Bid Submission Drawings.pdf
PDF 19 MB Posted
- Attached to
- Ice Storage and Chiller Replacement Federal contract opportunity
- Solicitation number
- 47PD0123R0002
About this file
This government file provides details on a federal contract opportunity for ice storage and chiller replacement services. The General Services Administration Public Buildings Service Region 3 is soliciting proposals under solicitation number 47PD0123R0002 to replace existing ice storage and chiller systems. Bidders should review the attached solicitation and bid submission drawings documents for requirements, specifications, response date, and award timing. The opportunity is for non-personal services related to mechanical system upgrades at one or more GSA facilities.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. GENERAL SERVICES ADMINISTRATION
PUBLIC BUILDINGS SERVICE
MID - ATLANTIC REGION
ANNEX BUILDING
6401 SECURITY BOULEVARD - BALTIMORE, MARYLAND 21235
BID SUBMISSION - AUGUST 12, 2020
ICE STORAGE REMOVAL
AND CHILLER REPLACEMENT
VICINITY MAPLOCATION MAP
SCALE: 1" = 2000'
NNNN
PROJECT
LOCATION
SITE
© COPYRIGHT ADC THE MAP PEOPLE
PERMITTED USE NUMBER 21002216
© COPYRIGHT ADC THE MAP PEOPLE
PERMITTED USE NUMBER 21002216
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
22089 09/01/2024
GENERAL:
1. PACKAGED, SELF-CONTAINED UNIT CONSISTING OF COMPRESSOR,
AIR-COOLED CONDENSER, RECOVERY SYSTEM, TANK PRESSURE GAGES,
FILTER DRYER, AND VALVING THAT ALLOWS FOR SWITCHING BETWEEN
LIQUID- AND VAPOR-RECOVERY MODE.
2. RRS-1 & RRS-2 WILL OPERATE UNDER MANUAL CONTROL, AS NEEDED, FOR
CHILLER MAINTENANCE. MONITORING THROUGH BAS IS NOT REQUIRED.
REFRIGERANT RECOVERY SYSTEM -
SEQUENCE OF OPERATION
GENERAL:
1. THE CONDENSER WATER SYSTEM IS AN EXISTING SYSTEM COMPRISED
OF THREE COOLING TOWERS AND CONDENSER WATER PUMPS. SYSTEM
PUMPS P-2.1, P-2.2, AND P-2.3 ARE REPLACED AS PART OF THIS PROJECT
AND ARE ARRANGED IN LEAD/LAG/STANDBY CONFIGURATION. COOLING
TOWERS CT-1, CT-2 AND CT-3 ARE EXISTING TO REMAIN AND ARE
ARRANGED BY LEAD/LAG STANDBY. ROTATE DESIGNATIONS ON A
WEEKLY BASIS. PROVIDE NEW SEQUENCE OF OPERATION AS INDICATED
BELOW EXCEPT WHERE INDICATED TO BE EXISTING SEQUENCE TO
REMAIN IN SECTION 8 OF COOLING TOWER SEQUENCE OF OPERATION.
2. THE SYSTEM INCLUDES EXISTING TO REMAIN TOWER SUMP SWEEPER
AND FILTRATION SYSTEMS, METERED MAKEUP WATER CONNECTION,
LOW PRESSURE STEAM FOR FREEZE PROTECTION, AND WATER
TREATMENT. EXISTING CONTROL LOGIC FOR THESE ELEMENTS IS
EXISTING TO REMAIN.
3. UNDER NORMAL CONDITIONS, THE CENTRAL PLANT OPTIMIZATION (CPO)
PROGRAM WILL DETERMINE NUMBER OF PUMPS AND COOLING TOWERS
TO OPERATE, CONDENSER WATER TEMPERATURE SETPOINTS, AND
VARIABLE FREQUENCY DRIVE SPEED FOR COOLING TOWER FANS AND
PUMPS. WHEN CPO PROGRAM IS NOT ACTIVE, BAS SHALL CONTROL
CONDENSER WATER SYSTEM AS DESCRIBED BELOW. EXISTING
CONTROLS FOR THE BASIN HEATER, SWEEPING AND FILTRATION
SYSTEM, LOW TEMPERATURE TOWER BYPASS, CHEMICAL TREATMENT
SYSTEM, AND SYSTEM FILL SHALL REMAIN AND BE INTEGRATED INTO
CONTROLS PROVIDED ON THIS PROJECT.
4. THE CONDENSER WATER TEMPERATURES SHALL BE MAINTAINED AS
FOLLOWS:
CONDENSER WATER SUPPLY 85 DEG F MAXIMUM
CONDENSER WATER RETURN 96 DEG F
DESIGN AMBIENT CONDITIONS 95 DEG F DB / 78 DEG F WB
5. SYSTEM OPERATION OPERATES FULLY AUTOMATIC WITH MANUAL
OVERRIDES.
6. SYSTEM OPERATING STATUS AND SCHEDULES, TEMPERATURE
SETPOINTS, AND EQUIPMENT ALARM CONDITIONS SHALL BE MONITORED
AND ADJUSTED THROUGH DDC SYSTEM GRAPHICAL USER INTERFACE.
OPERATOR SHALL ALSO BE ABLE TO PERFORM ALL MONITORING AND
CONTROL OF THE CONDENSER WATER SYSTEM DIRECTLY FROM DDC
PANEL THROUGH FIELD INTERFACE.
EXISTING COOLING TOWERS (CT-1; CT-2; CT-3)
1. UNDER NORMAL CONDITIONS, COOLING TOWERS SHALL OPERATE ON A
LEAD/LAG/STANDBY BASIS. ROTATE LEAD/LAG/STANDBY ON A WEEKLY
BASIS WHEN CH-1 AND CH-2 ARE OPERATING TOGETHER, ONLY A SINGLE
COOLING TOWER AND CONDENSER WATER PUMP IS REQUIRED TO
OPERATE. ENERGIZE SECOND COOLING TOWER WHEN CH-3 OR CH-4 IS
ENERGIZED.
2. OPEN COOLING TOWER ISOLATION VALVE V-1E AND V-4E WHEN COOLING
TOWER IS ENABLED THROUGH BAS. OPEN V-3E AND CLOSE LINKED
VALVE V-2E TO DIRECT WATER THROUGH SPRAY NOZZLES. ONCE
ISOLATION VALVE IS PROVEN OPEN, START ASSOCIATED CONDENSER
WATER PUMP.
3. EXISTING CONTROLS FOR EACH TOWER INCLUDE A BASIN WATER
TEMPERATURE SENSOR. WHEN BASIN WATER TEMPERATURE EXCEEDS
75F FOR AN OPERATING COOLING TOWER, THE COOLING TOWER VFD
SHALL ENERGIZE AND MODULATE AS REQUIRED TO MAINTAIN SUPPLY
WATER TEMPERATURE OF 75F. WHEN VFD REACHES FULL SPEED, BASIN
WATER TEMPERATURE IS PERMITTED TO RISE TO 85F DESIGN SET
POINT. MINIMUM VFD SET POINT IS 18 HZ (ADJ).
4. ON A DROP IN SUPPLY WATER TEMPERATURE BELOW 75F (TS-23
ADJUSTABLE), DE-ENERGIZE THE COOLING TOWER FAN AND MODULATE
CHILLER BYPASS CONTROL VALVES V-9, V-10, AND V-11 TO MAINTAIN 65F
MINIMUM SUPPLY WATER TEMPERATURE AS SENSED BY CONDENSER
WATER SUPPLY TEMPERATURE SENSORS TS-16, TS-18, TS-20, AND TS-22.
CPO CONTROLS MAY OVERRIDE 65 F SET POINT AND ALLOW LOWER
CONDENSER WATER TEMPERATURES BASED ON CHILLER OPERATING
PERFORMANCE.
5. WHEN A TOWER IS OFF, CLOSE VALVE V-1E AND V-4E AND OPEN LINKED
VALVES V-2E AND V-3E TO 50% TO ALLOW WATER TO DRAIN FROM THE
RISER TO SPRAY HEADS.
6. ANY COOLING TOWER MAY BE COMMANDED OFF THROUGH BAS. WHEN
COMMANDED OFF, EXISTING TO REMAIN BAS CONTROL LOGIC SHALL
SIGNAL PACKAGED COOLING TOWER CONTROLS DE-ENERGIZE FAN.
EXISTING WATER LEVEL CONTROLS AND BASIN FREEZE PROTECTION
MUST REMAIN OPERATIONAL. CLOSE TOWER ISOLATION CONTROL
VALVES V-1E AT THE CWS CONNECTION TO EACH COOLING TOWER.
7. DDC WILL MONITOR AND ANNUNCIATE A GENERAL COOLING TOWER
PACKAGED CONTROL ALARM.
8. FILTRATION SYSTEM, COOLING TOWER WATER MAKE-UP, AND BASIN
HEATERS SHALL OPERATE IN ACCORDANCE WITH EXISTING BAS LOGIC
AS DESCRIBED BELOW.
A.FILTRATION SYSTEM SHALL RUN CONTINUOUSLY AND BE MONITORED
BY BAS SYSTEM. WHEN ACTIVATED, PUMP TFP-1 SHALL OPERATE AND
VALVE V-5E AND VALVE V-6E SHALL OPEN TO ONE TOWER BASIN
WHILE THE VALVES V-5E AND V-6E TO THE OTHER BASINS SHALL
REMAIN CLOSED. BASIN SERVED BY FILTRATION SYSTEM SHALL
ROTATE EVERY 24 HOURS.
B.STEAM CONTROL VALVE V-7E SHALL OPEN WHEN SUMP
TEMPERATURE FALLS BELOW 45F AND SHALL CLOSE WHEN SUMP
TEMPERATURE RISES ABOVE 50F.
C.CONDENSER WATER MAKE UP VALVE V-8E SHALL OPEN WHEN SUMP
WATER LEVEL DROPS BELOW LOW LEVEL SET POINT AND CLOSE
WHEN WATER LEVEL RISES TO HIGH LEVEL SET POINT.
D.CONDENSER WATER BLOWDOWN VALVE V-9E SHALL OPERATE
THROUGH EXISTING BAS WATER TREATMENT CONTROLS TO MAINTAIN
WATER QUALITY AS DETERMINED BY WATER TREATMENT EQUIPMENT.
9. UPON A COOLING TOWER FAILURE, AS SENSED BY COOLING TOWER
VFD, EACH REMAINING COOLING TOWER SHALL BE ADVANCED ONE
POSITION AND SIGNAL ALARM TO BAS.
CONDENSER WATER PUMPS (P-2.1; P-2.2; P-2.3)
1. PUMPS SHALL OPERATE IN A LEAD/LAG/STANDBY CONFIGURATION.
ROTATE PUMP DESIGNATIONS ON AN WEEKLY BASIS. PUMPS MUST BE
CONTROLLED TO OPERATE WITH CHILLERS AS ASSIGNED THROUGH THE
BAS. THE PIPING AND VALVING PERMITS ANY PUMP TO OPERATE WITH
ANY CHILLER. SYSTEM WILL BE VARIABLE FLOW UNDER CONTROL OF
CPO PROGRAM AND CONSTANT FLOW WHEN CPO PROGRAM IS
DISABLED.
2. START LEAD CONDENSER WATER PUMP WHEN LEAD CHILLER ISOLATION
VALVE LIMIT SWITCH IS PROVEN OPEN.
3. MODULATE LEAD PUMP UNDER VFD CONTROL TO MAINTAIN ASSOCIATED
CHILLER DESIGN FLOW RATE BASED ON PRESSURE DIFFERENCE
ACROSS CHILLER.
4. START LAG CONDENSER WATER PUMP WHEN BAS CALLS FOR
ADDITIONAL FLOW AS DESCRIBED IN CHILLER SECTION ABOVE. LEAD
PUMP IS DESIGNED TO PROVIDE ADEQUATE COMBINED FLOW FOR CH-1
AND CH-2.
5. WHEN OPERATING CONDENSER WATER PUMP FAILS AS SENSED BY
PUMP VFD, ANNUNCIATE ALARM TO CENTRAL BAS SYSTEM GRAPHICAL
USER INTERFACE AND ACTIVATE STANDBY PUMP. IF STANDBY PUMP
FAILS, DEACTIVATE THE ASSOCIATED CHILLER AND COOLING TOWER
AND ANNUNCIATE AN ALARM AT CENTRAL WORKSTATION GRAPHICAL
INTERFACE.
6. CONDENSER WATER SYSTEM SHALL BE BALANCED FOR TAB WITH CH-1,
CH-2, AND CH-4 OPERATIONAL AT DESIGN FLOW.
7. VFD TURNDOWN UNDER CPO CONTROL SHALL BE LIMITED BY MINIMUM
ALLOWABLE FLOW THROUGH THE CHILLER AS MEASURED BY EACH
CHILLER FLOW METER. MINIMUM FLOW SETPOINT SHALL BE
COORDINATED WITH PROVIDED CHILLER. BASIS OF DESIGN SETPOINT
FOR CHILLERS CH-1 AND CH-2 MINIMUM FLOW IS 390 GPM, AND FOR
CHILLERS CH-3 AND CH-4 MINIMUM FLOW IS 720 GPM.
8. CONDENSER WATER PUMP MUST BE ENERGIZED PRIOR TO COOLING
TOWER FAN AND CHILLER START. CONDENSER PUMP MUST NOT START
UNTIL CONDENSER WATER SUPPLY CONTROL VALVE FOR ASSOCIATED
TOWER (V-1E) AND CHILLER (V-2, V-4, V-6, V-8) IS PROVEN OPEN.
PROVIDE FLOW SWITCHES AS INDICATED TO ASSURE FLOW PRIOR TO
CHILLER OPERATION.
CONDENSER WATER - SEQUENCE OF OPERATION
GENERAL:
1. WHEN THERE IS A "HIGH REFRIGERANT LEVEL" ALARM IN EITHER ROOM A-123 OR D-129, OPEN EXHAUST AND OUTSIDE AIR DAMPERS SERVING ROOM AND RUN FAN CONTINUOUSLY AND ENERGIZE STROBES LOCATED AT EACH ROOM ENTRANCE. OPERATE IN THIS MANNER UNTIL OPERATOR STOPS FAN AND STROBES DE-ENERGIZE WHILE DAMPERS IN THE OTHER ROOM REMAIN CLOSED. (D-1 AND D-2 FOR A-123 AND D-3, 4, AND 5 FOR ROOM D-129).
2. WHEN THE "HIGH REFRIGERANT LEVEL" ALARM OCCURS IN ROOM D-129, DE-ENERGIZE EXISTING TRANSFER FAN AND EXISTING EXHAUST FAN. SEE MD400s AND M400 DRAWINGS FOR LOCATION OF EXISTING FANS. FANS MUST
BE MANUALLY RESET BY OPERATOR.
3. SIGNAL "FAN FAILURE" ALARM TO BAS WHEN FAN FAILS AS SENSED BY CURRENT SENSOR.
4. SIGNAL "DAMPER FAILURE" ALARM TO BAS WHEN DAMPER FAILS TO OPEN AS SENSED BY LIMIT SWITCH.
5. SIGNAL "HIGH REFRIGERANT LEVEL" ALARM TO BAS WHEN REFRIGERANT LEVEL IN EITHER ROOM A-123 OR ROOM
D-129 EXCEEDS ALARM SET POINT OF 1000 PPM (ADJUSTABLE).
EXHAUST FAN EF-1 - SEQUENCE OF OPERATION
REF:
SCALE: NONE
REFRIGERANT EXHAUST CONTROL SCHEMATIC
M-605
LS
OUTSIDE
AIR
LS
D-4, ROOM
SUPPLY DAMPER
ROOM
D-129
LS D-5
LS
OUTSIDE
AIR
ROOM
A-123
LS
D-2D-1
D-3
OA
DAMPER
EA DAMPER
CS
EF-1OA
DAMPER
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
ELECTRICAL PANELBOARD (208Y/120V, 3Ø, 4W+G), UON
ELECTRICAL PANELBOARD (480Y/277V, 3Ø, 4W+G), UON
NON-FUSED DISCONNECT SWITCH, SUBSCRIPT INDICATES
AMPACITY AND NUMBER OF POLES.
MOTOR
HEATER
JUNCTION BOX
SPECIFIC NOTE NUMBER
DEMOLITION NOTE NUMBER
SECTION NUMBER
DRAWING NUMBER WHERE SHOWN
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
CONDUIT TURNED UP
CONDUIT TURNED DOWN
CONDUIT WITH WIRES, 2#12AWG+1#12G IN 3/4"C. UNLESS
OTHERWISE NOTED, NUMBER OF CONDUCTORS AS REQUIRED.
FOR 3 PHASE, 208/120V OR 480/277V CIRCUITS IN ONE
HOMERUN, PROVIDE 4 WIRES AND GROUND FOR EACH CIRCUIT.
PROVIDE DEDICATED NEUTRALS FOR ALL MULTIPLE SINGLE
PHASE CIRCUITS IN ONE HOMERUN.
RP-31:1,3,5
M
MOTOR RATED MANUAL STARTER, SINGLE POLE, 20A, 120V
WITH HOA SWITCH AND PILOT LIGHT.
SM
PANELBOARDS
SAFETY SWITCHES/STARTERS/SWITCHES
EQUIPMENT CONNECTIONS
MISCELLANEOUS
WIRING
H
JJ
ELECTRICAL LEGEND
FEEDER SIZE
TRANSFORMER, AS SHOWN ON PLANST
TRANSFORMER, AS SHOWN ON SINGLE LINE DIAGRAMS
SWITCH AND FUSE
NEW WORK
EXISTING WORK
DEMOLITION WORK
LIGHTING SYSTEM
PM DIGITAL POWER METER
RECEPTACLES
DUPLEX CONVENIENCE RECEPTACLE, 20A, 125VAC, NEMA
5-20R CONFIGURATION. MOUNT 18" AFF, UON.
GROUNDING
GB COPPER GROUND BUS
DRAWOUT CIRCUIT BREAKER
F FUSED SAFETY DISCONNECT SWITCH. SUBSCRIPT
INDICATES AMPACITY OF FUSE AND NUMBER OF POLES.
MOLDED CASE CIRCUIT BREAKER
FUSE
GROUND
GROUND FAULT RELAYGF
DUPLEX GFCI RECEPTACLE, 20A, 125VAC, NEMA
5-20R CONFIGURATION. MOUNT 18" AFF, UON.
G
FIRE SMOKE DAMPERF/S
B ENCLOSED CIRCUIT BREAKER, UPPER NUMERAL INDICATES
TRIP SIZE, LOWER NUMERAL INDICATES FRAME SIZE100
SPD SURGE PROTECTION DEVICE
BRANCH CIRCUIT HOMERUN TO PANELBOARD, RP-31 DENOTES
TO PANEL RP-31 AND NUMERALS IDENTIFY CIRCUIT NUMBERS.
ARROWS DENOTE NO. OF CIRCUITS. PROVIDE DEDICATE PHASE
AND NEUTRALS AND COMMON GROUND FOR EACH CIRCUITS.
MAXIMUM OF 3 CIRCUITS PER HOMERUN (i.e.
6#12AWG+1#12G-3/4"C), UON.
1'X4' FLUORESCENT SURFACE, WALL OR PENDANT LIGHTING
FIXTURE
FLUORESCENT ROUND PENDANT FIXTURE
VFD VARIABLE FREQUENCY DEVICE
BPM BUILDING PHASE MONITOR
LR LINE REACTOR
VFD VARIABLE FREQUENCY DEVICE, SUBSCRIPT INDICATES SIZE.
PULL BOXPB
COMBINATION DISCONNECT SWITCH/ STARTER.
5HP
4'-0" FLUORESCENT INDUSTRIAL FIXTURE
ELECTRICAL SCOPE
THE OVERALL SCOPE OF THIS PROJECT IS:
1. DISCONNECTION AND REMOVAL OF BRANCH CIRCUITS AND CONTROLS SERVING EXISTING CHILLED WATER
PUMPS AND CONDENSER WATER PUMPS. NEW CONDENSER WATER PUMPS FED FROM EXISTING MOTOR CONTROL CENTER WITH NEW BRANCH CIRCUITS. NEW VFD'S AND STARTERS ARE PROVIDED AS REQUIRED.
2. DISCONNECTION AND REMOVAL OF EXISTING CHILLERS FROM EXISTING SWITCHGEAR. FOUR NEW CHILLERS
PROVIDED AND FED FROM EXISTING SWITCHGEAR.
3. REMOVAL AND INSTALLATION OF NEW EQUIPMENT IS PHASED WITH MECHANICAL EQUIPMENT PHASING.
1. DEMOLISH ALL EXISTING ELECTRICAL WORK UNLESS SHOWN OTHERWISE OR INDICATED AS
EXISTING TO REMAIN.
2. DEMOLISH ALL INDICATED LIGHTING FIXTURES, SWITCHES, ASSOCIATED JUNCTION BOXES, CONDUITS AND WIRES BACK TO PANEL BOARD.
3. DEMOLISH ALL MOTOR STARTERS, DISCONNECT SWITCHES AND CONTROL FROM ALL
MECHANICAL EQUIPMENT INDICATED OR NOTED TO BE DEMOLISHED. DEMOLISH ALL
ASSOCIATED CONDUITS AND WIRES BACK TO SOURCE.
4. DEMOLISH ALL EXISTING RECEPTACLES, ALL ASSOCIATED JUNCTION BOXES, CONDUITS AND
WIRES BACK TO PANEL.
5. ALL EXISTING ELECTRICAL EQUIPMENT, DEVICES AND WIRES SHALL BE DISPOSED AS DIRECTED
BY THE CONTRACTING OFFICER'S REPRESENTATIVE.
6. AFTER REMOVAL OF ALL CONDUITS, SEAL OFF ALL FLOOR AND WALL PENETRATIONS WITH
APPROPRIATE FIRE RATED SEALANT.
7. DEMOLISH ALL EXPOSED CONDUITS UNLESS OTHERWISE NOTED.
8. ABANDON ALL CONDUITS CONCEALED IN SLAB OR WALL. CUT CONDUITS FLUSH WITH WALL OR
SLAB. IDENTIFY CONDUITS AS EMPTY IN CONSPICUOUS PLACE.
