About this file
This is a clarifying questions and answers document for Invitation to Bid #2026-78 issued by Clackamas County Water Environment Services for the Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements project. The bid solicitation addresses refurbishment of four conventional activated-sludge aeration basins, including basin cleaning, structural repairs, replacement of air flow control assemblies, diffuser membrane heads in three basins, valves, access hatches, and SCADA system upgrades. The project is divided into two phases with Aeration Basins 1 and 2 required to reach substantial completion by September 30, 2027, and Aeration Basins 3 and 4 by September 30, 2028. The bid due date was originally set for a specific date but was extended by one week per Addendum #1 as confirmed in these clarifying questions. A mandatory pre-bid conference was held on October 21, 2026, and the overall contract must be completed within 700 calendar days from Notice to Proceed, which is estimated around mid-December 2028. The project engineer's estimate is $3.7 million.
The document clarifies that bidders must define their own divisions of work and conduct Good Faith Effort outreach to at least three State of Oregon-certified or self-identified Minority, Women, and Emerging Small Businesses (M/W/ESB) subcontractors for each division of work to be subcontracted, with documentation required within two hours of bid closing. HDPE diffuser membranes must be furnished and installed by the contractor for Basins 1, 3, and 4, while Basin 2 diffuser membranes were recently replaced and should not be replaced by the contractor; damaged PVC diffuser housing should be reported to the owner for replacement. The fixed milestone dates of September 30, 2027 and September 30, 2028 are not adjusted based on the Notice to Proceed date. Liquidated damages of $2,290 per day apply for missed milestone or substantial completion dates. All bidders must be registered with the Oregon Construction Contractors Board and provide CCB registration numbers with their bids, and bid security of 10% of the total bid amount is required along with 100% performance and payment bonds within twenty calendar days of contract acceptance.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID #2026-78
Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements (“BID”)
RESPONSE TO CLARIFYING QUESTIONS #1
October 26, 2026
Note that these are questions submitted by interested firms to the above referenced solicitation.
The below answers are for clarification purposes only and in no way alter or amend the BID as published.
1. Has the County identified specific Divisions of Work for Good Faith Effort (GFE) solicitations on this project, or should Bidders select these divisions themselves?
Categories such as concrete work, hauling, and flagging used to be listed in the specifications of past Clackamas WES projects.
Answer: The County has not designated specific Divisions of Work for Good Faith Effort (GFE) outreach on this project. Bidders define their own Divisions of Work based on how they intend to subcontract the project.
Per Section 1, Good Faith Effort, of the Instructions to Bidders, GFE requires the Bidder to contact at least three Historically Underrepresented Business subcontractors (State of Oregon-certified or self-identified MBE/WBE/ESB, or firms with equivalent federal or other-state certification) for each division of work that will be subcontracted out. If fewer than three such firms are reasonably available for a Division of Work, the Bidder must document why on Form 2. Outreach should give subcontractors at least 5 calendar days to respond.
Any Division of Work the Bidder will self-perform must be listed in the “Prime Self- Performing” section of Form 1, and GFE outreach is not required for those Divisions.
The examples on the forms (“painting, electrical, landscaping, etc.”) are only illustrations. They are not a required list.
2. Are the diffusers pre-purchased by the owner or are they to be supplied by the contractor?
Answer: HDPE diffuser membranes are to be furnished and installed by Contractor for Basins number 1, 3, and 4. Diffuser membranes in Basin number 2 have recently been replaced and should neither be furnished nor installed by the Contractor. See notes on process mechanical sheets for more information on diffuser membranes.
Specification 01 11 00 – Summary of Work discusses diffuser replacement within Section 1.01.A.3.a.2. In this subsection, remove the sentence, “(Contractor to replace damaged diffusers with Owner provided replacements)”. Replace this sentence with “(Contractor to replace damaged PVC diffuser housing with Owner-provided replacements)”. Contractor shall notify owner of damaged PVC diffuser housings. Owner will furnish replacement diffuser housing units as needed.
3. Due to current bid activity, would it be possible to extend the due date for this Bid by one week?
Answer: Yes. See Addendum #1
4. The Invitation to Bid (ITB) gives 700 calendar days for completion, but the Spec has specific milestone dates. Will the milestone dates be adjusted to accommodate the 700 calendar days?
Answer: No, the milestone dates of September 30th, 2027 and September 30th, 2028 are fixed and not dependent on the Notice to Proceed date. 700 calendar days after Notice to Proceed will be a day that comes after both milestones and is currently estimated around mid-December 2028.
End of Clarifying Questions #1