This document is a Response to Clarifying Questions #4 for BID 2026-78, issued by Clackamas County Water Environment Services on behalf of the Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements project in Oregon City, Oregon. The clarifying questions address technical specifications and construction logistics for the aeration basin refurbishment work. Key topics covered include manufacturer information for existing fabricated slide gates (which is unavailable as the equipment was installed circa 1983), contractor responsibility for determining crane placement and equipment movement methods around the aeration basins with guidance on feasible locations including the driveway south of Aeration Basin 4 and areas near the Blower Building, specifications for Davit Crane base plates (DBI Sala Model 8516563, Center Mount Sleeve, Stainless Steel Base) and handrail modifications, reconnection procedures for the 10-inch ALP elbow in Zone 2 requiring cutting, rotating, and re-welding with flanged vertical connections to match other zones, and sun shield requirements for outdoor-mounted instruments and panels including flow transmitters FIT-3274 and FIT-3275 and thermal mass flow meters. The response confirms that pressure gauges mounted on manifolds do not require sun shields and indicates that selected contractors will receive access to historical drawings from previous basin improvements conducted in 1983, 2001, and 2012.

The document provides technical clarifications necessary for bidders to prepare accurate proposals and indicates that the owner has identified multiple feasible construction methodologies and site access options to accommodate the contractor's equipment and staging needs. No pricing information, set-asides, incumbent data, or funding details are contained in this clarifying questions response document, which serves solely to address technical ambiguities and design specifications raised by interested firms during the pre-bid period.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID #2026-78

Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements (“BID”)

RESPONSE TO CLARIFYING QUESTIONS #4

November 16, 2026

Note that these are questions submitted by interested firms to the above referenced solicitation.

The below answers are for clarification purposes only and in no way alter or amend the BID as published.

1. Section 35 20 16.25 Fabricated Slide Gates: Please provide the manufacturer name(s) and serial number(s) for the existing basin side wall slide gates and existing channel flow isolation gate.

Answer: Manufacturer or model information on the existing slide gates is not available; they were installed when the plant was built, around 1983, and Owner is not able to provide any submittal or other supporting documentation.

2. DWG 005-C-1000 SHEET 16 Overall Site Plan, Access, and Staging: Please provide an acceptable area for the Contractor to set up a crane for lifting the materials in to and out of the work areas.

Answer: Contractor must determine the means and methods for lifting and handling large equipment into and around the aeration basins. Owner identifies several feasible options. For items that need to be lowered down to the basement-level pipe galleries, Owner's access hatches and permanently installed overhead cranes can be used to lower equipment down to this level, but Contractor is responsible for other moving equipment. Crane access around the aeration basins is possible and has been used in the past. Large cranes can be set up at several locations in a manner that does not exceed load limits or hinder regular traffic. The driveway South of Aeration Basin 4, between that basin and the neighboring MBR building can be used. To access the North end of the Aeration Basins Structure (Aeration Basin #1), some vehicles smaller than a full-size crane can be driven all the way up to Aeration Basin 1 in the space immediately East of the Blower Building. Vehicle access is feasible between that building and an existing fuel storage canopy, where the car is parked in the photo below:

3. Section 01 11 00 1.01 3. e. 5); DWG 320-S-1010 SHEET 37 Structural Top of Basins Overall:

Please provide specifications/details for the Davit Crane base plates and handrail modifications at the Davit Crane locations in Aeration Basins 1, 2, 3, and 4.

Answer: The davit bases will be DBI Sala Model 8516563, Center Mount Sleeve, Stainless Steel Base. A handrail detail has been added. See attached drawing 900-S-5001. (Addendum 2)

4. DWG 320-D-5001 SHEET 55 Process Mechanical ALP Control Manifolds Details: Please confirm how the elbow below the 10” ALP in the ALP Flow Meter Manifold Detail for Zone 2 is to be connected to an existing pipe that is stubbed out of the wall; there is no flange connection or weld symbol shown.

Answer: The existing 10” ALP elbows in Zones 2 will need to be cut, rotated and re-weld with the flanged connection in the vertical such that Zone 2 matches the ALP piping configuration of Zones 3 thru 5. See demo sheet 320-DX-3001 Section A Sheet Keynote 2. The following marked up photos highlight what is being directed on the demo sheet:

5. DWG 900-N-5001 SHEET 75 Instrumentation and Control 4091-384 Note 1 “ALL

INSTRUMENTSAND PANELS LOCATED OUTDOORS SHALL HAVE A SUN SHIELD, SEE

4091-382.”: Please confirm whether instruments directly mounted on the manifolds require sun shields/shades or just case mounted instruments at four locations shown on DWG 320-D-1000 SHEET 42 per Section 40 90 00 Supplement 2.

Answer: Instruments and panels installed outdoors shall be provided with sun shields as indicated on Detail 4091-382 and Section 40 90 00 Supplement 2. Specifically, flow transmitters FIT-3274 and FIT-3275 are mounted outdoors per Detail 4091-382 and therefore require sun shields. The ACP and RIO panels identified in Supplement 2 likewise require sun shields. In addition, Thermal Mass Flow Meters (F51) shall be furnished with the manufacturer's standard sun shields in accordance with Section 40 91 00 2.06, Paragraph C. Pressure gauges mounted on the manifolds are not required to be provided with sun shields.

6. Can you please provide the Aeration Basin As-built drawings.

Answer: Aeration Basins 1 through 4 have undergone several significant improvements in their lifetime, notably around the years 1983, 2001, and 2012. Drawings and records from these past projects were used by the Engineer to form the current bid documents. Selected Contractor will be given access to historical drawings to perform the Work of this Project.

Attachments: Updated 900-S-5001

End of Clarifying Questions #4

FILENAME: PLOT DATE: PLOT TIME:13-NOV-2026 12:43

T H

IS

D

O C

U M

E N

T

A N

D T

H E I

D E

A S A

N D D

E S

IG

N S I

N C

O R

P O

R A

T E

D H

E R

E

IN

A S A

N I

N S

T R

U M

E N

T O

F P

R O

F E

S S

IO

N A

L S

E R

V

IC

E

IS

T

H E P

R O

P E

R T

Y O

F R

E U

S E O

F D

O C

U M

E N

T S

1 2 3 4 5 6

B

C

D

VERIFY SCALE

BAR IS ONE INCH ON

ORIGINAL DRAWING.

1"0 c

PROJ

DATE

D A

T E

N O

D S

G N

D R

R E

V

IS

IO

N

C H

K

A P

V D

B Y

A P

V D

SHEET

DWG

A

A E

R A

T

IO

N B

A S

IN

I

M P

R O

V E

M E

N T P

R O J E

C T

T R I-

C

IT

Y W

A T

E R R

E S

O U

R C

E R

E C

O V

E R

Y F

A C

IL

IT

Y

C L

A C

K A

M A

S W

A T

E R E

N V

IR

O N

M E

N T S

E R

V

IC

E S

O R

E G

O N C

IT

Y

O R

E G

O N

J A

C O

B S A

N D I S N

O T T

O B

E U

S E

D

IN

W

H O

L E O

R I

N P

A R

T F

O R A

N Y O

T H

E R P

R O J E

C T W

IT

H

O U

T T

H E W

R

IT

T E

N A

U T

H O

R

IZ

A T

IO

N O

F J

A C

O B

S

J A

C O

B S

A

L L R

IG

H T S R

E S

E R

V E

D

D

E S

IG

N S

U B

M

IT

T A

L

SEPTEMBER 2026

D3900000

900-S-5001_D3900000.dgn

900-S-5001

L S

C O

G G

IN

S H J

O C

H

IM

S E

N

F

IR

H

S

R U

C T

U R

L

S

A N

D A

R D D

E T

A

IL

S

T D

Y E

0552-041

RAILING WELDED CONNECTION - STEEL

NTS

CJP

TYP

3/16

(1/4)

TYP

PICKET POST ANCHORAGE

PLAN

(MECHANICAL)

3 1/4" EMBED

(ADHESIVE)

4" EMBED

ELEVATION

/2

TYP

2 1/4"2 1/4"1 1/4"

3/4" RADIUS, TYP

CL POST & RAIL

ANCHORS

CONCRETE

4 - 1/2" DIA

7"

GROUT

1/2" MIN - 3/4" MAX

5/8" STEEL PLATE

B. POST: 0.200 INCH, MINIMUM

A. RAIL: 0.145 INCH, MINIMUM

WALL THICKNESS:3.

OUTSIDE DIAMETER 1.90 INCH2.

ASTM A500/A500M GRADE B OR C

HOT-DIP GALVANIZED, CARBON STEEL, 1.

PIPE RAILING/POSTS:

3/16

MATCH EXISTING

PICKETS TO

POST ANCHORAGE