9. COORDINATE DEMOLITION OF ALL ELECTRICAL DEVICES AND WIRING RELATED TO MECHANICAL
EQUIPMENT WITH PHASING OF MECHANICAL EQUIPMENT DEMOLITION.
10. COORDINATE WITH SEQUENCE OF CONSTRUCTION AND MECHANICAL EQUIPMENT FOR
TEMPORARY WORK AS WELL AS CONNECTION TO PERMANENT POWER SOURCE.
DEMOLITION NOTES
GENERAL:
1. THE ENERGY POWER METER SYSTEM (EPMS) IS AN EXISTING TO REMAIN SYSTEM
CENTRALLY LOCATED AT THE RMB BUILDING AND CURRENTLY SUPPORTED BY
SCHNEIDER ELECTRIC.
2. MAKE ENERGY CONSUMPTION (REAL TIME KW AND TOTAL KW) FROM EACH
CHILLER AND PUMP VFD AVAILABLE TO THE EPMS THROUGH THE BAS. PROVIDE
WIRING, GATEWAY, AND ANY NECESSARY SOFTWARE AND HARDWARE
UPGRADES FOR DATA EXCHANGE BETWEEN BAS AND SCHNEIDER ELECTRIC
SYSTEMS.
ENERGY POWER METER SYSTEM (EPMS)
AND BAS COORDINATION
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
34708 07/24/2023
AMPERESA
AC ALTERNATING CURRENT
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHU
AIC
AIR HANDLING UNIT
MCB MAIN CIRCUIT BREAKER
MOLDED CASE CIRCUIT BREAKER
MOUNTING HEIGHT
MINIMUM
MAIN LUGS ONLY
MCCB
MH
MIN
MLO
MTD
MTG MOUNTING
MOUNTED
NEUTRAL
NATIONAL ELECTRICAL CODE
N
NEC
NEMA
NFSS
NIC
NATIONAL ELECTRICAL
MANUFACTURER'S ASSOCIATION
NON FUSED SAFETY SWITCH
NOT IN CONTRACT
NOT TO SCALE
AMPERES INTERRUPTING CAPACITY,
(SYM, RMS AMPS)
AUTO
AUX
AWG
AUTOMATIC
AUXILIARY
AMERICAN WIRE GAUGE
BREAKER
BUILDINGBLDG
BKR
C
CB
CKT
CP
CU
DISC
DN
CONDUIT
CIRCUIT BREAKER
CIRCUIT
CONTROL PANEL
COPPER
DISCONNECT
DOWN
DP
DWG
EF
EH
ELEV
EMT
ENCL
EQUIP
ETR
EXHAUST FAN
ELECTRIC HEATER
ELEVATION
ELECTRIC METALLIC TUBING
ENCLOSURE
EQUIPMENT
EXISTING TO REMAIN
EX, EXIST
FA
FDR
FL
FMC
FT FOOT OR FEET
FLEXIBLE METAL CONDUIT
FLOOR
FEEDER
FRAME AMPS
EXISTING
G
GFI
GFP
HP
HVAC
HZ
JB
KAIC
KV
KVA KILOVOLT AMPERE
KILOVOLT
THOUSAND AMPERES INTERRUPTING
CAPACITY
JUNCTION BOX
HERTZ
HEATING, VENTILATION AIR CONDITIONING
HORSEPOWER
GROUND FAULT PROTECTION
GROUND FAULT INTERRUPTER
GROUND
LIQUID TIGHT FLEXIBLE METAL
CONDUIT
NTS
P
PH
PNL
RGS
RM
RMS
RX
POLE OR POLES
PHASE
REMOVE EXISTING
ROOT MEAN SQUARE
RIGID GALVANIZED STEEL
PANELBOARD
SIC
SS
S/N
SW
SWBD
SWGR
SYM
SYS SYSTEM
SYMMETRICAL
SWITCHGEAR
SWITCHBOARD
SWITCH
SOLID NEUTRAL
STAINLESS STEEL
SYMMETRICAL INTERRUPTING
CURRENT
TYP
UH
UON
V
VFD
W W W/
WP
XFMR
Ø
NUMBER
PHASE
TRANSFORMER
WEATHERPROOF
WITH
WIRE
WATTS
VARIABLE FREQUENCY DRIVE
VOLTS OR VOLTAGE
UNLESS OTHERWISE NOTED
UNIT HEATER
TYPICAL
ABBREV. DESCRIPTION
ROOM
CT COOLING TOWER
DISTRIBUTION PANELBOARD
DRAWING
LFMC
GENERAL NOTES
RECPT RECEPTACLE
LTG LIGHTING
HTR HEATER
ABBREVIATIONS
CHP CHILLED WATER PUMP
CWP CONDENSER WATER PUMP
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
SF SUPPLY FAN
UL UNDERWRITERS LABORATORIES
PM POWER METER
SPD SURGE PROTECTION DEVICE
MAIN DISTRIBUTION PANELMDP
UPS UNINTERRUPTIBLE POWER SUPPLY
EPO EMERGENCY POWER OFF
AT AMP TRIP
ARF ABOVE RAISED FLOOR
AF AMP FRAME
HV HIGH VOLTAGE
1. ELECTRICAL WORK SHALL BE PERFORMED IN
ACCORDANCE WITH THE LATEST EDITION OF THE
NATIONAL ELECTRICAL CODE (NFPA 70) AND ALL
APPLICABLE LOCAL CODES.
2. CONDUIT RUNS ARE SHOWN DIAGRAMMATICALLY ONLY
AND SHALL BE INSTALLED IN A MANNER TO PREVENT
CONFLICTS WITH EQUIPMENT AND STRUCTURAL
CONDITIONS. ALL ABOVE CEILING, CONCEALED, AND
EXPOSED CONDUITS SHALL BE INSTALLED PARALLEL TO
THE BEAMS AND WALLS.
3. PROVIDE ALL REQUIRED PULL BOXES AND JUNCTION
BOXES FOR INSTALLATION OF THE WIRING IN
ACCORDANCE WITH THE CONTRACT SPECIFICATIONS,
THOUGH THE BOXES MAY NOT BE INDICATED ON THE
DRAWINGS.
4. FINAL LOCATIONS FOR ALL ELECTRICAL EQUIPMENT,
INCLUDING RECEPTACLES, JUNCTION BOXES FOR
SPECIFIED EQUIPMENT, LIGHTING FIXTURES, SWITCHES,
ETC. SHALL BE APPROVED BY THE ENGINEER PRIOR TO
INSTALLATION.
5. THE WIRING DIAGRAMS, QUANTITY AND SIZE OF WIRES
AND CONDUITS ARE BASED UPON SELECTED STANDARD
COMPONENTS OF ELECTRICAL EQUIPMENT.
MODIFICATIONS APPROVED BY ENGINEER MAY BE MADE
BY THE CONTRACTOR AT THEIR EXPENSE TO
ACCOMMODATE EQUIPMENT ACTUALLY PURCHASED.
6. PROVIDE ALL NECESSARY COMPONENTS REQUIRED FOR
MAKING FINAL CONNECTION OF ALL EQUIPMENT
INSTALLED OR MODIFIED AS PART OF THIS CONTRACT.
7. ALARM INDICATION AND CONTROL WIRING SHALL BE
WIRED TO NUMBERED TERMINAL STRIPS AND IDENTIFIED
WITH ADHESIVE LABELS AS TO START AND END OF RUN.
8. ELECTRICAL EQUIPMENT INSTALLED AGAINST CONCRETE
OR MASONRY WALLS SHALL BE INSTALLED WITH A 1/4"
SPACER BETWEEN THE EQUIPMENT AND THE MOUNTING
SURFACE. SPACERS SHALL BE STAINLESS STEEL.
9. DRAWINGS ARE DIAGRAMMATIC. ACTUAL LOCATION OF
EQUIPMENT TO BE DETERMINED IN THE FIELD. NEW
EQUIPMENT SHALL FIT INTO EXISTING AVAILABLE SPACE.
PROVIDE EQUIPMENT WHICH MEETS THE SPACE
REQUIREMENT. RELOCATION OF EQUIPMENT TO FIT INTO
EXISTING AVAILABLE SPACE SHALL BE ACCOMPLISHED AT
NO ADDITIONAL COST TO THE OWNER. PROVIDE REVISED
LAYOUT FOR REVIEW AND APPROVAL PRIOR TO
EQUIPMENT PURCHASED.
10. CONTRACTOR SHALL SUBMIT A LIST OF ALL MAJOR
EQUIPMENT AS SPECIFIED TO THE ENGINEER FOR REVIEW
AND APPROVAL. ALL EQUIPMENT SHALL BE NEW AND BEAR
THE MANUFACTURER'S NAME AND TRADE NAME. ALL
EQUIPMENT SHALL BE UL LISTED.
11. DRAWINGS ARE PREPARED IN ENGLISH UNITS. WIRE SIZE
IS INDICATED IN THE AMERICAN WIRE GAUGE. ALL
CONDUIT SIZES ARE INDUSTRY STANDARD.
12. THE CIRCUIT NUMBERS ARE FOR IDENTIFICATION
PURPOSE ONLY. THE CONTRACTOR IS RESPONSIBLE FOR
BALANCING LOADS WITHIN 10% OF EACH PHASE AND
CORRECTLY PHASING THE CIRCUITS IN PANELBOARD.
13. ELECTRICAL REQUIREMENTS FOR MECHANICAL
EQUIPMENT ARE BASED ON EQUIPMENT SPECIFIED.
COORDINATE EXACT REQUIREMENTS WITH MECHANICAL
SHOP DRAWINGS PRIOR TO ORDERING AND INSTALLING
EQUIPMENT.
14. WHERE ELECTRICAL INSTALLATIONS DEPEND UPON WORK
OF OTHER TRADES, THE ELECTRICAL CONTRACTOR SHALL
ENSURE THAT NECESSARY INSTRUCTIONS, TEMPLATES,
MATERIALS, ETC. ARE PROVIDED AND SUPERVISE THE
WORK OF THE OTHER TRADES FOR QUALITY AND CODE
COMPLIANCE.
15. THE CONTRACTOR SHALL VISIT THE JOB SITE AND
EXAMINE THE EXISTING CONDITIONS THAT MAY AFFECT
HIS WORK BEFORE STARTING WORK PRIOR TO BIDDING.
16. OPENINGS AND PASSAGE OF CONDUITS OR WIREWAYS
THROUGH FLOOR SLABS FIRE RATED WALLS OR
PARTITIONS SHALL BE PROVIDED WITH UL LISTED FIRE
RATED SLEEVING SYSTEMS AS MANUFACTURED BY
PROSET SYSTEMS INC., OR APPROVED EQUAL. MATCH THE
FIRE RATING THAT HAS BEEN PENETRATED.
17. ALL DEVICE BOXES, JUNCTION AND PULL BOXES SHALL BE
LABELED WITH ASSOCIATED PANEL NAME, CIRCUIT
NUMBER(S), SYSTEM VOLTAGE, AND SYSTEM TYPE, USING
ADHESIVE VINYL LABELS. ALL BOXES, JUNCTION AND PULL
BOXES SHALL BE INSTALLED IN AN ACCESSIBLE LOCATION.
18. CUT AND PATCH SLABS, CEILING, ROOF, FLOOR, WALL AND
OTHER SURFACES AS NECESSARY TO ACCOMPLISH
CONSTRUCTION WORK UNDER THIS CONTRACT.
19. COORDINATE, SCHEDULE OUTAGE AND OBTAIN WRITTEN
APPROVAL OF ALL WORK RELATED TO ELECTRICAL
SERVICE FROM COR. CONTRACTOR SHALL PROVIDE A
MINIMUM OF 5 WEEKS IN ADVANCE NOTICE PRIOR TO
OUTAGE OF BUILDING EQUIPMENT, DEVICES AND
ASSOCIATED POWER CONNECTIONS.
20. SERIES RATED CIRCUIT BREAKERS SHALL NOT BE
ALLOWED.
21. ALL CONDUIT SHALL BE 3/4" MINIMUM UON. ALL
CONDUCTOR SHALL BE A MINIMUM SIZE OF #12AWG
COPPER, UON. SHARED NEUTRAL WIRES ARE PROHIBITED.
22. WIRE AND CABLE SHALL BE CONTINUOUS FROM SOURCE
TO LOAD. SPLICES ARE NOT PERMITTED UNLESS
APPROVED IN WRITING BY ENGINEER.
23. PROVIDE SEPARATE PHASE AND NEUTRAL CONDUCTORS
FOR ALL SINGLE PHASE CIRCUITS, UON.
24. ALL WORK SHOWN ON THE DRAWINGS ARE EXISTING TO
REMAIN, UON.
25. PROVIDE AS-BUILT WITH "RED LINES" INCLUDING REVISED
SWITCHGEAR, SWITCHBOARD, MCC AND PANELBOARD
SCHEDULES TO COR UPON COMPLETION OF THE PROJECT.
CONTRACTOR TO MARK-UP ALL CHANGES FROM
DRAWINGS, ALL FEEDER CONDUIT ROUTES 2" AND
LARGER, PULLBOXES, JUNCTION BOXES AND CORRECTED
CIRCUIT NUMBERS AS A MINIMUM.
26. ALL EXISTING TO REMAIN STRUCTURES SHALL BE
PROTECTED AGAINST DAMAGE. IF DAMAGED SHALL BE
RESTORED TO ORIGINAL CONDITION AT NO ADDITIONAL
COST TO COR.
27. CONDUITS IN FINISHED AREAS SHALL BE INSTALLED
CONCEALED ABOVE CEILINGS, AND IN WALLS. NO CONDUIT
SHALL BE EXPOSED.
28. DEVICE BOXES, JUNCTION BOXES AND PULLBOXES IN
FINISHED AREAS SHALL BE INSTALLED CONCEALED ABOVE
CEILINGS, AND IN WALLS. NO BOXES SHALL BE EXPOSED.
PROVIDE BOX IN ACCESSIBLE LOCATIONS.
29. ALL DEVICES, WIRING DEVICES, RECEPTACLES, SWITCHES,
LIGHT FIXTURES, CONTROLS SHALL BE LABELED ON FACE
PLATE / COVER WITH PANELBOARD AND CIRCUIT NUMBER
ACCORDING TO NEC.
30. ALL PANELBOARDS ARE SHOWN WITH MINIMUM AIC
RATINGS. PROVIDE PANELBOARDS WITH NEXT HIGHER
RATING IF NEEDED. ALL PANELBOARD BUSES SHALL BE
COPPER.
31. PANELBOARDS SHALL HAVE MOUNTING BRACKETS, BUS
CONNECTIONS, FILLER PLATES AND NECESSARY
APPURTENANCES REQUIRED FOR 20% FUTURE SPACE
CAPACITY FOR INSTALLATION OF FUTURE DEVICES.
32. PROVIDE PULL CORD IN ALL EMPTY CONDUITS AND CAP
BOTH ENDS FOR FUTURE USE.
33. PROVIDE CONDUIT BUSHINGS IN ALL CONDUITS, JUNCTION
BOXES, PULL BOXES AND ENCLOSURES.
34. GALVANIZED SHEET SLOTTED SUPPORT CHANNELS SHALL
BE ANODIZED FINISH.
35. PROVIDE REVISED MACHINE TYPED PANELBOARD
DIRECTORIES TO REFLECT FINAL INSTALLATION
CONDITIONS.
36. MOUNT DEVICE BOXES SO THAT NONE OCCUR BACK TO
BACK IN WALLS.
37. MOUNTING HEIGHTS, UNLESS OTHERWISE NOTED IS TO
CENTER LINE OF EQUIPMENT, EXCEPT MOUNTING HEIGHT
OF LIGHTING FIXTURES WHICH IS TO BOTTOM OF FIXTURE.
38. TRANSFORMER WINDINGS SHALL BE COPPER.
39. PROVIDE NAMEPLATES ON EXTERIOR TOP CENTER FOR
EXISTING PANELBOARD ENCLOSURES AS FOLLOWS:
LINE 1: EQUIPMENT ID
LINE 2: EQUIPMENT RATING
LINE 3: POWER SOURCE
LINE 4: COLUMN #
LINE 5: INSTALLATION DATE
40. PROVIDE NAMEPLATES ON EXTERIOR TOP CENTER FOR
EXISTING SWITCHBOARD AS FOLLOWS:
LINE 1: EQUIPMENT ID
LINE 2: EQUIPMENT RATING
LINE 3: POWER SOURCE
LINE 4: COLUMN #
LINE 5: INSTALLATION DATE
41. PROVIDE NAMEPLATES ON EXTERIOR TOP CENTER FOR
EXISTING ELECTRICAL EQUIPMENT ENCLOSURES AS
FOLLOWS:
LINE 1: EQUIPMENT ID
LINE 2: EQUIPMENT RATING
LINE 3: POWER SOURCE
LINE 4: COLUMN #
LINE 5: INSTALLATION DATE
FOR MOTOR STARTERS AND DISCONNECT SWITCHES THE
TOP LINE SHALL BE THE NAME/DESIGNATION OF THE
EQUIPMENT BEING FED BY THE STARTER/SWITCH.
42. PROVIDE NAMEPLATES AT EXISTING SWITCHGEAR.
LOCATE ONE NAMEPLATE AT EACH INCOMING MAIN
SECTION.
LINE 1: EQUIPMENT ID
LINE 2: EQUIPMENT RATING
LINE 3: POWER SOURCE
LINE 4: COLUMN #
LINE 5: INSTALLATION DATE
43. EXPOSED CONDUIT SHALL BE RIGID GALVANIZED STEEL
(RGS).
44. PROVIDE INSULATING BUSHINGS (ARLINGTON TYPE R6D
OR APPROVED EQUAL) IN ALL CONDUITS, JUNCTION AND
PULL BOXES AND ENCLOSURES TO PROTECT CABLES.
45. PROVIDE NAMEPLATES ON EXTERIOR TOP CENTER FOR
EXISTING MCC AS FOLLOWS:
LINE 1: EQUIPMENT ID
LINE 2: EQUIPMENT RATING
LINE 3: POWER SOURCE
LINE 4: COLUMN #
LINE 5: INSTALLATION DATE
46. PANELBOARD BUSES INCLUDING PHASE, NEUTRAL AND
GROUND SHALL BE COPPER. ALUMINUM BUSES ARE NOT
PERMITTED.
47. LOCATE ALL RACEWAYS TO AVOID INTERFERENCE WITH
DUCTS, PIPES, MECHANICAL EQUIPMENT, WITH REMOVAL
OR WITH ACCESS TO EQUIPMENT WHICH REQUIRES
PERIODIC ADJUSTMENT OR MAINTENANCE.
48. REFER TO MECHANICAL DRAWINGS FOR PHASING WORK
AND REQUIREMENTS. THE CONTRACTOR SHALL
COORDINATE ALL DEMOLITION AND NEW WORK WITH
MECHANICAL PHASING.
49. PROVIDE TEMPORARY POWER PROVISIONS DURING
COURSE OF DEMOLITION AND CONSTRUCTION.
RP RECEPTACLE PANELBOARD
COR CONTRACTING OFFICER'S
REPRESENTATIVE
PANELBOARD XXXX
225A, 120/208V-3Ø, 4W+G
FEED FROM PANEL XXXX
COLUMN 3K9
INSTALLED: MM/YYYY
SWITCHBOARD XXXX
2000A, 120/208V-3Ø, 4W+G
FEED FROM PANEL XXXX
COLUMN 3K9
INSTALLED: MM/YYYY
EQUIPMENT XXXX
30A, 480V-1Ø, 3W+G
FEED FROM PANEL XXXX
COLUMN 3K9
INSTALLED: MM/YYYY
ECB ENCLOSED CIRCUIT BREAKER
COMPUTER ROOM UNITCRU
TRANSFORMERT
W/W WIREWAY
ABBREV. DESCRIPTION
SWITCHGEAR XXXX
2400A, 120/208V-3Ø, 4W+G
FEED FROM PANEL XXXX
COLUMN 3K9
INSTALLED: MM/YYYY
MON MONITOR
HWP HEATING WATER PUMP
BUILDING PHASE MONITORBPM
LR LINE REACTOR
CHGP CHILLED GLYCOL PUMP
DWRP DOMESTIC WATER RECIRCULATING PUMP
CP CENTRIFUGAL PUMP
SP SPARE
MCC1 XXXX
800A, 120/208V-3Ø, 4W+G
FEED FROM PANEL XXXX
COLUMN 3K9
INSTALLED: MM/YYYY
FURNISH: SUPPLY AND DELIVER TO PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION, AND SIMILAR OPERATIONS.
INSTALL: UNLOAD, TEMPORARILY STORE, UNPACK, ASSEMBLE, ERECT, PLACE, ANCHOR, APPLY, WORK TO DIMENSION, FINISH, CURE, PROTECT, CLEAN AND SIMILAR OPERATIONS AT PROJECT SITE.
PROVIDE: FURNISH AND INSTALL, COMPLETE AND READY FOR INTENDED USE.
WIRING: INSTALL CONDUIT AND WIRES/CONDUCTORS
DEMOLISH/REMOVE: DETACH ITEMS FROM EXISTING CONSTRUCTION AND DISPOSE OF THEM OFF-SITE UNLESS
INDICATED TO BE SALVAGED OR REINSTALLED.
RELOCATE: DETACH FROM EXISTING CONSTRUCTION, IN A MANNER TO PREVENT DAMAGE, PREPARE FOR REUSE, AND REINSTALL WHERE INDICATED.
EXISTING TO REMAIN: LEAVE EXISTING ITEMS THAT ARE NOT TO BE REMOVED AND THAT ARE NOT OTHERWISE
INDICATED TO SALVAGED OR REINSTALLED.
INDICATED: REQUIREMENTS EXPRESSED BY GRAPHIC REPRESENTATIONS OR LN WRITTEN FORM ON DRAWINGS, IN SPECIFICATIONS AND IN CONTRACT DOCUMENTS. OTHER ITEMS INCLUDING SHOWN, "NOTED,' "SCHEDULED," AND
SPECIFIED" HAVE THE SAME MEANING AS INDICATED.
DEFINITIONS
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
MECH ROOM
A023
SWITCH GEAR
ROOM
A029
EX PANEL RP
EX (3) 13.2KV, 3Ø, DELTA
PRIMARY FEEDERS AND
GROUNDING CONDUCTOR
EX GEN. BOX
EX SWITCHGEAR
POWER METER
M
M
M
M
M
M
M
M
EX MOTOR
CONTROL CENTER
MCC1 (ON
PLATFORM ABOVE)
EX
XFMR
T32
EX
SWGR
#2
(FRONT)
EX
SWGR
#1A
EX
XFMR
T33
EX
XFMR
T35
EX
XFMR
T31
EX
XFMR
T37
EX FEEDER
BUSWAY "C"
EX FEEDER
BUSWAY "A"
EX PANEL EDP
(FRONT)
(FRONT)
EX
CONTINUOUS
COPPER
GROUND
GRID BUS
EX
GROUND
ROD
(TYP. OF 8)
EX UTILITY
TUNNEL
CH-1.3
P-2.1
P-2.3
P-1.1
P-1.3
EX FEEDER
BUSWAY "D"
EX
FEEDER
BUSWAY
"B"
EX
SWGR
#1B
EX
XFMR
T38
M
(FRONT)(FRONT)
(FRONT) (FRONT)(FRONT)
EX XFMR
T34
(FRONT)
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EXEX
EX
EX XFMR
TE
(FRONT)
PB
EX
EX
EX
EX
EX
EX
(FRONT)EX
EX
P-2.2P-1.2
EX SW
BD
CH-1.1
CH-1.2
EX LC-6 ANNEX BLDG
SQ. D POWER METER EX PANEL DPE
EX
ATS-2
EX
T-PNL
GL12
EX PANEL EL
J
EX PNL
ER
EX MOTOR
CONTROL CENTER
MCC1 (ON
PLATFORM ABOVE)
PB
PB
PB
PB
PBPBPB
PB
PB
J
REF:
SCALE: 1/8" = 1'-0"
POWER BASEMENT PLAN - DEMOLITION
ED101
8' 16'4'0
SCALE:1/8"=1'
1. REFER TO DRAWINGS E-001 AND E-002 FOR LEGEND,
ABBREVIATIONS AND GENERAL NOTES.
2. CONTRACTOR SHALL PROVIDE A MINIMUM OF FIVE
WEEKS NOTICE FOR A SCHEDULED POWER OUTAGE
TO COR. REFER TO PHASING NOTES ON MECHANICAL
DRAWINGS.
3. ALL DEMOLITION WORK SHALL BE COORDINATED
WITH EXISTING FIELD CONDITIONS AND NEW WORK.
4. CONTRACTOR SHALL CIRCUIT TRACE ALL POWER
EQUIPMENT CIRCUITS PRIOR TO THE START OF
DEMOLITION.
5. EXISTING ELECTRICAL ROOM SHALL REMAIN
OPERATIONAL THROUGHOUT CONSTRUCTION. WORK
AND OUTAGES SHALL BE COORDINATED WITH COR
AND REQUIRE WRITTEN AUTHORIZATION PRIOR TO
SHUTTING DOWN ANY FEEDER OR EQUIPMENT.
6. DISPOSE ALL EQUIPMENT/DEVICES AND MATERIALS
AS DIRECTED BY COR.
7. AFTER REMOVAL OF CONDUCTORS, ABANDON ALL
CONDUITS CONCEALED WITHIN FLOOR SLAB, CUT
FLUSH WITH SLAB SURFACE AND FILL WITH
CONCRETE.
8. REFER TO DRAWING ED601 FOR DEMOLITION SINGLE
LINE DIAGRAM.
DRAWING NOTES
DEMOLITION KEYNOTES
DISCONNECT MECHANICAL EQUIPMENT. REMOVE
BRANCH CIRCUIT WIRING AND CONDUIT BACK TO
SOURCE. REMOVE ASSOCIATED
DISCONNECT/STARTER SWITCHES, STARTERS, ETC.
DISCONNECT AND REMOVE EX RECEPTACLE AND WALL
PLATE. RETAIN OUTLET BOX AND BRANCH CIRCUIT
WIRING FOR REUSE. REFER TO DRAWING E101.
DISCONNECT EX REFRIGERANT MONITORING SYSTEM.
RETAIN EXISTING BRANCH CIRCUIT WIRING AND
CONDUIT FOR REUSE. REFER TO DRAWING E101.
2 (TYP)
2 (TYP)
E-502
E-502
E-502
7 6 5 4 3 2
H
J
K
AREA OF WORK
1 1
1 1
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
LOADING
DOCK LOBBY
A111
SWITCH GEAR
A129
SERVICE
CORRIDOR
A119
ICE STORAGE
D129
MECHANICAL ROOM
A123
SERVICE
CORRIDOR
D119
SERVICE
CORRIDOR
D119
SERVICE
CORRIDOR
D118
REF:
SCALE: 1/8" = 1'-0"
LIGHTING FIRST FLOOR PART PLAN - DEMOLITION
ED102
8' 16'4'0
SCALE:1/8"=1'
1. REFER TO DRAWINGS E-001 AND E-002 FOR
LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. CONTRACTOR SHALL PROVIDE A MINIMUM OF FIVE
WEEKS NOTICE FOR A SCHEDULED POWER
OUTAGE TO COR. REFER TO PHASING NOTES ON
MECHANICAL DRAWINGS.
3. CONTRACTOR SHALL TRACE ALL LIGHTING FIXTURE
BRANCH CIRCUITS PRIOR TO THE START OF
DEMOLITION.
4. ALL DEMOLITION WORK SHALL BE COORDINATED
WITH EXISTING FIELD CONDITIONS AND NEW WORK.
5. DISPOSE ALL EQUIPMENT/DEVICES AND MATERIALS
AS DIRECTED BY COR.
6. AFTER REMOVAL OF CONDUCTORS, ABANDON ALL
CONDUITS CONCEALED WITHIN FLOOR SLAB AND
CUT FLUSH WITH SLAB SURFACE.
7. REFER TO DRAWING ED601 FOR DEMOLITION
SINGLE LINE DIAGRAM.
DRAWING NOTES
DISCONNECT EX LIGHTING FIXTURE AND RETAIN
FOR RELOCATION. RETAIN EXISTING LIGHTING
BRANCH CIRCUIT AND CONTROLS FOR REUSE.
REFER TO DRAWING E-102 FOR NEW LOCATION
(TYPICAL).
TEMPORARILY SUPPORT EXISTING LIGHTING
FIXTURES DURING CEILING GRID REMOVAL AND
UPGRADES. REFER TO DRAWING AD101 FOR
ADDITIONAL INFORMATION AND DRAWING E102
FOR NEW WORK.
EXISTING WALL MOUNTED LIGHTING IN CORRIDOR
SUPPORTED FROM WALL BRACKETS.
TEMPORARILY SUPPORT EXISTING LIGHTING
FIXTURES IN THESE AREAS AS REQUIRED DURING
CEILING GRID REMOVAL AND UPGRADES. REFER
TO DRAWING AD101 FOR ADDITIONAL
INFORMATION.
TEMPORARILY SUPPORT EXISTING LIGHTING
FIXTURES (TYP. OF 4) DURING CEILING GRID
REMOVAL AND UPGRADE. REFER TO DRAWING
AD102 FOR ADDITIONAL INFORMATION AND
DRAWING E103 FOR NEW WORK.
DEMOLITION KEYNOTES
F
G
25678 4 3
AREA OF WORK
FG
GH
H
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
SERVICE
CORRIDOR
D118
REF:
SCALE: 1/8" = 1'-0"
LIGHTING FIRST FLOOR PART PLAN - DEMOLITION
ED103
8' 16'4'0
SCALE:1/8"=1'
1. REFER TO DRAWINGS E-001 AND E-002 FOR
LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. CONTRACTOR SHALL PROVIDE A MINIMUM OF FIVE
WEEKS NOTICE FOR A SCHEDULED POWER
OUTAGE TO COR. REFER TO PHASING NOTES ON
MECHANICAL DRAWINGS.
3. CONTRACTOR SHALL TRACE ALL LIGHTING FIXTURE
BRANCH CIRCUITS PRIOR TO THE START OF
DEMOLITION.
4. ALL DEMOLITION WORK SHALL BE COORDINATED
WITH EXISTING FIELD CONDITIONS AND NEW WORK.
5. DISPOSE ALL EQUIPMENT/DEVICES AND MATERIALS
AS DIRECTED BY COR.
6. AFTER REMOVAL OF CONDUCTORS, ABANDON ALL
CONDUITS CONCEALED WITHIN FLOOR SLAB AND
CUT FLUSH WITH SLAB SURFACE.
7. REFER TO DRAWING ED601 FOR DEMOLITION
SINGLE LINE DIAGRAM.
DRAWING NOTES
TEMPORARILY SUPPORT EXISTING LIGHTING
FIXTURES DURING CEILING GRID REMOVAL AND
UPGRADES. REFER TO DRAWING AD102 FOR
ADDITIONAL INFORMATION AND DRAWING E103
FOR NEW WORK..
DEMOLITION KEYNOTES
DE
EF
AREA OF WORK
E
F
FG
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
PA
PA
ICE STORAGE
D129
SERVICE
CORRIDOR
D118
EX FEEDER
BUSWAY "D"
VFD
P-3.2
EX FEEDER
BUSWAY "C"
P-9.1
M M TT
P-3.1 P-3.2
M P-9.2
M
M P-8.1
M P-8.2
P-8.1 P-8.1
P-8.2
P-8.2
VFD
P-3.1
P-9.1
P-9.2
SERVICE
CORRIDOR
D119
SERVICE
CORRIDOR
A119
BL
PA
ET
R
TF
-1 x1
O
A x2
0A
EX
F
IL
TE
R R
AC
K
R X
1/
2" R
VR
X
1/
2" R
V 4"
R V
4" R
V
REF:
SCALE: 1/8" = 1'-0"
POWER FIRST FLOOR PLAN - DEMOLITION
ED104
8' 16'4'0
SCALE:1/8"=1'
1. REFER TO DRAWINGS E-001 AND E-002 FOR LEGEND,
ABBREVIATIONS AND GENERAL NOTES.
2. CONTRACTOR SHALL PROVIDE A MINIMUM OF FIVE
WEEKS NOTICE FOR A SCHEDULED POWER OUTAGE
TO COR. REFER TO PHASING NOTES ON MECHANICAL
DRAWINGS.
3. ALL DEMOLITION WORK SHALL BE COORDINATED
WITH EXISTING FIELD CONDITIONS AND NEW WORK.
4. CONTRACTOR SHALL CIRCUIT TRACE ALL POWER
EQUIPMENT CIRCUITS PRIOR TO THE START OF
DEMOLITION.
5. EXISTING ELECTRICAL ROOM SHALL REMAIN
OPERATIONAL THROUGHOUT CONSTRUCTION. WORK
AND OUTAGES SHALL BE COORDINATED WITH COR
AND REQUIRE WRITTEN AUTHORIZATION PRIOR TO
SHUTTING DOWN ANY FEEDER OR EQUIPMENT.
6. DISPOSE ALL EQUIPMENT/DEVICES AND MATERIALS
AS DIRECTED BY COR.
7. AFTER REMOVAL OF CONDUCTORS, ABANDON ALL
CONDUITS CONCEALED WITHIN FLOOR SLAB AND CUT
FLUSH WITH SLAB SURFACE.
8. REFER TO DRAWING ED601 FOR DEMOLITION SINGLE
LINE DIAGRAM.
9. TURN OVER VFD'S AND TRANSFORMER TO COR.
DRAWING NOTES
DEMOLITION KEYNOTES
DISCONNECT MECHANICAL EQUIPMENT. REMOVE
BRANCH CIRCUIT WIRING AND CONDUIT BACK TO EX
MCC1. REMOVE ASSOCIATED DISCONNECT SWITCHES,
STARTERS, ETC.
DISCONNECT AND REMOVE EX RECEPTACLE AND WALL
PLATE. RETAIN OUTLET BOX AND BRANCH CIRCUIT
WIRING FOR REUSE. REFER TO DRAWING E101.
DISCONNECT PUMP. REMOVE BRANCH CIRCUIT
WIRING AND CONDUIT BACK TO EX MCC1. REMOVE
ASSOCIATED VFD AND TRANSFORMER.
2(TYP)
AREA OF WORK
7 6 5 4 3 2
F
G
H
FG
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
52 #7 52 #11
52 #14
EXISTING SWITCHGEAR
(OPERATIONS BUILDING)
T-33
1500KVA
13.2KV-480Y/277V
3Ø
3200AF
2400AT
T-32
1500KVA
13.2KV-480Y/277V
3Ø
3200AF
2400AT
SPD
VFD
BPM
SPARE
M
3Ø
MON.
P-3.1
M
ETR
HWP
4.2
P-2.1 P-1.3 P-2.2 P-1.1 P-1.2 P-2.3
M
ETR
DWRP
#1
M
ETR
DWRP
#2
T-31
1500KVA
13.2KV-480Y/277V
3Ø
T-37
1500KVA
13.2KV-480Y/277V
3Ø
3200AF
2400AT
3200AF
2400AT
BUSWAY
D
BUSWAY
C
T-35
1000KVA
13.2KV-480Y/277V
3Ø
TIE
3200AF
2400AT
BUSWAY
A
1600AF
1600AT
1600AF
1600AT
SB
LC-6
#1A(4) BUSWAY
B
2000AF
2000AT
M
CH-
1.2
M
CH-
1.1
M
CH-
1.3
800AF
600AT
EX MCC1
600A, 480V, 3Ø, 3W
LOAD CENTER 6
(ANNEX)
250AF
100AT
TIE
M
ELEV.
SWBD #1
2000A, 480/277V, 3Ø, 4W
SWGR #1A
2400A, 480/277V, 3Ø, 4W
SWGR #1B
2400A, 480/277V, 3Ø, 4W
MAIN A MAIN B MAIN A 3200AF
2400AT MAIN B
A4 A5 A6
225AF
200AT
B1 B2
600AF
600AT
E8 E9
100AF
30AT
3A
MCP
3A
MCP
P-9.2P-9.1
J
P-8.2P-8.1
E7E6E5E4E3E1
SPACE SPACE SPACESPACE
E2
M M M M M M
D5D4D3D2D1
SPACE
100A
MCP
150A
MCP
100A
MCP
150A
MCP
150A
MCP
100A
MCP
C6B4 B6
SPACE
B3 B5 C5
SPACE
SPARE
C4C3C2
LR
C1
SPACE
LR
M
ETR
HWP
4.1
SPACE SPACE SPACE
M M
J
M M
100HP
100HP
40HP 40HP 40HP60HP 60HP 60HP
10HP
10HP
10HP
10HP
2HP
2HP
2HP
2HP
T-3.1
112.5KVA
480V-208/120 3Ø
VFD
M P-3.2
100HP
100HP
T-3.2
112.5KVA
480V-208/120 3Ø
100AF
20AT
P-2.3
100AF
20AT
100AF
30AT
LSIG
LSILSI
800AF
800AT
LSI
800AF
600AT
LSI
800AF
600AT
LSI
1600AF
1600AT
1600AF
1600AT
1600AF
1600AT
1600AF
1600AT
SB
LC-6
#1B(4)
LSIG
LSIG
LSIG
LSI LSI LSI LSI LSI LSI
LSIG
LSIG
LSIG
ETR
ETR
225AF
200AT
1. SEE E-001 AND E-002 FOR LEGEND, ABBREVIATIONS
AND GENERAL NOTES.
2. REFER TO DRAWINGS ED101 - ED103 FOR
LOCATIONS OF EQUIPMENT TO BE REMOVED.
3. REFER TO DRAWINGS E-501 AND E-502 FOR
SWITCHGEAR, SWITCHBOARD AND MCC EQUIPMENT
ELEVATIONS.
4. REFER TO MECHANICAL DRAWINGS FOR PHASING
WORK AND REQUIREMENTS.
5. WHERE CIRCUITS ARE REMOVED AT MCC1 AND
SWBD1, CONTRACTOR SHALL DISPOSE ALL
EQUIPMENT AND MATERIALS AS DIRECTED BY COR.
LABEL CIRCUIT AS 'SPACE.'
DRAWING NOTES
DEMOLISH WIRING AND CONDUIT BACK TO SOURCE
(APPROXIMATELY 100 FT). EXISTING CIRCUIT
BREAKER FEEDING DEMOLISHED EQUIPMENT
SHALL REMAIN AND LABELED AS SPARE. PROVIDE
UPDATED SWITCHBOARD NAMEPLATE.
DISCONNECT AND REMOVE EXISTING BRANCH
CIRCUIT WIRING AND CONDUIT BACK TO SOURCE
(APPROXIMATELY 80 FT). REMOVE CIRCUIT
BREAKERS, STARTERS, MCPS, ETC. AS INDICATED.
PRIOR TO DISCONNECTING LINE REACTOR,
CONFIRM THAT ASSOCIATED PUMP IS BEING
DISCONNECTED.
DEMOLITION KEYNOTES
222222
1 1 1
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
M
M M
VFD
MCC1-E2
P-1.3
MCC1-D3
P-1.2
MCC1-C6
P-1.1
MCC1-D2
P-2.1
MCC1-
D4 P-2.2
MCC1-D5
P-2.3
VFD
SWGR#1A-B2
CH-3
VFD
SWGR#1B-B2
CH-4
M
RRS-2
MCC1-E9
J
VFD
VFD
VFD
VF
D
VFD
M
M M
M
M
EX MCC1
ON PLATFORM
S1
S1 S1
EX PANEL RP
EX (3) 13.2KV, 3Ø, DELTA
PRIMARY FEEDERS AND
GROUNDING CONDUCTOR
EX GEN. BOX
EX SWITCHGEAR
POWER METER
EX
XFMR
T32
EX
SWGR
#2
(FRONT)
EX
SWGR
#1A
EX
XFMR
T33
EX
XFMR
T35
EX
XFMR
T31
EX
XFMR
T37
EX FEEDER
BUSWAY "C"
EX FEEDER
BUSWAY "A"
EX PANEL EDP
(FRONT)
(FRONT)
EX
CONTINUOUS
COPPER
GROUND
GRID BUS
EX
GROUND
ROD
(TYP. OF 8)
EX UTILITY
TUNNEL
EX FEEDER
BUSWAY "D"
EX
FEEDER
BUSWAY
"B"
EX
SWGR
#1B
EX
XFMR
T38
(FRONT)(FRONT)
(FRONT) (FRONT)(FRONT)
EX XFMR
T34
(FRONT)
EX
EX
EX
EX
EX
EX
EX
EX
EX
EX
EXEX
EX
EX XFMR
TE
(FRONT)
PB
EX
EX
EX
EX
EX
EX
(FRONT)EX
EX
EX SW
BD
EX LC-6 ANNEX BLDG
SQ. D POWER METER EX PANEL DPE
EX
ATS-2
EX
T-PNL
GL12
EX PANEL EL
EX PNL
ER
PA
PA PA
BL
BL
PA
PA J
S1
S1 S1
EX MOTOR
CONTROL CENTER
MCC1 (ON
PLATFORM ABOVE)
PB
PB
PB
PB
PBPBPB
PB
PB
J
PA
SERVICE
CORRIDOR
A119
M
EC
H
AN
IC
AL
R O
O M
A1
ST
AI
R A1
LO
AD
IN
G
D O
C K
LO
BB
Y
SW
IT
C H
G
EA
R A1
SE
R
VI
C
E C
O R
R
ID
O R
A1
LI
BR
AR
Y
A1
LI
BR
AR
Y
D
LA
N
D
SE
R
VI
C
E C
O R
R
ID
O R
D
C U
ST
O
D
IA
L O
FF
IC
E D
IC
E
ST
O
R
AG
E D
W O
M
EN
'S
LO
C
KE
R R
M D
M
EN
'S
LO
C
KE
R R
M D
AR
M
S R
M
D
VE
ST
IB
U
LE
D
M
EC
H D
SE
R
VI
C
E C
O R
R
ID
O R
D
C O
R R
ID
O
R D
SO
U
TH
LO
AD
IN
G D
O C
K
BL
PA
PA
BL
PA PA
BL
BL
PA
PA
PA
C U
ST
O
D
IA
L O
FF
IC
E D
REF:
SCALE: 1/8" = 1'-0"
POWER BASEMENT PLAN - NEW WORK
E-102
8' 16'4'0
SCALE:1/8"=1'
1. REFER TO DRAWINGS E-001 AND E-002 FOR LEGEND,
ABBREVIATIONS AND GENERAL NOTES.
2. REFER TO DRAWINGS M401 AND M403 FOR LOCATIONS OF
MECHANICAL EQUIPMENT. REFER TO DRAWING M606 FOR
MECHANICAL EQUIPMENT SCHEDULES.
3. REFER TO DRAWING E601 FOR ONE LINE DIAGRAM.
REFER TO DRAWINGS E602-E604 FOR ELECTRICAL
SCHEDULES.
4. PROVIDE SLEEVES AS REQUIRED FOR CONDUIT ROUTED
THROUGH SLAB TO SLAB WALLS.
5. CONTRACTOR SHALL BE RESPONSIBLE FOR FIRE RATING
ALL CONDUIT PENETRATIONS THROUGH FIRE RATED
WALLS AND SHALL MEET THE FIRE RATING OF THAT WALL.
6. COORDINATE LOCATION OF EQUIPMENT PRIOR TO
INSTALLATION OF CONDUITS.
7. REFER TO VFD SCHEDULE ON DRAWING M-606 FOR VFD
REQUIREMENTS.
8. VFD'S PROVIDED UNDER DIVISION 23.
DRAWING NOTES
CONNECT TO CIRCUIT BREAKER AT EX MCC1. REFER TO
DRAWING E601 FOR ONE LINE DIAGRAM AND DRAWING
E602 FOR MCC SCHEDULE.
PROVIDE NEW CIRCUIT BREAKER AT EXISTING CUBICLE IN
EX SWITCHGEAR. COORDINATE IN FIELD PRIOR TO MAKING
CONNECTIONS. PROVIDE CIRCUIT BREAKER WITH SAME
MANUFACTURER AND AIC RATING AS EX SWITCHGEAR.
