Bid Schedule for Contractors.xlsx
XLSX spreadsheet 93 KB Posted
- Attached to
- Colorado Avenue Handicap Ramp Improvements
- Solicitation number
- 3
- Issued by
- Sedgwick County, Colorado
About this file
The document is a detailed bid schedule for the Colorado Avenue Handicap Ramp Improvements project in San Miguel County, Colorado, specifically in the Town of Telluride. The project involves comprehensive infrastructure improvements across multiple street locations including Pine Street, Spruce Street (mid-block crossing), Willow Street, Alder Street, W Pacific Avenue, Aspen Street, and Oak Street. The scope includes removal and replacement of approximately 750 square yards of concrete, 1,300 linear feet of curb and gutter, and 160 tons of hot mix asphalt, with a primary focus on creating Americans with Disabilities Act (ADA) compliant curb ramps and sidewalks. The project encompasses removing and replacing approximately nine town-supplied lamp posts, installing heat coils, and performing electrical, concrete, asphalt, and plumbing work across three intersections, one mid-block crossing, and one alternate intersection.
The bid schedule provides a comprehensive breakdown of quantities and unit prices for various construction activities, with detailed schedules for each street segment. The estimated construction costs are not specified in the document, and pricing appears to have placeholder values. The project includes supplemental costs for design, lighting design, bidding support, construction observation, and materials testing. A note indicates the construction cost estimate is valid for six months from April 9, 2024, with the understanding that actual costs may fluctuate due to market conditions, material prices, labor rates, and potential project scope modifications. The document suggests multiple trades will be involved, and the project requires precise coordination across different infrastructure elements while maintaining ADA compliance and CDOT standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OPC
| Notes: | |
| San Miguel County, Colorado | |
| Town of Telluride | |
| KLJ Project 2304-00116 | |
| Colorado Ave Ramps Project |
| Schedule 1: Pine St | |||||||||||
| Item No. | Description | Quantity | Unit | Unit Price | Total | ||||||
| Removals/Site Prep | |||||||||||
| 1 | Remove Sidewalk | 970 | SF | ||||||||
| 2 | Remove Hydronic Heating System | 308 | SF | ||||||||
| 3 | Remove Curb & Gutter | 350 | LF | ||||||||
| 4 | Remove Concrete Pavement | 475 | SF | ||||||||
| 5 | Remove Asphalt Mat | 1,700 | SF | ||||||||
| 6 | Milling Asphalt Mat | 0 | SF | ||||||||
| 7 | Remove Brick Pavers | 10 | SF | ||||||||
| 8 | Remove Electrical Junction Box | 5 | EA | ||||||||
| 9 | Remove Light Post and Foundation | 4 | EA | ||||||||
| 10 | Relocate Fire Hydrant | 1 | EA | ||||||||
| 11 | Remove & Salvage Sign | 4 | EA | ||||||||
| 12 | Reset Trash Bins | 4 | EA | ||||||||
| 13 | Reset Bench | 1 | EA | ||||||||
| 14 | Adjust Manhole Ring and Cover | 1 | EA | ||||||||
| 15 | Unclassified Excavation (Complete In Place) | 25 | CY | ||||||||
| Pavement | |||||||||||
| 16 | Hot Mix Asphalt | 40 | TON | ||||||||
| 17 | Aggregate Base Course | 142 | TON | ||||||||
| Concrete | |||||||||||
| 18 | Concrete Sidewalk | 715 | SF | ||||||||
| 19 | Concrete Curb Ramp | 1,325 | SF | ||||||||
| 20 | Concrete Valley Pan | 300 | SF | ||||||||
| 21 | Curb and Gutter Type 2 (Section II-B) | 379 | LF | ||||||||
| Signing, Striping, & Lighting | |||||||||||
| 22 | Pedestrian Light Post and Foundation | 4 | EA | ||||||||
| Misc. | |||||||||||
| 23 | Hydronic Sidewalk Heating System | 2,040 | SF | ||||||||
| General | |||||||||||
| 24 | Mobilization/Demobilization (Includes payment and performance bonds) | 1 | LS | ||||||||
| 25 | Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) | 1 | LS | ||||||||
| 26 | Construction Surveying and Stakeout (Includes as-builts) | 1 | LS | ||||||||
| 27 | Construction Traffic Control (Includes MHTs) | 4 | EA | ||||||||
| 28 | F/A Minor Contract Revisions | 1 | F A | ||||||||
| Subtotal | $ - 0 | ||||||||||
| Schedule 2: Spruce St (Mid-Block Crossing) | |||||||||||
| Item No. | Description | Quantity | Unit | Unit Price | Total | ||||||
| Removals/Site Prep | |||||||||||
| 29 | Remove Sidewalk | 465 | SF | 463.1784 | |||||||
| 30 | Remove Curb & Gutter | 160 | LF | 144.9553 | 159.45083 | ||||||
| 31 | Remove Asphalt Mat | 904 | SF | 903.8435 | |||||||
| 32 | Milling Asphalt Mat | 297 | SF | 296.5844 | |||||||
| 33 | Remove Brick Pavers | 10 | SF | 9.9964 | |||||||
| 34 | Remove Drainage Structure | 1 | EA | ||||||||
| 35 | Remove Pipe | 10 | LF | ||||||||
| 36 | Remove Electrical Junction Box | 1 | EA | ||||||||
| 37 | Remove Light Post and Foundation | 1 | EA | ||||||||
| 38 | Unclassified Excavation (Complete In Place) | 5 | CY | 600.7087 | 66.7454111111 | ||||||
| Pavement | 62.6662 | 6.9629111111 | |||||||||
| 39 | Hot Mix Asphalt | 10 | TON | 110 LBS/ (SY x IN) | 296.8355 | 9.9769709722 | |||||
| 40 | Aggregate Base Course | 63 | TON | 133 LBS/CF | 1702.9036 | 851.4518 | 62.28369917 | depth in feet | 0.5 | ||
| Concrete | |||||||||||
| 41 | Concrete Sidewalk | 578 | SF | 64.14 | 577.26 | ||||||
| 42 | Concrete Curb Ramp | 600 | SF | 600.7087 | |||||||
| 43 | Curb and Gutter Type 2 (Section II-B) | 164 | LF | 148.49 | 163.339 | ||||||
| Signing, Striping, & Lighting | |||||||||||
| 44 | Pedestrian Light Post and Foundation | 4 | EA | ||||||||
| Misc. | |||||||||||
| 45 | Hydronic Sidewalk Heating System | 1,178 | SF | ||||||||
| 46 | Grate Inlet and Box | 2 | EA | ||||||||
| 47 | Stormwater Curb Opening | 1 | EA | ||||||||
| 48 | 4-inch PVC Drain Pipe | 13 | LF | ||||||||
| General | |||||||||||
| 49 | Mobilization/Demobilization (Includes payment and performance bonds) | 1 | LS | ze | |||||||
| 50 | Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) | 1 | LS | 917.251 | 101.9167777778 | ||||||
| 51 | Construction Surveying and Stakeout (Includes as-builts) | 1 | LS | 295.2237 | |||||||
| 52 | Construction Traffic Control (Includes MHTs) | 2 | EA | 252.1415 | 28.0157222222 | ||||||
| 53 | F/A Minor Contract Revisions | 1 | F A | 2317.7491 | 257.5276777778 | ||||||
| Subtotal | $ - 0 | 15.0722 | 1.6746888889 | ||||||||
| Schedule 3: Willow St | |||||||||||
| Item No. | Description | Quantity | Unit | Unit Price | Total | ||||||
| Removals/Site Prep | |||||||||||
| 54 | Remove Sidewalk | 920 | SF | 917.1 | |||||||
| 55 | Remove Hydronic Heating System | 670 | SF | 668.7 | |||||||
| 56 | Remove Curb & Gutter | 325 | LF | 295.2237 | 324.74607 | ||||||
| 57 | Remove Concrete Pavement | 252 | SF | 252 | |||||||
| 58 | Remove Asphalt Mat | 2,320 | SF | 2317.5 | |||||||
| 59 | Milling Asphalt Mat | 485 | SF | 484.6261 | |||||||
| 60 | Remove Brick Pavers | 16 | SF | 15.3 | |||||||
| 61 | Remove Electrical Junction Box | 2 | EA | ||||||||
| 62 | Remove Light Post and Foundation | 3 | EA | ||||||||
| 63 | Relocate Fire Hydrant | 1 | EA | ||||||||
| 64 | Remove & Salvage Sign | 4 | EA | ||||||||
| 65 | Reset Trash Bins | 6 | EA | ||||||||
| 66 | Unclassified Excavation (Complete In Place) | 10 | CY | ||||||||
| Pavement | |||||||||||
| 67 | Hot Mix Asphalt | 43 | TON | 110 LBS/ (SY x IN) | 1256.1244 | 39.5679186 | 42.2197367778 | ||||
| 68 | Aggregate Base Course | 154 | TON | 133 LBS/CF | 4194.4018 | 2097.2009 | 153.410245835 | depth in feet | 0.5 | ||
| Concrete | |||||||||||
| 69 | Concrete Sidewalk | 700 | SF | 699.301 | sf | ||||||
| 70 | Concrete Curb Ramp | 1,338 | SF | 1337.6308 | sf | ||||||
| 71 | Concrete Valley Pan | 420 | SF | 420 | sf | ||||||
| 72 | Curb and Gutter Type 2 (Section II-B) | 354 | LF | 321.4284 | 353.57124 | ||||||
| Signing, Striping, & Lighting | |||||||||||
| 73 | Pedestrian Light Post and Foundation | 4 | EA | ||||||||
| Misc. | |||||||||||
| 74 | Hydronic Sidewalk Heating System | 2,038 | SF | 307.4454 | 34.1606 | ||||||
| General | |||||||||||
| 75 | Mobilization/Demobilization (Includes payment and performance bonds) | 1 | LS | ||||||||
| 76 | Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) | 1 | LS | ||||||||
| 77 | Construction Surveying and Stakeout (Includes as-builts) | 1 | LS | ||||||||
| 78 | Construction Traffic Control (Includes MHTs) | 4 | EA | ||||||||
| 79 | F/A Minor Contract Revisions | 1 | F A | ||||||||
| Subtotal | $ - 0 | ||||||||||
| Schedule 4: Alder St | 8.7096 | 0.9677333333 | |||||||||
| Item No. | Description | Quantity | Unit | Unit Price | Total | 7.3066 | 0.8118444444 | ||||
| Removals/Site Prep | |||||||||||
| 80 | Remove Sidewalk | 1,160 | SF | 1159.2 | |||||||
| 81 | Remove Hydronic Heating System | 202 | SF | 201.6 | |||||||
| 82 | Remove Curb & Gutter | 253 | LF | 230.2 | 253.22 | 23.02 | |||||
| 83 | Remove Concrete Pavement | 53 | SY | 64.8 | 7.2 | ||||||
| 84 | Remove Asphalt Mat | 1,757 | SF | 1756.8 | 195.2 | ||||||
| 85 | Milling Asphalt Mat | 340 | SF | 339.7888 | |||||||
| 86 | Remove Brick Pavers | 9 | SF | 8.1 | 0.9 | ||||||
| 87 | Remove Electrical Junction Box | 1 | EA | ||||||||
| 88 | Remove Light Post and Foundation | 1 | EA | ||||||||
| 89 | Remove Trench Plate | 1 | EA | ||||||||
| 90 | Remove & Salvage Sign | 2 | EA | ||||||||
| 91 | Reset Trash Bins | 2 | EA | ||||||||
| 92 | Adjust Manhole Ring and Cover | 1 | EA | ||||||||
| 93 | Unclassified Excavation (Complete In Place) | 25 | CY | ||||||||
| Pavement | |||||||||||
| 94 | Hot Mix Asphalt | 37 | TON | 110 LBS/ (SY x IN) | 1089.8118 | 34.3290717 | 36.6297855 | 121.0902 | |||
| 95 | Aggregate Base Course | 72 | TON | 133 LBS/CF | 1951.0474 | 975.5237 | 71.359558655 | depth in feet | 0.5 | ||
| Concrete | |||||||||||
| 96 | Concrete Sidewalk | 930 | SF | 929.4196 | sf | ||||||
| 97 | Concrete Curb Ramp | 425 | SF | 422.7327 | sf | ||||||
| 98 | Concrete Valley Pan | 132 | SF | 22 | 132 | SF | |||||
| 99 | Curb and Gutter Type 2 (Section II-B) | 223 | LF | 202.4925 | 222.74175 | ||||||
| Signing, Striping, & Lighting | |||||||||||
| 100 | Pedestrian Light Post and Foundation | 3 | EA | ||||||||
| Misc. | |||||||||||
| 101 | Hydronic Sidewalk Heating System | 1,355 | SF | ||||||||
| 102 | Potholing Utilities | 5 | EA | ||||||||
| 103 | Combination Curb/Gutter Inlet (Single) | 1 | EA | ||||||||
| 104 | Combination Curb/Gutter Inlet (Double) | 1 | EA | ||||||||
| 105 | Concrete Flared End Section (RCAP 15" Equiv. Dia.) | 1 | EA | ||||||||
| 106 | Reinforced Concrete Arch Pipe (15" Equiv. Dia.)(Class IV) | 116 | LF | ||||||||
| General | |||||||||||
| 107 | Mobilization/Demobilization (Includes payment and performance bonds) | 1 | LS | ||||||||
| 108 | Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) | 1 | LS | ||||||||
| 109 | Construction Surveying and Stakeout (Includes as-builts) | 1 | LS | ||||||||
| 110 | Construction Traffic Control (Includes MHTs) | 3 | EA | ||||||||
| 111 | F/A Minor Contract Revisions | 1 | F A | ||||||||
| Subtotal | $ - 0 | ||||||||||
| Schedule 5:W Pacific Ave & Aspen St | |||||||||||
| Item No. | Description | Quantity | Unit | Unit Price | Total | ||||||
| Removals/Site Prep | |||||||||||
| 112 | Remove Sidewalk | 588 | SF | ||||||||
| 113 | Remove Curb & Gutter | 350 | LF | ||||||||
| 114 | Remove Concrete Pavement | 53 | SY | ||||||||
| 115 | Remove Asphalt Mat | 1,340 | SF | ||||||||
| 116 | Milling Asphalt Mat | 353 | SF | ||||||||
| 117 | Relocate Fire Hydrant | 1 | EA | ||||||||
| 118 | Remove & Salvage Sign | 2 | EA | ||||||||
| 119 | Unclassified Excavation (Complete In Place) | 25 | CY | ||||||||
| Pavement | |||||||||||
| 120 | Hot Mix Asphalt | 22 | TON | ||||||||
| 121 | Aggregate Base Course | 47 | TON | ||||||||
| Concrete | |||||||||||
| 122 | Concrete Sidewalk | 93 | SF | ||||||||
| 123 | Concrete Curb Ramp | 645 | SF | ||||||||
| 124 | Concrete Valley Pan | 301 | SF | ||||||||
| 125 | Curb and Gutter Type 2 (Section II-B) | 332 | LF | ||||||||
| General | |||||||||||
| 126 | Mobilization/Demobilization (Includes payment and performance bonds) | 1 | LS | ||||||||
| 127 | Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) | 1 | LS | ||||||||
| 128 | Construction Surveying and Stakeout (Includes as-builts) | 1 | LS | ||||||||
| 129 | Construction Traffic Control (Includes MHTs) | 4 | EA | ||||||||
| 130 | F/A Minor Contract Revisions | 1 | F A | ||||||||
| Subtotal | $ - 0 |
| Schedule 6: Aspen St | |||||
| Item No. | Description | Quantity | Unit | Unit Price | Total |
| 1 | Removal of Sidewalk | ERROR:#REF! | SY | ||
| 2 | Removal of Curb and Gutter | ERROR:#REF! | LF | ||
| 3 | Removal of Concrete Pavement | ERROR:#REF! | SY | ||
| 4 | Mill | ERROR:#REF! | SY | ||
| 5 | Removal of Asphalt Mat | ERROR:#REF! | SY | ||
| 6 | Removal of Brick | 0.97 | SY | ||
| 7 | Removal of ADA | 0.81 | SY | ||
| 8 | Removal of Sign | 3.00 | EACH | ||
| 9 | Relocate Fire Hydrant | 1.00 | EACH | ||
| 10 | Removal of Electrical Vault | 1.00 | EACH | ||
| 11 | Removal of Light Post | 1.00 | EACH | ||
| 12 | Unclassified Excavation (Complete In Place) | 5.00 | CY | ||
| 13 | Concrete Washout Structure | 1.00 | EACH | ||
| 14 | Erosion Control Management | 14.00 | DAY | ||
| 15 | Hot Mix Asphalt (Grading SX) (75) (PG 64-28) | ERROR:#REF! | TON | ||
| 16 | Traffic Control (Special) LS | 1.00 | LS | ||
| 17 | Overlay | ERROR:#REF! | SY | ||
| 18 | Aggregate Base Course (Class 6) | ERROR:#REF! | CY | ||
| 19 | Concrete Sidewalk | ERROR:#REF! | SY | ||
| 20 | Concrete Curb Ramp | ERROR:#REF! | SY | ||
| 21 | ADA | ERROR:#REF! | SY | ||
| 22 | Curb and Gutter Type 2 (Section II-B) | ERROR:#REF! | LF | ||
| 23 | Pavement Marking - 12" White | ERROR:#REF! | LF | ||
| 24 | Construction Surveying | 1.00 | LS | ||
| 25 | Mobilization | 1.00 | LS | ||
| 26 | F/A Minor Contract Revisions | 1.00 | F A | ||
| 27 | Aggregate Bags | ERROR:#REF! | LF | ||
| 28 | Saw Cut | ERROR:#REF! | LF | ||
| 29 | Install Pedestrian Light | 2.00 | EACH | ||
| Subtotal | $ - 0 |
| Schedule 7: Oak St (Mid-Block Crossing) | |||||
| Item No. | Description | Quantity | Unit | Unit Price | Total |
| 1 | Removal of Sidewalk | ERROR:#REF! | SY | ||
| 2 | Removal of Curb and Gutter | ERROR:#REF! | LF | ||
| 3 | Mill | ERROR:#REF! | SY | ||
| 4 | Removal of Asphalt Mat | ERROR:#REF! | SY | ||
| 5 | Removal of Brick | ERROR:#REF! | SY | ||
| 6 | Removal of Sign | 3.00 | EACH | ||
| 7 | Removal of Snow Sensor | 3.00 | EACH | ||
| 8 | Adjust Valve | 2.00 | EACH | ||
| 9 | Removal of Electrical Vault | 2.00 | EACH | ||
| 10 | Removal of Light Post | 2.00 | EACH | ||
| 11 | Adjust Manhole Ring and Cover | 1.00 | EACH | ||
| 12 | Unclassified Excavation (Complete In Place) | 5.00 | CY | ||
| 13 | Concrete Washout Structure | 1.00 | EACH | ||
| 14 | Erosion Control Management | 14.00 | DAY | ||
| 15 | Hot Mix Asphalt (Grading SX) (75) (PG 64-28) | ERROR:#REF! | TON | ||
| 16 | Traffic Control (Special) LS | 1.00 | LS | ||
| 17 | Overlay | ERROR:#REF! | SY | ||
| 18 | Aggregate Base Course (Class 6) | ERROR:#REF! | CY | ||
| 19 | Concrete Sidewalk | ERROR:#REF! | SY | ||
| 20 | Concrete Curb Ramp | ERROR:#REF! | SY | ||
| 21 | ADA | ERROR:#REF! | SY | ||
| 22 | Curb and Gutter Type 2 (Section II-B) | ERROR:#REF! | LF | ||
| 23 | Pavement Marking - 24" White | ERROR:#REF! | LF | ||
| 24 | Construction Surveying | 1.00 | LS | ||
| 25 | Mobilization | 1.00 | LS | ||
| 26 | F/A Minor Contract Revisions | 1.00 | F A | ||
| 27 | Aggregate Bags | ERROR:#REF! | LF | ||
| 28 | Saw Cut | ERROR:#REF! | LF | ||
| 29 | Heat Coil | ERROR:#REF! | SY | ||
| 30 | Install Pedestrian Light | 4.00 | EACH | ||
| Subtotal | $ - 0 |
| Schedule 8: Fir St | |||||
| Item No. | Description | Quantity | Unit | Unit Price | Total |
| 1 | Removal of Sidewalk | ERROR:#REF! | SY | ||
| 2 | Removal of Curb and Gutter | ERROR:#REF! | LF | ||
| 3 | Removal of Concrete Pavement | ERROR:#REF! | SY | ||
| 4 | Mill | ERROR:#REF! | SY | ||
| 5 | Removal of Asphalt Mat | ERROR:#REF! | SY | ||
| 6 | Removal of Brick | ERROR:#REF! | SY | ||
| 7 | Removal of Sign | 2.00 | EACH | ||
| 8 | Removal of Snow Sensor | 2.00 | EACH | ||
| 9 | Relocate Fire Hydrant | 1.00 | EACH | ||
| 10 | Adjust Valve | 2.00 | EACH | ||
| 11 | Reset Trash Bins | 6.00 | EACH | ||
| 12 | Reset Bench | 1.00 | EACH | ||
| 13 | Removal of Electrical Vault | 2.00 | EACH | ||
| 14 | Removal of Light Post | 2.00 | EACH | ||
| 15 | Adjust Manhole Ring and Cover | 1.00 | EACH | ||
| 16 | Unclassified Excavation (Complete In Place) | 10.00 | CY | ||
| 17 | Concrete Washout Structure | 1.00 | EACH | ||
| 18 | Erosion Control Management | 14.00 | DAY | ||
| 19 | Hot Mix Asphalt (Grading SX) (75) (PG 64-28) | ERROR:#REF! | TON | ||
| 20 | Traffic Control (Special) LS | 1.00 | LS | ||
| 21 | Overlay | ERROR:#REF! | SY | ||
| 22 | Aggregate Base Course (Class 6) | ERROR:#REF! | CY | ||
| 23 | Concrete Sidewalk | ERROR:#REF! | SY | ||
| 24 | Concrete Curb Ramp | ERROR:#REF! | SY | ||
| 25 | ADA | ERROR:#REF! | SY | ||
| 26 | Curb and Gutter Type 2 (Section II-B) | ERROR:#REF! | LF | ||
| 27 | Pavement Marking - 12" White | ERROR:#REF! | LF | ||
| 28 | Construction Surveying | 1.00 | LS | ||
| 29 | Mobilization | 1.00 | LS | ||
| 30 | F/A Minor Contract Revisions | 1.00 | F A | ||
| 31 | Aggregate Bags | ERROR:#REF! | LF | ||
| 32 | Saw Cut | ERROR:#REF! | LF | ||
| 33 | Heat Coil | ERROR:#REF! | SY | ||
| 34 | Valley Pan | ERROR:#REF! | LF | ||
| 35 | Install Pedestrian Light | 4.00 | EACH | ||
| Subtotal | $ - 0 |
| Summary of Estimated Construction Costs | |||
| Schedule 1: Pine St | $ - 0 | ||
| Schedule 2: Spruce St (Mid-Block Crossing) | $ - 0 | ||
| Schedule 3: Willow St | $ - 0 | ||
| Schedule 4: Alder St | $ - 0 | ||
| Schedule 5:W Pacific Ave & Aspen St | $ - 0 | ||
| Total Estimated | |||
| Construction Costs | $ - 0 |
| Supplemental Costs |
| Design including Lighting Design (Paid for by City) |
| Estimated Bidding Support |
| Construction Observation & Administration (By City Staff) |
| Estimated Construction Design Support |
| Estimated Construction Materials Testing |
| Total Estimated |
Supplemental Costs
| Opinion of Probable Costs | |
| Estimated Cost | $ - 0 |
| Notes: |
| The construction cost estimate provided in this document is valid for a period of six months. The validity period starts from the date of this cost estimate statement, April 9, 2024. |
| It is essential to note that construction costs are subject to fluctuations in the market, including changes in material prices, labor rates, currency exchange rates, and unforeseen project conditions. Additionally, modifications to the project scope, design changes, or any other significant changes in project requirements may affect the estimated costs. |
&8&D &8&P of &N
Pine
| Schedule 1: Pine St | |||||
| Item No. | Description | Unit | Quantity | Unit Price | Quantity Price |
| Removals/Site Prep | |||||
| 1 | Remove Sidewalk | SF | 970 | ||
| 3 | Remove Curb & Gutter | LF | 350 | ||
| 4 | Remove Concrete Pavement | SF | 475 | ||
| 5 | Remove Asphalt Mat | SF | 1,700 | ||
| 6 | Milling Asphalt Mat | SF | 0 | ||
| 7 | Remove Brick Pavers | SF | 10 | ||
| 8 | Remove Electrical Junction Box | EA | 5 | ||
| 9 | Remove Light Post and Foundation | EA | 4 | ||
| 10 | Relocate Fire Hydrant | EA | 1 | ||
| 11 | Remove & Salvage Sign | EA | 4 | ||
| 12 | Reset Trash Bins | EA | 4 | ||
| 13 | Reset Bench | EA | 1 | ||
| 14 | Adjust Manhole Ring and Cover | EA | 1 | ||
| 15 | Unclassified Excavation (Complete In Place) | CY | 25 | ||
| Pavement | |||||
| 16 | Hot Mix Asphalt | TON | 40 | ||
| 17 | Aggregate Base Course | TON | 142 | ||
| Concrete | |||||
| 18 | Concrete Sidewalk | SF | 715 | ||
| 20 | Concrete Valley Pan | SF | 300 | ||
| 21 | Curb and Gutter Type 2 (Section II-B) | LF | 379 | ||
| Lighting | |||||
| 22 | Pedestrian Light Post and Foundation | EA | 4 | ||
| Misc. | |||||
| 23 | Hydronic Sidewalk Heating System | SF | 2,040 | ||
| General | |||||
| 24 | Mobilization/Demobilization (Includes payment and performance bonds) | LS | 1 | ||
| 25 | Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) | LS | 1 | ||
| 26 | Construction Surveying and Stakeout (Includes as-builts) | LS | 1 | ||
| 27 | Construction Traffic Control (Includes MHTs) | EA | 4 | ||
| 28 | F/A Minor Contract Revisions | F A | 1 |
Spruce
| Schedule 2: Spruce St (Mid-Block Crossing) | |||||
| Item No. | Description | Unit | Quantity | Unit Price | Quantity Price |
| Removals/Site Prep | |||||
| 29 | Remove Sidewalk | SF | 465 | ||
| 30 | Remove Curb & Gutter | LF | 160 | ||
| 31 | Remove Asphalt Mat | SF | 904 | ||
| 32 | Milling Asphalt Mat | SF | 297 | ||
| 33 | Remove Brick Pavers | SF | 10 | ||
| 34 | Remove Drainage Structure | EA | 1 | ||
| 35 | Remove Pipe | LF | 10 | ||
| 36 | Remove Electrical Junction Box | EA | 1 | ||
| 37 | Remove Light Post and Foundation | EA | 1 | ||
| 38 | Unclassified Excavation (Complete In Place) | CY | 5 | ||
| Pavement | |||||
| 39 | Hot Mix Asphalt | TON | 10 | ||
| 40 | Aggregate Base Course | TON | 63 | ||
| Concrete | |||||
| 41 | Concrete Sidewalk | SF | 578 | ||
| 42 | Concrete Curb Ramp | SF | 600 | ||
| 43 | Curb and Gutter Type 2 (Section II-B) | LF | 164 | ||
| Lighting | |||||
| 44 | Pedestrian Light Post and Foundation | EA | 4 | ||
| Misc. | |||||
| 45 | Hydronic Sidewalk Heating System | SF | 1178 | ||
| 46 | Grate Inlet and Box | EA | 2 | ||
| 47 | Stormwater Curb Opening | EA | 1 | ||
| 48 | 4-inch PVC Drain Pipe | LF | 13 | ||
| General | |||||
| 49 | Mobilization/Demobilization (Includes payment and performance bonds) | LS | 1 | ||
| 50 | Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) | LS | 1 | ||
| 51 | Construction Surveying and Stakeout (Includes as-builts) | LS | 1 | ||
| 52 | Construction Traffic Control (Includes MHTs) | EA | 2 | ||
| 53 | F/A Minor Contract Revisions | F A | 1 |
Willow
| Schedule 3: Willow St | |||||
| Item No. | Description | Unit | Quantity | Unit Price | Quantity Price |
| Removals/Site Prep | |||||
| 54 | Remove Sidewalk | SF | 920 | ||
| 55 | Remove Hydronic Heating System | SF | 670 | ||
| 56 | Remove Curb & Gutter | LF | 325 | ||
| 57 | Remove Concrete Pavement | SF | 252 | ||
| 58 | Remove Asphalt Mat | SF | 2320 | ||
| 59 | Milling Asphalt Mat | SF | 485 | ||
| 60 | Remove Brick Pavers | SF | 16 | ||
| 61 | Remove Electrical Junction Box | EA | 2 | ||
| 62 | Remove Light Post and Foundation | EA | 3 | ||
| 63 | Relocate Fire Hydrant | EA | 1 | ||
| 64 | Remove & Salvage Sign | EA | 4 | ||
| 65 | Reset Trash Bins | EA | 6 | ||
| 66 | Unclassified Excavation (Complete In Place) | CY | 10 | ||
| Pavement | |||||
| 67 | Hot Mix Asphalt | TON | 43 | ||
| 68 | Aggregate Base Course | TON | 154 | ||
| Concrete | |||||
| 69 | Concrete Sidewalk | SF | 700 | ||
| 70 | Concrete Curb Ramp | SF | 1338 | ||
| 71 | Concrete Valley Pan | SF | 420 | ||
| 72 | Curb and Gutter Type 2 (Section II-B) | LF | 354 | ||
| Lighting | |||||
| 73 | Pedestrian Light Post and Foundation | EA | 4 | ||
| Misc. | |||||
| 74 | Hydronic Sidewalk Heating System | SF | 2038 | ||
| General | |||||
| 75 | Mobilization/Demobilization (Includes payment and performance bonds) | LS | 1 | ||
| 76 | Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) | LS | 1 | ||
| 77 | Construction Surveying and Stakeout (Includes as-builts) | LS | 1 | ||
| 78 | Construction Traffic Control (Includes MHTs) | EA | 4 | ||
| 79 | F/A Minor Contract Revisions | F A | 1 |
Alder
| Schedule 4: Alder St | |||||
| Item No. | Description | Unit | Quantity | Unit Price | Quantity Price |
| Removals/Site Prep | |||||
| 80 | Remove Sidewalk | SF | 1160 | ||
| 81 | Remove Hydronic Heating System | SF | 202 | ||
| 82 | Remove Curb & Gutter | LF | 253 | ||
| 83 | Remove Concrete Pavement | SY | 53 | ||
| 84 | Remove Asphalt Mat | SF | 1757 | ||
| 85 | Milling Asphalt Mat | SF | 340 | ||
| 86 | Remove Brick Pavers | SF | 9 | ||
| 87 | Remove Electrical Junction Box | EA | 1 | ||
| 88 | Remove Light Post and Foundation | EA | 1 | ||
| 89 | Remove Trench Plate | EA | 1 | ||
| 90 | Remove & Salvage Sign | EA | 2 | ||
| 91 | Reset Trash Bins | EA | 2 | ||
| 92 | Adjust Manhole Ring and Cover | EA | 1 | ||
| 93 | Unclassified Excavation (Complete In Place) | CY | 25 | ||
| Pavement | |||||
| 94 | Hot Mix Asphalt | TON | 37 | ||
| 95 | Aggregate Base Course | TON | 72 | ||
| Concrete | |||||
| 96 | Concrete Sidewalk | SF | 930 | ||
| 97 | Concrete Curb Ramp | SF | 425 | ||
| 98 | Concrete Valley Pan | SF | 132 | ||
| 99 | Curb and Gutter Type 2 (Section II-B) | LF | 223 | ||
| Lighting | |||||
| 100 | Pedestrian Light Post and Foundation | EA | 3 | ||
| Misc. | |||||
| 101 | Hydronic Sidewalk Heating System | SF | 1355 | ||
| 102 | Potholing Utilities | EA | 5 | ||
| 103 | Combination Curb/Gutter Inlet (Single) | EA | 1 | ||
| 104 | Combination Curb/Gutter Inlet (Double) | EA | 1 | ||
| 105 | Concrete Flared End Section (RCAP 15" Equiv. Dia.) | EA | 1 | ||
| 106 | Reinforced Concrete Arch Pipe (15" Equiv. Dia.)(Class IV) | LF | 116 | ||
| General | |||||
| 107 | Mobilization/Demobilization (Includes payment and performance bonds) | LS | 1 | ||
| 108 | Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) | LS | 1 | ||
| 109 | Construction Surveying and Stakeout (Includes as-builts) | LS | 1 | ||
| 110 | Construction Traffic Control (Includes MHTs) | EA | 3 | ||
| 111 | F/A Minor Contract Revisions | F A | 1 |
Aspen & Pac
| BID ADD ALTERNATE | |||||
| Schedule 5:W Pacific Ave & Aspen St | |||||
| Item No. | Description | Unit | Quantity | Unit Price | Quantity Price |
| Removals/Site Prep | |||||
| 112 | Remove Sidewalk | SF | 588 | ||
| 113 | Remove Curb & Gutter | LF | 350 | ||
| 114 | Remove Concrete Pavement | SY | 53 | ||
| 115 | Remove Asphalt Mat | SF | 1340 | ||
| 116 | Milling Asphalt Mat | SF | 353 | ||
| 117 | Relocate Fire Hydrant | EA | 1 | ||
| 118 | Remove & Salvage Sign | EA | 2 | ||
| 119 | Unclassified Excavation (Complete In Place) | CY | 25 | ||
| Pavement | |||||
| 120 | Hot Mix Asphalt | TON | 22 | ||
| 121 | Aggregate Base Course | TON | 47 | ||
| Concrete | |||||
| 122 | Concrete Sidewalk | SF | 93 | ||
| 123 | Concrete Curb Ramp | SF | 645 | ||
| 124 | Concrete Valley Pan | SF | 301 | ||
| 125 | Curb and Gutter Type 2 (Section II-B) | LF | 332 | ||
| General | |||||
| 126 | Mobilization/Demobilization (Includes payment and performance bonds) | LS | 1 | ||
| 127 | Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) | LS | 1 | ||
| 128 | Construction Surveying and Stakeout (Includes as-builts) | LS | 1 | ||
| 129 | Construction Traffic Control (Includes MHTs) | EA | 4 | ||
| 130 | F/A Minor Contract Revisions | F A | 1 |
Totals
| Subtotal: | Schedule 1: Pine St |
| Subtotal: | Schedule 2: Spruce St (Mid-Block Crossing) |
| Subtotal: | Schedule 3: Willow St |
| Subtotal: | Schedule 4: Alder St |
| Subtotal: | Schedule 5:W Pacific Ave & Aspen St (ADD ALTERNATE) |
| Grand Total: |
SWMP Info
| SWMP info | Area of construction site (sq ft) | Area of final impervious surface (sq ft) |
| ERROR:#REF! | 3272046.32 | 140544.1 |
| Area of pre-project impervious surface (sq ft) | ||
| 138553.99 |