Bid_25-14._Addenda_7.pdf

PDF 425 KB Posted

Attached to
East Palatka Septic to Sewer Project - Phase IV
Solicitation number
Bid 25-14
Issued by
Polk County, Florida

About this file

This document is Addendum 7 for Bid 25-14, issued by the Putnam County Procurement Department for the East Palatka Septic to Sewer Project - Phase IV. The addendum addresses several key questions and clarifications for potential bidders, including water service for the lift station, transformer placement and coordination with FPL, generator installation, and pump manufacturer specifications. Specifically, Putnam County Public Works will coordinate water service from the adjacent Fire Station, FPL will supply the transformer, and the contractor will need to coordinate installation. No generator will be installed with this current project, and only Flygt/Xylem for the master lift station and E/One and Barnes for grinder pumps are approved pump manufacturers.

The addendum provides technical details about project requirements, noting that there is no specific electrical supplier list, the ATS (Automatic Transfer Switch) is not part of this project, and will be installed in the future with a generator. Gas for the generator will be arranged separately when it is installed. Pump lead sizes will be determined by the manufacturer and depend on the options ordered. The document emphasizes that the contractor will not be required to install the generator or remote stop at this time, and various technical coordination efforts will be needed with different utility and service providers to complete the project successfully.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .