BI-2B-483-CA 1200.1 ADDENDUM 1 06.15.2026.pdf
PDF 113 KB Posted
- Solicitation number
- BI-2B-483 CA
- Issued by
- Hartford County, Connecticut
About this file
This is an Addendum to the Request for Qualifications for Construction Administrator Services issued by the Connecticut Department of Administrative Services (DAS) Construction Services for the Office of the Chief Medical Examiner (OCME) Building Expansion & Renovation project located at 11 Shuttle Road, Farmington, Connecticut. Addendum No. 1, dated June 15, 2026, clarifies two key aspects of the Construction Administrator (CA) role and modifies the original RFQ requirements. The original QBS Submittal Booklet due date remains Monday, June 22, 2026, at 3:00 PM. The addendum specifies that the CA will not be required to perform a Prevailing Labor Agreement (PLA) needs assessment or study to determine PLA requirements, eliminating a previously described task. Additionally, regarding the CA's responsibility for managing claims and disputes during the Construction phase, the addendum references the 0600 Construction Administration Procedures Manual (CAPM) and Article 38 of the General Conditions for the Construction Manager/General Contractor (CMR), establishing the framework for how the CA should handle disputes between the CMR and subcontractors, various project teams, and the Owner.
No changes to pricing terms, set-asides, funding sources, or contract award conditions are addressed in this addendum. The clarifications provided serve to refine the scope and expectations of Construction Administrator Services without modifying the qualifications-based selection process, submission requirements, or evaluation criteria outlined in the original RFQ. Questions regarding this addendum should be directed to DAS.CS.RFQ@ct.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Connecticut Department of
Administrative Services 1200.1
Addendum
Addendum No.: 1 Date of Addendum: June 15, 2026
CT DAS 1200.1 (Rev. 03.11.2026) 1200 Consultant Selection Forms
Connecticut Department of Administrative Services, Construction Services
Office of Legal Affairs, Policy, & Procurement 450 Columbus Boulevard, Suite 1302, Hartford, Connecticut 06103
Consultant Services Addendum For:
Contract Number: BI-2B-483-CA
Project Title: OCME Building Expansion & Renovation Project Location: 11 Shuttle Road, Farmington, CT 06032
Original QBS Submittal Booklet Due Date / Time:
Monday, June 22, 2026 / 3:00 PM
Previous Addenda: NONE To Firms: This Addendum forms part of the QBS Documents and modifies or clarifies the original RFQ
Web Advertisement for this Project.
The following clarifications are applicable to the RFQ Web Advertisement for the Project referenced above.
Contact For Questions: Email: DAS.CS.RFQ@ct.gov
Addendum Item No. 1:
• QUESTION: During the Preconstruction phase, please clarify the role of the CA in “performing a PLA needs assessment/study to determine the requirement of a PLA”. Is the assessment a comparison between a PLA and a traditional trades bidding process? Is the CA to include the services of a consultant for this task?
• RESPONSE: The CA will not be required to perform a PLA needs assessment/study.
Addendum Item No. 2:
• QUESTION: During the Construction phase, please clarify the role of the CA in “managing all claims and disputes”.
Are these claims and disputes between the CMR and subcontractors or between various project teams and the Owner, or other types of claims and disputes? Will the CA act as a facilitator to these disputes or will the CA need legal and contractual assistance in managing this process?
• RESPONSE: Regarding “managing all claims and disputes”, refer to the 0600 Construction Administration Procedures Manual (CAPM) including but not limited to section 2.4.10. The CAPM is a critical document for use in determining expectations, in conjunction with other relevant project documents such as Article 38 of the General Conditions [for CMR] which is referenced in the CAPM.
End of Addendum No.: 1 cc: DAS Deputy Commissioner: D. Hobbs DAS/CS ADPM for Project: P. Austin DAS/CS Agency Legal Director: J. Padula DAS/CS Project Manager: S. Westerberg DAS/CS Chief Architect: D. Barkin DAS/CS Panel Member: N. Zalewski DAS/CS Director of Project Management: P. Simmons Agency Panel Member: J. Gill DAS/CS Director of Support Services: C. Russell File: BI-2B-483-CA DAS/CS QBS Unit: R. Cutler / G. Fehrs / T. Wargo DAS/CS Legal Affairs: R. Tamborra / A. Buzzard / C. Phelps / T. Keating Observers and Others: H. Docouto / M. DeJoseph / L.D. Gordon mailto:DAS.CS.RFQ@ct.gov