TELLURIDE, CO
VICINITY MAP
1" = 500'
KLJ PROJECT NO. 2304-00116
COLORADO AVENUE RAMP REPLACEMENT
TOWN OF TELLURIDE
TELLURIDE, CO
April 2024
TOWN OF TELLURIDE
KYLE BECK
PUBLIC WORKS DIRECTOR
TELLURIDE, CO 81435
PH: 970.728.2177
KBECK@TELLURIDE-CO.GOV
C O
LO
R
AD
O
A
VE
N U
E R
AM
P
R
EP
LA
C
EM
EN
T
FOR BID © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:14pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\Roadway\2304-00116_RDWY_TITLE.dwg (1 COVER SHEET)
PROJECT LOCATIONS
SCHEDULE OF WORK
1 PINE ST
2 SPRUCE ST (MID-BLOCK)
3 WILLOW ST
4 ALDER ST
5 W. PACIFIC AVE
KLJ ENGINEERING
JASON REIMER, PE
PROJECT ENGINEER
210 E MAIN ST
MONTROSE, CO 81401
970-567-9396
PROJECT LOCATION
UTILITY CONTACT LIST
CONTACT NAME TITLE COMPANY PHONE
KYLE BECK PUBLIC WORKS DIRECTOR TOWN OF TELLURIDE (970) 728-3077
TARA OGREN TOWN ENGINEER TOWN OF TELLURIDE (970) 728-2169
LINDSEY MILLS COMMUNICATIONS MANAGER TOWN OF TELLURIDE (970) 728-2165
JOSH COMTE CHIEF MARSHAL TOWN OF TELLURIDE (970) 728-8448
JOHN BENNET DISTRICT FIRE CHIEF TOWN OF TELLURIDE (970) 728-3801
MICH ESTES STREETS SUPERINTENDENT TOWN OF TELLURIDE (970) 728-3074
AMIE MARTELL WATER & WASTEWATER MANAGER TOWN OF TELLURIDE (970) 728-8454
SHAWN HUGHES GAS BLACK HILLS ENERGY (970) 729-1405
BYRD WILLIAMS ELECTRIC SAN MIGUEL POWER (970) 626-5549 x567
TODD ANDREWS COMMUNIUCATIONS (FIBER/PHONE) CHARTER/SPECTRUM (970) 316-1700
LYNN WHITE WATER, SEWER, & STORM TOWN OF TELLURIDE (970) 901-0747
Sheet List Table
Sheet Number Sheet Title
1 COVER SHEET
2 GENERAL NOTES I
3 GENERAL NOTES II
4 PROJECT SURVEY CONTROL
5 QUANTITIES
6 CDOT DETAIL - CONCRETE WASHOUT & TRACKING PAD
7 CDOT DETAIL - AGGREGATE BAG
8 CDOT DETAIL - INLET PROTECTION
9 CDOT DETAIL - CURB RAMP I
10 CDOT DETAIL - CURB RAMP II
11 CDOT DETAIL - CURB RAMP III
12 CDOT DETAIL - CURB RAMP IV
13 CDOT DETAIL - DETECTABLE WARNING SURFACE I
14 CDOT DETAIL - DETECTABLE WARNING SURFACE II
15 CDOT DETAIL - CURB, GUTTERS, & SIDEWALK
16 PAVING DETAILS
17 DRAINAGE DETAILS
18 LIGHTING DETAILS
19 TRAFFIC PLAN
20 REMOVAL PLAN - N PINE ST
21 REMOVAL PLAN - S PINE ST
22 CONSTRUCTION PLAN - N PINE ST
23 CONSTRUCTION PLAN - S PINE ST
24 SIGNING, STRIPING, & LIGHTING PLAN - PINE ST
25 TEMPORARY SWMP PLAN - N PINE ST
26 TEMPORARY SWMP PLAN - S PINE ST
27 REMOVAL PLAN - MID-BLOCK (SPRUCE ST)
28 CONSTRUCTION PLAN - MID-BLOCK (SPRUCE ST)
29 SIGNING, STRIPING, & LIGHTING PLAN - MID-BLOCK (SPRUCE ST)
30 TEMPORARY SWMP PLAN - MID-BLOCK (SPRUCE ST)
31 REMOVAL PLAN - N WILLOW ST
32 REMOVAL PLAN - S WILLOW ST
33 CONSTRUCTION PLAN - N WILLOW ST
34 CONSTRUCTION PLAN - S WILLOW ST
35 SIGNING, STRIPING, & LIGHTING PLAN - WILLOW ST
36 TEMPORARY SWMP PLAN - N WILLOW ST
37 TEMPORARY SWMP PLAN - S WILLOW ST
38 REMOVAL PLAN - ALDER ST
39 CONSTRUCTION PLAN - N ALDER ST
40 CONSTRUCTION PLAN - S ALDER ST
41 SIGNING, STRIPING, & LIGHTING PLAN - ALDER ST
42 TEMPORARY SWMP PLAN - ALDER ST
43 DRAINAGE PLAN & PROFILE - ALDER ST
44 REMOVAL PLAN - W PACIFIC AVE
45 CONSTRUCTION PLAN - W PACIFIC AVE
46 CONSTRUCTION PLAN - E PACIFIC AVE
47 SIGNING, STRIPING, & LIGHTING PLAN - W PACIFIC AVE
48 TEMPORARY SWMP PLAN - W PACIFIC AVE
49 CROSS SECTIONS - SW PINE ST
50 CROSS SECTIONS - NW PINE ST
51 CROSS SECTIONS - SE PINE ST
52 CROSS SECTIONS - NE PINE ST
53 CROSS SECTIONS - MID-BLOCK (SPRUCE ST)
54 CROSS SECTIONS - SW WILLOW ST
55 CROSS SECTIONS - NW WILLOW ST
56 CROSS SECTIONS - SE WILLOW ST
57 CROSS SECTIONS - NE WILLOW ST
58 CROSS SECTIONS - NW & S ALDER ST
59 CROSS SECTIONS - NE ALDER ST
60 CROSS SECTIONS - SW W PACIFIC AVE
61 CROSS SECTIONS - NW W PACIFIC AVE
62 CROSS SECTIONS - SE W PACIFIC AVE
63 CROSS SECTIONS - NE W PACIFIC AVE
ADDENDUM NO. 02:
1. SHEET ADDED.
04/24/2024
PROJECT CONTACTS:
OWNER: TOWN OF TELLURIDE
OWNER PM: KYLE BECK
PHONE: (970) 728-3077
EMIAL: kbeck@telluride-co.gov
ENGINEER: KLJ ENGINEERING
ENGINEER OF RECORD: JASON REIMER, PE
PHONE: (970) 567-9396
EMAIL: jason.reimer@kljeng.com
PROJECT STANDARDS AND SPECIFICATIONS:
1. THE INTENT OF THIS PROJECT IS TO REPLACE CURRENT PEDESTRIAN RAMPS WITH
ADA-COMPLIANT RAMPS UTILIZING BUMP OUTS. DUE TO THE EXISTING CONDITIONS OF THE
PROJECT AREA AND BUILDING CONSTRAINTS, EVERY EFFORT WAS MADE TO MEET GRADES. THE
CONTRACTOR SHALL NOTIFY THE OWNER AND ENGINEER IN WRITING PRIOR TO POURING ANY
CONCRETE FOR THIS PROJECT IF GRADES DO NOT MEET THE DRAWINGS OR ADA. THE
FOLLOWING GRADES ARE MINIMUMS FOR THE PROJECT:
a. GUTTER FLOWLINE = MINIMUM OF 0.30% OR 0.0030 FT/FT
b. SIDEWALK = MAXIMUM OF 1.95% CROSS SLOPE AND 4.95% RUNNING SLOPE
c. RAMPS = MEET CDOT DETAILS INCLUDED IN DRAWINGS
d. ASPHALT TIE-INS = PER CROSS SECTIONS INCLUDED IN DRAWINGS
2. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH TOWN OF TELLURIDE STANDARDS AND
SPECIFICATIONS FOR THE DESIGN AND CONSTRUCTION OF PUBLIC IMPROVEMENTS (“OWNER
STANDARDS”), DATED MAY 2012, AND AS SUBSEQUENTLY REVISED AND IN ACCORDANCE WITH
THE DRAWINGS AND SPECIFICATIONS INCLUDED HEREIN.
3. IN SOME INSTANCES, REFERENCES ARE MADE TO COLORADO DEPARTMENT OF
TRANSPORTATION (CDOT) STANDARDS AND MATERIALS BOTH ON THESE DRAWINGS AND WITHIN
THE OWNER STANDARDS. THIS REFERENCE IS TO THE CURRENT EDITION OF THE CDOT
STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND M&S STANDARD
DRAWINGS.
4. THE CONTRACTOR SHALL HAVE IN THEIR POSSESSION AT ALL TIMES HARD COPIES OF THE
PROJECT DRAWINGS AND ALL REFERENCE DESIGN STANDARDS AND SPECIFICATIONS
5. ORDER OF PRECEDENCE IN CASE OF CONFLICT BETWEEN THE DRAWINGS, SPECIFICATIONS, OR
OTHER DOCUMENTS SHALL BE (1) PROJECT DRAWINGS; (2) PROJECT TECHNICAL
SPECIFICATIONS; (3) OWNER STANDARDS; AND (4) CDOT STANDARD SPECIFICATIONS AND
DRAWINGS.
6. ALL ITEMS NOTED AS "INCIDENTAL" OR “NO SEPARATE PAY” WILL NOT BE MEASURED AND PAID SEPARATELY. ALL COSTS FOR ITEMS NOTED AS "INCIDENTAL" OR “NO SEPARATE PAY” SHALL BE
INCLUDED IN OTHER RELATED ITEMS OF WORK.
7. OWNER AND ENGINEER HAVE DONE THEIR BEST TO QUANTIFY ITEMS AND PROVIDE BID ITEMS ACCORDING TO THE WORK. IF THERE ARE ITEMS NOT IDENTIFIED IN THE BID FORM FOR WORK
AND ARE RELATED TO OTHER ITEMS OF WORK, CONTRACTOR SHALL ASSUME THESE COSTS
ARE INCLUDED IN RELATED ITEMS OF WORK AND WILL NOT BE PAID FOR SEPARATELY, EVEN IF THEY ARE NOT IDENTIFIED AS "INCIDENTAL" OR "NO SEPARATE PAY". IF THERE ARE ITEMS THE
CONTRACTOR THINKS SHOULD BE INCLUDED IN THE BID FORM, HE/SHE SHALL NOTIFY THE
OWNER AND ENGINEER IN WRITING PRIOR TO THE BID OPENING FOR CLARIFICATION AND
POTENTIAL INCLUSION IN THE BID FORM.
REQUIRED NOTIFICATIONS AND SUBMITTALS:
8. THE CONTRACTOR SHALL NOTIFY THE OWNER OF ANY UTILITY SERVICE OUTAGE(S) AT LEAST 48
HOURS PRIOR TO DISRUPTION OF SERVICE. ALL SERVICE OUTAGES MUST BE APPROVED BY THE
OWNER PRIOR TO DISRUPTION OF SERVICE AND MAY REQUIRE WORKING ATYPICAL HOURS IN
ORDER TO AVOID DISRUPTING SERVICE DURING DAYTIME HOURS.
9. THE CONTRACTOR SHALL NOTIFY THE OWNER OF ALL ROAD CLOSURES AND FIRE HYDRANTS TO
BE TAKEN OUT OF SERVICE AT LEAST 48 HOURS PRIOR TO THE CLOSURE'S IMPLEMENTATION.
10. THE CONTRACTOR SHALL VERIFY ALL FIELD DIMENSIONS AND ELEVATIONS PRIOR TO START OF
DEMOLITION OF EXISTING FACILITIES.
11. CONTRACTOR SHALL SUBMIT ANY CHANGE OR DEVIATION FROM THE PROJECT DRAWINGS TO
THE ENGINEER FOR APPROVAL PRIOR TO STARTING THE WORK.
12. CONTRACTOR SHALL SUBMIT ALL SHOP DRAWINGS AND/OR MANUFACTURER'S TECHNICAL
LITERATURE FOR ALL PROPOSED MATERIALS TO BE INCORPORATED INTO THE PROJECT. THESE
SHALL BE APPROVED IN WRITING BY THE OWNER OR ENGINEER PRIOR TO ORDERING AND
PLACEMENT/CONSTRUCTION.
13. THE CONTRACTOR SHALL RECORD PRECISE LOCATIONS AND ELEVATIONS OF ANY VARIATIONS
FROM THE DESIGN ON "AS-BUILT" DRAWINGS SHOWING THE LOCATIONS AND DIMENSIONS OF
ANY ELEMENT OF THE PROJECT THAT IS NOT INSTALLED AS DESIGNED AND SHALL PROVIDE
THAT INFORMATION TO THE OWNER PRIOR TO RELEASE OF FINAL PAYMENT.
14. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL IDENTIFY DISPOSAL SITES FOR ANY
MATERIALS LEAVING THE PROJECT AREA. IF MATERIALS ARE BEING TAKEN TO ANYWHERE
BESIDES A REGISTERED LANDFILL OR GREEN WASTE FACILITY, CONTRACTOR SHALL PROVIDE
WRITTEN AGREEMENTS FROM RECEIVING PROPERTY OWNER INDICATING THEIR ACCEPTANCE
OF THE MATERIAL AND ANY CONDITIONS FOR USE OF THEIR SITE. FOLLOWING PROJECT
COMPLETION, THE OWNER WILL ALSO REQUIRE WRITTEN VERIFICATION FROM THE PROPERTY
OWNER THAT THESE CONDITIONS WERE MET BEFORE RETAINAGE IS RELEASED.
15. SHOULD HAZARDOUS MATERIALS BE ENCOUNTERED ON THE SITE, THE CONTRACTOR SHALL
LEAVE SUCH MATERIALS UNDISTURBED AND SHALL CONTACT THE OWNER FOR DIRECTION
REGARDING HANDLING AND DISPOSAL OF THE MATERIALS.
16. ONCE MOBILIZED, THE CONTRACTOR SHALL ATTEND WEEKLY PROGRESS MEETINGS WITH THE
OWNER AND ENGINEER TO DISCUSS THE WORK PROGRESS AND ANY OUTSTANDING ISSUES. AT
A MINIMUM, THE CONTRACTOR'S SITE SUPERINTENDENT AND REPRESENTATIVES FROM ANY
SUBCONTRACTORS PERFORMING WORK THAT WEEK SHALL ATTEND THIS MEETING.
17. A CHANGE ORDER SIGNED BY THE OWNER IS REQUIRED TO QUALIFY ANY EXTRA WORK FOR
EXTRA PAYMENT. ANY EXTRA WORK COMPLETED BY THE CONTRACTOR WITHOUT A SIGNED
CHANGE ORDER SHALL BE DEEMED TO HAVE BEEN COMPLETED FOR THE CONTRACTOR'S
CONVENIENCE AND SHALL NOT BE ELIGIBLE FOR EXTRA COMPENSATION.
SPECIAL INSPECTIONS AND TESTING:
18. SPECIAL INSPECTIONS SHALL BE PROVIDED BY THE OWNER AND/OR ENGINEER. SPECIAL
INSPECTIONS ARE REQUIRED FOR THE FOLLOWING WORK.
a. BOTTOM OF EXCAVATIONS FOR LINE, GRADE, AND CONDITION PRIOR TO PLACEMENT OF
BACKFILL
b. UTILITY INSTALLATIONS FOR LINE, GRADE, AND CONDITION PRIOR TO PLACEMENT OF
BACKFILL
c. THRUST BLOCKING, UTILITY CONNECTIONS/FITTINGS, AND HYDRANTS
d. PREPARED BASE COURSE AND SUBGRADE FOR LINE, GRADE, AND CONDITION PRIOR TO
PLACEMENT OF PAVEMENT OR CONSTRUCTION OF CURB AND GUTTER, SIDEWALKS, OR
DRIVEWAYS
e. ALL CONCRETE, FORMWORK, AND REINFORCING STEEL
THESE INSPECTIONS ARE PROVIDED FOR THE OWNER'S BENEFIT WITH THE INTENT OF
IDENTIFYING ANY PROBLEMS PRIOR TO CONSTRUCTION OF PROJECT COMPONENTS. THE
INSPECTIONS DO NOT RELIEVE THE CONTRACTOR OF ANY LIABILITY FOR PROJECT QUALITY OR
CONFORMANCE WITH THE DRAWINGS.
19. MATERIALS TESTING SHALL BE CONDUCTED IN ACCORDANCE WITH THE OWNER STANDARDS BY
AN INDEPENDENT COMPANY SUBCONTRACTED TO THE CONTRACTOR. ALL MATERIALS TESTING
SHALL BE PAID FOR BY THE CONTRACTOR.
20. THE OWNER SHALL BE NOTIFIED IMMEDIATELY VIA PHONE AND EMAIL OF ANY FAILING TESTS, INCLUDING, BUT NOT LIMITED TO, COMPACTION, CONCRETE AIR CONTENT, CONCRETE SLUMP, ETC.
21. CONTRACTOR SHALL SUBMIT FORMAL QUALITY CONTROL REPORTS ON A MONTHLY BASIS
SUMMARIZING ALL TESTING PERFORMED DURING THE PERIOD, IDENTIFYING ANY FAILED TESTS
AND WHAT WAS DONE TO ADDRESS ANY FAILURES, AND SUMMARIZING QUANTITIES/AREAS
REPRESENTED BY THE TESTING
22. CONTRACTOR IS RESPONSIBLE FOR TRACKING PROJECT QUANTITIES/AREAS AND TO MAKE
SURE THAT ALL REQUIRED TESTING IS BEING PERFORMED ACCORDING TO OWNER STANDARDS
AND MEETS REQUIRED MINIMUM TESTING FREQUENCIES.
23. CONTRACTOR SHALL PROVIDE THE OWNER A MINIMUM 24-HOUR ADVANCE NOTICE FOR ALL
SPECIAL INSPECTIONS. DELAYS INCURRED BY FAILURE TO PROVIDE THE PROPER ADVANCE
NOTICE SHALL NOT BE THE BASIS FOR ADDITIONAL PAYMENT.
GENERAL NOTES:
24. THE CONTRACTOR SHALL PERFORM ALL WORK NECESSARY TO COMPLETE THE SCOPE OF
WORK SHOWN ON THE DRAWINGS OR DESCRIBED IN THE SPECIFICATIONS IN A MANNER
SATISFACTORY TO THE OWNER. UNLESS STATED OTHERWISE, THE CONTRACTOR SHALL
FURNISH ALL MATERIALS, EQUIPMENT, TOOLS, LABOR, AND INCIDENTALS NECESSARY TO
COMPLETE THE WORK.
25. WATER USED FOR THE PROJECT WILL NOT BE PAID FOR SEPARATELY BUT SHALL BE INCLUDED
IN RELATED ITEMS OF WORK.
26. ALL MATERIAL GENERATED WITHIN THE PROJECT LIMITS SHALL BE REMOVED FROM THE
PROJECT SITE AT NO COST TO THE PROJECT, UNLESS SPECIFIED BY THE CONTRACT
DOCUMENTS.
27. THE CONTRACTOR IS FULLY RESPONSIBLE FOR ENSURING SAFETY AT THE JOB SITE AND IS
REQUIRED TO CARRY OUT ALL TASKS IN STRICT COMPLIANCE WITH ALL APPLICABLE SAFETY
REGULATIONS SET FORTH BY FEDERAL, STATE, AND LOCAL AUTHORITIES.
28. EXISTING FIELD CONDITIONS MAY VARY FROM THE CONTRACT DOCUMENTS. THE CONTRACTOR
SHALL VERIFY ACTUAL FIELD CONDITIONS PRIOR TO SUBMITTING BIDS FOR THE PROJECT.
29. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, LINES, LEVELS, MATERIALS, ETC. PRIOR TO
THE START OF CONSTRUCTION AND SHALL NOTIFY THE ENGINEER OF ANY DISCREPANCIES IN
WRITING.
30. IN SOME CASES, THERE ARE AREAS OF THE SITE DEPICTED ON MORE THAN ONE PAGE OF THE
DRAWINGS AND ALL IMPROVEMENTS ARE NOT DEPICTED ON EVERY PAGE. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL PLAN SHEETS AND SHALL BE RESPONSIBLE
FOR ANY COSTS ASSOCIATED WITH TO FAILURE TO REVIEW ALL PLAN SHEETS.
31. PROJECT ACCESS AND STAGING SHALL BE RESTRICTED TO THE LIMITS OF DISTURBANCE AND
EASEMENT AREAS IDENTIFIED ON THE DRAWINGS. ALL ACCESS SHALL BE FROM OWNER
PROPERTY OR RIGHT-OF-WAY, UNLESS SPECIFICALLY NOTED OR APPROVED OTHERWISE.
32. CONTRACTOR SHALL PLACE TEMPORARY ORANGE CONSTRUCTION OR RIBBON FENCING ALONG
WORK EXTENTS WHERE IDENTIFIED IN THE DRAWINGS IN ORDER TO DELINEATE ALLOWABLE
WORK AREAS AND AVOID TRESPASS ONTO NEIGHBORING LAND.
FENCING SHALL BE REMOVED UPON SUBSTANTIAL COMPLETION OF THE WORK.
33. REMAINING AREAS BEYOND THOSE IDENTIFIED ON THE DRAWINGS TO RECEIVE TEMPORARY
RIBBON FENCING DO NOT NEED TO BE FENCED ALONG DISTURBANCE LIMITS UNLESS
CONTRACTOR IS UNABLE TO AVOID DISTURBANCE BEYOND THESE LINES. IF CONTRACTOR
ROUTINELY DISTURBS BEYOND THESE LINES, THE OWNER MAY REQUEST THE ADDITION OF
RIBBON FENCING AT THE CONTRACTOR'S COST.
34. WATER SHALL BE USED AS A DUST CONTROL, WHERE REQUIRED. LOCATIONS SHALL BE AS
DIRECTED BY THE ENGINEER. WATER FOR DUST CONTROL WILL NOT BE PAID FOR SEPARATELY
BUT INCLUDED IN THE WORK.
35. THE CONTRACTOR SHALL PROVIDE A CERTIFIED SCALE AND CERTIFIED WEIGHER AT THE POINT
OF LOADING FOR ALL AGGREGATES AND WATER DELIVERED TO THE PROJECT.
36. THE CONTRACTOR SHALL BE RESPONSIBLE TO MAINTAIN DRAINAGE DURING THE WORK. ANY
REWORK OF MATERIALS DUE TO LACK OF THE MAINTENANCE SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE.
37. SANITARY FACILITIES SHALL BE LOCATED ON SITE AND SHALL BE FULLY OPERATIONAL BEFORE CONSTRUCTION CAN BEGIN. SANITARY FACILITY PAY ITEM SHALL INCLUDE CLEANING A MINIMUM OF ONCE PER WEEK. THIS WILL BE SUBSIDIARY TO THE PAY ITEM FOR THE SANITARY FACILITY
AND WILL NOT BE PAID FOR SEPARATELY.
38. THE CONTRACTOR SHALL PROTECT ALL EXISTING SURVEY MONUMENTS DESIGNATED TO
REMAIN FROM DAMAGE DURING CONSTRUCTION OPERATIONS. ANY MONUMENTS DISTURBED BY
THE CONTRACTOR THAT ARE NOT DESIGNATED FOR RELOCATION SHALL BE RESET AT THE
CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL NOTE THOSE MONUMENTS IN THE FIELD
PRIOR TO CONSTRUCTION.
39. THE CONTRACTOR SHALL REPAIR OR REPLACE AT THE CONTRACTOR'S EXPENSE ANY EXISTING
SIGNS DAMAGED BY CONTRACTOR.
40. CONTRACTOR SHALL FAMILIARIZE THEMSELVES WITH THE QUALITY CONTROL TESTING
REQUIREMENTS OF THE OWNER. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO
CONTACT THE TESTING FIRM 24 HOURS IN ADVANCE OF THE NEED FOR TESTING AND TO VERIFY
THAT THE APPROPRIATE NUMBER OF TESTS HAVE BEEN TAKEN. ALL FAILING TESTS SHALL BE
PERFORMED UNTIL PASSING RESULTS ARE OBTAINED. PAYMENT OF QUALITY CONTROL TESTING
IS THE CONTRACTOR'S RESPONSIBILITY AND SHALL NOT BE PAID FOR SEPARATELY BUT SHALL
BE INCIDENTAL TO THE WORK. THE OWNER WILL PROVIDE QUALITY ASSURANCE TESTING.
41. MATERIALS FOR THE SUBBASE SHALL BE CDOT AGGREGATE BASE COURSE (ABC) CLASS 6 AS
SHOWN IN SUBSECTION 703.03 UNLESS SPECIFICALLY NOTED OTHERWISE.
42. ALL MATERIALS AND WORKMANSHIP SHALL BE SUBJECT TO INSPECTION BY THE OWNER OR
THEIR ASSIGNED REPRESENTATIVE. THE OWNER AND THEIR ASSIGNED REPRESENTATIVES
RESERVE THE RIGHT TO ACCEPT OR REJECT ANY SUCH MATERIALS AND WORKMANSHIP THAT
DO NOT CONFORM TO THE DRAWINGS AND SPECIFICATIONS LISTED HEREIN. REQUIRED QUALITY
CERTIFICATIONS AND DOCUMENTATION SHALL BE SUBMITTED TO THE OWNER PRIOR TO
PLACEMENT OR USE OF THE MATERIAL.
REMOVALS AND CLEARING
43. WHERE EXISTING ASPHALT PAVEMENT, CONCRETE PAVEMENT, OR CONCRETE SIDEWALK IS TO
BE REMOVED ADJACENT TO STRUCTURES. CONCRETE, OR ASPHALT TO REMAIN, IT SHALL BE
CUT FULL DEPTH TO A NEAT LINE. CONCRETE REMOVALS SHALL BE TO THE NEAREST TOOL
JOINT UNLESS NOTED OTHERWISE.
44. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DISPOSING OF ALL MATERIALS REMOVED FROM THE SITE IN ACCORDANCE WITH APPLICABLE WASTE HANDLING AND DISPOSAL LAWS. THE COST
FOR HAULING AND DISPOSAL OF REMOVED MATERIAL SHALL BE INCLUDED IN THE UNIT PRICE
FOR THE RELATED BID ITEM UNLESS SPECIFICALLY NOTED OTHERWISE.
45. THE POTENTIAL EXISTS FOR BURIED RUBBLE (ASPHALT, CONCRETE, DEBRIS, ETC) TO BE
ENCOUNTERED WITHIN PROJECT EXCAVATIONS. IF ENCOUNTERED, THESE MATERIALS SHALL BE
SEGREGATED FROM EXCAVATED SOILS AND DISPOSED OF AT THE LOCAL LANDFILL.
46. ALL PROJECT FOOTPRINT AND SPOIL FILL AREAS SHALL BE CLEARED AND GRUBBED TO INCLUDE
ALL SURFACE OBJECTS, TREES, ROOTS, STUMPS, AND OTHER PROTRUDING OBSTRUCTIONS
NOT DESIGNATED TO REMAIN. TOPSOIL SHALL BE SEGREGATED, STOCKPILED, AND RESTORED
FOLLOWING FINAL GRADING PER RESTORATION SECTION. TREE STUMPS SHALL BE REMOVED
OR GRINDED TO AT LEAST TWO FEET BELOW EXISTING GROUND OR PROPOSED SUBGRADE,
WHICHEVER IS LOWER.
47. BURNING OF REMOVED MATERIAL WILL NOT BE ALLOWED WITHIN THE PROJECT AREA. SHOULD
BURNING BE UTILIZED FOR CLEARING AND GRUBBING OPERATIONS OFF-SITE, THE BURN
OPERATION SHALL BE PERMITTED WITH THE LOCAL FIRE DISTRICT AND THE COLORADO
DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT PRIOR TO IMPLEMENTATION. BURNING
OPERATIONS SHALL TAKE PLACE UNDER THE CONSTANT CARE OF THE CONTRACTOR AND
SHALL BE EXTINGUISHED DURING OFF-WORK HOURS.
EXCAVATION, BACKFILL, AND SPOILS
48. EXCAVATION SHALL BE UNCLASSIFIED EXCAVATION MEASURED WITH NEAT LINES FROM THE
BOTTOM OF ASPHALT MAT.
49. CONTRACTOR SHALL USE VIBRATORY ROLLERS ON GRANULAR MATERIALS AND SHEEPSFOOT
ROLLERS ON COHESIVE SOILS. SHEEPSFOOT ROLLER SHALL BE OF SIMILAR COMPACTIVE
EFFORT TO A CAT CP74 OR LARGER.
50. MAXIMUM COMPACTED LIFT THICKNESS FOR ALL SOILS SHALL BE 8 INCHES UNLESS APPROVED
OTHERWISE.
51. CONTRACTOR SHALL THOROUGHLY MOISTURE CONDITION (BY WETTING OR DRYING AS NEEDED
AND MIXING THOROUGHLY) ALL BACKFILL MATERIALS PRIOR TO PLACEMENT. WATERING OF
LOOSE BACKFILL AFTER IT HAS BEEN PLACED IS PROHIBITED. MOISTURE CONDITIONING
OPERATIONS FOR IMPORTED BACKFILL SHALL TAKE PLACE OUTSIDE OF THE PROPOSED
FOOTPRINT UNLESS APPROVED OTHERWISE.
52. ALL EXCAVATION WORK SHALL BE IN ACCORDANCE WITH STATE AND FEDERAL OSHA
REGULATIONS.
53. CONTRACTOR SHALL UTILIZE SHORING WHERE NECESSARY TO CONTROL THE WIDTH OF
TRENCH EXCAVATIONS. PAYMENT WILL NOT BE MADE FOR BACKFILL MORE THAN 6 INCHES
BEYOND THE TRENCH WIDTHS SPECIFIED ON THE DRAWINGS OR BEYOND A 14 X14 EXCAVATION
AT MANHOLE AREAS. ESTABLISHED UNIT WEIGHTS BASED ON COMPACTION PROCTORS AND
OBSERVED EXCESS VOLUME WILL SERVE AS THE BASIS FOR CALCULATING PORTIONS OF
BACKFILL INELIGIBLE FOR PAYMENT.
54. CONTRACTOR SHALL PROTECT EXISTING UTILITIES NEAR EXCAVATIONS DURING
CONSTRUCTION. EXCAVATIONS NEAR EXISTING PIPES AND UTILITIES SHALL BE PERFORMED
USING HAND TOOLS IN ORDER TO PREVENT DAMAGE.
55. PRECIPITATION RUNOFF AND CONSTRUCTION WATER SHALL BE CONTROLLED SUCH THAT
WATER IS NOT ALLOWED TO ACCUMULATE IN THE EXCAVATIONS, IN PAVEMENT AREAS, OR BASE
COURSE LAYERS. PONDED WATER SHOULD BE REMOVED AND ANY BEARING SOILS THAT
BECOME SATURATED OR SOFTENED REMOVED AND REPLACED PRIOR TO PLACEMENT OF
OVERLYING FILL, CONCRETE OR PAVEMENTS.
56. ALL EXCAVATED MATERIALS NOT APPROVED FOR RE-USE, LOOSE SOILS, SOFT SOILS, ORGANIC
MATERIALS, DEBRIS, FROZEN SOIL, ICE, AND OTHER DELETERIOUS MATERIALS SHOULD BE
REMOVED FROM EXCAVATIONS PRIOR TO PLACEMENT OF OVERLYING FILL, CONCRETE, OR
PAVEMENTS.
57. IF UNSTABLE GROUND IS ENCOUNTERED IN TRENCHES, 1.5-INCH TRENCH STABILIZATION ROCK
MAY BE USED TO STABILIZE THE BOTTOM OF THE TRENCH PRIOR TO THE INSTALLATION OF
PIPELINES, WHERE APPROVED BY THE ENGINEER. PAYMENT WILL BE MADE BY THE TON OF
ROCK ACCORDING TO THE BID FORM AND SHALL INCLUDE THE OVEREXCAVATION AND REMOVAL
OF UNSUITABLE MATERIAL.
58. EXCESS SPOILS FROM TRENCH EXCAVATIONS MAY BE USED TO CONSTRUCT EMBANKMENTS
PER THE PROJECT DRAWINGS. ONCE EMBANKMENTS ARE CONSTRUCTED, ALL REMAINING
EXCESS SPOILS SHALL BE REMOVE AND DISPOSED OF OFF-SITE BY THE CONTRACTOR UNLESS
APPROVED OTHERWISE.
SHEET
ISSUE DATE
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING ARE APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:14pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\General\2304-00116_DESIGN_GENERAL NOTES.dwg (2 GENERAL NOTES I)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
G
EN
ER
A
L N
O
TE
S I
2304-00116
04/2024
JR
SAM
4/
/2
AD
D
EN
D
U M
N O
. 0 2, S
EE
S H
EE
T
FO
R
M O
D
IF
IC
AT
IO
N
S
ADDENDUM NO. 02:
1. NOTE ADDED.
2. INDENT ADJUSTED.
3. SPELLING CORRECTED.
AGGREGATE BASE COURSE (ABC)
68. FOR BASE AND SUBBASE (ABC) TO BE USED ON THIS PROJECT, THE CONTRACTOR SHALL
SUBMIT TO THE ENGINEER AN APPROVED GRADATION THAT MEETS THE OWNER
SPECIFICATIONS.
69. ABC SHALL BE PLACED IN CONFORMANCE WITH THE OWNER STANDARDS.
70. ABC SHALL BE PAID FOR BY THE TON.
71. FOR ESTIMATING PLAN QUANTITIES, THE RATE OF 133 POUNDS PER CUBIC FOOT WAS USED [133
LBS / CF].
72. FOR ESTIMATING PLAN QUANTITIES, AN AVERAGE OF 6 INCHES OF WAS USED.
CONCRETE AND REINFORCEMENT
73. ENGINEER HAS INCLUDED 10% ADDITIONAL ESTIMATED QUANTITIES THAN SHOWN ON
DRAWINGS FOR "REMOVAL OF CURB AND GUTTER" AND "CURB AND GUTTER TYPE 2 (SECTION
II-B)" TO ALLOW THE OWNER TO COMPLETE ADDITIONAL LOCATIONS IN THE PROJECT AREA THAT
MAY NEED REPLACEMENT.
74. ALL CONCRETE ON THIS PROJECT SHALL BE CDOT CLASS D, UNLESS SPECIFICALLY NOTED
OTHERWISE.
75. SEVERITY OF SULFATE EXPOSURE SHALL BE CLASS 2.
76. CONTRACTOR SHALL DEMONSTRATE THAT PROPOSED MIX DESIGN MEETS SPECIFIED
STRENGTH FOR AT LEAST 95% OF ALL CONCRETE REPRESENTED BY ROUTINE
QUALITY-CONTROL TESTING OVER THE PAST 18 MONTHS OR AS OTHERWISE APPROVED
77. CONCRETE PLACED IN ABUTMENTS AND WINGWALLS SHALL CURE FOR AT LEAST 7 DAYS OR
UNTIL A COMPRESSIVE STRENGTH OF AT LEAST 3,600 PSI (AS DETERMINED BY VERIFICATION
TEST CYLINDERS) HAS BEEN REACHED PRIOR TO BACKFILLING.
78. VEHICULAR TRAFFIC SHOULD BE KEPT OFF OF NEW CONCRETE FOR A MINIMUM OF FIVE (5) DAYS
OR UNTIL THE CONCRETE REACHES A COMPRESSIVE STRENGTH OF 2,500 PSI. DAMAGE TO NEW
CONCRETE AS A RESULT OF FAILURE TO PROPERLY PROTECT THE CONCRETE FROM
CONSTRUCTION OR VEHICULAR TRAFFIC SHALL BE REPAIRED BY THE CONTRACTOR AT THEIR
EXPENSE.
79. CONTRACTOR IS RESPONSIBLE FOR PROTECTING FRESHLY POURED CONCRETE FROM
VANDALISM AND/OR DAMAGE DURING ITS INITIAL SET. ANY DAMAGED OR VANDALIZE CONCRETE
SHALL BE REPAIRED OR REPLACE AT NO COST TO THE OWNER.
80. ALL EXPOSED EDGES OF CONCRETE STRUCTURES SHALL HAVE A 0.75-INCH X 45-DEGREE
CHAMFER.
81. ALL REINFORCING STEEL SHALL BE STANDARD BLACK REINFORCING STEEL CONFORMING TO
AASHTO M31, 60 KSI (ASTM A615 GRADE 60).
82. MINIMUM COVER FOR REINFORCING STEEL SHALL BE PROVIDED IN ACCORDANCE WITH ACI 318
CHAPTER 7 AS FOLLOWS:
a. CONCRETE DEPOSITED DIRECTLY AGAINST GROUND: 3”
b. FORMED CONCRETE EXPOSED TO WEATHER OR GROUND: 2
83. ”ALL REINFORCING STEEL SHALL BE BENT, DETAILED, AND CHAIRED PER THE "ACI MANUAL OF
STANDARD PRACTICE FOR DETAILING OF REINFORCED CONCRETE STRUCTURES."
HOT MIX ASPHALT (HMA)
84. FOR HOT MIX ASPHALT (HMA) TO BE USED ON THIS PROJECT, THE CONTRACTOR SHALL SUBMIT
TO THE ENGINEER AN APPROVED MIX DESIGN THAT MEETS THE OWNER SPECIFICATIONS. THE
ASPHALT CEMENT BINDER GRADE SHALL BE AS SPECIFIED IN THE OWNER STANDARDS. THE HMA
MIX DESIGN SHALL CONFORM TO GRADATION REQUIREMENTS AS SPECIFIED IN THE OWNER
STANDARDS.
85. HMA SHALL BE PLACED IN CONFORMANCE WITH THE OWNER STANDARDS.
86. HMA SHALL BE PAID FOR BY THE TON.
87. FOR ESTIMATING PLAN QUANTITIES, THE RATE OF 110 POUNDS PER SQUARE YARD PER INCH
WAS USED [110 LBS / (SY x IN)].
88. FOR ESTIMATING PLAN QUANTITIES, 7 INCHES IN FULL DEPTH AREAS AND 2 INCHES IN OVERLAY
AREAS WERE USED. THIS IS TO ACCOUNT FOR FULL-DEPTH AND MILLING/FILL AREAS, COMBINED.
EROSION CONTROL
89. INSTALLATION OF EROSION CONTROL MEASURES SHALL BE COMPLETED PRIOR TO SOIL
DISTURBANCE OR EXCAVATION.
90. WHENEVER SEDIMENT IS TRANSPORTED ONTO A PUBLIC ROAD, THE ROAD SHALL BE CLEANED
AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM ROADS BY SHOVELING OR
SWEEPING AND TRANSPORTED TO A DISPOSAL AREA. ROAD WASHING SHALL NOT BE ALLOWED
UNTIL SEDIMENT IS REMOVED IN THIS MANNER. STORM SEWER INLET PROTECTIVE MEASURES
SHALL BE IN PLACE AT THE TIME OF ROAD WASHING.
91. ALL STORM SEWER INLETS MADE OPERABLE DURING CONSTRUCTION SHALL BE TEMPORARILY
PROTECTED TO PREVENT SEDIMENT-LADEN RUNOFF FROM ENTERING THE STORM DRAIN
SYSTEM.
92. THE CONTRACTOR SHALL MAKE ROUTINE CHECKS ON ALL EROSION CONTROL MEASURES AND
MAKE REPAIRS OR REMOVE BUILT-UP SEDIMENT AS NECESSARY. ALL EROSION CONTROL
MEASURES SHALL ALSO BE CHECKED FOLLOWING A PRECIPITATION EVENT.
93. SEDIMENT DEPOSITS SHALL BE REMOVED ONCE THEY HAVE ACCUMULATED TO A HEIGHT OF
ONE HALF OF THE BARRIER OR PRIOR TO REMOVING EROSION CONTROL MEASURES.
94. A STORMWATER CONSTRUCTION PERMIT WITH THE COLORADO DEPARTMENT OF PUBLIC
HEALTH AND ENVIRONMENT (CDPHE) IS REQUIRED FOR THIS PROJECT. CONTRACTOR IS
RESPONSIBLE FOR OBTAINING THIS PERMIT THROUGH THE COLORADO ENVIRONMENTAL ONLINE
SERVICE WEB PORTAL (INCLUDING PREPARATION OF THE ASSOCIATED SWMP), KEEPING THE
SITE IN COMPLIANCE WITH THE PERMIT THROUGHOUT CONSTRUCTION, AND CLOSING OUT THE
PERMIT UPON PROJECT COMPLETION AND SUCCESSFUL SITE STABILIZATION. AS REQUIRED BY
CDPHE, INSPECTIONS OF THE SITE WILL BE REQUIRED UNTIL AT LEAST 70% REVEGETATION IS
ACHIEVED AND THE PERMIT IS CLOSED OUT.
SURVEYING AND PROJECT LAYOUT
95. CONSTRUCTION STAKEOUT WILL BE PROVIDED BY THE CONTRACTOR.
96. PROJECT LAYOUT WILL BE PROVIDED BY STAKING OR PAINTING THE ACTUAL LOCATION OF
PROJECT COMPONENTS OR OFFSETS (WHERE APPROPRIATE). THE CONTRACTOR IS
RESPONSIBLE FOR PROTECTING THIS LAYOUT AND/OR OFFSETTING LAYOUT POINTS TO ALLOW
FOR POINTS TO BE RE-ESTABLISHED DURING CONSTRUCTION.
97. THE CONTRACTOR SHALL GIVE THE OWNER AT LEAST 72 HOURS ADVANCE NOTICE FOR LAYOUT
OF PROJECT COMPONENTS TO ALLOW OWNER TO REVIEW. DELAYS/COSTS INCURRED BY
FAILURE TO PROVIDE THE PROPER ADVANCE NOTICE SHALL BE PAID FOR BY THE CONTRACTOR.
TRAFFIC CONTROL AND STRIPING
98. THE CONTRACTOR SHALL PREPARE A TRAFFIC CONTROL PLAN FOR APPROVAL BY THE OWNER
PRIOR TO MOBILIZATION. AN EXAMPLE OF A TRAFFIC PLAN IS PROVIDED IN THE DRAWINGS.
99. ALL TRAFFIC CONTROL SHALL BE IN ACCORDANCE WITH THE MOST RECENT VERSION OF THE
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD).
100. CONTRACTOR SHALL PERFORM ROUTINE INSPECTIONS OF TRAFFIC CONTROL AS NECESSARY
TO MAINTAIN SAFE AND EFFECTIVE TRAFFIC CONTROL IN COMPLIANCE WITH MUTCD
STANDARDS AND THE APPROVED TRAFFIC CONTROL PLAN.
101. EXISTING ROADS MAY BE CLOSED TO THROUGH TRAFFIC DURING ACTIVE WORK AND THE
ROADS MUST BE RE-OPENED TO ALL TRAFFIC FOR ANY GAPS IN ACTIVE WORK GREATER THAN
72 HOURS UNLESS APPROVED OTHERWISE BY THE OWNER.
102. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN PUBLIC AND PRIVATE ACCESS DRIVES FROM
THE POINT OF DISRUPTION TO THE TRAVELED WAY THROUGHOUT CONSTRUCTION; THE
CONTRACTOR WILL NOT BE ALLOWED TO SHUT OFF ACCESS TO ANY PROPERTY UNLESS
REQUIRED FOR DRIVEWAY CONSTRUCTION OR OPEN TRENCHES IN ACTIVE WORK AREAS, IN
WHICH CASE, THE SHUTOFF MUST BE COORDINATED WITH THE PROPERTY OWNER OR
ALTERNATE ACCESS PROVIDED.
103. THE OWNER'S ROADS DEPARTMENT WILL PROVIDE ROAD NAME SIGNS FOR THIS PROJECT. THE
CONTRACTOR SHALL PROVIDE AND INSTALL ALL OTHER PROJECT SIGNAGE.
SITE RESTORATION
104. THE CONTRACTOR IS RESPONSIBLE FOR RESTORING ALL DISTURBED AREAS TO A CONDITION
EQUAL TO OR BETTER THAN EXISTING CONDITIONS PRIOR TO DISTURBANCE OR AS
SPECIFICALLY SHOWN ON THE DRAWINGS. REQUIREMENTS SPECIFIC TO MAIN RESTORATION
ELEMENTS ARE SUMMARIZED BELOW:
a. TOPSOIL RE-USE: STRIP, SEGREGATE, AND RE-USE TOPSOIL TO THE EXTENT PRACTICABLE.
REPLACE ALL STOCKPILED TOPSOIL OVER THE TOP OF ROAD EMBANKMENTS AND EXCESS
SPOIL FILL AREAS FOLLOWING FINAL GRADING.
b. PRIVATE LAWNS: REPLACE PRIVATE GRASS LAWNS WITH SOD AND NOTIFY LANDOWNERS TO
ENSURE THE SOD IS WATERED AND WILL TAKE. SEE THE NOTE BELOW REGARDING
SPRINKLERS.
c. IRRIGATED FARMLANDS: RESTORE IRRIGATED FARMLANDS BY RE-ESTABLISHING ORIGINAL
GRADE, REPLACING TOPSOIL, AND RE-ESTABLISHING IRRIGATION FURROWS/IRRIGATION
DITCHES.
d. UPLAND AREAS: GRADE SMOOTH, RESTORE TOPSOIL, AND SEED DRILL WITH A NATIVE SEED
MIX MATCHING THE SURROUNDING VEGETATION
WETLAND AREAS: DISTURBANCES TO WETLANDS AREAS ARE PROHIBITED.
105. ALL EXISTING IRRIGATION/SPRINKLER SYSTEMS WITHIN THE PROJECT AREA SHALL BE MODIFIED
AS NECESSARY TO MAINTAIN THE SYSTEM'S FUNCTIONALITY AND ACCOMMODATE NEW
CONSTRUCTION. CONTRACTOR SHALL COORDINATE WITH THE OWNERS OF THE SPRINKLER
SYSTEMS TO PERFORM THESE MODIFICATIONS. SPRINKLER SYSTEM MODIFICATION WILL NOT BE
PAID FOR SEPARATELY BUT SHALL BE CONSIDERED INCIDENTAL TO THE WORK.
106. REPAIR OF CONTRACTOR DAMAGED PRIVATE SPRINKLER SYSTEMS WITHIN AND ADJACENT TO
THE PROJECT AREA SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. THE CONTRACTOR
SHALL RESTORE THE DAMAGED IRRIGATION SYSTEM TO PRE-CONSTRUCTION CONDITION AT
CONTRACTOR'S EXPENSE. CONTRACTOR SHALL VERIFY THE CONDITION OF EXISTING
SPRINKLER SYSTEMS WITH A REPRESENTATIVE OF THE PROPERTY OWNER AND THE ENGINEER
PRIOR TO CONSTRUCTION.
107. ALL MATERIALS USED FOR LANDSCAPING AND SITE RESTORATION MUST BE APPROVED BY THE
ENGINEER PRIOR TO USE. THIS INCLUDES, AT A MINIMUM, DECORATIVE ROCK, LANDSCAPE
FABRIC, SOD, AND SEED MIXES AS APPLICABLE.
ENVIRONMENTAL
108. DURING ALL SUBSURFACE ACTIVITIES, WORKERS SHALL BE ALERT FOR VISUAL AND OLFACTORY
SIGNS OF CONTAMINATION. IF CONTAMINATION IS ENCOUNTERED, WORK SHALL STOP AND
PROCEDURES ESTABLISHED IN THE CDOT 250 SPEC SHALL BE FOLLOWED. ANY CONTAMINATED
SOILS OR LANDFILL MATERIAL SHALL BE PROPERLY HANDLED AND SAMPLED PRIOR TO
DISPOSAL.
109. KEEP ALL STAGING, PARKING, AND MATERIAL STOCKPILES TO PREVIOUSLY DISTURBED AREAS.
110. THE CONTRACTOR SHALL ENSURE THAT NO MATERIALS, EQUIPMENT, OR VEHICLES ARE STAGED
OR PARKED WITHIN 100 FEET OF WETLANDS, RIPARIAN, OR DRAINAGE AREAS, UNLESS
SPECIFICALLY ALLOWED AS NOTED IN THE DRAWINGS.
111. THE CONTRACTOR SHALL NOT DISTURB OR PARK ANY VEHICLES OR EQUIPMENT IN AREAS NOT
APPROVED BY THE ENGINEER. THE CONTRACTOR SHALL ADHERE TO THE CONSTRUCTION
LIMITS AS NOTED IN THE DRAWINGS AND DEMARCATE THE WORK AREA TO PREVENT GROUND
DISTURBANCE OUTSIDE THOSE PRESCRIBED AREAS.
112. TO COMPLY WITH SECTION 404 OF THE CLEAN WATER ACT, A NATIONWIDE PERMIT NUMBER 14 -
LINEAR TRANSPORTATION PROJECTS IS REQUIRED. GENERAL CONDITIONS OF THAT PERMIT
SHALL BE MET BY THE CONTRACTOR (SEE SWMP NOTEBOOK FOR NW-14 SUMMARY).
113. ANY WETLAND IMPACTS MUST BE MITIGATED IN ACCORDANCE WITH THE USACE SEC. 404
PERMIT CONDITIONS. SOURCE OF CONDITION: EXECUTIVE ORDER 11990 - WETLANDS
UTILITY
114. EXISTING LINES, AS SHOWN ON THE PLAN SHEETS, ARE PLOTTED FROM THE BEST AVAILABLE
INFORMATION (ASCE 38-22 STANDARD QUALITY LEVEL C).
115. CONTRACTOR HAS BEEN PROVIDED POTHOLING PAY ITEM FOR AREAS WHERE WE ARE
INSTALLING NEW STORM SEWER IN ALDER ST. THIS IS TO ALLOW ENGINEER AND OWNER AN
OPPORTUNITY TO VERIFY AND CORRECT ANY POTENTIAL UTILITY CONFLICTS PRIOR TO TRENCH
WORK FOR THE STORM SEWER. THE CONTRACTOR SHALL PROVIDE SURVEY GRADE
ELEVATIONS TO TOP OF EXISTING UTILITIES AND UTILITY SIZES TO THE ENGINEER AT LEAST 72
HOURS PRIOR TO STARTING TRENCH EXCAVATION FOR STORM SEWER.
116. THE CONTRACTOR SHALL COMPLY WITH ARTICLE 1.5 OF TITLE 9, CRS ("EXCAVATION
REQUIREMENTS") WHEN EXCAVATING OR GRADING IS PLANNED IN THE AREA OF UNDERGROUND
UTILITY FACILITIES. THE CONTRACTOR SHALL NOTIFY ALL AFFECTED UTILITIES AT LEAST TWO (2)
BUSINESS DAYS, NOT INCLUDING THE ACTUAL DAY NOTICE, PRIOR TO COMMENCING SUCH
OPERATIONS. THE CONTRACTOR SHALL CONTACT THE UTILITY NOTIFICATION CENTER OF
COLORADO (UNCC) AT 811 OR 1-800-922-1987, TO HAVE LOCATIONS OF UNCC REGISTERED LINES
MARKED BY MEMBER COMPANIES. UTILITY SERVICE LATERALS SHALL ALSO BE LOCATED PRIOR
TO BEGINNING EXCAVATION OR GRADING. THE LOCATION OF ALL EXISTING UTILITIES (PUBLIC OR
PRIVATE) SHALL BE IDENTIFIED OR VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION
OF PROJECT COMPONENTS. AS NECESSARY. THE CONTRACTOR SHALL BEAR THE FULL COST OF
REMOVAL, REPLACEMENT, AND DELAY RELATED TO UNVERIFIED EXISTING UTILITIES.
117. THE CONTRACTOR'S ATTENTION IS DIRECTED TO SUBSECTION 105.11 OF THE CDOT STANDARD SPECIFICATIONS AND THE UTILITY PROJECT SPECIAL PROVISIONS CONCERNING UTILITIES. THE
CONTRACTOR SHALL COORDINATE AND COOPERATE WITH UTILITY OWNERS IN THE THEIR
REMOVAL, ADJUSTMENT, AND/OR RELOCATION OPERATIONS SO THAT THE UTILITY WORK CAN
BE ACCOMPLISHED WITHOUT IMPACTING THE CONSTRUCTION SCHEDULE.
118. THERE ARE POSSIBLE UTILITY CONFLICTS WITHIN THE PROJECT LIMITS. THE CONTRACTOR
SHALL REQUEST UTILITY LOCATES PRIOR TO COMMENCING ANY TYPE OF EXCAVATION,
GUARDRAIL INSTALLATION, OR OTHER IMPROVEMENTS. BASED UPON IMPROVEMENTS,
ADJUSTMENTS MAY BE DIRECTED BY THE PROJECT ENGINEER TO AVOID UTILITY CONFLICTS.
HAND DIGGING MAY BE REQUIRED.
119. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL UTILITIES THROUGHOUT
CONSTRUCTION. ANY UTILITIES DAMAGED BY THE CONTRACTOR SHALL BE RESTORED TO THEIR
PRE-PROJECT CONDITION AT THE CONTRACTOR'S EXPENSE.
120. DURING THE COURSE OF CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTING NEWLY INSTALLED UTILITIES FROM DAMAGE WITHIN THE PROJECT AREA. THE
RESPONSIBILITY FOR LOCATING UTILITIES WILL BECOME THAT OF THE OWNER FOLLOWING
FINAL ACCEPTANCE.
121. HYDRONIC SNOW MELTING SYSTEMS EXIST WITHIN THE PROJECT AREA. ENGINEER AND OWNER
HAVE DONE BEST TO IDENTIFY LIMITS ON DRAWINGS. CONTRACTOR SHALL COORDINATE WITH
ADJACENT PROPERTY OWNERS AND THEIR PLUMBERS TO DRAIN ANY SYSTEMS PRIOR TO
STARTING DEMOLITION. QUANTITIES HAVE ALSO BEEN INCLUDED FOR REMOVAL AND DISPOSE
OF EXISTING HEATING ELEMENTS AND INSTALL NEW ENGINEERED HYDRONIC SNOW MELT
COMPONENTS IN ALL NEW CONCRETE FOR RECONNECTION OF EXISTING SYSTEMS OR FUTURE
SYSTEMS TO BE TIED INTO. CONTRACTOR SHALL PROVIDE A SHOP DRAWING SHOWING THE
PROPOSED LAYOUT OF TUBING AND CROSS-SECTIONS BASED ON ENGINEERED DESIGN FOR
HYDRONIC SYSTEM THAT MEETS THE EXISTING BOILER BTU OUTPUTS. ALL SHOP DRAWINGS
SHALL BE IN CONFORMANCE WITH LOCAL BUILDING AND PLUMBING CODES AND PER
MANUFACTURES RECOMMENDATIONS.
DRY-UTILITIES
122. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING THE RELOCATION OF NATURAL GAS, TELECOMMUNICATIONS, CABLE COMMUNICATIONS, AND POWER UTILITIES WITHIN THE PROJECT
AREA THAT ARE IN CONFLICT WITH THE PROPOSED IMPROVEMENTS. PAYMENT FOR UTILITY
RELOCATION WILL BE PAID FOR ACCORDING TO THE BID FORM.
PERMITS
123. CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCEPTANCE AND CONTROL OF ALL SURFACE, SUBSURFACE DRAINAGE, AND GROUNDWATER ENTERING THE PROJECT AREA. THE
CONTRACTOR IS RESPONSIBLE FOR PROVIDING DEWATERING AS NEEDED AT NO ADDITIONAL
COST TO THE PROJECT, UNLESS A BID ITEM IS PROVIDED. DEWATERING MEANS AND METHODS
SHALL BE APPROVED BY THE OWNER OR ENGINEER, AND THE CONTRACTOR SHALL OBTAIN A
CDPHE CONSTRUCTION DEWATERING PERMIT FOR ALL CONSTRUCTION ACTIVITIES, WHEN
NECESSARY.
124. ANY PUMPING OF WATER MAY REQUIRE A DISCHARGE PERMIT FROM THE COLORADO
DEPARTMENT OF PUBLIC HEALTH AND ENVIRONMENT (CDPHE) WATER QUALITY CONTROL
DIVISION AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ONLY CLEAN WATER THAT
HAS NOT PICKED UP SEDIMENT FROM THE WORK AREA SHALL BE DISCHARGED FROM THE SITE
WITHOUT PRIOR TREATMENT. WATER CONTAINING ELEVATED LEVELS OF SEDIMENT SHALL BE
TREATED PRIOR TO DISCHARGE USING BEST MANAGEMENT PRACTICES AS APPROVED BY THE
ENGINEER. CONDITIONS FOR THE PERMIT INCLUDING MONITORING AND REPORTING WILL NOT
BE PAID FOR SEPARATELY BUT SHALL BE INCLUDED IN THE WORK.
125. COLORADO DEPARTMENT OF PUBLIC SAFETY (CDPS) PERMIT: PROJECT ACTIVITIES WILL RESULT
IN LESS THAN ONE ACRE OF EARTH DISTURBANCE. A COLORADO DISCHARGE PERMIT SYSTEM -
STORMWATER CONSTRUCTION PERMIT WILL NOT BE REQUIRED. THE CONTRACTOR IS
RESPONSIBLE FOR PROVIDING A STORMWATER MANAGEMENT PLAN PRIOR TO CONSTRUCTION.
126. WETLANDS AND THREATENED AND ENDANGERED SPECIES: WORK ACTIVITIES INCLUDING THE
MOVEMENT AND PLACEMENT OF VEHICLES AND EQUIPMENT SHALL NOT DISTURB WETLANDS
BEYOND THE PLANNED LIMITS OR THREATENED AND ENDANGERED SPECIES (OR THEIR
HABITAT).
SHEET
ISSUE DATE
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING ARE APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:14pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\General\2304-00116_DESIGN_GENERAL NOTES.dwg (3 GENERAL NOTES II)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
G
EN
ER
A
L N
O
TE
S
II
2304-00116
04/2024
JR
SAM
4/
/2
AD
D
EN
D
U M
N O
. 0 2, S
EE
S H
EE
T
FO
R
M O
D
IF
IC
AT
IO
1. DEPTH OF ASPHALT ADJUSTED.
2. GRAMMAR FIXED.
3. NOTE REMOVED.
4. SPELLING CORRECTED.
5. FIXED NOTE NUMBER INCLUDING
ALL NOTES FOLLOWING.
4 4
SHEET
ISSUE DATE
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING ARE APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:14pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\General\2304-00116_DESIGN_GENERAL NOTES.dwg (4 PROJECT SURVEY CONTROL)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
PR
O
JE
C
T
SU
R
VE
Y C
O N
TR
O
L
2304-00116
04/2024
JR
SAM
500 0 500 1000
SCALE FEET
CP COLORADO AND ALDER
CP COLORADO AND FIR
CP HILLTOP
CP COLORADO AND TOWNSEND
BM TELLURIDE
COORDINATE SYSTEM: LOCAL PROJECTION
COORDINATE SYSTEM CODE: TELLURIDE-TLCS
COORDINATE SYSTE, DESCRIPTION: TELLURIDE, TOWN OF - TELLURIDE LOCAL
COORDINATE SYSTEM
HORIZ. DATUM: NAD 83
VERT. DATUM. NAVD 88
GEOID: GRS 1980
UNITS: US SURVEY FOOT
POINT OF ORIGIN: 37.937153553°
LONGITUDE: -107.810772069°
LOCAL EASTING: 60,000 FT
LOCAL NORTHING: 20,000 FT
SCALE: 1.00041854
W 145 SPUR HWY
COLORADO AVE
M
AH
O N
EY D
R
ALD
ER
ST
W
ILLO
W
ST
SPRUCE ST (M
ID-BLO
CK)
PINE ST
M
ILL C
R
EEK R
D
SHELL GAS STATION
ELD
ER
C R
EEK LN
DESCRIPTION POINT # NAD83 LATITUDE NAD83 LONGITUDE NORTHING EASTING ELEV. (FT)
BENCHMARK (BM) TELLURIDE 0001 37° 56' 53.454413" N 107° 50' 50.042780" W 24019.7500 49481.1762 8723.7303
CONTROL POINT (CP) COLORADO AND FIR 1063 37° 56' 14.748714" N 107° 48' 42.308573" W 20100.7860 59717.1515 8786.6185 CONTROL POINT (CP) HILLTOP 1461 37° 56' 15.971121" N 107° 48' 47.054503" W 20224.4968 59336.7827 8795.3412
CONTROL POINT (CP) COLORADO AND ALDER 1463 37° 56' 11.074441" N 107° 48' 28.124352" W 19728.9725 60853.9855 8763.3558 CONTROL POINT (CP) COLORADO AND TOWNSEND 1464 37° 56' 18.345899" N 107° 48' 56.118801" W 20464.8452 58610.3226 8773.3318
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING IS APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:14pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\Quantities and Tables\2304-00116_RDWY_QUANTITIES.dwg (5 QUANTITIES)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
Q U
A N
TI
TI
ES
2304-00116
04/2024
JR
SAM
4/
/2
AD
D
EN
D
U M
N O
. 0 2, S
EE
S H
EE
T
FO
R
M O
D
IF
IC
AT
IO
Schedule 2: Spruce St (Mid-Block Crossing)
Item No. Description Unit Quantity Final Quantity
Removals/Site Prep
29 Remove Sidewalk SF 463
30 Remove Curb & Gutter LF 160
31 Remove Asphalt Mat SF 904
32 Milling Asphalt Mat SF 297
33 Remove Brick Pavers SF 10
34 Remove Drainage Structure EA 1
35 Remove Pipe LF 10
36 Remove Electrical Junction Box EA 1
37 Remove Light Post and Foundation EA 1
38 Unclassified Excavation (Complete In Place) CY 15
Pavement
39 Hot Mix Asphalt TON 18
40 Aggregate Base Course TON 73
Concrete
41 Concrete Sidewalk SF 577
42 Concrete Curb Ramp SF 601
43 Curb and Gutter Type 2 (Section II-B) LF 163
Signing, Striping, & Lighting
44 Pedestrian Light Post and Foundation EA 4
Misc.
45 Hydronic Sidewalk Heating System SF 1178
46 Grate Inlet and Box EA 2
47 Stormwater Curb Opening EA 1
48 4-inch PVC Drain Pipe LF 13
General
49 Mobilization/Demobilization (Includes payment and performance bonds) LS 1
Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) LS 1
51 Construction Surveying and Stakeout (Includes as-builts) LS 1
52 Construction Traffic Control (Includes MHTs) EA 2
53 F/A Minor Contract Revisions F A 1
Schedule 1: Pine St
Item No. Description Unit Quantity Final Quantity
Removals/Site Prep
1 Remove Sidewalk SF 968
2 Remove Hydronic Heating System SF 308
3 Remove Curb & Gutter LF 352
4 Remove Concrete Pavement SF 476
5 Remove Asphalt Mat SF 1,700
6 Milling Asphalt Mat SF 617
7 Remove Brick Pavers SF 10
8 Remove Electrical Junction Box EA 5
9 Remove Light Post and Foundation EA 4
10 Relocate Fire Hydrant EA 1
11 Remove & Salvage Sign EA 4
12 Reset Trash Bins EA 4
13 Reset Bench EA 1
14 Adjust Manhole Ring and Cover EA 1
15 Unclassified Excavation (Complete In Place) CY 25
Pavement
16 Hot Mix Asphalt TON 62
17 Aggregate Base Course TON 165
Concrete
18 Concrete Sidewalk SF 713
19 Concrete Curb Ramp SF 1,325
20 Concrete Valley Pan SF 176
21 Curb and Gutter Type 2 (Section II-B) LF 379
Signing, Striping, & Lighting
22 Pedestrian Light Post and Foundation EA 4
Misc.
23 Hydronic Sidewalk Heating System SF 2,038
General
24 Mobilization/Demobilization (Includes payment and performance bonds) LS 1
Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) LS 1
26 Construction Surveying and Stakeout (Includes as-builts) LS 1
27 Construction Traffic Control (Includes MHTs) EA 4
28 F/A Minor Contract Revisions F A 1
Schedule 3: Willow St
Item No. Description Unit Quantity Final Quantity
Removals/Site Prep
54 Remove Sidewalk SF 917
55 Remove Hydronic Heating System SF 669
56 Remove Curb & Gutter LF 325
57 Remove Concrete Pavement SF 252
58 Remove Asphalt Mat SF 2318
59 Milling Asphalt Mat SF 712
60 Remove Brick Pavers SF 15
61 Remove Electrical Junction Box EA 3
62 Remove Light Post and Foundation EA 3
63 Relocate Fire Hydrant EA 1
64 Remove & Salvage Sign EA 4
65 Reset Trash Bins EA 6
66 Adjust Manhole Ring and Cover EA 1
67 Unclassified Excavation (Complete In Place) CY 25
Pavement
68 Hot Mix Asphalt TON 69
69 Aggregate Base Course TON 179
Concrete
70 Concrete Sidewalk SF 700
71 Concrete Curb Ramp SF 1338
72 Concrete Valley Pan SF 381
73 Curb and Gutter Type 2 (Section II-B) LF 354
Signing, Striping, & Lighting
74 Pedestrian Light Post and Foundation EA 4
Misc.
75 Hydronic Sidewalk Heating System SF 2038
General
76 Mobilization/Demobilization (Includes payment and performance bonds) LS 1
Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) LS 1
78 Construction Surveying and Stakeout (Includes as-builts) LS 1
79 Construction Traffic Control (Includes MHTs) EA 4
80 F/A Minor Contract Revisions F A 1
Schedule 4: Alder St
Item No. Description Unit Quantity Final Quantity
Removals/Site Prep
81 Remove Sidewalk SF 1165
82 Remove Hydronic Heating System SF 375
83 Remove Curb & Gutter LF 230
84 Remove Concrete Pavement SY 65
85 Remove Asphalt Mat SF 1685
86 Milling Asphalt Mat SF 361
87 Remove Brick Pavers SF 12
88 Remove Electrical Junction Box EA 1
89 Remove Light Post and Foundation EA 1
90 Remove Trench Plate EA 1
91 Remove & Salvage Sign EA 2
92 Reset Trash Bins EA 2
93 Adjust Manhole Ring and Cover EA 1
94 Unclassified Excavation (Complete In Place) CY 25
Pavement
95 Hot Mix Asphalt TON 51
96 Aggregate Base Course TON 155
Concrete
97 Concrete Sidewalk SF 1085
98 Concrete Curb Ramp SF 559
99 Concrete Valley Pan SF 127
100 Curb and Gutter Type 2 (Section II-B) LF 237
Signing, Striping, & Lighting
101 Pedestrian Light Post and Foundation EA 3
Misc.
102 Hydronic Sidewalk Heating System SF 1644
103 Potholing Utilities EA 5
104 Combination Curb/Gutter Inlet (Single) EA 1
105 Combination Curb/Gutter Inlet (Double) EA 1
106 Concrete Flared End Section (RCAP 15" Equiv. Dia.) EA 1
107 Reinforced Concrete Arch Pipe (15" Equiv. Dia.)(Class IV) LF 112
General
108 Mobilization/Demobilization (Includes payment and performance bonds) LS 1
Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) LS 1
110 Construction Surveying and Stakeout (Includes as-builts) LS 1
111 Construction Traffic Control (Includes MHTs) EA 3
112 F/A Minor Contract Revisions F A 1
Schedule 5:W Pacific Ave & Aspen St
Item No. Description Unit Quantity Final Quantity
Removals/Site Prep
113 Remove Sidewalk SF 588
114 Remove Curb & Gutter LF 228
115 Remove Concrete Pavement SY 212
116 Remove Asphalt Mat SF 1411
117 Milling Asphalt Mat SF 282
118 Relocate Fire Hydrant EA 1
119 Remove & Salvage Sign EA 2
120 Unclassified Excavation (Complete In Place) CY 25
Pavement
121 Hot Mix Asphalt TON 34
122 Aggregate Base Course TON 100
Concrete
123 Concrete Sidewalk SF 74
124 Concrete Curb Ramp SF 701
125 Concrete Valley Pan SF 301
126 Curb and Gutter Type 2 (Section II-B) LF 253
General
127 Mobilization/Demobilization (Includes payment and performance bonds) LS 1
Erosion Control and Site Restoration (Includes SWMP, erosion control measures, inspections, and final site grading/restoration) LS 1
129 Construction Surveying and Stakeout (Includes as-builts) LS 1
130 Construction Traffic Control (Includes MHTs) EA 4
131 F/A Minor Contract Revisions F A 1
ADDENDUM NO. 02:
1. QUANTITIES FOR VARIOUS ITEMS UPDATED
PER PRE-BID MEETING DISCUSSIONS.
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING IS APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:14pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\Roadway\2304-00116_RDWY_DETAILS.dwg (6 CDOT DETAIL - CONCRETE WASHOUT & TRACKING PAD)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
C D
O T
D
ET
A
IL
C
O N
C R
ET
E
W A
SH
O
U T
T
R A
C K
IN
G
P A
D
2304-00116
04/2024
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING IS APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:14pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\Roadway\2304-00116_RDWY_DETAILS.dwg (7 CDOT DETAIL - AGGREGATE BAG)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
C D
O T
D
ET
A
IL
A
G G
R
EG
A
TE
B A
G
2304-00116
04/2024
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING IS APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:14pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\Roadway\2304-00116_RDWY_DETAILS.dwg (8 CDOT DETAIL - INLET PROTECTION)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
C D
O T
D
ET
A
IL
IN
LE
T
PR
O
TE
C
TI
O
N
2304-00116
04/2024
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING IS APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:14pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\Roadway\2304-00116_RDWY_DETAILS.dwg (9 CDOT DETAIL - CURB RAMP I)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
C D
O T
D
ET
A
IL
C
U R
B R
A M
P I
2304-00116
04/2024
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING IS APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:14pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\Roadway\2304-00116_RDWY_DETAILS.dwg (10 CDOT DETAIL - CURB RAMP II)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
C D
O T
D
ET
A
IL
C
U R
B R
A M
P
II
2304-00116
04/2024
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING IS APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:14pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\Roadway\2304-00116_RDWY_DETAILS.dwg (11 CDOT DETAIL - CURB RAMP III)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
C D
O T
D
ET
A
IL
C
U R
B R
A M
P
III
2304-00116
04/2024
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING IS APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:14pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\Roadway\2304-00116_RDWY_DETAILS.dwg (12 CDOT DETAIL - CURB RAMP IV)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
C D
O T
D
ET
A
IL
C
U R
B R
A M
P
IV
2304-00116
04/2024
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING IS APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:14pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\Roadway\2304-00116_RDWY_DETAILS.dwg (13 CDOT DETAIL - DETECTABLE WARNING SURFACE I)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
C D
O T
D
ET
A
IL
D
ET
EC
TA
B
LE
W
A R
N
IN
G S
U R
FA
C
E I
2304-00116
04/2024
JR
SAM
4/
/2
AD
D
EN
D
U M
N O
. 0 2, S
EE
S H
EE
T
FO
R
M O
D
IF
IC
AT
IO
1. DETECTABLE WARNING SURFACES ARE
SUBSIDIARY TO RELATED ITEMS OF WORK AND
SHALL NOT BE PAID FOR SEPARATELY.
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING IS APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:15pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\Roadway\2304-00116_RDWY_DETAILS.dwg (14 CDOT DETAIL - DETECTABLE WARNING SURFACE II)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
C D
O T
D
ET
A
IL
D
ET
EC
TA
B
LE
W
A R
N
IN
G S
U R
FA
C
E
II
2304-00116
04/2024
JR
SAM
4/
/2
AD
D
EN
D
U M
N O
. 0 2, S
EE
S H
EE
T
FO
R
M O
D
IF
IC
AT
IO
1. DETECTABLE WARNING SURFACES ARE
SUBSIDIARY TO RELATED ITEMS OF WORK AND
SHALL NOT BE PAID FOR SEPARATELY.
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING IS APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:15pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\Roadway\2304-00116_RDWY_DETAILS.dwg (15 CDOT DETAIL - CURB GUTTERS & SIDEWALK)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
C D
O T
D
ET
A
IL
C
U R
B , G
U
TT
ER
S, S
ID
EW
A
LK
2304-00116
04/2024
9"
6"
1'-6"
TYP.
SIDEWALK
SIDEWALK
SI
D
EW
AL
K
SI
D
EW
AL
K
CONTRACTION JOINT
AT 5' O.C., TYP..
9"
5'-6" RADIUS
PAY LI
MITS O
F
CURB R
ETUN, T
YP.
1/2" EXPANSION JOINT
AT THIS LOCATION,
AND AT 20' O.C. ALONG
SIDEWALKS, TYP.
CONCRETE CURB RETURN
FILLET, 6" THICK WITH
FIBERMESH, POUR
MONOLITHIC WITH CURB
AND GUTTER
7' -0
TY
P.
7'-0"
TYP.
5'-6" RADIUS
SCORING CURB
AND GUTTER, TYP.
CONCRETE CURB
AND GUTTER, TYP.
GREEN SPACE, TYP.
SCORING LINES, TYP.
CONC. VALLEY PAN, SEE
PLAN DRAWINGS FOR WIDTH
SEE TYPICAL
V-PAN SECTION
2" EXPANSION
JOINT MATERIAL,
TYP.
9"
6" THICK, TYP.
SCORING LINES TYP.
CONTRACTION JOINT
AT 5' O.C., TYP.
2" EXPANSION JOINT AT 20' O.C.
ALONG SIDEWALKS, TYP.
R
EF
. P
LA
N
FO
R W
ID
TH
9" T
YP
TOP BACK OF CURB
FLOWLINE OF GUTTER
EDGE OF PAVEMENT
SHEET
ISSUE DATE
DRAFTED
PROJECT NUMBER
REVIEWED
D
AT
E R
EV
IS
IO
N
N O
FOR BID - SEAL FOR THIS DRAWING IS APPLIED TO THE COVER SHEET © KLJ ENGINEERING LLC 2024 Apr 24, 2024 - 2:15pm - K:\Projects\City\CO\Telluride\2304-00116_ColoradoAveRamps\CAD\Drawings\Roadway\2304-00116_RDWY_DETAILS.dwg (16 PAVING DETAILS)
C O
LO
R
A D
O A
VE
N
U E
R A
M P
R
EP
LA
C
EM
EN
T
TO
W N
O F
TE
LL
U R
ID
E
TE
LL
U R
ID
E, C O
PA
VI
N G
D
ET
A
IL
S
2304-001…
This is the start of the file's text. The full file is on GovTribe.