Bid_25-14._Addendum_6.pdf

PDF 529 KB Posted

Attached to
East Palatka Septic to Sewer Project - Phase IV
Solicitation number
Bid 25-14
Issued by
Polk County, Florida

About this file

This document is Addendum 6 for Bid 25-14, issued by the Putnam County Procurement Department for the East Palatka Septic to Sewer Project - Phase IV. The addendum provides clarifications and responses to technical questions regarding the project, including details about groundwater discharge, electrical services, water supply, and installation specifications. Key points include guidance on discharging groundwater adjacent to the lift station site, recommendations for a temporary sediment basin, verification of FDOT right-of-way boundaries, water service coordination from the Fire Station, and electrical service connection details.

The addendum addresses multiple technical aspects of the project, such as allowing alternative grinder pumps (Barnes ZOGP series), confirming abandonment of existing drainfields in place, and specifying electrical feed requirements from residential service connections. Additional clarifications include confirming that residential pump stations will be owned and maintained by the County, allowing directional boring for forcemain piping at the contractor's option, and confirming that contractors are not responsible for tying into or abandoning additional grey water tanks. The document provides specific technical guidance to ensure contractors understand the precise requirements and expectations for the infrastructure project.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .