BID 2026-78 Clarifying Questions 2.pdf

PDF 137 KB Posted

Attached to
BID 2026-78 Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements
Solicitation number
S-C01010-00018145
Issued by
Clackamas County, Oregon

About this file

This document is a Response to Clarifying Questions #2 for BID 2026-78, issued by Clackamas County on behalf of Water Environment Services for the Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements project. The clarification addresses four key technical questions submitted by interested bidding firms regarding coating systems, existing coating repairs, new valve finishes, and refurbishment requirements for existing valves and slide gates. The responses clarify that System No. 4 coating applies to exposed metal RAS piping in the gallery (not System No. 2 for submerged metal), that coating repairs within 24 inches of replaced valves should be estimated at 5% of valve flanges in the basement-level gallery and 5% of 400 linear feet of existing W5 flush water piping per basin, that plug valves in submerged applications require a second epoxy coating field application to achieve the specified 16-mil System No. 2 requirement, and that existing valves and slide gates require only touch-up painting to damaged areas rather than full repainting. These clarifications are provided for guidance only and do not alter the original bid documents or specifications. Bidders are advised to reference the Piping Schedule and project drawings (Sheets 320-D-1031, 320-D-1032, 320-D-3002, and 001-G-0090) in conjunction with these answers when preparing their bids for submission by the November 10, 2026 deadline.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INVITATION TO BID #2026-78

Tri-City Water Resource Recovery Facility (WRRF) Aeration Basin Improvements (“BID”)

RESPONSE TO CLARIFYING QUESTIONS #2

November 5, 2026

Note that these are questions submitted by interested firms to the above referenced solicitation.

The below answers are for clarification purposes only and in no way alter or amend the BID as published.

1. Gallery coating system: General Note 2 on 320-D-1031 calls for System 2, while 320-D- 1032 and the interior RAS piping schedule on 001-G-0090 indicate System 4. Please confirm which system applies to the gallery repairs.

Answer: The RAS piping in the Gallery is exposed metal, which per the Piping Schedule requires System no. 4. System No. 2 is for Submerged Metal piping. Please follow the Piping Schedule which matches the coating systems to the conditions, in this case System No. 4. 320-D-1031 will be corrected to note System 4.

2. Existing coating repairs: Sheets 320-D-1031, 320-D-1032, and 320-D-3002 require repairs to existing pipe and flange coatings around the valve work. Please define the repair limits and estimated quantities. If these cannot be established before bidding, would an allowance reconciled on agreed time-and-material rates be acceptable?

Answer: For all coating repairs: Notify Engineer of all coating damage prior to repair.

In basement-level pipe gallery (pertaining to Sheets 320-D-1031 and 320-D-1032):

coating repairs shall be made when damage is within 24 inches of the valve being replaced. Bidders should estimate that 5% of all valve flanges will have small sections of pipe within this 24-inch limit requiring coating repairs.

For W5 Flush Water piping in all four basins (pertaining to Sheet 320-D-3002): Bidder should estimate that, in addition to 5W valves called out for replacement, each basin contains 400 linear feet of existing 5W piping to remain. Coating repairs should be made on piping-to-remain where coating is damaged. Bidders should assume 5% of the total length will require coating repair (400 linear feet/basin * 4 basins * 5% repair needs = 80 linear feet total).

3. New valve finishes: Section 40 27 02 specifies factory epoxy finishes for the plug valves, including a minimum 7-mil thickness under §2.04.B. System 2 requires 16 mils total, and §3.02 references field finishing. Please confirm whether the new valves will be supplied with the complete specified coating system, leaving field touch-ups only, or whether additional field coats are required.

Answer: The Plug Valve specification is for plug valves in multiple locations. In the case of the Flush plug valves, which are submerged, the valves will need a second epoxy coating once installed in order to comply with coating System No. 2. This second epoxy coating can be done at the same time as the coating repair work on the related pipe and flanges.

4. Please confirm whether the existing valves and slide gates being refurbished require full repainting or touch-ups to damaged areas only

Answer: Touch-up to damaged areas will suffice.