The file is a Bid Schedule Excel spreadsheet for the Tonopah Office Parking Lot Gates Replacement project solicited by the Department of the Interior Bureau of Land Management Nevada Region under Solicitation Number 140L3925Q0045. The bid schedule outlines three primary components: a base option for a vehicle gate and two optional pedestrian gates (North and South), with detailed line items for materials, installation, and system integration.
The bid schedule breaks down costs for gate materials, including operators, heaters, batteries, safety devices, and card readers, with line items for mobilization, trenching, electrical connections, and system integration with the existing Physical Access Control (PAC) system. Each gate option includes separate pricing for materials, installation, and electronic system connections. However, the current document shows placeholder pricing of $0.00 for all line items, suggesting this is a preliminary or template pricing document prepared for the solicitation process.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3925Q0045_Amd_0001.pdf | ||
| Questions___Answers_0001.docx | DOCX document | |
| Sol_140L3925Q0045.pdf | ||
| A06_Drawings.pdf | ||
| A06_Specifications.pdf | ||
| B03_DBA_Wage_Determination.pdf | ||
| A04_SOW.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Estimate Bid Schedule for Tonopah Office Parking Lot Gates Replacement
| Item Number | Item Description | Measurement Unit | Quantities | Price Per Unit ($) | Total ($) |
| Base Option: Vehicle Gate | |||||
| 1 | Mob and Demo of crew to the site (from Las Vegas or Reno) | L.S. | 1 | $0 | |
| 2 | Gate including the operator, heater, batteries, safety devices, Card Reader, etc. (materials) | L.S. | 1 | $0 | |
| 3 | Trenching for electrical conduits and electronic (Connect to existing PAC system) | Hours | $0 | ||
| 4 | Backfilling after trenching and paving for loops | L.S. | 1 | $0.00 | |
| 5 | Installing the gate and operator and ID card Reader, and loops | Hours | $0.00 | ||
| 7 | Connection of electrical and PAC system | Hours | $0.00 | ||
| Base Subtotal | $0.00 |
| Option 1: North Pedestrian Gate | ||||
| 1 | Gate including locks, Card Reader, batteries, etc. (materials) | L.S. | 1 | $0.00 |
| 2 | Gate installation & Electrical connection | Hours | $0.00 | |
| 3 | ID reader connection to existing system | Hours | $0.00 | |
| Option 1 Subtotal | $0.00 |
| Option 2: South Pedestrian Gate | ||||
| 1 | Gate including locks, Card Reader, batteries, etc. (materials) | L.S. | 1 | $0.00 |
| 2 | Gate installation & Electrical connection | Hours | $0.00 | |
| 3 | ID reader connection to existing system (hours) | Hours | $0.00 |
| Option 2 Subtotal | $0.00 |
| Total | $0 |