03. AE Des Grp OCME 2020.2021 Study.pdf
PDF 2 MB Posted
- Solicitation number
- BI-2B-483 CA
- Issued by
- Hartford County, Connecticut
About this file
This document consists of architectural design drawings and a schematic cost estimate for the Connecticut Office of Chief Medical Examiner (OCME) expansion and renovation project located at 11 Shuttle Road, Farmington, Connecticut, prepared by AE Design Group, LLC. The project, identified as BI-2B-471, includes a two-story building addition of approximately 5,728 square feet and comprehensive renovation of the existing 31,800 square-foot facility. The design features a new building addition containing specialized spaces such as a main autopsy suite (2,942 SF), radiology suite (656 SF), organ donor laboratory (512 SF), refrigerated storage (1,320 SF), and supporting facilities including locker rooms, restrooms, and mechanical spaces. The renovation encompasses all three floors of the existing building, with the second floor designed for administrative and office functions (approximately 2,858 SF of office space) and the third floor allocated to laboratory spaces including anthropology, medical records, and histology departments. The site plan indicates provisions for parking modifications, new paving, generator placement, and dual chiller systems. The drawings, dated January 4, 2021, provide detailed floor plans, elevation views, and construction specifications for all building systems and finishes.
The order of magnitude estimate prepared by D.H. Bolton, Inc. as of December 30, 2020, projects total building construction costs of approximately $15.5 million for fiscal year 2021, escalating to approximately $17.7 million by fiscal year 2025 based on assumed inflation rates of 3 to 6 percent annually. The direct cost of construction is estimated at $8.3 million, with additional allocations for general requirements, contingencies, equipment allowances, and phasing logistics totaling approximately $7.2 million. The estimate includes Connecticut prevailing wage labor costs and excludes design contingency, lab and autopsy equipment costs (with a $1 million reference allowance), and builder's risk insurance. Key cost components include substructure ($246,102), shell construction ($892,530), interiors ($2,019,027), and MEP/fire protection systems ($4,247,356). The estimate assumes commercial-grade materials throughout, new fire protection systems per NFPA 13, LED lighting upgrades for existing and new areas, and a façade repair allowance of $20,000 for investigation and remediation of existing precast stone panels on the east elevation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATE OF CONNECTICUT
DEPARTMENT OF ADMINISTRATIVE SERVICES
450 COLUMBUS BOULEVARD
HARTFORD, CT 06103
JOSH GEBALLE, COMMISSIONER
CONNECTICUT OFFICE OF CHIEF MEDICAL EXAMINER
OCME FORMULATION STUDY
11 SHUTTLE ROAD
FARMINGTON, CT 06032
PROJECT #: BI-2B-471
OCME FORMULATION DRAWINGS
JANUARY 4, 2021
AE DESIGN GROUP, LLC
40 NORTH MAIN STREET
SOUTHINGTON, CT 06489
860-621-9348
ARCHITECT:
LIST OF DRAWINGS:
COVER SHEET
SITE PLAN
FIRST FLOOR PLAN
SECOND FLOOR PLAN
THIRD FLOOR PLAN
EXTERIOR ELEVATION
OCME FORMULATION STUDY
11 SHUTTLE ROAD
FARMINGTON, CT 06032
PROJECT #: BI-2B-471
CONNECTICUT OFFICE OF CHIEF MEDICAL EXAMINER
SITE PLAN
JANUARY 4, 2021
AE DESIGN GROUP, LLC
40 NORTH MAIN STREET
SOUTHINGTON, CT 06489
860-621-9348
AutoCAD SHX Text
SHUTTLE ROAD
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
OFFICE OF CHIEF MEDICAL EXAMINER
AutoCAD SHX Text
EXISTING GARAGE
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
HANDICAP PARKING
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
ADDITION TOTAL AREA - 5,728 SF
AutoCAD SHX Text
20 FT BOX TRUCK
AutoCAD SHX Text
20 FT BOX TRUCK
AutoCAD SHX Text
GEN
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text S1
AutoCAD SHX Text S2
AutoCAD SHX Text S4
AutoCAD SHX Text S3
AutoCAD SHX Text
EXISTING PAVING
AutoCAD SHX Text
NEW PAVING
AutoCAD SHX Text
SITE PLAN KEYNOTES
AutoCAD SHX Text
MODIFY DRIVEWAY / PARKING BITUMINOUS PAVING.
AutoCAD SHX Text S1
AutoCAD SHX Text
AutoCAD SHX Text S2
AutoCAD SHX Text
PROVIDE FILL WHERE NEW PAVING IS TO BE INSTALLED.
AutoCAD SHX Text REMOVE PAVING AND EARTH AT NEW BUILDING LOCATION FOR NEW SLAB-ON-GRADE AND FOUNDATION WALLS. FOUNDATION WALLS SHALL EXTEND A MIN. OF 4'-0" BELOW GRADE.
AutoCAD SHX Text S4
AutoCAD SHX Text
PROVIDE NEW PAVING IN AREA INDICATED.
AutoCAD SHX Text S3
AutoCAD SHX Text
GENERAL SITE RENOVATION NOTES
AutoCAD SHX Text
1. PROVIDE NEW GENERATOR FOR ENTIRE BUILDING UPGRADE. PROVIDE NEW GENERATOR FOR ENTIRE BUILDING UPGRADE. GENERATOR SIZING SHALL BE DETERMINED FOR BACKUP POWER FOR ALL LIFE SAFETY COMPONENTS, EMERGENCY LIGHTING THROUGHOUT, ALL LAB SPACE POWER, AUTOPSY SUITE, RADIOLOGY SUITE, REFRIGERATOR STORAGE AND SELECT OFFICE POWER. 2. NEW CHILLER AND BOILER SHALL BE PROVIDED FOR NEW CHILLER AND BOILER SHALL BE PROVIDED FOR EXISTING AND NEW BUILDING. 3. NEW AIR HANDLERS SHALL BE PROVIDED FOR ENTIRE NEW AIR HANDLERS SHALL BE PROVIDED FOR ENTIRE FACILITY. MULTIPLE AIR UNITS SHALL BE PROVIDED FOR THE FOLLOWING (MINIMUM ZONING): AUTOPSY SUITE RADIOLOGY SUITE EXISTING AND NEW LABORATORY ROOMS OFFICE, CUBICLE, ADMIN, CONFERENCE SPACES
AutoCAD SHX Text 0'
AutoCAD SHX Text 5'
AutoCAD SHX Text 10'
AutoCAD SHX Text 20'
AutoCAD SHX Text 40'
AutoCAD SHX Text
SCALE : 1"=20'-0"
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PLAN
EVIDENCE
STORAGE
MAINTENACE MECHANICAL
IDENTIFICATION
VIEWING
ELEV
JAN.
ELEV
MACH
ROOM
LAV
REFRIGERATOR GARAGE
CONNECTICUT OFFICE OF CHIEF MEDICAL EXAMINER
FIRST FLOOR PLAN
JANUARY 4, 2021
AE DESIGN GROUP, LLC
40 NORTH MAIN STREET
SOUTHINGTON, CT 06489
860-621-9348
AutoCAD SHX Text
RADIOLOGY SUITE
AutoCAD SHX Text
656 SF
AutoCAD SHX Text
ORGAN DONOR LAB
AutoCAD SHX Text
512 SF
AutoCAD SHX Text
REFRIGERATOR STORAGE
AutoCAD SHX Text
1320 SF
AutoCAD SHX Text
MAIN AUTOPSY
AutoCAD SHX Text
2942 SF
AutoCAD SHX Text
MEDICAL WASTE
AutoCAD SHX Text
270 SF
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
165 SF
AutoCAD SHX Text
MEN
AutoCAD SHX Text
165 SF
AutoCAD SHX Text
WOMEN
AutoCAD SHX Text
150 SF
AutoCAD SHX Text
MEN
AutoCAD SHX Text
150 SF
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
180 SF
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
170 SF
AutoCAD SHX Text
MEN LOCKER
AutoCAD SHX Text
345 SF
AutoCAD SHX Text
WOMEN LOCKER
AutoCAD SHX Text
345 SF
AutoCAD SHX Text
AutoCAD SHX Text
NEW BUILDING ADDITION
AutoCAD SHX Text
EXISTING BUILDING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE
AutoCAD SHX Text
106 SF
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
607 SF
AutoCAD SHX Text
LAUNDRY
AutoCAD SHX Text
135 SF
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
360 SF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
ANTEROOM
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VEST.
AutoCAD SHX Text
70 SF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
FIRST FLOOR KEYNOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text NEW BUILDING ADDITION (TYPE 2A): A. SLAB-ON-GRADE W/UNDERSLAB VAPOR RETARDER SLAB-ON-GRADE W/UNDERSLAB VAPOR RETARDER AND INSULATION AROUND ENTIRE PERIMETER. B. CONCRETE FOUNDATION WALL AND FOOTING DOWN CONCRETE FOUNDATION WALL AND FOOTING DOWN TO MIN. 4'-0" BELOW GRADE. C. STRUCTURAL STEEL FRAME (WF COLUMNS, STRUCTURAL STEEL FRAME (WF COLUMNS, GIRDERS, BEAMS), W/ 1 HOUR FIREPROOFING. D. NEW SPRINKLER SYSTEM PER NFPA 13 NEW SPRINKLER SYSTEM PER NFPA 13 THROUGHOUT NEW BUILDING. E. METAL ROOF DECK WITH VAPOR RETARDER, METAL ROOF DECK WITH VAPOR RETARDER, SUBSTRATE BOARD, MIN R-30 POLYISO INSULATION, ROOF COVER BOARD AND WHITE TPO. METAL ROOF FASCIA AROUND PERIMETER. F. EXTERIOR WALLS SHALL BE CONSTRUCTED OF EXTERIOR WALLS SHALL BE CONSTRUCTED OF 8" CMU BACKUP, FLUID APPLIED AIR & VAPOR BARRIER, MIN R-12 CAVITY INSULATION, AIR SPACE AND CAST STONE VENEER. G. ROOF SHALL RECEIVE ALUMINUM FRAME ROOF SHALL RECEIVE ALUMINUM FRAME STRUCTURAL SKYLIGHT OVER THE AUTOPSY SPACE(60'-0" X 16"-0"). H. ALL INTERIOR NON-BEARING PARTITIONS SHALL BE ALL INTERIOR NON-BEARING PARTITIONS SHALL BE CONSTRUCTED OF " GYPSUM BOARD OVER METAL 58" GYPSUM BOARD OVER METAL STUDS WITH CAVITY INSULATION, FULL WIDTH. I. ALL DOORS AND FRAMES SHALL BE PAINTED ALL DOORS AND FRAMES SHALL BE PAINTED STEEL.
AutoCAD SHX Text
NEW BODY STORAGE REFRIGERATION WITH CADAVER STORAGE RACKS. 32'-0" X 40'-0" UNIT.
AutoCAD SHX Text
AutoCAD SHX Text
GARAGE / RECEIVING AREA TO REMAIN. NEW GARAGE STEEL DOOR TO BE PROVIDED.
AutoCAD SHX Text
AutoCAD SHX Text
ORGAN DONOR LAB: EXISTING LAB TO BE RENOVATED AS NEW.
AutoCAD SHX Text
AutoCAD SHX Text MEDICAL WASTE ROOM: EXISTING COLD ROOM TO BE REMOVED AND SPACE TO BE RENOVATED AS MEDICAL WASTE ROOM.
AutoCAD SHX Text
AutoCAD SHX Text
OFFICE TO BE RENOVATED AS NEW.
AutoCAD SHX Text
AutoCAD SHX Text NEW MEN AND WOMEN LOCKER ROOMS. QUARRY TILE TO BE REMOVED DOWN TO CONCRETE SLAB, NEW SLAB PENETRATIONS FOR NEW FIXTURES. ALL PARTITIONS SHALL BE 6" CMU WITH TILE ON CONCRETE SLAB AND WALLS.
AutoCAD SHX Text
AutoCAD SHX Text
LAUNDRY ROOM SHALL BE RENOVATED AS NEW.
AutoCAD SHX Text
AutoCAD SHX Text EXISTING MEN AND WOMEN TOILET FACILITIES SHALL BE DEMOLISHED COMPLETELY AND RENOVATED AS NEW TO BE FULLY ADA ACCESSIBLE. PROVIDE NEW TWO LAVATORIES AND TWO WATER CLOSETS. NEW FLOOR AND WALL TILE THROUGHOUT.
AutoCAD SHX Text
AutoCAD SHX Text RADIOLOGY SUITE: PERIMETER WALLS AND DOORS SHALL BE PROVIDED WITH LEAD LINING. WALLS SHALL BE LEAD LINED UP TO 7'-0" AFF. NEW XRAY TABLE AND EQUIPMENT, AND NEW CT SCAN EQUIPMENT.
AutoCAD SHX Text
AutoCAD SHX Text EXISTING AUTOPSY AREA SHALL BE RENOVATED FOR NEW STORAGE ROOM. COMPLETE DEMOLITION INCLUDING AND NOT LIMITED TO REMOVAL OF QUARRY TILE. FLOOR LEVELING REQUIRED FOR FLOOR FINISH.
AutoCAD SHX Text
AutoCAD SHX Text EXISTING X-RAY SUITE SHALL BE RENOVATED FOR NEW STORAGE ROOM. COMPLETE DEMOLITION INCLUDING AND NOT LIMITED TO REMOVAL OF QUARRY TILE. FLOOR LEVELING REQUIRED FOR NEW FLOOR FINISH.
AutoCAD SHX Text MAIN UPTOPSY FINISHES TO INCLUDE STAINLESS AND EPOXY COUNTERTOPS ON STEEL LAB CASEWORK. ALL CABINETRY TO BE STEEL LAB CASEWORK.
AutoCAD SHX Text
AutoCAD SHX Text
GENERAL RENOVATION NOTES
AutoCAD SHX Text
1. ALL AREAS IN THE EXISTING BUILDING, NOT LISTED IN THE ALL AREAS IN THE EXISTING BUILDING, NOT LISTED IN THE KEYNOTES, SHALL BE PROVIDED WITH NEW PAINTING, FLOORING AND CEILING PADS. UPGRADE EXISTING FACILITY TO NEW LED LIGHTING. NEW BUILDING SHALL BE PROVIDED WITH LED LIGHTING THROUGHOUT. 2. ENTIRE EAST ELEVATION PRE-CAST STONE OF THE ENTIRE EAST ELEVATION PRE-CAST STONE OF THE EXISTING BUILDING SHALL BE REMOVED AND REPLACED WITH NEW TO MATCH EXISTING. BEFORE INSTALLING NEW, THE EXISTING AIR AND VAPOR BARRIER SYSTEM SHALL BE REPAIRED AT ALL NEW CONNECTION POINTS. ESTIMATOR TO PROVIDE ALLOWANCE FOR INVESTIGATION AND REPAIR OF FACADE. 3. ALL NEW WALLS INSTALLED ON THE FIRST FLOOR SHALL ALL NEW WALLS INSTALLED ON THE FIRST FLOOR SHALL BE 6" CMU BLOCK. ALL NEW WALLS INSTALLED ON THE SECOND AND THIRD FLOORS SHALL BE METAL STUD AND GYPSUM BOARD. 4. PROVIDE NFPA 13 FIRE PROTECTION SYSTEM THROUGHOUT PROVIDE NFPA 13 FIRE PROTECTION SYSTEM THROUGHOUT EXISTING AND NEW PORTIONS OF THE BUILDING.
AutoCAD SHX Text 0'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text
SCALE : 1/8"=1'-0"
AutoCAD SHX Text
NORTH
VESTIBULE
RECEPTION
VESTIBULE
MEN
WOMEN
ELEV
JAN.
LOUNGE
CONFERENCE
ROOM
STORAGE OFFICE
CONFERENCE
ROOM
CHIEF
SECRETARY
DEPUTY
ASSOCIATE
ASSOCIATE
ASSOCIATE
ASSOCIATE
ADMIN.
ASSISTANT
ADMINISTRATIVE
SERVICES
ASSOCIATE
ASSOCIATE
CONNECTICUT OFFICE OF CHIEF MEDICAL EXAMINER
SECOND FLOOR PLAN
JANUARY 4, 2021
AE DESIGN GROUP, LLC
40 NORTH MAIN STREET
SOUTHINGTON, CT 06489
860-621-9348
AutoCAD SHX Text
AUTOPSY ROOF
AutoCAD SHX Text
PRIVATE OFFICES
AutoCAD SHX Text
1058 SF
AutoCAD SHX Text
PRIVATE OFFICES
AutoCAD SHX Text
1800 SF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RTU 1
AutoCAD SHX Text
RTU 2
AutoCAD SHX Text
EXHAUST FAN 1
AutoCAD SHX Text
EXHAUST FAN 2
AutoCAD SHX Text
EXHAUST FAN 3
AutoCAD SHX Text
SKYLIGHT ASSEMBLY
AutoCAD SHX Text
SECOND FLOOR KEYNOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text EXISTING OFFICE CUBICLE AND PARTIAL CONFERENCE ROOM SPACE SHALL BE RENOVATED INTO NEW RECONFIGURED PRIVATE OFFICES. ASSUMED TO HAVE 5 OFFICES, COPY SPACE AND KITCHENETTE SHALL BE PROVIDED.
AutoCAD SHX Text
AutoCAD SHX Text EXISTING RECORD ARCHIVE, MAILROOM AND ACCOUNTING SPACES SHALL BE RENOVATED INTO NEW RECONFIGURED OFFICE SPACE. ASSUMED TO HAVE 6 OFFICES AND 6 CUBICLES. COPY SPACE AND KITCHENETTE SHALL BE PROVIDED.
AutoCAD SHX Text
GENERAL RENOVATION NOTES
AutoCAD SHX Text
1. ALL AREAS IN THE EXISTING BUILDING, NOT LISTED IN THE ALL AREAS IN THE EXISTING BUILDING, NOT LISTED IN THE KEYNOTES, SHALL BE PROVIDED WITH NEW PAINTING, FLOORING AND CEILING PADS. UPGRADE EXISTING FACILITY TO NEW LED LIGHTING. NEW BUILDING SHALL BE PROVIDED WITH LED LIGHTING THROUGHOUT. 2. ENTIRE EAST ELEVATION PRE-CAST STONE OF THE ENTIRE EAST ELEVATION PRE-CAST STONE OF THE EXISTING BUILDING SHALL BE REMOVED AND REPLACED WITH NEW TO MATCH EXISTING. BEFORE INSTALLING NEW, THE EXISTING AIR AND VAPOR BARRIER SYSTEM SHALL BE REPAIRED AT ALL NEW CONNECTION POINTS. ESTIMATOR TO PROVIDE ALLOWANCE FOR INVESTIGATION AND REPAIR OF FACADE. 3. ALL NEW WALLS INSTALLED ON THE FIRST FLOOR SHALL ALL NEW WALLS INSTALLED ON THE FIRST FLOOR SHALL BE 6" CMU BLOCK. ALL NEW WALLS INSTALLED ON THE SECOND AND THIRD FLOORS SHALL BE METAL STUD AND GYPSUM BOARD. 4. PROVIDE NFPA 13 FIRE PROTECTION SYSTEM THROUGHOUT PROVIDE NFPA 13 FIRE PROTECTION SYSTEM THROUGHOUT EXISTING AND NEW PORTIONS OF THE BUILDING.
AutoCAD SHX Text 0'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text
SCALE : 1/8"=1'-0"
AutoCAD SHX Text
NORTH
CONFERENCE
ROOM
STORAGE
STORAGE
MEN
WOMENCLOSET
ELEV
JAN.
IT ROOM
SERVER
ROOM
LAB
STORAGE
OFFICE PHOTO
WORKROOM
OFFICE
STUDENT
LOUNGE
SLIDE
STORAGE
GLASSWARE DARK
ROOM
CONNECTICUT OFFICE OF CHIEF MEDICAL EXAMINER
THIRD FLOOR PLAN
JANUARY 4, 2021
AE DESIGN GROUP, LLC
40 NORTH MAIN STREET
SOUTHINGTON, CT 06489
860-621-9348
AutoCAD SHX Text
OFFICE SUITE
AutoCAD SHX Text
1704 SF
AutoCAD SHX Text
AutoCAD SHX Text
ANTHROPOLOGY
AutoCAD SHX Text
396 SF
AutoCAD SHX Text
AutoCAD SHX Text
MEDICAL RECORDS
AutoCAD SHX Text
1362 SF
AutoCAD SHX Text
AutoCAD SHX Text
HISTOLOGY
AutoCAD SHX Text
636 SF
AutoCAD SHX Text
AutoCAD SHX Text
RTU 1
AutoCAD SHX Text
RTU 2
AutoCAD SHX Text
EXHAUST FAN 1
AutoCAD SHX Text
AUTOPSY ROOF
AutoCAD SHX Text
LAB / SLIDE STORAGE
AutoCAD SHX Text
600 SF
AutoCAD SHX Text
AutoCAD SHX Text
EXHAUST FAN 2
AutoCAD SHX Text
EXHAUST FAN 3
AutoCAD SHX Text
SKYLIGHT ASSEMBLY
AutoCAD SHX Text
THIRD FLOOR KEYNOTES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text EXISTING LABORATORY SPACE SHALL BE RENOVATED FOR UPDATED LABORATORY STANDARDS. ALL NEW LABORATORY CASEWORK SHALL BE MOVEABLE PAINTED METAL CASEWORK WITH EPOXY TOPS. TOPS. EXAMPLE (KEWAUNEE ENTERPRISE SYSTEM). CASEWORK SHALL BE PROVIDED WITH MOBILE BASE CABINETS. LAB SHALL BE PROVIDED WITH ONE 5'-0" LAB SHALL BE PROVIDED WITH ONE 5'-0" FUME HOOD AND TWO LAB SINKS. FLOORING SHALL BE SEAMLESS VINYL FLOORING WITH INTEGRAL WALL BASE. WALLS SHALL BE PAINTED WITH EPOXY PAINT. CEILING SHALL BE LAY-IN TYPE, ARMSTRONG ULTIMA PANELS IN 15/16" GRID
AutoCAD SHX Text
AutoCAD SHX Text EXISTING LABORATORY, STORAGE AND OFFICE SPACE SHALL BE RENOVATED INTO NEW OFFICE SUITE. ASSUMED TO HAVE 5 PRIVATE OFFICES, 6 CUBICLES, KITCHENETTE AND COPY SPACE.
AutoCAD SHX Text
AutoCAD SHX Text EXISTING LABORATORY SPACE TO BE COMPLETELY RENOVATED INTO NEW RECORDS STORAGE SUITE, INCLUDING RECORDS STORAGE, MAILROOM, ACCOUNTING SPACES.
AutoCAD SHX Text
AutoCAD SHX Text EXISTING LABORATORY SPACE TO BE COMPLETELY RENOVATED INTO NEW LABORATORY AND SLIDE STORAGE INCLUDING REMOVING TWO FUME HOODS, CASEWORK, QUARRY TILE AND CEILING. PROVIDE NEW RESILIENT TILE FLOORING, TEGULAR CEILING PANELS AND GRID, AND PAINTING THROUGHOUT.
AutoCAD SHX Text
GENERAL RENOVATION NOTES
AutoCAD SHX Text
1. ALL AREAS IN THE EXISTING BUILDING, NOT LISTED IN THE ALL AREAS IN THE EXISTING BUILDING, NOT LISTED IN THE KEYNOTES, SHALL BE PROVIDED WITH NEW PAINTING, FLOORING AND CEILING PADS. UPGRADE EXISTING FACILITY TO NEW LED LIGHTING. NEW BUILDING SHALL BE PROVIDED WITH LED LIGHTING THROUGHOUT. 2. ENTIRE EAST ELEVATION PRE-CAST STONE OF THE ENTIRE EAST ELEVATION PRE-CAST STONE OF THE EXISTING BUILDING SHALL BE REMOVED AND REPLACED WITH NEW TO MATCH EXISTING. BEFORE INSTALLING NEW, THE EXISTING AIR AND VAPOR BARRIER SYSTEM SHALL BE REPAIRED AT ALL NEW CONNECTION POINTS. ESTIMATOR TO PROVIDE ALLOWANCE FOR INVESTIGATION AND REPAIR OF FACADE. 3. ALL NEW WALLS INSTALLED ON THE FIRST FLOOR SHALL ALL NEW WALLS INSTALLED ON THE FIRST FLOOR SHALL BE 6" CMU BLOCK. ALL NEW WALLS INSTALLED ON THE SECOND AND THIRD FLOORS SHALL BE METAL STUD AND GYPSUM BOARD. 4. PROVIDE NFPA 13 FIRE PROTECTION SYSTEM THROUGHOUT PROVIDE NFPA 13 FIRE PROTECTION SYSTEM THROUGHOUT EXISTING AND NEW PORTIONS OF THE BUILDING.
AutoCAD SHX Text 0'
AutoCAD SHX Text 2'
AutoCAD SHX Text 4'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text
SCALE : 1/8"=1'-0"
AutoCAD SHX Text
NORTH
EXTERIOR ELEVATION
JANUARY 4, 2021
AE DESIGN GROUP, LLC
40 NORTH MAIN STREET
SOUTHINGTON, CT 06489
860-621-9348
330 Main St
2ND Flr.
Hartford, Connecticut 06106
T|860.200.8551 F|860.200.8552 www.dh-bolton.com
SCHEMATIC PLAN
ORDER OF MAGNITUDE ESTIMATE
PREPARED BY: D.H BOLTON, INC.
December 30, 2020
Hartford, Connecticut 06106
December 30, 2020
Daniel S. LaMontagne, AIA
AE Design Group
40 North Main St
Southington, CT 06489
RE: Connecticut Office of Chief Medical Examiner
Order of Magnitude Estimate
UNIFORMAT II Elemental Cost Summary BCC & SCC- Level 1
Mr. LaMontagne, Pursuant to your request, DH BOLTON has reviewed AE Design Group’s Schematic Plan for the
Connecticut Office of Chief Medical Examiner (OCME) and performed an Order of Magnitude Estimate
UNIFORMAT II Level-1 for the Building Construction Cost (BCC) and associated Site Construction Cost
(SCC).
Please also consider the following Assumptions/Qualifications used to determine OME cost for the OCME schematic plan:
• All material cost are Commercial Grade only except where otherwise noted for equipment and specialty ceiling.
• Labor cost are CT Prevailing Wage
• Winterization or Phasing are Excluded from the Construction Cost. Phasing & Site Logistics
Allowance was carried under Contingencies.
• New wall interior partition construction assembly at the existing building assumed as cmu for the 1st
Floor and Gypsum Board Assemblies for the 2nd – 3rd.
• Assumes new Fire Protection System at the OCME building. New Addition Roof storm drainage may require site trenching if unable to connect into existing system.
• Design Contingency Excluded.
• Lab and Autopsy Equipment cost are not included with the Direct Cost of Construction. Allowance carried under Contingencies. Cubicles and office equipment are Excluded.
• Additional Insurances i.e Builder’s Risk, Excess Umbrella, etc as required by the State are
Excluded.
Hartford, Connecticut 06106
Should you have any questions, or require additional information, feel free to give me a call at 860-869-
3944.
Sincerely, Dwight H. Bolton
President
Attach: Level-1 UNIFORMAT II BCC/SCC Summary
Level-3 UNIFORMAT II BCC/SCC Details
UNIFORMAT II ELEMENTAL COST SUMMARY BCC
Project Office of Chief Medical Examiner-Schematic Plan GFA - New Addition 5,728 SF
GFA - Renovation 31,800 SF
LEVEL 1 GROUP ELEMENTS Ratio Cost per %
Qty/GFA Quantity Unit UC Cost Unit GFA
A SUBSTRUCTURE 246,102.00$
Standard Foundations- New Addition 246,102.00$ 42.96$ 6.79%
B SHELL 892,530.00$
Superstructure- New Addition 812,530.00$ 141.85$ 22.41%
Exterior Enclosures- Renovation 80,000.00$ 2.52$ 1.70%
C INTERIORS 2,019,027.00$
Interiors - New Addition 383,482.00$ 66.95$ 11%
Interiors - Renovation 1,635,545.00$ 51.43$ 35%
D SERVICES 4,247,356.00$
MEP/FP Systems - New Addition 1,721,856.00$ 300.60$ 47%
MEP/FP Systems - Renovation 2,525,500.00$ 79.42$ 54%
E EQUIPMENT & FURNISHINGS 211,200.00$
*Equipment - New Addition (Reference Equipment Allowance) 211,200.00$ 36.87$ 6% *Equipment - Renovation (Reference Equipment Allowance) -$
F SPECIAL CONSTRUCTION & DEMOLITION 478,590.00$
Selective Demolition - Renovation 478,590.00$ 15.05$ 10%
G SITEWORK 249,832.80$
Sitework - New Addition 249,832.80$ 43.62$ 7%
BUILDING ELEMENTAL COST WITHOUT DESIGN ALLOWANCE - New Addition 3,625,002.80$ 632.86$ 100.00%
BUILDING ELEMENTAL COST WITHOUT DESIGN ALLOWANCE - Renovation 4,719,635.00$ 148.42$ 100.00%
Z10 GENERAL REQUIREMENTS
Z70 TAXES, PERMITS, INSURANCES & BONDS
Z7050 Permit Fees NA
Z7070 Bond Fee 2% 166,892.76$
Z7070 G&L 2% 166,892.76$
Z90 FEES & CONTINGENCIES
Z9010 Overhead 5% 417,231.89$
Z9010 General Conditions 7% 584,124.65$
Z9030 Profit 10% 834,463.78$
Z9050 Construction Contingencies 10% 834,463.78$
Estimate Contingency 10% 834,463.78$
Material & Labor Escalation (FY21) 3% 250,339.13$
Design Allowance Not Included -$
*Lab & Autoposy Equipment / Casework Allowance 1,000,000.00$
Phasing & Site Logistics Allowance 25% 2,086,159.45$
Investigate/Evaluate Repair of Façade Precast Panels Allowance 20,000.00$
BUILDING CONSTRUCTION COST 15,539,669.77$ 414.08$
Element
Project : Office of Chief Medical Examiner-Schematic Plan
Order of Magnitude Estimate (OME)
2021 2022 2023 2024 2025
*Escalation 3% 5% 6% 6% 6%
Direct Cost of Construction 8,344,637.80$ 8,594,976.93$ 9,024,725.78$ 9,566,209.33$ 10,140,181.89$
DCC w/Escalation 250,339.13$ 429,748.85$ 541,483.55$ 573,972.56$ 608,410.91$
Soft Cost 6,944,692.84$ 6,944,692.84$ 6,944,692.84$ 6,944,692.84$ 6,944,692.84$
Total Cost 15,539,669.77$ 15,969,418.62$ 16,510,902.17$ 17,084,874.73$ 17,693,285.64$
Assumptions:
FY 2021
Assumed CPI inflation remains below 2.5%
Assumed minor cost changes in material & labor cost
FY 2022
Assumed inflation grows to approximately 3%
Assumed material & labor cost increase to approximately 2%
FY 2023 - FY 2025
Assumed inflation remains at approximately 3%
Assumed material & labor cost escalate to approximately 3%
Fiscal Year Escalation Allowances
*Escalation Estimated from Budget Phase Through Design Development. Material Escalation from Construction Start thru Mid-point of
Construction is Excluded
UNIFORMAT II- ELEMENTAL COST ESTIMATE (BCC/SCC)
New Addition
Description Quantity Unit UC Cost
A SUBSTRUCTURE
A10 FOUNDATIONS $64,350.00
A1010 Standard Foundations [24"x12" Footings & 4'-Fnd. Wall] 66 CYDS $975.00 $64,350.00
A20 SPECIAL FOUNDATIONS $125,000.00
A1020 Underpinning 50 LF $2,500.00 $125,000.00
A40 SLABS-ON-GRADE $56,752.00
A4010 Standard Slabs-On-Grade [6" SOG w/ vapor barrier & underslab prep] 5,728 SF $9.00 $51,552.00
A4090 Slab-On-Grade Supplementary Components [Bit. Damproofing & Rigid Insulation] 1,040 SF $5.00 $5,200.00
B SHELL
B10 SUPERSTRUCTURE $200,480.00
B1020 Roof Construction [Wide Flange Steel beams, girders & decking] 5,728 SF $35.00 $200,480.00
B20 EXTERIOR VERTICLE ENCLOSURES $348,850.00
B2010 Exterior Walls [8"cmu backup avb, insulation 4" cast stone veneer] 3,900 SF $55.00 $214,500.00
B2010 Exterior Walls [Repair Ex. Precast Panels] 1,600 SF $65.00 $104,000.00
B2020 Exterior Windows [Alum Frame & glazing commercial grade] 20% of wall- Allowance 780 SF $25.00 $19,500.00
B2050 Exterior Doors & Grilles [Steel Frames, metal doors, hrdwr commercial grade] 2 EA $2,500.00 $5,000.00
B2070 Exterior Louvers & Vents 3,900 SF $1.50 $5,850.00
B30 EXTERIOR HORIZONTAL ENCLOSURES $263,200.00
B3010 Roofing [Substrate board, poly-iso, coverboard, tapered & Sgl Ply TPO] 5,728 SF $25.00 $143,200.00
B3060 Horizontal Openings [ 60'-0" x 16'-0" Alum. Framed skylight clear Low E glass] 960 SF $125.00 $120,000.00
C INTERIORS
C10 INTERIOR CONSTRUCTION $239,344.00
C1010 Interior Partitions [3-5/8" Mtl Stud 5/8" GWB T&F] 6,200 SF $30.00 $186,000.00
C1020 Interior Windows [Alum Framed clear glass]- Office 106 1 Allo $1,500.00 $1,500.00
C1030 Interior Doors SGL[KD Frames HM Door & Hrdw Lead Lined] 1 EA $6,500.00 $6,500.00
C1030 Interior Doors DBL [KD Frames HM Door & Hrdwr commercial grade] 2 EA $3,600.00 $7,200.00
C1070 Specialty Suspended Ceiling Construction 4,768 SF $8.00 $38,144.00
C20 INTERIOR FINISHES $144,138.00
C2010 Wall Finishes [Epoxy Paint] 11,058 SF $6.00 $66,348.00
C2010 Wall Finishes (8# Lead Lined backed 5/8"GWB ) 730 SF $40.00 $29,200.00
C2030 Flooring [Commercial grade] 2,786 SF $15.00 $41,790.00
C2030 Resinous Epoxy Flooring & Base 340 SF $20.00 $6,800.00
UNIFORMAT II- ELEMENTAL COST ESTIMATE (BCC/SCC)
New Addition
D SERVICES
D20 PLUMBING $243,440.00
D2010 Domestic Water Distribution [Gas fired Water Heaters] 5,728 SF $25.00 $143,200.00
D2010 Plumbing Fixtures [Autopsy suppy & drainage] 5,728 SF $15.00 $85,920.00
D2030 Stormwater Drainage 5,728 SF $2.50 $14,320.00
D30 HEATING, VENTALATION, AND AIR CONDITIONING (HVAC) $716,000.00
D3020 Heat Generating Systems & Distribution Pumps [Gas Fired Boilers] 5,728 SF $125.00 $716,000.00
D3030 Cooling Generating Systems [ACC Chiller & Distribution Pumps] Incl w/D3020
D3050 Single Zone RTU (Incl w/D3020)
D40 FIRE PROTECTION $51,552.00
D4010 Sprinklers [ per NFPA 13] - New Addition 5,728 SF $9.00 $51,552.00
D50 ELECTRICAL $710,864.00
D5010 Packaged Generator Assemblies + ATS 1 Allo $350,000.00 $350,000.00
D5020 Electrical Service & Distribution 5,728 SF $28.00 $160,384.00
D5040 LED Lighting 5,728 SF $30.00 $171,840.00
D5080 Misc. Electrical Systems [Lightning Protection] 5,728 SF $5.00 $28,640.00
E EQUIPMENT & FURNISHINGS
E10 EQUIPMENT $211,200.00
E1030 Commercial Equipment- X-Ray Table [Included w/ ALLOWANCE] 1 EA $0.00 $0.00
E1030 Commercial Equipment- CAT Scan [Included w/ ALLOWANCE] 1 EA $0.00 $0.00
E1040 Lab Equipment - Stainless Steel Lab Casework w/ Epoxy Countertops [Included w/ Allowance] 115 LF $0.00 $0.00
E1090 Other Equipment- Cadaver Storage Racks 32'-0" x 40'-0" [Included w/ Allowance] 1,280 Unit $0.00 $0.00
E1090 Other Equipment- Autopsy Sink 'Mopec CC200 Unit' [Included w/ Allowance] 12 EA $0.00 $0.00
E1090 Other Equipment- SS Anatomy Dissection Table 'Mopec HA300 Cart' [Included w/ Allowance] 12 EA $0.00 $0.00
E1090 Other Equipment- Overhead Mounted Lighting 'Mopec BB109 or Similar' [Included w/ Allowance] 12 EA $0.00 $0.00
E1090 Other Equipment - 5'-0" Fume Hood [Included w/ Allowance] 1 EA $0.00 $0.00
E1090 Lab Sinks [Included w/ Allowance] 2 EA $0.00 $0.00
E1090 Other Equipment- Walk-In Refrigeration Unit $1,320.00 SF $160.00 $211,200.00
G SITEWORK
G10 SITE PREPARATION $128,972.00
G1020 Site Elements Demolition 5,728 SF $7.00 $40,096.00
G1070 Grading 5,728 SF $12.00 $68,736.00
G1070 Excavation & Backfill 212 CYDS $95.00 $20,140.00
G20 SITE IMPROVEMENTS $52,124.80
G2020 Asphalt Paving [Proof roll grade, base & subbase, binder & wearing crs) 5,728 SF $5.00 $28,640.00
G2030 Pedestrian Plazas & Walkways [Conc walks] 5,728 SF $2.75 $15,752.00
G2060 Site Development [Site furnishings & signage] 5,728 SF $0.75 $4,296.00
G2080 Landscapping [Topsoil & seed] 5,728 SF $0.60 $3,436.80
G30 LIQUID & GAS SITE UTILITIES $68,736.00
G3010 Site Domestic Water Distribution 5,728 SF $0.00 $0.00
G3010 Site Fire Protection Water Distribution 5,728 SF $0.00 $0.00
G3020 Sanitary Sewage Utility 5,728 SF $6.00 $34,368.00
G3030 Site Storm Drainage 5,728 SF $6.00 $34,368.00
UNIFORMAT II- ELEMENTAL COST ESTIMATE (BCC)
RENOVATION
B SHELL
B20 EXTERIOR VERTICLE ENCLOSURES $15,000.00
B2050 Exterior Doors [Steel Frames, metal doors, hrdwr commercial grade]- Renovation 2 EA $2,500.00 $5,000.00
B2070 Exterior Louvers & Vents 1 Allo $10,000.00 $10,000.00
B30 EXTERIOR HORIZONTAL ENCLOSURES $50,000.00
B3010 Patch Repair Existing Roof 1 Allo $50,000.00 $50,000.00
C INTERIORS
C10 INTERIOR CONSTRUCTION $721,050.00
C1010 Interior Partitions [CMU 1st Flr] 3,110 SF $35.00 $108,850.00
C1010 Interior Partitions [GWB Assemblies 2nd & 3rd Flrs] 6,620 SF $10.00 $66,200.00
C1020 Interior Windows [Alum Framed clear glass] 1 Allo $50,000.00 $50,000.00
C1030 Interior Doors SGL[KD Frames HM Door & Hrdwr commercial grade] 81 EA $1,800.00 $145,800.00
C1030 Interior Doors DBL [Welded Frames HM Door & Hrdwr commercial grade] 7 EA $5,000.00 $35,000.00
C1070 Specialty Suspended Ceiling Construction- Renovation 31,800 SF $8.00 $254,400.00
C1090 Interior Specialties [Toilet & bathrm accessories] - Renovation 1,160 SF $5.00 $5,800.00
C1090 Other Interior Specialty [Allowance] - Renovation 1 Allo $25,000.00 $25,000.00
C1090 Other Interior Specialty [Arch Millwork Kitchenette] - Renovation 1 Allo $30,000.00 $30,000.00
C1090 Compartments & Cubicles [Office Partitions] - Included w/ Allowance 4,580 SF $0.00 $0.00
C20 INTERIOR FINISHES $914,495.00
C2010 Wall Finishes [Epoxy Paint]- Renovation 67,745 SF $6.00 $406,470.00
C2010 Wall Finishes [Ceramic Tile]- Renovation 760 SF $25.00 $19,000.00
C2030 Resinous Epoxy Flooring & Base 425 SF $20.00 $8,500.00
C2030 Floor Finishes [Ceramic Tile Flooring] 990 SF $25.00 $24,750.00
C2030 Flooring [Commercial grade] - Renovation 30,385 SF $15.00 $455,775.00
D SERVICES
D20 PLUMBING $453,200.00
D2010 Domestic Water Distribution [Gas fired Water Heaters] 31,800 SF $8.00 $254,400.00
D2010 Plumbing Fixtures [Lab supply & drainage] 31,800 SF $4.00 $127,200.00
Plumbing Fixtures [Water Closets w/ automatic flush sensor] 8 SF $2,700.00 $21,600.00
Plumbing Fixtures- [Lavatories w/automatic sensors] 8 SF $2,200.00 $17,600.00
Plumbing Fixtures- [Urinals w/automatic flush sensor] 2 SF $2,700.00 $5,400.00
Plumbing Fixtures- [Showers] 6 SF $4,500.00 $27,000.00
D30 HEATING, VENTALATION, AND AIR CONDITIONING (HVAC) $1,017,600.00
D3020 Heat Generating Systems [Gas Fired Boilers] 31,800 SF $8.00 $254,400.00
D3030 Cooling Generating Systems [ACC Chillers & Distribution Pumps] 31,800 SF $15.00 $477,000.00
D3050 Multi-zone RTUs [Re-use Ex Distribution Ductwork] 31,800 SF $9.00 $286,200.00
D40 FIRE PROTECTION $286,200.00
D4010 Sprinklers [ per NFPA 13] 31,800 SF $9.00 $286,200.00
D50 ELECTRICAL $768,500.00
D5020 Electrical Service & Distribution 31,800 SF $0.00 $0.00
D5040 LED Lighting & Branch Wiring, Misc. Power 31,800 SF $22.50 $715,500.00
D5080 Misc. Electrical Systems [Lightning Protection] 10,600 SF $5.00 $53,000.00
E EQUIPMENT & FURNISHINGS
E10 EQUIPMENT $0.00
E1030 Commercial Equipment- Industrial Washers & Dryers [Included w/ Allowance] 4 EA $0.00 $0.00
E1040 Lab Equipment - Stainless Steel Lab Casework w/ Epoxy Countertops [Included w/ Allowance] 1,010 SF $0.00 $0.00
E1090 Other Equipment - 5'-0" Fume Hood [Included w/ Allowance] 3 EA $0.00 $0.00
E1090 Lab Sinks [Included w/ Allowance] 4 EA $0.00 $0.00
F SPECIAL CONSTRUCTION & DEMOLITION
F30 DEMOLITION $478,590.00
F3030 Selective Demolition- Interior Items 31,800 SF $12.00 $381,600.00
F3030 Selective Demolition - MEP 31,800 SF $3.05 $96,990.00
| OCME Floor Plans-rev2-COVER |
| Sheets and Views |
| OCME Floor Plans-rev2-COVER |
| OCME Floor Plans-rev2-SITE |
| Sheets and Views |
| OCME Floor Plans-rev2-SITE |
| OCME Floor Plans-rev2-1ST |
| Sheets and Views |
| OCME Floor Plans-rev2-1ST |
| OCME Floor Plans-rev2-2ND |
| Sheets and Views |
| OCME Floor Plans-rev2-2ND |
| OCME Floor Plans-rev2-3RD |
| Sheets and Views |
| OCME Floor Plans-rev2-3RD |
| OCME Floor Plans-rev2-ELEV |
| Sheets and Views |
| OCME Floor Plans-rev2-ELEV |
| Sheets and Views |
| COVER |
File details come from the government source that posted it. Updated .