Bid Schedule for Contractors.xlsx

XLSX spreadsheet 93 KB Posted

Attached to
Colorado Avenue Handicap Ramp Improvements
Solicitation number
3
Issued by
Sedgwick County, Colorado

About this file

The document is a detailed bid schedule for the Colorado Avenue Handicap Ramp Improvements project in San Miguel County, Colorado, specifically in the Town of Telluride. The project involves comprehensive infrastructure improvements across multiple street locations including Pine Street, Spruce Street (mid-block crossing), Willow Street, Alder Street, W Pacific Avenue, Aspen Street, and Oak Street. The scope includes removal and replacement of approximately 750 square yards of concrete, 1,300 linear feet of curb and gutter, and 160 tons of hot mix asphalt, with a primary focus on creating Americans with Disabilities Act (ADA) compliant curb ramps and sidewalks. The project encompasses removing and replacing approximately nine town-supplied lamp posts, installing heat coils, and performing electrical, concrete, asphalt, and plumbing work across three intersections, one mid-block crossing, and one alternate intersection.

The bid schedule provides a comprehensive breakdown of quantities and unit prices for various construction activities, with detailed schedules for each street segment. The estimated construction costs are not specified in the document, and pricing appears to have placeholder values. The project includes supplemental costs for design, lighting design, bidding support, construction observation, and materials testing. A note indicates the construction cost estimate is valid for six months from April 9, 2024, with the understanding that actual costs may fluctuate due to market conditions, material prices, labor rates, and potential project scope modifications. The document suggests multiple trades will be involved, and the project requires precise coordination across different infrastructure elements while maintaining ADA compliance and CDOT standards.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPC

Notes:
San Miguel County, Colorado
Town of Telluride
KLJ Project 2304-00116
Colorado Ave Ramps Project
Schedule 1: Pine St
Item No.DescriptionQuantityUnitUnit PriceTotal
Removals/Site Prep
1Remove Sidewalk970SF
2Remove Hydronic Heating System308SF
3Remove Curb & Gutter350LF
4Remove Concrete Pavement475SF
5Remove Asphalt Mat1,700SF
6Milling Asphalt Mat0SF
7Remove Brick Pavers10SF
8Remove Electrical Junction Box5EA
9Remove Light Post and Foundation4EA
10Relocate Fire Hydrant1EA
11Remove & Salvage Sign4EA
12Reset Trash Bins4EA
13Reset Bench1EA
14Adjust Manhole Ring and Cover1EA
15Unclassified Excavation (Complete In Place)25CY
Pavement
16Hot Mix Asphalt40TON
17Aggregate Base Course142TON
Concrete
18Concrete Sidewalk715SF
19Concrete Curb Ramp1,325SF
20Concrete Valley Pan300SF
21Curb and Gutter Type 2 (Section II-B)379LF
Signing, Striping, & Lighting
22Pedestrian Light Post and Foundation4EA
Misc.
23Hydronic Sidewalk Heating System2,040SF
General
24Mobilization/Demobilization (Includes payment and performance bonds)1LS
25Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration)1LS
26Construction Surveying and Stakeout (Includes as-builts)1LS
27Construction Traffic Control (Includes MHTs)4EA
28F/A Minor Contract Revisions1F A
Subtotal$ - 0
Schedule 2: Spruce St (Mid-Block Crossing)
Item No.DescriptionQuantityUnitUnit PriceTotal
Removals/Site Prep
29Remove Sidewalk465SF463.1784
30Remove Curb & Gutter160LF144.9553159.45083
31Remove Asphalt Mat904SF903.8435
32Milling Asphalt Mat297SF296.5844
33Remove Brick Pavers10SF9.9964
34Remove Drainage Structure1EA
35Remove Pipe10LF
36Remove Electrical Junction Box1EA
37Remove Light Post and Foundation1EA
38Unclassified Excavation (Complete In Place)5CY600.708766.7454111111
Pavement62.66626.9629111111
39Hot Mix Asphalt10TON110 LBS/ (SY x IN)296.83559.9769709722
40Aggregate Base Course63TON133 LBS/CF1702.9036851.451862.28369917depth in feet0.5
Concrete
41Concrete Sidewalk578SF64.14577.26
42Concrete Curb Ramp600SF600.7087
43Curb and Gutter Type 2 (Section II-B)164LF148.49163.339
Signing, Striping, & Lighting
44Pedestrian Light Post and Foundation4EA
Misc.
45Hydronic Sidewalk Heating System1,178SF
46Grate Inlet and Box2EA
47Stormwater Curb Opening1EA
484-inch PVC Drain Pipe13LF
General
49Mobilization/Demobilization (Includes payment and performance bonds)1LSze
50Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration)1LS917.251101.9167777778
51Construction Surveying and Stakeout (Includes as-builts)1LS295.2237
52Construction Traffic Control (Includes MHTs)2EA252.141528.0157222222
53F/A Minor Contract Revisions1F A2317.7491257.5276777778
Subtotal$ - 015.07221.6746888889
Schedule 3: Willow St
Item No.DescriptionQuantityUnitUnit PriceTotal
Removals/Site Prep
54Remove Sidewalk920SF917.1
55Remove Hydronic Heating System670SF668.7
56Remove Curb & Gutter325LF295.2237324.74607
57Remove Concrete Pavement252SF252
58Remove Asphalt Mat2,320SF2317.5
59Milling Asphalt Mat485SF484.6261
60Remove Brick Pavers16SF15.3
61Remove Electrical Junction Box2EA
62Remove Light Post and Foundation3EA
63Relocate Fire Hydrant1EA
64Remove & Salvage Sign4EA
65Reset Trash Bins6EA
66Unclassified Excavation (Complete In Place)10CY
Pavement
67Hot Mix Asphalt43TON110 LBS/ (SY x IN)1256.124439.567918642.2197367778
68Aggregate Base Course154TON133 LBS/CF4194.40182097.2009153.410245835depth in feet0.5
Concrete
69Concrete Sidewalk700SF699.301sf
70Concrete Curb Ramp1,338SF1337.6308sf
71Concrete Valley Pan420SF420sf
72Curb and Gutter Type 2 (Section II-B)354LF321.4284353.57124
Signing, Striping, & Lighting
73Pedestrian Light Post and Foundation4EA
Misc.
74Hydronic Sidewalk Heating System2,038SF307.445434.1606
General
75Mobilization/Demobilization (Includes payment and performance bonds)1LS
76Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration)1LS
77Construction Surveying and Stakeout (Includes as-builts)1LS
78Construction Traffic Control (Includes MHTs)4EA
79F/A Minor Contract Revisions1F A
Subtotal$ - 0
Schedule 4: Alder St8.70960.9677333333
Item No.DescriptionQuantityUnitUnit PriceTotal7.30660.8118444444
Removals/Site Prep
80Remove Sidewalk1,160SF1159.2
81Remove Hydronic Heating System202SF201.6
82Remove Curb & Gutter253LF230.2253.2223.02
83Remove Concrete Pavement53SY64.87.2
84Remove Asphalt Mat1,757SF1756.8195.2
85Milling Asphalt Mat340SF339.7888
86Remove Brick Pavers9SF8.10.9
87Remove Electrical Junction Box1EA
88Remove Light Post and Foundation1EA
89Remove Trench Plate1EA
90Remove & Salvage Sign2EA
91Reset Trash Bins2EA
92Adjust Manhole Ring and Cover1EA
93Unclassified Excavation (Complete In Place)25CY
Pavement
94Hot Mix Asphalt37TON110 LBS/ (SY x IN)1089.811834.329071736.6297855121.0902
95Aggregate Base Course72TON133 LBS/CF1951.0474975.523771.359558655depth in feet0.5
Concrete
96Concrete Sidewalk930SF929.4196sf
97Concrete Curb Ramp425SF422.7327sf
98Concrete Valley Pan132SF22132SF
99Curb and Gutter Type 2 (Section II-B)223LF202.4925222.74175
Signing, Striping, & Lighting
100Pedestrian Light Post and Foundation3EA
Misc.
101Hydronic Sidewalk Heating System1,355SF
102Potholing Utilities5EA
103Combination Curb/Gutter Inlet (Single)1EA
104Combination Curb/Gutter Inlet (Double)1EA
105Concrete Flared End Section (RCAP 15" Equiv. Dia.)1EA
106Reinforced Concrete Arch Pipe (15" Equiv. Dia.)(Class IV)116LF
General
107Mobilization/Demobilization (Includes payment and performance bonds)1LS
108Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration)1LS
109Construction Surveying and Stakeout (Includes as-builts)1LS
110Construction Traffic Control (Includes MHTs)3EA
111F/A Minor Contract Revisions1F A
Subtotal$ - 0
Schedule 5:W Pacific Ave & Aspen St
Item No.DescriptionQuantityUnitUnit PriceTotal
Removals/Site Prep
112Remove Sidewalk588SF
113Remove Curb & Gutter350LF
114Remove Concrete Pavement53SY
115Remove Asphalt Mat1,340SF
116Milling Asphalt Mat353SF
117Relocate Fire Hydrant1EA
118Remove & Salvage Sign2EA
119Unclassified Excavation (Complete In Place)25CY
Pavement
120Hot Mix Asphalt22TON
121Aggregate Base Course47TON
Concrete
122Concrete Sidewalk93SF
123Concrete Curb Ramp645SF
124Concrete Valley Pan301SF
125Curb and Gutter Type 2 (Section II-B)332LF
General
126Mobilization/Demobilization (Includes payment and performance bonds)1LS
127Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration)1LS
128Construction Surveying and Stakeout (Includes as-builts)1LS
129Construction Traffic Control (Includes MHTs)4EA
130F/A Minor Contract Revisions1F A
Subtotal$ - 0
Schedule 6: Aspen St
Item No.DescriptionQuantityUnitUnit PriceTotal
1Removal of SidewalkERROR:#REF!SY
2Removal of Curb and GutterERROR:#REF!LF
3Removal of Concrete PavementERROR:#REF!SY
4MillERROR:#REF!SY
5Removal of Asphalt MatERROR:#REF!SY
6Removal of Brick0.97SY
7Removal of ADA0.81SY
8Removal of Sign3.00EACH
9Relocate Fire Hydrant1.00EACH
10Removal of Electrical Vault1.00EACH
11Removal of Light Post1.00EACH
12Unclassified Excavation (Complete In Place)5.00CY
13Concrete Washout Structure1.00EACH
14Erosion Control Management14.00DAY
15Hot Mix Asphalt (Grading SX) (75) (PG 64-28)ERROR:#REF!TON
16Traffic Control (Special) LS1.00LS
17OverlayERROR:#REF!SY
18Aggregate Base Course (Class 6)ERROR:#REF!CY
19Concrete SidewalkERROR:#REF!SY
20Concrete Curb RampERROR:#REF!SY
21ADAERROR:#REF!SY
22Curb and Gutter Type 2 (Section II-B)ERROR:#REF!LF
23Pavement Marking - 12" WhiteERROR:#REF!LF
24Construction Surveying1.00LS
25Mobilization1.00LS
26F/A Minor Contract Revisions1.00F A
27Aggregate BagsERROR:#REF!LF
28Saw CutERROR:#REF!LF
29Install Pedestrian Light2.00EACH
Subtotal$ - 0
Schedule 7: Oak St (Mid-Block Crossing)
Item No.DescriptionQuantityUnitUnit PriceTotal
1Removal of SidewalkERROR:#REF!SY
2Removal of Curb and GutterERROR:#REF!LF
3MillERROR:#REF!SY
4Removal of Asphalt MatERROR:#REF!SY
5Removal of BrickERROR:#REF!SY
6Removal of Sign3.00EACH
7Removal of Snow Sensor3.00EACH
8Adjust Valve2.00EACH
9Removal of Electrical Vault2.00EACH
10Removal of Light Post2.00EACH
11Adjust Manhole Ring and Cover1.00EACH
12Unclassified Excavation (Complete In Place)5.00CY
13Concrete Washout Structure1.00EACH
14Erosion Control Management14.00DAY
15Hot Mix Asphalt (Grading SX) (75) (PG 64-28)ERROR:#REF!TON
16Traffic Control (Special) LS1.00LS
17OverlayERROR:#REF!SY
18Aggregate Base Course (Class 6)ERROR:#REF!CY
19Concrete SidewalkERROR:#REF!SY
20Concrete Curb RampERROR:#REF!SY
21ADAERROR:#REF!SY
22Curb and Gutter Type 2 (Section II-B)ERROR:#REF!LF
23Pavement Marking - 24" WhiteERROR:#REF!LF
24Construction Surveying1.00LS
25Mobilization1.00LS
26F/A Minor Contract Revisions1.00F A
27Aggregate BagsERROR:#REF!LF
28Saw CutERROR:#REF!LF
29Heat CoilERROR:#REF!SY
30Install Pedestrian Light4.00EACH
Subtotal$ - 0
Schedule 8: Fir St
Item No.DescriptionQuantityUnitUnit PriceTotal
1Removal of SidewalkERROR:#REF!SY
2Removal of Curb and GutterERROR:#REF!LF
3Removal of Concrete PavementERROR:#REF!SY
4MillERROR:#REF!SY
5Removal of Asphalt MatERROR:#REF!SY
6Removal of BrickERROR:#REF!SY
7Removal of Sign2.00EACH
8Removal of Snow Sensor2.00EACH
9Relocate Fire Hydrant1.00EACH
10Adjust Valve2.00EACH
11Reset Trash Bins6.00EACH
12Reset Bench1.00EACH
13Removal of Electrical Vault2.00EACH
14Removal of Light Post2.00EACH
15Adjust Manhole Ring and Cover1.00EACH
16Unclassified Excavation (Complete In Place)10.00CY
17Concrete Washout Structure1.00EACH
18Erosion Control Management14.00DAY
19Hot Mix Asphalt (Grading SX) (75) (PG 64-28)ERROR:#REF!TON
20Traffic Control (Special) LS1.00LS
21OverlayERROR:#REF!SY
22Aggregate Base Course (Class 6)ERROR:#REF!CY
23Concrete SidewalkERROR:#REF!SY
24Concrete Curb RampERROR:#REF!SY
25ADAERROR:#REF!SY
26Curb and Gutter Type 2 (Section II-B)ERROR:#REF!LF
27Pavement Marking - 12" WhiteERROR:#REF!LF
28Construction Surveying1.00LS
29Mobilization1.00LS
30F/A Minor Contract Revisions1.00F A
31Aggregate BagsERROR:#REF!LF
32Saw CutERROR:#REF!LF
33Heat CoilERROR:#REF!SY
34Valley PanERROR:#REF!LF
35Install Pedestrian Light4.00EACH
Subtotal$ - 0
Summary of Estimated Construction Costs
Schedule 1: Pine St$ - 0
Schedule 2: Spruce St (Mid-Block Crossing)$ - 0
Schedule 3: Willow St$ - 0
Schedule 4: Alder St$ - 0
Schedule 5:W Pacific Ave & Aspen St$ - 0
Total Estimated
Construction Costs$ - 0
Supplemental Costs
Design including Lighting Design (Paid for by City)
Estimated Bidding Support
Construction Observation & Administration (By City Staff)
Estimated Construction Design Support
Estimated Construction Materials Testing
Total Estimated

Supplemental Costs

Opinion of Probable Costs
Estimated Cost$ - 0
Notes:
The construction cost estimate provided in this document is valid for a period of six months. The validity period starts from the date of this cost estimate statement, April 9, 2024.
It is essential to note that construction costs are subject to fluctuations in the market, including changes in material prices, labor rates, currency exchange rates, and unforeseen project conditions. Additionally, modifications to the project scope, design changes, or any other significant changes in project requirements may affect the estimated costs.

&8&D &8&P of &N

Pine

Schedule 1: Pine St
Item No.DescriptionUnitQuantityUnit PriceQuantity Price
Removals/Site Prep
1Remove SidewalkSF970
3Remove Curb & GutterLF350
4Remove Concrete PavementSF475
5Remove Asphalt MatSF1,700
6Milling Asphalt MatSF0
7Remove Brick PaversSF10
8Remove Electrical Junction BoxEA5
9Remove Light Post and FoundationEA4
10Relocate Fire HydrantEA1
11Remove & Salvage SignEA4
12Reset Trash BinsEA4
13Reset BenchEA1
14Adjust Manhole Ring and CoverEA1
15Unclassified Excavation (Complete In Place)CY25
Pavement
16Hot Mix AsphaltTON40
17Aggregate Base CourseTON142
Concrete
18Concrete SidewalkSF715
20Concrete Valley PanSF300
21Curb and Gutter Type 2 (Section II-B)LF379
Lighting
22Pedestrian Light Post and FoundationEA4
Misc.
23Hydronic Sidewalk Heating SystemSF2,040
General
24Mobilization/Demobilization (Includes payment and performance bonds)LS1
25Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration)LS1
26Construction Surveying and Stakeout (Includes as-builts)LS1
27Construction Traffic Control (Includes MHTs)EA4
28F/A Minor Contract RevisionsF A1

Spruce

Schedule 2: Spruce St (Mid-Block Crossing)
Item No.DescriptionUnitQuantityUnit PriceQuantity Price
Removals/Site Prep
29Remove SidewalkSF465
30Remove Curb & GutterLF160
31Remove Asphalt MatSF904
32Milling Asphalt MatSF297
33Remove Brick PaversSF10
34Remove Drainage StructureEA1
35Remove PipeLF10
36Remove Electrical Junction BoxEA1
37Remove Light Post and FoundationEA1
38Unclassified Excavation (Complete In Place)CY5
Pavement
39Hot Mix AsphaltTON10
40Aggregate Base CourseTON63
Concrete
41Concrete SidewalkSF578
42Concrete Curb RampSF600
43Curb and Gutter Type 2 (Section II-B)LF164
Lighting
44Pedestrian Light Post and FoundationEA4
Misc.
45Hydronic Sidewalk Heating SystemSF1178
46Grate Inlet and BoxEA2
47Stormwater Curb OpeningEA1
484-inch PVC Drain PipeLF13
General
49Mobilization/Demobilization (Includes payment and performance bonds)LS1
50Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration)LS1
51Construction Surveying and Stakeout (Includes as-builts)LS1
52Construction Traffic Control (Includes MHTs)EA2
53F/A Minor Contract RevisionsF A1

Willow

Schedule 3: Willow St
Item No.DescriptionUnitQuantityUnit PriceQuantity Price
Removals/Site Prep
54Remove SidewalkSF920
55Remove Hydronic Heating SystemSF670
56Remove Curb & GutterLF325
57Remove Concrete PavementSF252
58Remove Asphalt MatSF2320
59Milling Asphalt MatSF485
60Remove Brick PaversSF16
61Remove Electrical Junction BoxEA2
62Remove Light Post and FoundationEA3
63Relocate Fire HydrantEA1
64Remove & Salvage SignEA4
65Reset Trash BinsEA6
66Unclassified Excavation (Complete In Place)CY10
Pavement
67Hot Mix AsphaltTON43
68Aggregate Base CourseTON154
Concrete
69Concrete SidewalkSF700
70Concrete Curb RampSF1338
71Concrete Valley PanSF420
72Curb and Gutter Type 2 (Section II-B)LF354
Lighting
73Pedestrian Light Post and FoundationEA4
Misc.
74Hydronic Sidewalk Heating SystemSF2038
General
75Mobilization/Demobilization (Includes payment and performance bonds)LS1
76Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration)LS1
77Construction Surveying and Stakeout (Includes as-builts)LS1
78Construction Traffic Control (Includes MHTs)EA4
79F/A Minor Contract RevisionsF A1

Alder

Schedule 4: Alder St
Item No.DescriptionUnitQuantityUnit PriceQuantity Price
Removals/Site Prep
80Remove SidewalkSF1160
81Remove Hydronic Heating SystemSF202
82Remove Curb & GutterLF253
83Remove Concrete PavementSY53
84Remove Asphalt MatSF1757
85Milling Asphalt MatSF340
86Remove Brick PaversSF9
87Remove Electrical Junction BoxEA1
88Remove Light Post and FoundationEA1
89Remove Trench PlateEA1
90Remove & Salvage SignEA2
91Reset Trash BinsEA2
92Adjust Manhole Ring and CoverEA1
93Unclassified Excavation (Complete In Place)CY25
Pavement
94Hot Mix AsphaltTON37
95Aggregate Base CourseTON72
Concrete
96Concrete SidewalkSF930
97Concrete Curb RampSF425
98Concrete Valley PanSF132
99Curb and Gutter Type 2 (Section II-B)LF223
Lighting
100Pedestrian Light Post and FoundationEA3
Misc.
101Hydronic Sidewalk Heating SystemSF1355
102Potholing UtilitiesEA5
103Combination Curb/Gutter Inlet (Single)EA1
104Combination Curb/Gutter Inlet (Double)EA1
105Concrete Flared End Section (RCAP 15" Equiv. Dia.)EA1
106Reinforced Concrete Arch Pipe (15" Equiv. Dia.)(Class IV)LF116
General
107Mobilization/Demobilization (Includes payment and performance bonds)LS1
108Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration)LS1
109Construction Surveying and Stakeout (Includes as-builts)LS1
110Construction Traffic Control (Includes MHTs)EA3
111F/A Minor Contract RevisionsF A1

Aspen & Pac

BID ADD ALTERNATE
Schedule 5:W Pacific Ave & Aspen St
Item No.DescriptionUnitQuantityUnit PriceQuantity Price
Removals/Site Prep
112Remove SidewalkSF588
113Remove Curb & GutterLF350
114Remove Concrete PavementSY53
115Remove Asphalt MatSF1340
116Milling Asphalt MatSF353
117Relocate Fire HydrantEA1
118Remove & Salvage SignEA2
119Unclassified Excavation (Complete In Place)CY25
Pavement
120Hot Mix AsphaltTON22
121Aggregate Base CourseTON47
Concrete
122Concrete SidewalkSF93
123Concrete Curb RampSF645
124Concrete Valley PanSF301
125Curb and Gutter Type 2 (Section II-B)LF332
General
126Mobilization/Demobilization (Includes payment and performance bonds)LS1
127Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration)LS1
128Construction Surveying and Stakeout (Includes as-builts)LS1
129Construction Traffic Control (Includes MHTs)EA4
130F/A Minor Contract RevisionsF A1

Totals

Subtotal:Schedule 1: Pine St
Subtotal:Schedule 2: Spruce St (Mid-Block Crossing)
Subtotal:Schedule 3: Willow St
Subtotal:Schedule 4: Alder St
Subtotal:Schedule 5:W Pacific Ave & Aspen St (ADD ALTERNATE)
Grand Total:

SWMP Info

SWMP infoArea of construction site (sq ft)Area of final impervious surface (sq ft)
ERROR:#REF!3272046.32140544.1
Area of pre-project impervious surface (sq ft)
138553.99

image1.png

File details come from the government source that posted it. Updated .