Addendum 6 for Bid 25-14 is issued by the Putnam County Procurement Department for the East Palatka Septic to Sewer Project - Phase IV, dated April 28, 2025. The addendum provides clarifications and additional details for bidders, addressing specific technical and logistical aspects of the project including groundwater discharge procedures, electrical service connections, water service for the master lift station, and installation specifications for pump stations and piping.

Key clarifications include confirmation that groundwater will be discharged adjacent to the lift station site with filtration through a temporary sediment basin, water for the lift station will be supplied from the Fire Station, and residential pump stations will be owned and maintained by the County. The addendum also specifies electrical requirements, such as meeting NFPA 70 standards, allows for alternative grinder pumps like the Barnes ZOGP series, confirms existing drainfields will be abandoned in place, and clarifies that electrical feeds will come from the service to each residence. Additionally, the contractor is not responsible for tying into or abandoning any additional greywater tanks found on private property.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .