AND E-002 FOR LEGEND, ABBREVIATIONS

AND GENERAL NOTES.

2. REFER TO DRAWINGS ED101 - ED103 FOR

LOCATIONS OF EQUIPMENT TO BE REMOVED.

3. REFER TO DRAWINGS E-501 AND E-502 FOR

SWITCHGEAR, SWITCHBOARD AND MCC EQUIPMENT

ELEVATIONS.

4. REFER TO MECHANICAL DRAWINGS FOR PHASING

WORK AND REQUIREMENTS.

5. WHERE CIRCUITS ARE REMOVED AT MCC1 AND

SWBD1, CONTRACTOR SHALL DISPOSE ALL

EQUIPMENT AND MATERIALS AS DIRECTED BY COR.

LABEL CIRCUIT AS 'SPACE.'

DRAWING NOTES

DEMOLISH WIRING AND CONDUIT BACK TO SOURCE

(APPROXIMATELY 100 FT). EXISTING CIRCUIT

BREAKER FEEDING DEMOLISHED EQUIPMENT

SHALL REMAIN AND LABELED AS SPARE. PROVIDE

UPDATED SWITCHBOARD NAMEPLATE.

DISCONNECT AND REMOVE EXISTING BRANCH

CIRCUIT WIRING AND CONDUIT BACK TO SOURCE

(APPROXIMATELY 80 FT). REMOVE CIRCUIT

BREAKERS, STARTERS, MCPS, ETC. AS INDICATED.

PRIOR TO DISCONNECTING LINE REACTOR,

CONFIRM THAT ASSOCIATED PUMP IS BEING

DISCONNECTED.

DEMOLITION KEYNOTES

222222

1 1 1

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

M

M M

VFD

MCC1-E2

P-1.3

MCC1-D3

P-1.2

MCC1-C6

P-1.1

MCC1-D2

P-2.1

MCC1-

D4 P-2.2

MCC1-D5

P-2.3

VFD

SWGR#1A-B2

CH-3

VFD

SWGR#1B-B2

CH-4

M

RRS-2

MCC1-E9

J

VFD

VFD

VFD

VF

D

VFD

M

M M

M

M

EX MCC1

ON PLATFORM

S1

S1 S1

EX PANEL RP

EX (3) 13.2KV, 3Ø, DELTA

PRIMARY FEEDERS AND

GROUNDING CONDUCTOR

EX GEN. BOX

EX SWITCHGEAR

POWER METER

EX

XFMR

T32

EX

SWGR

#2

(FRONT)

EX

SWGR

#1A

EX

XFMR

T33

EX

XFMR

T35

EX

XFMR

T31

EX

XFMR

T37

EX FEEDER

BUSWAY "C"

EX FEEDER

BUSWAY "A"

EX PANEL EDP

(FRONT)

(FRONT)

EX

CONTINUOUS

COPPER

GROUND

GRID BUS

EX

GROUND

ROD

(TYP. OF 8)

EX UTILITY

TUNNEL

EX FEEDER

BUSWAY "D"

EX

FEEDER

BUSWAY

"B"

EX

SWGR

#1B

EX

XFMR

T38

(FRONT)(FRONT)

(FRONT) (FRONT)(FRONT)

EX XFMR

T34

(FRONT)

EX

EX

EX

EX

EX

EX

EX

EX

EX

EX

EXEX

EX

EX XFMR

TE

(FRONT)

PB

EX

EX

EX

EX

EX

EX

(FRONT)EX

EX

EX SW

BD

EX LC-6 ANNEX BLDG

SQ. D POWER METER EX PANEL DPE

EX

ATS-2

EX

T-PNL

GL12

EX PANEL EL

EX PNL

ER

PA

PA PA

BL

BL

PA

PA J

S1

S1 S1

EX MOTOR

CONTROL CENTER

MCC1 (ON

PLATFORM ABOVE)

PB

PB

PB

PB

PBPBPB

PB

PB

J

PA

SERVICE

CORRIDOR

A119

M

EC

H

AN

IC

AL

R O

O M

A1

ST

AI

R A1

LO

AD

IN

G

D O

C K

LO

BB

Y

SW

IT

C H

G

EA

R A1

SE

R

VI

C

E C

O R

R

ID

O R

A1

LI

BR

AR

Y

A1

LI

BR

AR

Y

D

LA

N

D

SE

R

VI

C

E C

O R

R

ID

O R

D

C U

ST

O

D

IA

L O

FF

IC

E D

IC

E

ST

O

R

AG

E D

W O

M

EN

'S

LO

C

KE

R R

M D

M

EN

'S

LO

C

KE

R R

M D

AR

M

S R

M

D

VE

ST

IB

U

LE

D

M

EC

H D

SE

R

VI

C

E C

O R

R

ID

O R

D

C O

R R

ID

O

R D

SO

U

TH

LO

AD

IN

G D

O C

K

BL

PA

PA

BL

PA PA

BL

BL

PA

PA

PA

C U

ST

O

D

IA

L O

FF

IC

E D

REF:

SCALE: 1/8" = 1'-0"

POWER BASEMENT PLAN - NEW WORK

E-102

8' 16'4'0

SCALE:1/8"=1'

1. REFER TO DRAWINGS E-001 AND E-002 FOR LEGEND,

ABBREVIATIONS AND GENERAL NOTES.

2. REFER TO DRAWINGS M401 AND M403 FOR LOCATIONS OF

MECHANICAL EQUIPMENT. REFER TO DRAWING M606 FOR

MECHANICAL EQUIPMENT SCHEDULES.

3. REFER TO DRAWING E601 FOR ONE LINE DIAGRAM.

REFER TO DRAWINGS E602-E604 FOR ELECTRICAL

SCHEDULES.

4. PROVIDE SLEEVES AS REQUIRED FOR CONDUIT ROUTED

THROUGH SLAB TO SLAB WALLS.

5. CONTRACTOR SHALL BE RESPONSIBLE FOR FIRE RATING

ALL CONDUIT PENETRATIONS THROUGH FIRE RATED

WALLS AND SHALL MEET THE FIRE RATING OF THAT WALL.

6. COORDINATE LOCATION OF EQUIPMENT PRIOR TO

INSTALLATION OF CONDUITS.

7. REFER TO VFD SCHEDULE ON DRAWING M-606 FOR VFD

REQUIREMENTS.

8. VFD'S PROVIDED UNDER DIVISION 23.

DRAWING NOTES

CONNECT TO CIRCUIT BREAKER AT EX MCC1. REFER TO

DRAWING E601 FOR ONE LINE DIAGRAM AND DRAWING

E602 FOR MCC SCHEDULE.

PROVIDE NEW CIRCUIT BREAKER AT EXISTING CUBICLE IN

EX SWITCHGEAR. COORDINATE IN FIELD PRIOR TO MAKING

CONNECTIONS. PROVIDE CIRCUIT BREAKER WITH SAME

MANUFACTURER AND AIC RATING AS EX SWITCHGEAR.

REFER TO DRAWING E502 FOR SWITCHGEAR ELEVATIONS

AND E602-E603 FOR SWITCHGEAR SCHEDULES.

REUSE EX OUTLET BOX. CONNECT TO EXISTING

RECEPTACLE BRANCH CIRCUIT IN SAME LOCATION.

POWER CONNECTION AT REFRIGERANT MONITORING

SYSTEM. EXTEND EXISTING BRANCH CIRCUIT TO NEW

MONITORING PANEL LOCATION.

PROVIDE MOTOR STARTER (NEMA SIZE 2) AND 30A MCP AT

MCC1. COORDINATE WITH MECHANICAL CONTRACTOR

PRIOR TO ORDERING AND INSTALLATION. REFER TO EX

MCC1 ELEVATION ON DRAWING E501 AND REFER TO EX

MCC1 SCHEDULE ON DRAWING E602.

STROBE LIGHT FOR REFRIGERANT MONITORING PANEL.

CONTROL OF LIGHT TO BE PROVIDED BY MECHANICAL

CONTRACTOR.

CONNECT TO NEAREST EXISTING 120V RECEPTACLE

BRANCH CIRCUIT.

CONSTRUCTION KEYNOTES

(TYP)3

(TYP)3

1 1

2 2

E-501

E-502

E-502

E-502

MECH ROOM

A023

SWITCHGEAR

ROOM

A029

STAIR

AREA OF WORK

7 6 5 4 3 2

H

J

K 5

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

A111

SWITCH GEAR

A129

SERVICE

CORRIDOR

A119

ICE STORAGE

D129

SERVICE

CORRIDOR

A119

MECHANICAL ROOM

A123

SERVICE

CORRIDOR

D119

REF:

SCALE: 1/8" = 1'-0"

LIGHTING FIRST FLOOR PART PLAN - NEW WORK

E-102

8' 16'4'0

SCALE:1/8"=1'

1. REFER TO DRAWINGS E-001 AND E-002 FOR LEGEND,

ABBREVIATIONS AND GENERAL NOTES.

2. REFER TO DRAWINGS M401 AND M403 FOR

LOCATIONS OF MECHANICAL EQUIPMENT. REFER TO

DRAWING M606 FOR MECHANICAL EQUIPMENT

SCHEDULES.

3. REFER TO DRAWING E601 FOR ONE LINE DIAGRAM.

REFER TO DRAWINGS E602-E604 FOR ELECTRICAL

SCHEDULES.

4. CLEAN AND RE-LAMP ALL EXISTING LIGHTING

FIXTURES.

5. REFER TO DRAWING E604 FOR LIGHTING FIXTURE

SCHEDULE.

DRAWING NOTES

RELOCATED LIGHT FIXTURE. EXTEND EXISTING LIGHTING

BRANCH CIRCUIT TO NEW FIXTURE LOCATION. LIGHTING

FIXTURE SHALL BE CONNECTED TO EXISTING LIGHTING

CONTROLS IN THE SPACE.

REINSTALL EXISTING LIGHTING FIXTURE AT NEW CEILING

GRID. SUPPORT EX LIGHTING FIXTURE INDEPENDENTLY

FROM BUILDING STRUCTURE IN 4 CORNERS (TYP.). REFER

TO DRAWING A101 FOR ADDITIONAL INFORMATION.

EXISTING WALL MOUNTED LIGHTING IN CORRIDOR

SUPPORTED FROM WALL BRACKETS. REINSTALL EXISTING

LIGHTING FIXTURES IN THESE AREAS AS REQUIRED ONCE

CEILING GRID HAS BEEN REPLACED. REFER TO DRAWING

A101 FOR ADDITIONAL INFORMATION.

REINSTALL EXISTING LIGHTING FIXTURE AT NEW CEILING

GRID. SUPPORT EX LIGHTING FIXTURE INDEPENDENTLY

FROM BUILDING STRUCTURE IN 4 CORNERS (TYP.). REFER

TO DRAWING A102 FOR ADDITIONAL INFORMATION.

CONSTRUCTION KEYNOTES

F

FG

5678 4 3

H

GH

AREA OF WORK

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

SERVICE

CORRIDOR

D118

REF:

SCALE: 1/8" = 1'-0"

LIGHTING FIRST FLOOR PART PLAN - NEW WORK

E103

8' 16'4'0

SCALE:1/8"=1'

1. REFER TO DRAWINGS E-001 AND E-002 FOR

LEGEND, ABBREVIATIONS AND GENERAL NOTES.

2. CONTRACTOR SHALL PROVIDE A MINIMUM OF FIVE

WEEKS NOTICE FOR A SCHEDULED POWER

OUTAGE TO COR. REFER TO PHASING NOTES ON

MECHANICAL DRAWINGS.

3. REFER TO DRAWING E601 FOR ONE LINE DIAGRAM.

REFER TO DRAWINGS E602-E604 FOR ELECTRICAL

SCHEDULES.

4. CLEAN AND RE-LAMP ALL EXISTING LIGHTING

FIXTURES.

5. REFER TO DRAWING E604 FOR LIGHTING FIXTURE

SCHEDULE.

DRAWING NOTES

DE

EF

AREA OF WORK

E

F

FG

REINSTALL EXISTING LIGHTING FIXTURE AT NEW CEILING

GRID. SUPPORT EX LIGHTING FIXTURE INDEPENDENTLY

FROM BUILDING STRUCTURE IN 4 CORNERS (TYP.). REFER

TO DRAWING A102 FOR ADDITIONAL INFORMATION.

CONSTRUCTION KEYNOTES

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

A111

SWITCH GEAR

A129

ICE STORAGE

D129

MECHANICAL ROOM

A123

SERVICE

CORRIDOR

D118

CUSTODIAL

OFFICE

D134

VFD

SWBD#1-B3

M

CH-1

VFD

SWBD#1-C3

M

CH-2

VFD

MCC1-E4

M

P-8.1

MCC1-E7

M

P-8.2

MCC1-A6

M P-3.2

MCC1-B5

M P-3.1

M

EF-1

SM

MCC1-E8

M

RRS-1

RP-27,29

VFD

VFD VFD

J

RP-22

J

RP-21

EX FEEDER

BUSWAY "D"

EX FEEDER

BUSWAY "C"

SERVICE

CORRIDOR

A119

CORRIDOR

SERVICE

CORRIDOR

D119

PA

BL

PA

PA

PA PA

BL

BL

PA

PA

J

J

REF:

SCALE: 1/8" = 1'-0"

POWER FIRST FLOOR PLAN - NEW WORK

E-103

8' 16'4'0

SCALE:1/8"=1'

1. REFER TO DRAWINGS E-001 AND E-002 FOR LEGEND,

ABBREVIATIONS AND GENERAL NOTES.

2. REFER TO DRAWINGS M401 AND M403 FOR

LOCATIONS OF MECHANICAL EQUIPMENT. REFER TO

DRAWING M606 FOR MECHANICAL EQUIPMENT

SCHEDULES.

3. REFER TO DRAWING E601 FOR ONE LINE DIAGRAM.

REFER TO DRAWINGS E602-E604 FOR ELECTRICAL

SCHEDULES.

4. COORDINATE LOCATION OF EQUIPMENT PRIOR TO

INSTALLATION OF CONDUITS.

5. PROVIDE SLEEVES AS REQUIRED FOR CONDUIT

ROUTED THROUGH SLAB TO SLAB WALLS.

6. CONTRACTOR SHALL BE RESPONSIBLE FOR FIRE

RATING ALL CONDUIT PENETRATIONS THROUGH FIRE

RATED WALLS AND SHALL MEET THE FIRE RATING OF

THAT WALL.

7. REFER TO VFD SCHEDULE ON DRAWING M-606 FOR

VFD REQUIREMENTS.

8. VFD'S PROVIDED UNDER DIVISION 23.

DRAWING NOTES

PROVIDE NEW CIRCUIT BREAKER IN EXISTING CUBICLE IN

EXISTING MCC1. COORDINATE IN FIELD PRIOR TO MAKING

CONNECTIONS. MODIFY EXISTING MCC1 AS REQUIRED FOR

NEW CIRCUIT BREAKER AND NEW LOAD. REFER TO

DRAWING E501 FOR EX MCC1 ELEVATION/VFD MOUNTING

DETAIL AND DRAWING E602 FOR EX MCC1 SCHEDULE.

PROVIDE NEW CIRCUIT BREAKER IN EXISTING CUBICLE IN

EXISTING SWITCHBOARD. COORDINATE IN FIELD PRIOR TO

MAKING CONNECTIONS. MODIFY EXISTING SWITCHBOARD

AS REQUIRED FOR NEW CIRCUIT BREAKER AND NEW

LOAD. REFER TO DRAWING E602 FOR SWITCHBOARD

SCHEDULE.

REUSE EX OUTLET BOX. CONNECT TO EXISTING

RECEPTACLE BRANCH CIRCUIT IN SAME LOCATION.

EX PANEL RP LOCATED AT SWITCHGEAR A029.

POWER CONNECTION FOR CONTROL VALVES.

CONSTRUCTION KEYNOTES

(TYP) 3

AREA OF WORK

7 6 5 4 3 2

F

G

H

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

1/2" MIN. DEPTH OF

WATERPROOF SEALANT

AROUND ENTIRE PERIMETER

WATERPROOF MATERIAL

NEW/EXISTING

CONSTRUCTION

CONDUIT OR WIREWAY WITH

MAX. ANNULAR SPACE OF 3/16"

AROUND WIREWAY OR DUCT.

1 2 3 4

"MCC1" - ELEVATION DETAIL

NOT TO SCALEE-501

A1 B1 C1 D1

C2

A3 C3

C5

B6

A2

B4 C4

E1

E4

MOTOR CONTROL CENTER

INCOMING

FEEDER FR0M

SWBD #1

MAIN

SPACE

SECONDARY

CHILLED

WATER PUMP

P-3.2

SPACE

SPACE

SPACE

EX HEATING

WATER PUMP

4.2

SPARE

CONDENSER

WATER PUMP

P-1.1

SPACE

CONDUIT THROUGH WALL

NOT TO SCALEE-501

PENETRATION FOR

B2

B3

EX BPM

EX HEATING

WATER PUMP

4.1

B5

SPARE

C6

SPACE

SPACE

E3

EX 3Ø

MONITOR

E5

E6

SEC. CHILLED

WATER PUMP-

FC P-8.1

EX DOMESTIC

WATER RECIRC.

PUMP #1

EX DOMESTIC

WATER RECIRC.

PUMP #2

E7

E8

E9

RRS-2

EF-1

PAD

SEC. CHILLED

WATER PUMP-

FC P-8.2

VFD

FOR

PRIMARY

CHILLED

WATER

PUMP

P-1.1

FINISHED

FLOOR

6' -0

" M

AX

IM

U

M

SUPPORT FRAME

ASSEMBLY USING

SLOTTED CHANNELS

ELEVATION DETAIL (TYPICAL)

NOT TO SCALEE-501

SUPPORT STRUCTURE FOR VFD -

TRANSITION

FROM RGS

TO FMC

RGS CONDUIT

TO EQUIPMENT

FMC

SUPPORT FRAME POST BASE BY

SUPPORT FRAME MANUFACTURER.

ANCHOR TO CONCRETE FLOOR WITH

(4) 1/2" Ø HILTI KWIK BOLT TZ

EXPANSION ANCHORS OR APPROVED

EQUAL WITH 3" MINIMUM EMBEDMENT.

(TYPICAL)

ANCHOR UNISTRUT ASSEMBLY TO

CEILING WITH A MINIMUM OF (2) 1/2" Ø

HILTI KWIK BOLT TZ CARBON STEEL

EXPANSION ANCHORS OR APPROVED

EQUAL CONNECTION TO SUPPORT

FRAME SHALL BE DETAILED TO ALLOW

VERTICAL MOVEMENT. (TYPICAL)

D2

PRIMARY

CHILLED

WATER PUMP

P-2.1

D3

CONDENSER

WATER PUMP

P-1.2

D4

PRIMARY

CHILLED

WATER PUMP

P-2.2

D5

PRIMARY

CHILLED

WATER PUMP

P-2.3

CONDENSER

WATER PUMP

P-1.3

E2

SECONDARY

CHILLED

WATER PUMP

P-3.1

A6

SPACE

A5

SPD A4

FMC TO

EQUIPMENT

CONCRETE

SLAB

1. SEE E-001 AND E-002 FOR LEGEND, ABBREVIATIONS AND

GENERAL NOTES.

2. SEE E-101 THROUGH E-104 FOR EQUIPMENT LOCATIONS.

3. EQUIPMENT IS EXISTING TO REMAIN, UON.

4. CONTRACTOR SHALL PROVIDE GALVANIZED 12 GAGE

SLOTTED CHANNELS FOR SUPPORT FRAME ASSEMBLY.

SUPPORT FRAME ASSEMBLY SHALL BE SECURED AND FREE

FROM MOVEMENT DURING PUMP OPERATIONS. CONTRACTOR

SHALL SUBMIT SHOP DRAWINGS AND PRODUCT DATA SHEETS

FOR SUPPORT FRAME ASSEMBLY.

5. VERTICAL MEMBERS OF SUPPORT FRAME ASSEMBLY SHALL

BE A MINIMUM OF 1 5/8" WIDE AND 4 7/8" DEEP AND HAVE A

MINIMUM MOMENT OF INERTIA OF 2.805".

6. PRIOR TO INSTALLATION OF ANCHORS INTO CONCRETE, DRILL

SMALL PILOT HOLE TO VERIFY REBAR EXISTS. MOVE ANCHOR

TO AVOID CONFLICT AS NECESSARY.

7. REFER TO DRAWING E601 FOR ONE LINE DIAGRAM AND E602

FOR EXISTING MCC1 SCHEDULE.

DRAWING NOTES

PROVIDE NEW CIRCUIT BREAKER IN EXISTING CUBICLE AS

INDICATED. NEW CIRCUIT BREAKER SHALL MATCH

EXISTING BREAKERS TYPE, STYLE AND AIC RATING.

PROVIDE UPDATED NAMEPLATE.

PROVIDE MOTOR STARTER (NEMA SIZE 2) AND 30 A MCP.

CONSTRUCTION KEYNOTES

DEMOLITION KEYNOTES

DISCONNECT AND REMOVE EXISTING FEEDER.

REMOVE CIRCUIT BREAKER.

1 1

1 1

1 11 1

1 1

1 1

1 11 1

1 1

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

1 2 3 4

PAD

A1 B1 C1 D1

A2

A3

C3

E1

B2

B3

B4

C2 D2

D3

D4

E2

E3

RELAYS

BLANK

BUSWAY

"A"

CHILLER

CH-3

SPACE

SPACE

SPACE

SPACE

TIE

SB LC-6

#1A (4)

SPACE

SPACE

SPACE

BUSWAY

"B"

BLANK

MAIN CB A

MAIN CB B

TIE CB

CONTROLS

MAIN

(FED FROM

FEEDER #14

VIA XFMR

#T33)

F1

F2

F3

BLANK

MAIN

(FED FROM

FEEDER #7C

VIA XFMR

#T32)

1 2 3 4

PAD

A1 B1 C1 D1

A2

A3

C3

E1

B2

B3

B4

C2 D2

D3

D4

E2

E3

RELAYS

BLANK

BUSWAY

"D"

CHILLER

CH-4

SPACE

SPACE

SPACE

SPACE

TIE

SB LC-6

#1B (4)

SPACE

SPACE

SPACE

BUSWAY

"C"

BLANK

MAIN CB A

MAIN CB B

TIE CB

CONTROLS

MAIN

(FED FROM

FEEDER #14

VIA XFMR

#T31)

F1

F2

F3

BLANK

MAIN

(FED FROM

FEEDER #7C

VIA XFMR

#T37)

RELAYS

RELAYS

1 2 3

A1 B1 C1

C3

A3

C2

C4

B3

B2

B4

A2

PAD

METERS

BLANK

CHILLER

CH-1.3

CHILLER

CH-1.2

CHILLER

CH-1

SERVICE

ELEVATOR

CHILLER

CH-1.1

CHILLER

CH-2

SPACE

MAIN

(FED

FROM

FEEDER

#7C VIA

XFMR

#T35)

BUSDUCT

BLANK

MOTOR

CONTROL

CENTER

MCC1

(MECH RM)

A4

PULLBOX

EXISTING SWITCHGEAR #1B - ELEVATION DETAIL

NOT TO SCALEE-502

EXISTING SWITCHGEAR #1A - ELEVATION DETAIL

NOT TO SCALEE-502

2EXISTING SWITCHBOARD #1 - ELEVATION DETAIL

NOT TO SCALEE-502

1. SEE E-001 AND E-002 FOR LEGEND, ABBREVIATIONS AND

GENERAL NOTES.

2. SEE E-101 THROUGH E-103 FOR EQUIPMENT LOCATIONS.

3. EQUIPMENT IS EXISTING TO REMAIN, UON.

DRAWING NOTES

PROVIDE NEW CIRCUIT BREAKER IN EXISTING CUBICLE AS

INDICATED ON E-601. NEW CIRCUIT BREAKER SHALL

MATCH EXISTING SWITCHGEAR OR SWITCHBOARD

BREAKERS TYPE, STYLE AND AIC RATING. PROVIDE

UPDATED NAMEPLATE.

CONSTRUCTION KEYNOTES

DEMOLITION KEYNOTES

DISCONNECT AND REMOVE EXISTING FEEDER. CIRCUIT

BREAKER IS EXISTING TO REMAIN. LABEL THE EXISTING

CUBICLE AS SPARE.

1 1

1 1

PROFESSIONAL CERTIFICATION.

I HEREBY CERTIFY THAT THESE DOCUMENTS

WERE PREPARED OR APPROVED BY ME, AND

THAT I AM A DULY LICENSED PROFESSIONAL

ENGINEER UNDER THE LAWS OF THE STATE OF

MARYLAND, LICENSE NO.

EXPIRATION DATE:

SPD

BPM

SPARE

3Ø

MON.

M

EX

HWP

4.2 5.6

KW

M

EX

DWRP

#1 0.75

KW

M

EX

DWRP

#2 0.75

KW

LOAD CENTER 6

(ANNEX)

A4 A5 A6 B1 B2

600AF

600AT

E8 E9

P-8.1

E7E6E5E4E3E1

SPACESPACE

E2D5D4D3D2D1

SPACE

C6B4 B6

SPACE

B3 B5 C5

SPACE

SPARE

C4C3C2C1

SPACE

M

EX

HWP

4.1 5.6

KW

52 #7 52 #11

52 #14

EXISTING SWITCHGEAR

(OPERATIONS BUILDING)

T-33

1500KVA

3200AF

2400AT

T-32

1500KVA

3200AF

2400AT

T-31

1500KVA

T-37

1500KVA

3200AF

2400AT

3200AF

2400AT

1600AF

1000AT

BUSWAY

C

T-35

1000KVA

TIE

3200AF

2400AT

BUSWAY

A

BUSWAY

B

2000AF

2000AT

800AF

450AT

800AF

600AT

800AF

450AT

800AF

800AT

250AF

100AT

TIE

M

ELEV.

MAIN A MAIN B MAIN A 3200AF

2400AT MAIN B

SPACE

SPARE

VFD

M

CH-1

FLA

VFD

M

CH-2

FLA

BUSWAY

D

VFD

M

CH-4

FLA

1600AF

1000AT

VFD

M

CH-3

FLA

VFD

M P-3.1

VFD

M P-3.2

VFD

M P-1.1

VFD

M P-2.1

VFD

M P-1.2

VFD

M P-2.2

VFD

M P-2.3

VFD

M P-1.3

M

P-8.2

M

800AF

600AT

SPARE

800AF

600AT

SPARE

EX MCC1 800A,

480V, 3Ø, 3W

SWBD #1

2000A, 480/277V, 3Ø, 4W

SWGR #1A

2400A, 480/277V, 3Ø, 4W

SWGR #1B

2400A, 480/277V, 3Ø, 4W

60HP

60HP

60HP

60HP

20HP

20HP

40HP

40HP

20HP

20HP

20HP

20HP

40HP

40HP

40HP

40HP

10HP 10HP

VFD

10HP

VFD

10HP

EF-1

M 5HP

5HP

PANEL RP

100A, 208/120V, 3Ø, 4W

100AF

100AT

FED FROM

PNL DR101

250AF

150AT

250AF

150AT

100AF

70AT

250AF

125AT

100AF

70AT

250AF

125AT

250AF

125AT

100AF

70AT

100AF

40AT

100AF

40AT

100AF

15AT

LSILSILSI LSILSI

1600AF

1600AT

1600AF

1600AT

SB

LC-6

#1A(4)

1600AF

1600AT

1600AF

1600AT

1600AF

1600AT

1600AF

1600AT

SB

LC-6

#1B(4)

LSIG

LSIG

LSIG

LSI LSI LSI

LSIG LSIG

LSIG

LSI LSI LSILSI LSI

SPACE

LSI LSI

100AF

20AT

100AF

20AT

3A

MCP

3A

MCPSPACE

10HP

RRS-2

M 10HP

30A

MCP

EX

EX

1. REFER TO DRAWINGS E-001 AND E-002 FOR LEGEND,

ABBREVIATIONS AND GENERAL NOTES.

2. REFER TO DRAWINGS E-602-E-604 FOR SCHEDULES.

3. ALL CIRCUIT BREAKERS INDICATED ON THIS

DRAWING ARE 3-POLE, UON. REFER TO EACH PIECE

OF ELECTRICAL DISTRIBUTION EQUIPMENT FOR

ELECTRICAL RATINGS.

4. REFER TO VFD SCHEDULE ON DRAWING M-606 FOR

VFD REQUIREMENTS.

5. BOLD LINES INDICATE NEW EQUIPMENT.

6. VFD'S ARE PROVIDED UNDER DIVISION 23.

DRAWING NOTES

PROVIDE VFD MOUNTED ON KINDORF CHANNEL

ADJACENT TO PUMP AT 6'-0" AFF. SEE DETAIL #3 ON E-501

FOR ADDITIONAL INFORMATION.

3 SETS [(3) #400KCMIL & #2/0G] IN (3) 3"C.

2 SETS [(3) #4/0 & #2G] IN (2) 2 1/2"C

(3) #2 & #6G IN 1 1/2"C.

(3…