REFER TO DRAWING E502 FOR SWITCHGEAR ELEVATIONS
AND E602-E603 FOR SWITCHGEAR SCHEDULES.
REUSE EX OUTLET BOX. CONNECT TO EXISTING
RECEPTACLE BRANCH CIRCUIT IN SAME LOCATION.
POWER CONNECTION AT REFRIGERANT MONITORING
SYSTEM. EXTEND EXISTING BRANCH CIRCUIT TO NEW
MONITORING PANEL LOCATION.
PROVIDE MOTOR STARTER (NEMA SIZE 2) AND 30A MCP AT
MCC1. COORDINATE WITH MECHANICAL CONTRACTOR
PRIOR TO ORDERING AND INSTALLATION. REFER TO EX
MCC1 ELEVATION ON DRAWING E501 AND REFER TO EX
MCC1 SCHEDULE ON DRAWING E602.
STROBE LIGHT FOR REFRIGERANT MONITORING PANEL.
CONTROL OF LIGHT TO BE PROVIDED BY MECHANICAL
CONTRACTOR.
CONNECT TO NEAREST EXISTING 120V RECEPTACLE
BRANCH CIRCUIT.
CONSTRUCTION KEYNOTES
(TYP)3
(TYP)3
1 1
2 2
E-501
E-502
E-502
E-502
MECH ROOM
A023
SWITCHGEAR
ROOM
A029
STAIR
AREA OF WORK
7 6 5 4 3 2
H
J
K 5
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
A111
SWITCH GEAR
A129
SERVICE
CORRIDOR
A119
ICE STORAGE
D129
SERVICE
CORRIDOR
A119
MECHANICAL ROOM
A123
SERVICE
CORRIDOR
D119
REF:
SCALE: 1/8" = 1'-0"
LIGHTING FIRST FLOOR PART PLAN - NEW WORK
E-102
8' 16'4'0
SCALE:1/8"=1'
1. REFER TO DRAWINGS E-001 AND E-002 FOR LEGEND,
ABBREVIATIONS AND GENERAL NOTES.
2. REFER TO DRAWINGS M401 AND M403 FOR
LOCATIONS OF MECHANICAL EQUIPMENT. REFER TO
DRAWING M606 FOR MECHANICAL EQUIPMENT
SCHEDULES.
3. REFER TO DRAWING E601 FOR ONE LINE DIAGRAM.
REFER TO DRAWINGS E602-E604 FOR ELECTRICAL
SCHEDULES.
4. CLEAN AND RE-LAMP ALL EXISTING LIGHTING
FIXTURES.
5. REFER TO DRAWING E604 FOR LIGHTING FIXTURE
SCHEDULE.
DRAWING NOTES
RELOCATED LIGHT FIXTURE. EXTEND EXISTING LIGHTING
BRANCH CIRCUIT TO NEW FIXTURE LOCATION. LIGHTING
FIXTURE SHALL BE CONNECTED TO EXISTING LIGHTING
CONTROLS IN THE SPACE.
REINSTALL EXISTING LIGHTING FIXTURE AT NEW CEILING
GRID. SUPPORT EX LIGHTING FIXTURE INDEPENDENTLY
FROM BUILDING STRUCTURE IN 4 CORNERS (TYP.). REFER
TO DRAWING A101 FOR ADDITIONAL INFORMATION.
EXISTING WALL MOUNTED LIGHTING IN CORRIDOR
SUPPORTED FROM WALL BRACKETS. REINSTALL EXISTING
LIGHTING FIXTURES IN THESE AREAS AS REQUIRED ONCE
CEILING GRID HAS BEEN REPLACED. REFER TO DRAWING
A101 FOR ADDITIONAL INFORMATION.
REINSTALL EXISTING LIGHTING FIXTURE AT NEW CEILING
GRID. SUPPORT EX LIGHTING FIXTURE INDEPENDENTLY
FROM BUILDING STRUCTURE IN 4 CORNERS (TYP.). REFER
TO DRAWING A102 FOR ADDITIONAL INFORMATION.
CONSTRUCTION KEYNOTES
F
FG
5678 4 3
H
GH
AREA OF WORK
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
SERVICE
CORRIDOR
D118
REF:
SCALE: 1/8" = 1'-0"
LIGHTING FIRST FLOOR PART PLAN - NEW WORK
E103
8' 16'4'0
SCALE:1/8"=1'
1. REFER TO DRAWINGS E-001 AND E-002 FOR
LEGEND, ABBREVIATIONS AND GENERAL NOTES.
2. CONTRACTOR SHALL PROVIDE A MINIMUM OF FIVE
WEEKS NOTICE FOR A SCHEDULED POWER
OUTAGE TO COR. REFER TO PHASING NOTES ON
MECHANICAL DRAWINGS.
3. REFER TO DRAWING E601 FOR ONE LINE DIAGRAM.
REFER TO DRAWINGS E602-E604 FOR ELECTRICAL
SCHEDULES.
4. CLEAN AND RE-LAMP ALL EXISTING LIGHTING
FIXTURES.
5. REFER TO DRAWING E604 FOR LIGHTING FIXTURE
SCHEDULE.
DRAWING NOTES
DE
EF
AREA OF WORK
E
F
FG
REINSTALL EXISTING LIGHTING FIXTURE AT NEW CEILING
GRID. SUPPORT EX LIGHTING FIXTURE INDEPENDENTLY
FROM BUILDING STRUCTURE IN 4 CORNERS (TYP.). REFER
TO DRAWING A102 FOR ADDITIONAL INFORMATION.
CONSTRUCTION KEYNOTES
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
A111
SWITCH GEAR
A129
ICE STORAGE
D129
MECHANICAL ROOM
A123
SERVICE
CORRIDOR
D118
CUSTODIAL
OFFICE
D134
VFD
SWBD#1-B3
M
CH-1
VFD
SWBD#1-C3
M
CH-2
VFD
MCC1-E4
M
P-8.1
MCC1-E7
M
P-8.2
MCC1-A6
M P-3.2
MCC1-B5
M P-3.1
M
EF-1
SM
MCC1-E8
M
RRS-1
RP-27,29
VFD
VFD VFD
J
RP-22
J
RP-21
EX FEEDER
BUSWAY "D"
EX FEEDER
BUSWAY "C"
SERVICE
CORRIDOR
A119
CORRIDOR
SERVICE
CORRIDOR
D119
PA
BL
PA
PA
PA PA
BL
BL
PA
PA
J
J
REF:
SCALE: 1/8" = 1'-0"
POWER FIRST FLOOR PLAN - NEW WORK
E-103
8' 16'4'0
SCALE:1/8"=1'
1. REFER TO DRAWINGS E-001 AND E-002 FOR LEGEND,
ABBREVIATIONS AND GENERAL NOTES.
2. REFER TO DRAWINGS M401 AND M403 FOR
LOCATIONS OF MECHANICAL EQUIPMENT. REFER TO
DRAWING M606 FOR MECHANICAL EQUIPMENT
SCHEDULES.
3. REFER TO DRAWING E601 FOR ONE LINE DIAGRAM.
REFER TO DRAWINGS E602-E604 FOR ELECTRICAL
SCHEDULES.
4. COORDINATE LOCATION OF EQUIPMENT PRIOR TO
INSTALLATION OF CONDUITS.
5. PROVIDE SLEEVES AS REQUIRED FOR CONDUIT
ROUTED THROUGH SLAB TO SLAB WALLS.
6. CONTRACTOR SHALL BE RESPONSIBLE FOR FIRE
RATING ALL CONDUIT PENETRATIONS THROUGH FIRE
RATED WALLS AND SHALL MEET THE FIRE RATING OF
THAT WALL.
7. REFER TO VFD SCHEDULE ON DRAWING M-606 FOR
VFD REQUIREMENTS.
8. VFD'S PROVIDED UNDER DIVISION 23.
DRAWING NOTES
PROVIDE NEW CIRCUIT BREAKER IN EXISTING CUBICLE IN
EXISTING MCC1. COORDINATE IN FIELD PRIOR TO MAKING
CONNECTIONS. MODIFY EXISTING MCC1 AS REQUIRED FOR
NEW CIRCUIT BREAKER AND NEW LOAD. REFER TO
DRAWING E501 FOR EX MCC1 ELEVATION/VFD MOUNTING
DETAIL AND DRAWING E602 FOR EX MCC1 SCHEDULE.
PROVIDE NEW CIRCUIT BREAKER IN EXISTING CUBICLE IN
EXISTING SWITCHBOARD. COORDINATE IN FIELD PRIOR TO
MAKING CONNECTIONS. MODIFY EXISTING SWITCHBOARD
AS REQUIRED FOR NEW CIRCUIT BREAKER AND NEW
LOAD. REFER TO DRAWING E602 FOR SWITCHBOARD
SCHEDULE.
REUSE EX OUTLET BOX. CONNECT TO EXISTING
RECEPTACLE BRANCH CIRCUIT IN SAME LOCATION.
EX PANEL RP LOCATED AT SWITCHGEAR A029.
POWER CONNECTION FOR CONTROL VALVES.
CONSTRUCTION KEYNOTES
(TYP) 3
AREA OF WORK
7 6 5 4 3 2
F
G
H
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
1/2" MIN. DEPTH OF
WATERPROOF SEALANT
AROUND ENTIRE PERIMETER
WATERPROOF MATERIAL
NEW/EXISTING
CONSTRUCTION
CONDUIT OR WIREWAY WITH
MAX. ANNULAR SPACE OF 3/16"
AROUND WIREWAY OR DUCT.
1 2 3 4
"MCC1" - ELEVATION DETAIL
NOT TO SCALEE-501
A1 B1 C1 D1
C2
A3 C3
C5
B6
A2
B4 C4
E1
E4
MOTOR CONTROL CENTER
INCOMING
FEEDER FR0M
SWBD #1
MAIN
SPACE
SECONDARY
CHILLED
WATER PUMP
P-3.2
SPACE
SPACE
SPACE
EX HEATING
WATER PUMP
4.2
SPARE
CONDENSER
WATER PUMP
P-1.1
SPACE
CONDUIT THROUGH WALL
NOT TO SCALEE-501
PENETRATION FOR
B2
B3
EX BPM
EX HEATING
WATER PUMP
4.1
B5
SPARE
C6
SPACE
SPACE
E3
EX 3Ø
MONITOR
E5
E6
SEC. CHILLED
WATER PUMP-
FC P-8.1
EX DOMESTIC
WATER RECIRC.
PUMP #1
EX DOMESTIC
WATER RECIRC.
PUMP #2
E7
E8
E9
RRS-2
EF-1
PAD
SEC. CHILLED
WATER PUMP-
FC P-8.2
VFD
FOR
PRIMARY
CHILLED
WATER
PUMP
P-1.1
FINISHED
FLOOR
6' -0
" M
AX
IM
U
M
SUPPORT FRAME
ASSEMBLY USING
SLOTTED CHANNELS
ELEVATION DETAIL (TYPICAL)
NOT TO SCALEE-501
SUPPORT STRUCTURE FOR VFD -
TRANSITION
FROM RGS
TO FMC
RGS CONDUIT
TO EQUIPMENT
FMC
SUPPORT FRAME POST BASE BY
SUPPORT FRAME MANUFACTURER.
ANCHOR TO CONCRETE FLOOR WITH
(4) 1/2" Ø HILTI KWIK BOLT TZ
EXPANSION ANCHORS OR APPROVED
EQUAL WITH 3" MINIMUM EMBEDMENT.
(TYPICAL)
ANCHOR UNISTRUT ASSEMBLY TO
CEILING WITH A MINIMUM OF (2) 1/2" Ø
HILTI KWIK BOLT TZ CARBON STEEL
EXPANSION ANCHORS OR APPROVED
EQUAL CONNECTION TO SUPPORT
FRAME SHALL BE DETAILED TO ALLOW
VERTICAL MOVEMENT. (TYPICAL)
D2
PRIMARY
CHILLED
WATER PUMP
P-2.1
D3
CONDENSER
WATER PUMP
P-1.2
D4
PRIMARY
CHILLED
WATER PUMP
P-2.2
D5
PRIMARY
CHILLED
WATER PUMP
P-2.3
CONDENSER
WATER PUMP
P-1.3
E2
SECONDARY
CHILLED
WATER PUMP
P-3.1
A6
SPACE
A5
SPD A4
FMC TO
EQUIPMENT
CONCRETE
SLAB
1. SEE E-001 AND E-002 FOR LEGEND, ABBREVIATIONS AND
GENERAL NOTES.
2. SEE E-101 THROUGH E-104 FOR EQUIPMENT LOCATIONS.
3. EQUIPMENT IS EXISTING TO REMAIN, UON.
4. CONTRACTOR SHALL PROVIDE GALVANIZED 12 GAGE
SLOTTED CHANNELS FOR SUPPORT FRAME ASSEMBLY.
SUPPORT FRAME ASSEMBLY SHALL BE SECURED AND FREE
FROM MOVEMENT DURING PUMP OPERATIONS. CONTRACTOR
SHALL SUBMIT SHOP DRAWINGS AND PRODUCT DATA SHEETS
FOR SUPPORT FRAME ASSEMBLY.
5. VERTICAL MEMBERS OF SUPPORT FRAME ASSEMBLY SHALL
BE A MINIMUM OF 1 5/8" WIDE AND 4 7/8" DEEP AND HAVE A
MINIMUM MOMENT OF INERTIA OF 2.805".
6. PRIOR TO INSTALLATION OF ANCHORS INTO CONCRETE, DRILL
SMALL PILOT HOLE TO VERIFY REBAR EXISTS. MOVE ANCHOR
TO AVOID CONFLICT AS NECESSARY.
7. REFER TO DRAWING E601 FOR ONE LINE DIAGRAM AND E602
FOR EXISTING MCC1 SCHEDULE.
DRAWING NOTES
PROVIDE NEW CIRCUIT BREAKER IN EXISTING CUBICLE AS
INDICATED. NEW CIRCUIT BREAKER SHALL MATCH
EXISTING BREAKERS TYPE, STYLE AND AIC RATING.
PROVIDE UPDATED NAMEPLATE.
PROVIDE MOTOR STARTER (NEMA SIZE 2) AND 30 A MCP.
CONSTRUCTION KEYNOTES
DEMOLITION KEYNOTES
DISCONNECT AND REMOVE EXISTING FEEDER.
REMOVE CIRCUIT BREAKER.
1 1
1 1
1 11 1
1 1
1 1
1 11 1
1 1
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
1 2 3 4
PAD
A1 B1 C1 D1
A2
A3
C3
E1
B2
B3
B4
C2 D2
D3
D4
E2
E3
RELAYS
BLANK
BUSWAY
"A"
CHILLER
CH-3
SPACE
SPACE
SPACE
SPACE
TIE
SB LC-6
#1A (4)
SPACE
SPACE
SPACE
BUSWAY
"B"
BLANK
MAIN CB A
MAIN CB B
TIE CB
CONTROLS
MAIN
(FED FROM
FEEDER #14
VIA XFMR
#T33)
F1
F2
F3
BLANK
MAIN
(FED FROM
FEEDER #7C
VIA XFMR
#T32)
1 2 3 4
PAD
A1 B1 C1 D1
A2
A3
C3
E1
B2
B3
B4
C2 D2
D3
D4
E2
E3
RELAYS
BLANK
BUSWAY
"D"
CHILLER
CH-4
SPACE
SPACE
SPACE
SPACE
TIE
SB LC-6
#1B (4)
SPACE
SPACE
SPACE
BUSWAY
"C"
BLANK
MAIN CB A
MAIN CB B
TIE CB
CONTROLS
MAIN
(FED FROM
FEEDER #14
VIA XFMR
#T31)
F1
F2
F3
BLANK
MAIN
(FED FROM
FEEDER #7C
VIA XFMR
#T37)
RELAYS
RELAYS
1 2 3
A1 B1 C1
C3
A3
C2
C4
B3
B2
B4
A2
PAD
METERS
BLANK
CHILLER
CH-1.3
CHILLER
CH-1.2
CHILLER
CH-1
SERVICE
ELEVATOR
CHILLER
CH-1.1
CHILLER
CH-2
SPACE
MAIN
(FED
FROM
FEEDER
#7C VIA
XFMR
#T35)
BUSDUCT
BLANK
MOTOR
CONTROL
CENTER
MCC1
(MECH RM)
A4
PULLBOX
EXISTING SWITCHGEAR #1B - ELEVATION DETAIL
NOT TO SCALEE-502
EXISTING SWITCHGEAR #1A - ELEVATION DETAIL
NOT TO SCALEE-502
2EXISTING SWITCHBOARD #1 - ELEVATION DETAIL
NOT TO SCALEE-502
1. SEE E-001 AND E-002 FOR LEGEND, ABBREVIATIONS AND
GENERAL NOTES.
2. SEE E-101 THROUGH E-103 FOR EQUIPMENT LOCATIONS.
3. EQUIPMENT IS EXISTING TO REMAIN, UON.
DRAWING NOTES
PROVIDE NEW CIRCUIT BREAKER IN EXISTING CUBICLE AS
INDICATED ON E-601. NEW CIRCUIT BREAKER SHALL
MATCH EXISTING SWITCHGEAR OR SWITCHBOARD
BREAKERS TYPE, STYLE AND AIC RATING. PROVIDE
UPDATED NAMEPLATE.
CONSTRUCTION KEYNOTES
DEMOLITION KEYNOTES
DISCONNECT AND REMOVE EXISTING FEEDER. CIRCUIT
BREAKER IS EXISTING TO REMAIN. LABEL THE EXISTING
CUBICLE AS SPARE.
1 1
1 1
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE DOCUMENTS
WERE PREPARED OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED PROFESSIONAL
ENGINEER UNDER THE LAWS OF THE STATE OF
MARYLAND, LICENSE NO.
EXPIRATION DATE:
SPD
BPM
SPARE
3Ø
MON.
M
EX
HWP
4.2 5.6
KW
M
EX
DWRP
#1 0.75
KW
M
EX
DWRP
#2 0.75
KW
LOAD CENTER 6
(ANNEX)
A4 A5 A6 B1 B2
600AF
600AT
E8 E9
P-8.1
E7E6E5E4E3E1
SPACESPACE
E2D5D4D3D2D1
SPACE
C6B4 B6
SPACE
B3 B5 C5
SPACE
SPARE
C4C3C2C1
SPACE
M
EX
HWP
4.1 5.6
KW
52 #7 52 #11
52 #14
EXISTING SWITCHGEAR
(OPERATIONS BUILDING)
T-33
1500KVA
3200AF
2400AT
T-32
1500KVA
3200AF
2400AT
T-31
1500KVA
T-37
1500KVA
3200AF
2400AT
3200AF
2400AT
1600AF
1000AT
BUSWAY
C
T-35
1000KVA
TIE
3200AF
2400AT
BUSWAY
A
BUSWAY
B
2000AF
2000AT
800AF
450AT
800AF
600AT
800AF
450AT
800AF
800AT
250AF
100AT
TIE
M
ELEV.
MAIN A MAIN B MAIN A 3200AF
2400AT MAIN B
SPACE
SPARE
VFD
M
CH-1
FLA
VFD
M
CH-2
FLA
BUSWAY
D
VFD
M
CH-4
FLA
1600AF
1000AT
VFD
M
CH-3
FLA
VFD
M P-3.1
VFD
M P-3.2
VFD
M P-1.1
VFD
M P-2.1
VFD
M P-1.2
VFD
M P-2.2
VFD
M P-2.3
VFD
M P-1.3
M
P-8.2
M
800AF
600AT
SPARE
800AF
600AT
SPARE
EX MCC1 800A,
480V, 3Ø, 3W
SWBD #1
2000A, 480/277V, 3Ø, 4W
SWGR #1A
2400A, 480/277V, 3Ø, 4W
SWGR #1B
2400A, 480/277V, 3Ø, 4W
60HP
60HP
60HP
60HP
20HP
20HP
40HP
40HP
20HP
20HP
20HP
20HP
40HP
40HP
40HP
40HP
10HP 10HP
VFD
10HP
VFD
10HP
EF-1
M 5HP
5HP
PANEL RP
100A, 208/120V, 3Ø, 4W
100AF
100AT
FED FROM
PNL DR101
250AF
150AT
250AF
150AT
100AF
70AT
250AF
125AT
100AF
70AT
250AF
125AT
250AF
125AT
100AF
70AT
100AF
40AT
100AF
40AT
100AF
15AT
LSILSILSI LSILSI
1600AF
1600AT
1600AF
1600AT
SB
LC-6
#1A(4)
1600AF
1600AT
1600AF
1600AT
1600AF
1600AT
1600AF
1600AT
SB
LC-6
#1B(4)
LSIG
LSIG
LSIG
LSI LSI LSI
LSIG LSIG
LSIG
LSI LSI LSILSI LSI
SPACE
LSI LSI
100AF
20AT
100AF
20AT
3A
MCP
3A
MCPSPACE
10HP
RRS-2
M 10HP
30A
MCP
EX
EX
1. REFER TO DRAWINGS E-001 AND E-002 FOR LEGEND,
ABBREVIATIONS AND GENERAL NOTES.
2. REFER TO DRAWINGS E-602-E-604 FOR SCHEDULES.
3. ALL CIRCUIT BREAKERS INDICATED ON THIS
DRAWING ARE 3-POLE, UON. REFER TO EACH PIECE
OF ELECTRICAL DISTRIBUTION EQUIPMENT FOR
ELECTRICAL RATINGS.
4. REFER TO VFD SCHEDULE ON DRAWING M-606 FOR
VFD REQUIREMENTS.
5. BOLD LINES INDICATE NEW EQUIPMENT.
6. VFD'S ARE PROVIDED UNDER DIVISION 23.
DRAWING NOTES
PROVIDE VFD MOUNTED ON KINDORF CHANNEL
ADJACENT TO PUMP AT 6'-0" AFF. SEE DETAIL #3 ON E-501
FOR ADDITIONAL INFORMATION.
3 SETS [(3) #400KCMIL & #2/0G] IN (3) 3"C.
2 SETS [(3) #4/0 & #2G] IN (2) 2 1/2"C
(3) #2 & #6G IN 1 1/2"C.
(3…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .