This document is a Project Schedule and Summary for the 2024 Colorado Avenue Handicap Ramp Improvements project by the Town of Telluride, Colorado. The project involves removing and replacing approximately 750 square yards of 4-inch concrete, 1,300 linear feet of curb and gutter, and 160 tons of hot mix asphalt, with the goal of creating ADA-compliant curb ramps and sidewalks. The project scope includes replacing nine town-supplied lamp posts with 66-inch depth reinforced concrete bases, installing new heat coils, and working across three intersections (Pine, Willow, and Alder Streets), one mid-block crossing (Spruce Street), and an alternate intersection (Aspen Street and Pacific Avenue). Key dates include bid documents being available from April 11, 2024, with bids due on May 1, 2024, contract award on May 7, 2024, and project substantial completion targeted for November 15, 2024, with final completion by December 20, 2024.
The project involves multiple trades including concrete, asphalt, electrical, and plumbing work, with specific time constraints for different work items. For instance, Pine Street improvements must be completed by May 31, 2024, or delayed until September 23, 2024, due to restaurant parklets. Alder Street work must be completed by June 12, 2024, due to a Bluegrass Festival, and Spruce Street work must be finished by July 3, 2024, because of a Fourth of July parade. Work is generally restricted on weekends and during the high tourism period of Mid-June to Mid-September, with Public Works' approval required for working on more than one intersection simultaneously. Contract documents can be obtained from Telluride's Public Works Department or by emailing togren@telluride-co.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Documents – Page 1
PROJECT SCHEDULE & SUMMARY
2024 Colorado Avenue Handicap Ramp Improvements
Schedule:
Bid Documents Available: Thursday, April 11, 2024
Pre-Bid Meeting (Optional): Monday, April 15 at 2 pm (virtual and in-person at 1370 Black Bear Rd.)
Final Addenda Issuance: Wednesday, April 24, 3 PM (MST), 2024
Bids Due: Wednesday, May 1, 3 PM (MST), 2024
Award Contract: Tuesday, May 7, 2024
Contract Signed: Tuesday, May 14, 2024
Notice to Proceed: Contingent on Submittals and Temporary Traffic Control Inspection
Substantial Completion: Friday, November 15, 2024
Final Completion: Friday, December 20, 2024
Final Invoice Deadline: Tuesday, December 31, 2024
Project Description:
Removal and replacement of approximately 750 SY of 4-inch concrete, 1,300 LF of curb and gutter, and 160 TONS of hot mix asphalt (HMA). Formation of curb ramps and sidewalk to be compliant with Americans with Disability Act (ADA) and CDOT standards. Project also involves the removal and replacement of approximately nine (9) Town supplied lamp posts. Lamp posts require a 66-inch depth reinforced concrete base to be built by the contractor. Project involves placement of new heat coils and connections to existing heat coils within areas of heated sidewalk. Project involves the following trades: concrete, asphalt, electrical, and plumbing. Project involves three (3) intersections (Pine St., Willow St., Alder St.), one (1) mid-block crossing (Spruce St.), and one (1) add alternate intersection (Aspen St. & Pacific Ave.).
Construction Sequencing Priorities:
Work Item #1: Pine St. Pine Street Northwest and Southeast intersection improvements have the following time constraints due to restaurant parklets:
• Complete by May 31, 2024 OR
• Begin no earlier than September 23, 2024
Work Item #4: Alder St. Alder Street improvements have the following time constraint due to Bluegrass Festival:
• Complete by June 12, 2024
Work Item #3: Spruce St (mid-block crossing). Spruce Street work must be completed within the following time constraint due to Fourth of July parade:
• Complete by July 3, 2024
All locations will require an approved traffic control plan. See plan set for a general temporary traffic control plan.
Work shall generally not be permitted on the weekends without Public Works’ prior approval. In general, with high tourism and festivals Mid-June to Mid-September, Public Works’ approval is required for work beyond one intersection at a time (excluding Aspen St. and Pacific Ave. Add Alternate).
Copies of the Contract Documents, complete with Construction Specifications and schematic drawings, are available at
Telluride’s Public Works Department, 1370 Black Bear Road, Telluride, Colorado 81435, or a copy can be requested by emailing togren@telluride-co.gov.
togren Cloud+ togren Cloud+ Addendum No. 1 togren Cloud+ togren Cloud+ Addendum No. 1 togren Cloud+ togren Cloud+ Addendum No. 1
File details come from the government source that posted it. Updated .