B03_DBA_Wage_Determination.pdf
PDF 2 MB Posted
- Attached to
- Tonopah Fence Gates Replacement Federal contract opportunity
- Solicitation number
- 140L3925Q0045
About this file
This document is a Davis-Bacon wage determination for heavy construction projects in Nye County, Nevada, effective 02/14/2025. The wage determination specifies hourly rates and fringe benefits for multiple construction-related job classifications, including carpenters ($53.66/hour), line construction workers (linemen at $70.16/hour), power equipment operators across various equipment groups (ranging from $42.72 to $52.35/hour), ironworkers ($50.70 for reinforcing, $46.20 for structural), and laborers ($33.95 to $34.45/hour).
The document provides detailed wage rates for different equipment and job types, with specific notes about applicability under Executive Orders 14026 and 13658, which establish minimum wage requirements for federal contractors. It includes provisions for wage adjustments based on contract entry dates and clarifies that these rates apply to heavy construction projects in Nye County, specifically excluding Nevada Test Site, Tonopah Test Range, and National Test and Training Range. The wage determination also outlines a process for wage determination appeals and provides guidance on how rates are determined and updated.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L3925Q0045_Amd_0001.pdf | ||
| Questions___Answers_0001.docx | DOCX document | |
| Sol_140L3925Q0045.pdf | ||
| A06_Drawings.pdf | ||
| A06_Specifications.pdf | ||
| Bid_Schedule.xlsx | XLSX spreadsheet | |
| A04_SOW.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .