B6_-_Southerland_Lot_15_Single_Family_Dwelling_Site_Plan.pdf
PDF 29 MB Posted
- Solicitation number
- 25-019
- Issued by
- Charles County, Maryland
About this file
The document is a site plan for Lot 15 in the Southerland development, prepared by Soltesz for Timberlake Homes in Charles County, Maryland. The site plan details a single-family dwelling development on a 1.09-acre lot, including specific engineering specifications for site grading, stormwater management, utility connections, and erosion control. The plan includes detailed site elevations, utility layouts, drainage information, and construction requirements, with the site located along Mill Hill Road in the Sixth Election District of Charles County.
The site plan includes comprehensive technical details such as finished floor elevations at 222.02, basement floor elevation at 212.27, and specific requirements for stormwater management including a rain garden and rooftop disconnection strategies. The document mandates specific stabilization techniques, with requirements for 95% ground cover and detailed seeding specifications. The plan also includes notes about utility connections, specifically mentioning that the lot will require an ejector pump for basement plumbing and must comply with Charles County residential building requirements, including mandatory automatic fire sprinkler systems for single-family dwellings.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S
DD
DD
"C"
BcA
"C"
BcA
"D"
LQA
"C"
BaB
151’
R/W
R/W
R .3 ’ L
.5
(V A R
IA
B L E W
ID
T H R /W
M
IL
L H
IL
L R
O A
D
217.65
217.75
217.73 217.66
217.76
217.55
218.15
’ B .R .L
FF = 222.02
BF = 212.27
(2R)
PR. 253
LF 2" WHC
25’ B .R.L.
25’ B.R.L.
’ B .R .L
.0
.5
.1
.2
2.0’
31.6 7’
.1
.4
.3
220.72
GF =
(12R)
4.0’
1.00
1.33
ELEV. 1
THE SEVERN
219.80
29 20
LF
6"
SH
C P
IPE
1.5
217.28
.1
213.4’
38.8
.6
36.0
4.0’
E\W
(C/O #1)
(C/O #2) (C/O #3)
(C/O #4)
75 LF 6" PVC (SCH 40) @ 2.0% 50 LF 6" PVC (SCH 40) @ 1.5%
.0
SCE
217.39
219 @ 2.0%
40 LF 6" PVC (SCH 40)
50 LF 6" PVC (SCH 40) @
2.0%
28947 6/19/2024
DATE: CAD STANDARDS VERSION:
MAP GRID
ONE INCH
1" =
SHEET
OF
SOUTHERLAND LOT 15
PB 10, PG 102
SINGLE FAMILY DWELLING SITE PLAN
HORIZONTAL:
VERTICAL:
MISS UTILITY NOTE
3902-02-00
PAW/WDH
W5E / S3E
SIXTH (6TH) ELECTION DISTRICT, CHARLES COUNTY, MARYLAND
SITE DATUM
TAX MAP / PARCEL
RL (WCD)
7 / 216 14
1145 / 0127
I HEREBY CERTIFY THAT THESE DOCUMENTS WERE
PREPARED OR APPROVED BY ME, AND THAT I AM A DULY
LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO.____________, EXPIRATION DATE:__________
TIMBERLAKE HOMES, BT.
304 HARRY TRUMAN PARKWAY
SUITE M
ANNAPOLIS, MARYLAND
PHONE# 443-837-3115
FAX# 301-366-0885
BRIAN MESSINO
SEE SEAL
PROFESSIONAL CERTIFICATION
P:\05221600\Engineer\Sheet_Files\Site\INDV-LOTS\Timberlake\LOT.sht Scale= 30.0000 sf / in. User= CChobert PLTdrv= PDF_Special_150.pltcfg Pentbl= TEXT_SUB.tbl 3/2/2022 10:57:29 AM www.solteszco.comP. 301.870.2166 F. 301.870.2884
Waldorf, MD 20602
401 Post Office Road, Suite 103
WALDORF OFFICE
If v e ri fic a tio n o f th e in fo rm a tio n c o n ta in e d h e re o n is n e e d e d co n ta ct s h o u ld b e m a d e d ir e ct ly w ith S
O L T E S Z S
O L T E S Z m a ke s n o w a rr a n tie s, e xp re ss o r im p lie d co n ce rn in g t h e a cc u ra cy o f a n y in fo rm a tio n t h a t h a s b e e n t ra n sm itt e d b y e le ct ro n ic m e a n s.
T h e o ri g in a l o f th is d ra w in g d o cu m e n t w a s p re p a re d b y S o lte sz In c.
S
O L T E S Z I f th is d o cu m e n t w a s n o t o b ta in e d d ir e ct ly f ro m S
O L T E S Z a n d /o r it w a s tr a n sm itt e d e le ct ro n ic a lly S
O L T E S Z c a n n o t g u a ra n te e t h a t u n a u th o ri ze d c h a n g e s a n d o r a lte ra tio n s w e re n o t m a d e b y o th e rs
Environmental Sciences
Planning
Surveying
Engineering
Soltesz DC, LLC
Frederick
Leonardtown
Waldorf
Lanham
Rockville
V8 - NCS
NO.
DESIGNED:
REVISIONS
TECHNICIAN:
BY DATE
CHECKED:
PROJECT NO.
THAN NOTED MAY REQUIRE REVISIONS TO THIS PLAN.
BEFORE PROCEEDING WITH CONSTRUCTION. CLEARANCES LESS
LESS, CONTACT THE ENGINEER AND THE UTILITY COMPANY
SHOWN ON THIS PLAN OR TWELVE (12) INCHES, WHICHEVER IS
THE START OF EXCAVATION. IF CLEARANCES ARE LESS THAN
CONTACT "MISS UTILITY" AT 1-800-257-7777, 48 HOURS PRIOR TO
PITS BY HAND, WELL IN ADVANCE OF THE START OF EXCAVATION.
EXISTING UTILITIES AND UTILITY CROSSINGS BY DIGGING TEST
MUST DETERMINE THE EXACT LOCATION AND ELEVATION OF ALL
WAS OBTAINED FROM AVAILABLE RECORDS. THE CONTRACTOR
INFORMATION CONCERNING EXISTING UNDERGROUND UTILITIES
A B C D E F G H I J K L M N O
GRID
REFERENCE
ZONING CATEGORY: W&S CATEGORY:
GRID
LIBER / FOLIO
OWNER/DEVELOPER/APPLICANT
INC.SOLTESZ,
S T
A T
E
OF MARY
L A
N D
E R
N E
I
ENG
NO AL
P R
O
E
F
S
IS
E L
R E
KCAW MADA K
CI
R
T A
P
74982 .o N
VICINITY MAP
SCALE: 1"=2000’
WILLIAM DIGGS
E.S.
A.
ESTATES
MILL
HILL
M
IL
L
H
IL
L
R D
H
IL
L
R D
DAVI
S
R D
ST LE
X
IN
G
TO
S T
S U P E R
AS
TI
M E R C
H A N T
C O
U R
TBLAND
ST
ST
F R
A N
C
IS
TOWE
MILLLA
G R
IS
T C T
JA
Y
S T
FLOUR
CT
SPICE
CT
C T
M
IL
L
SITE
S T
A T
E
OF MARY
L A
N D
E R
N E
I
ENG
NO AL
P R
O
E
F
S
IS
E L
R E
KCAW MADA K
CI
R
T A
P
74982 .o N
LOT 14
PB10 PG102
L3012 F28
TM7 P216
BETH A. PENCE
CRAIG T. PENCE &
N/F
SITE TABULATIONS
STANDARD STABILIZATION NOTE
CONSIDERED ADEQUATELY STABILIZED.
VEGETATION IS ESTABLISHED, THE SITE SHALL HAVE 95% GROUNDCOVER TO BE
GRADED AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING. ONCE
VERTICAL (3:1); AND SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR
DITCHES, PERIMETER SLOPES, AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1
CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER CONTOLS, DIKES, SWALES,
PERMANENT OR TEMPORARY STABILIZTION SHALL BE COMPLETED WITHIN THREE (3)
FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, SEEDING FOR
STANDARD STABILIZATION NOTE
CONSIDERED ADEQUATELY STABILIZED.
VEGETATION IS ESTABLISHED, THE SITE SHALL HAVE 95% GROUNDCOVER TO BE
GRADED AREAS ON THE PROJECT SITE NOT UNDER ACTIVE GRADING. ONCE
VERTICAL (3:1); AND SEVEN (7) CALENDAR DAYS AS TO ALL OTHER DISTURBED OR
DITCHES, PERIMETER SLOPES, AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1
CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER CONTOLS, DIKES, SWALES,
PERMANENT OR TEMPORARY STABILIZTION SHALL BE COMPLETED WITHIN THREE (3)
FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, SEEDING FOR
ABBREVIATIONS
FF = FINISHED FLOOR
BF = BASEMENT FLOOR
GF = GARAGE FLOOR
HP = HIGH POINT
LP = LOW POINT
EXTENSION
DSE = DOWNSPOUT
LEGEND
180EXISTING CONTOUR
EXISTING TREELINE
PROPOSED TREELINE
PROPOSED CONTOUR 180
SILT FENCE
SUPER SILT FENCE
DISTURBANCE
LIMITS OF
PLAT
SEWAGE EASEMENT
AS SHOWN ON
PERCOLATION TEST
NEW PERCOLATION TEST
DRIVEWAY
CONCRETE
PAVED OR
F
T
30’ MIN
M
IN
ED-A2
EARTH DIKE
TSOS OR TGOS
MOUNTABLE BERM
S C
A L E
LOT AREA = 1.09 ACRES
NOT TO SCALE
VEGETATIVE CHANNEL "BIOFILTER" CONTRIBUTING AREA
DRY WELL COMPENSATION CONTRIBUTING AREA
DISCONNECTED ROOFTOP CONTRIBUTING AREA
ROOF PLAN SCHEMATIC
LEGEND
FRONT OF HOUSE
SITE PLAN
"RECONNECTS".
DOWNSPOUTS MUST BE AT LEAST 10’ AWAY FROM IMPERVIOUS SURFACES TO PREVENT 4.
THE ENTIRE VEGETATIVE CHANNEL IS AN AVERAGE OF 5% SLOPE OR LESS. SEE PLAN.3.
SEE ’DRYWELL DESIGN’ BELOW.
THE LENGTH OF THE DISCONNECTION IS 75’ MIN, OR COMPENSATED WITH A DRYWELL. 2.
SHEET.
OR LESS. THE AREAS UTILIZING THIS CREDIT ARE SHOWN ON THE ROOF PLAN THIS
THE CONTRIBUTING AREA OF ROOFTOP TO EACH DISCONNECTED DISCHARGE IS 500 SF 1.
(N-1) DISCONNECTED ROOFTOP CREDIT DESIGN
SEE ROOF PLAN SCHEMATIC THIS SHEET
30’
PB19 PG21
L1382 F403
TM7 P164
MARY B. PROCTOR
LARRY A. PROCTOR &
N/F
E X . R
IG
H T -O
F -W
A Y
E X . R
IG
H T -O
F -W
A Y
E X R
IG
H T -O
F -W
A Y
EX. RIGHT-OF-WAY
E X . R
IG
H T -O
F -W
A Y
E X . R
IG
H T -O
F -W
A Y
E X . R
IG
H T -O
F -W
A Y
E X C
M P
3/2/2022 C.C. C.C.
IMPERVIOUS AREA = 3,145 SF
INV. ELEV.: 215.62
TOP ELEV.: 219.15
V10 = 2.89 FPS
Q10 = 0.85 CFS
CONSULTANT CERTIFICATION:
SEAL
OF THE ENVIRONMENT STORMWATER MANAGEMENT REGULATIONS."
SEDIMENT CONTROL OR CURRENT REVISIONS THEREOF, AND DEPARTMENT
WITH THE 2011 STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND
"I HEREBY CERTIFY THAT THIS PLAN HAS BEEN DESIGNED IN ACCORDANCE
DATE:
SIGNATURE:
PHONE #:
ADDRESS:
FIRM:
TITLE:
PRINTED NAME:
MD LICENSE NO.: 28947
CONSULTANT CERTIFICATION:
SEAL
OF THE ENVIRONMENT STORMWATER MANAGEMENT REGULATIONS."
SEDIMENT CONTROL OR CURRENT REVISIONS THEREOF, AND DEPARTMENT
WITH THE 2011 STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND
"I HEREBY CERTIFY THAT THIS PLAN HAS BEEN DESIGNED IN ACCORDANCE
DATE:
SIGNATURE:
PHONE #:
ADDRESS:
FIRM:
TITLE:
PRINTED NAME:
MD LICENSE NO.: 28947
301-870-2166
WALDORF, MD 20602
401 POST OFFICE RD, SUITE 103
SOLTESZ
ASSOCIATE
PATRICK WACKERLE
3/2/2022
DISTURBED AREA (ON LOT)= 0.338 ACRES
(PUBLIC 50’ R
/W)
DEVONFIELD AVE
DESIGN SPEED
= 25 MPH
(3:1 MAX SLOPE)
STOCKPILE
15’ (W) X 15’ (L) X 4’ (H)
DISTURBED AREA (OFF LOT)= 0.105 ACRES
WOODED AREA DISTURBED = 0.306 ACRES
75’
75’
PR. 22 LF 15" SRP @ 0.5%
DISCONNECT
NON-ROOFTOP
1.0926 ACS
LOT 15
PB10 PG102
L1145 F127
TM7 P216
IGBAFEN MODUPE
N/F
UTILITY POLE
EX. RELOCATED
E X . P
U B L
IC
D
R A
IN
A G
E E
S M
T
75’
DISCONNECT
NON-ROOFTOP
DRAINAGE ESMT
EX. PUBLIC
D E S
IG
N S
P E E
D M
P H
297 SF
210 SF
209 SF
170 SF
364 SF
21 SF
RAIN GARDEN RAIN GARDEN
402 SF 232 SF
ROOFTOP
DISCONNECT
75 LF @ 2.6%
ROOFTOP
DISCONNECT
75 LF @ 2.9%
ROOFTOP
DISCONNECT
75 LF @ 2.8%
ROOFTOP
DISCONNECT
75 LF @ 2.7%
ROOFTOP
DISCONNECT
75 LF @ 2.8%
ROOFTOP
DISCONNECT
75 LF @ 3.2%
STANDARD DETAIL R/2.48
PER CHARLES COUNTY
REPLACE EXISITING ASPHALT
SAW CUT EXISTING ROADWAY,
STANDARD DETAIL R/2.48
PER CHARLES COUNTY
REPLACE EXISITING ASPHALT
SAW CUT EXISTING ROADWAY,
DETAIL R/2.22
CHARLES COUNTY STANDARD
REMOVED AND REPLACED PER
EX. CURB & GUTTER TO BE
STANDARD DETAIL R/2.48
PER CHARLES COUNTY
REPLACE EXISITING ASPHALT
SAW CUT EXISTING ROADWAY,
STANDARD DETAIL R/2.48
PER CHARLES COUNTY
REPLACE EXISITING ASPHALT
SAW CUT EXISTING ROADWAY,
CONSTRUCTION
CLOSED AT A TIME DURING
WITHIN MILL HILL ROAD SHALL BE
CONSTRUCTION ONLY (1) ONE LANE
LANE CLOSURE ASSOCIATED WITH
STANDARD DETAIL MD104.02-10 FOR
CONTRACTOR SHALL FOLLOW MSHA
AND DEVONFIELD AVENUE,
FOR WORK WITHIN MILL HILL ROAD
PR. INV. IN= 210.53
EX INV. OUT= 210.25
RIM ELEV.= 217.71
EX. MH#42 (VR#04-1-0124)
STANDARD DETAIL R/2.22
KIND) PER CHARLES COUNTY
REMOVED AND REPLACED (IN
EX. CURB & GUTTER TO BE
DETAIL R/2.22
CHARLES COUNTY STANDARD
REPLACED (IN KIND) PER
SIDEWALK TO BE REMOVED AND
EX. CURB, GUTTER AND
GENERAL NOTES
THE OWNER/BUILDER SHALL CONSTRUCT THE PERMANENT DRIVEWAY ENTRANCE AND CULVERT PER PLAN.
MILL HILL ROAD NOT COMPLETED. SHOULD CONSTRUCTION WITHIN MILL HILL ROAD BE COMPLETED PRIOR TO LOT 15, LINE WITH A TEMPORARY APRON AND CULVERT CONSTRUCTED WITHIN THE RIGHT-OF-WAY SHOULD IMPROVEMENTS TO
THE OWNER/BUILDER SHALL CONSTRUCT THE PROPOSED ASPHALT DRIVEWAY TO THE MILL HILL ROAD RIGHT-OF-WAY
THIS LOT WILL REQUIRE AN EJECTOR PUMP FOR BASEMENT PLUMBING.
DWELLINGS PER THE CHARLES COUNTY COMMISSIONERS BILL 2006-14 EFFECTIVE JANUARY 18, 2007.
AUTOMATIC FIRE SPRINKLER SYSTEMS ARE REQUIRED FOR ALL SINGLE FAMILY AND MULTIFAMILY RESIDENTIAL
FACILITIES AGREEMENT DECLARATION OF COVENANTS RECORDED AT LIBER AT FOLIO .
SEE SINGLE AND MULTIPLE LOT INSPECTION AND MAINTENANCE OF PRIVATE ON-SITE STORMWATER MANAGEMENT
REGULATIONS. CHANGES IN TOPOGRAPHY OR SITE DESIGNATION MAY VOID THIS APPROVAL.
THE HEALTH DEPARTMENT APPROVAL CERTIFIES THAT THE LOT SHOWN HEREON IS CONSISTENT WITH PERMIT LAWS AND
THIS LOT SHALL BE SERVED BY PUBLIC SEWER AND WATER.
FENCE.
ADJACENT LOTS DURING CONSTRUCTION. UP0N STABILIZATION OF EITHER LOT, THE DISTURBED LOT SHALL INSTALL SILT
CONSTRUCTION OF THE SUBJECT LOT, THE CONTRACTOR MAY ELECT TO NOT INSTALL SILT FENCE BETWEEN THE TWO
SWM INSPECTION. IF ADJACENT LOT(S) ARE UNDER SAME OWNERSHIP AND ARE ALSO NOT STABILIZED AT THE TIME OF
CERTIFICATION MUST BE SUBMITTED TO THE CHARLES COUNTY INSPECTION PERSONNEL AT OR BEFORE THE TIME OF
THE U&O IS REQUESTED. ALSO, IF THE CERTIFICATION FROM A PROFESSIONAL IS REQUIRED, THEN A COPY OF THE
CHARLES COUNTY INSPECTION PERSONNEL. CALL 301-645-0700 TO SCHEDULE THE INSPECTION AT LEAST 2 DAYS BEFORE
PRIOR TO THE ISSUANCE OF THE USE AND OCCUPANCY CERTIFICATE (U&O), A FINAL INSPECTION WILL BE PERFORMED BY
LOCATION TO BE DETERMINED IN THE FIELD.
SUMP PUMP OR FOUNDATION DRAIN SHALL DISCHARGE A MINIMUM OF 10 FEET AWAY FROM THE PROPOSED DWELLING.
SEDIMENT CONTROL INSPECTOR.
AFTER THE SITE IS ADEQUATELY AND VEGETATIVELY STABILIZED, INSPECTED, AND APPROVED BY THE EROSION &
ALL NECESSARY SEDIMENT AND EROSION CONTROL MEASURES PER THE CONSTRUCTION PLANS CAN ONLY BE REMOVED
HAVE 95% GROUND COVER TO BE CONSIDERED ADEQUATELY STABILIZED.
AS TO ALL OTHER DISTURBED AREAS ON THE PROJECT SITE. ONCE THE VEGETATION IS ESTABLISHED, THE SITE SHALL
DITCHES, PERIMETER SLOPES, AND ALL SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) AND SEVEN (7) DAYS
COMPLETED WITHIN THREE (3) CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER CONTROLS, DIKES, SWALES, FOLLOWING INITIAL SOIL DISTURBANCE OR REDISTURBANCE, PERMANENT OR TEMPORARY STABILIZATION SHALL BE
COUNTY STANDARDS FOR ASPHALT DRIVEWAYS AND CONCRETE LEAD WALKS.
AND GRADES SHOWN ON THIS PLAN. PROPOSED DRIVEWAY AND LEAD WALK SHALL BE CONSTRUCTED PER CHARLES
CONTRACTOR TO GRADE DRIVEWAY AS SHOWN ON DRIVEWAY ENTRANCE DETAIL R2.33 IN CONFORMANCE TO SLOPES
DATED SEPTEMBER 4, 2013 FEMA PANEL NO. 24017C 0065C.
THERE IS NO 100 YEAR FLOODPLAIN ON THIS LOT IN ACCORDANCE WITH THE F.I.R.M. FOR CHARLES COUNTY, MARYLAND, THIS LOT IS IN COMPLIANCE WITH THE CHARLES COUNTY COMPREHENSIVE WATER AND SEWER PLAN.
ACCORDANCE WITH THE CURRENT COUNTY ORDINANCES.
CONSTRUCTION MANUAL, THE LATEST CHARLES COUNTY DETAIL MANUAL, AND IN
OF PLANNING AND GROWTH MANAGEMENT STANDARDS AND SPECIFICATIONS FOR
ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST CHARLES COUNTY DEPARTMENT
(M
IN
O R A
R T E R
IA
L C
O L L E C T O
R
APPENDIX B.4.
6. THE PLANTING SOIL AND MULCH SHALL CONFORM TO THE SPECIFICATIONS FOUND IN
MAINTAIN SOIL MOISTURE AND TO PREVENT PREMATURE CLOGGING.
5. A MULCH LAYER TWO THREE INCHES DEEP SHALL BE APPLIED TO THE PLANTING SOIL TO
4. A MINIMUM SIX TO TWELVE-INCHES LAYER OF PLANTING SOIL SHALL BE PROVIDED.
CONSIDERED.
OF HSG C AND , AT-GRADE APPLICATION S OR SOIL AMENDMENTS SHOULD BE
3. EXCAVATED RAIN GARDENS WORK BEST WHERE HSG A AND B ARE PREVALENT. IN AREAS
ABOVE THE FACILITY WITH A SURFACE PONDING DEPTH OF 6-INCHES OR LESS.
CONTRIBUTING DRAINAGE AREA. TEMPORARY STORAGE OF THE ESDv MAY BE PROVIDED
DRAINAGE AREA. A PE VALUE BASED ON EQUATION 5.3 SHALL BE APPLIED TO THE
2. THE SURFACE AREA (Af) OF RAIN GARDENS SHALL BE AT LEAST 2% OF THE CONTRIBUTING
EXCEEDED.
BIORETENTION (F-6) SHOULD BE CONSIDERED WHEN THESE REQUIREMENTS ARE
SUBDIVISION SHALL BE 2,000 SQ.FT. OR LESS. MICRO-BIORETENTION (M-6) OR
1. THE DRAINAGE AREA TO A RAIN GARDEN SERVING A SINGLE LOT IN A RESIDENTIAL
(M-7) RAIN GARDEN (SEE NOTES/DETAILS ON SHEET 3)
ON SHEET 3)
(SEE DETAIL/NOTES
O.A. DA = 1,757 SF
GARDEN
21’ (L) X 8’ (W) RAIN
CASING
OF FUTURE 24" DIA STEEL
APPROX. LOCATION
INV = 217.70
UNDERDRAIN @ 0.0%
6" PERF PVC
DRAINAGE ESMT
EX. PUBLIC
EITHER SIDE OF CROSSING LOCATION.
CONCRETE ENCASEMENT SHALL BE PLACED 10-FT ON
CH. COUNTY STANDARD DETAIL M/2.05.
WATERMAIN WHICH IS LOCATED BELOW THE SHC PER
LOT 15, THE CONTRACTOR SHALL ENCASE THE
OF THE CONTRACTOR’S INSTALLATION OF THE SHC FOR
PROPOSED WATERMAIN WITHIN MILL HILL ROAD AHEAD
SHOULD CHARLES COUNTY CIP CONSTRUCT THE
UTILITY CROSSINGS (TYPICAL)
MOUNTABLE BERM
ENTRANCE WITH
CONSTRUCTION
STABILIZED
- 95% COMPACTED SUBRADE
- 6" BANK RUN GRAVEL OR CR6
PAVEMENT
- 2" HOT MIX ASPHALT SURFACE
DRIVEWAY PAVEMENT SECTION
MilesC Assign to Discipline
<ID:1>
WellsTR Snapshot
<ID:3>
WellsTR Callout <ID:3>Same day stabilization required for all trench work.
WellsTR Assign to Discipline
<ID:3>
ONE INCH
1" =
TAX MAP / PARCEL
RL (WCD)
LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO.____________, EXPIRATION DATE:__________
TIMBERLAKE HOMES, BT.
304 HARRY TRUMAN PARKWAY
SUITE M
ANNAPOLIS, MARYLAND
PHONE# 443-837-3115
FAX# 301-366-0885
BRIAN MESSINO
SEE SEAL
PROFESSIONAL CERTIFICATION
P:\05221600\Engineer\Sheet_Files\Site\INDV-LOTS\Timberlake\PROFILE.sht Scale= 50.0000 sf / in. User= CChobert PLTdrv= PDF_Special_150.pltcfg Pentbl= TEXT_SUB.tbl 3/2/2022 11:03:25 AM www.solteszco.comP. 301.870.2166 F. 301.870.2884
Waldorf, MD 20602
401 Post Office Road, Suite 103
WALDORF OFFICE
If v e ri fic a tio n o f th e in fo rm a tio n c o n ta in e d h e re o n is n e e d e d co n ta ct s h o u ld b e m a d e d ir e ct ly w ith S
O L T E S Z S
O L T E S Z m a ke s n o w a rr a n tie s, e xp re ss o r im p lie d co n ce rn in g t h e a cc u ra cy o f a n y in fo rm a tio n t h a t h a s b e e n t ra n sm itt e d b y e le ct ro n ic m e a n s.
T h e o ri g in a l o f th is d ra w in g d o cu m e n t w a s p re p a re d b y S o lte sz In c.
S
O L T E S Z I f th is d o cu m e n t w a s n o t o b ta in e d d ir e ct ly f ro m S
O L T E S Z a n d /o r it w a s tr a n sm itt e d e le ct ro n ic a lly S
O L T E S Z c a n n o t g u a ra n te e t h a t u n a u th o ri ze d c h a n g e s a n d o r a lte ra tio n s w e re n o t m a d e b y o th e rs
Environmental Sciences
Planning
Surveying
Engineering
Soltesz DC, LLC
Frederick
Leonardtown
Waldorf
Lanham
Rockville
V8 - NCS
NO.
DESIGNED:
REVISIONS
TECHNICIAN:
BY DATE
CHECKED:
PROJECT NO.
THAN NOTED MAY REQUIRE REVISIONS TO THIS PLAN.
BEFORE PROCEEDING WITH CONSTRUCTION. CLEARANCES LESS
LESS, CONTACT THE ENGINEER AND THE UTILITY COMPANY
SHOWN ON THIS PLAN OR TWELVE (12) INCHES, WHICHEVER IS
THE START OF EXCAVATION. IF CLEARANCES ARE LESS THAN
CONTACT "MISS UTILITY" AT 1-800-257-7777, 48 HOURS PRIOR TO
PITS BY HAND, WELL IN ADVANCE OF THE START OF EXCAVATION.
EXISTING UTILITIES AND UTILITY CROSSINGS BY DIGGING TEST
MUST DETERMINE THE EXACT LOCATION AND ELEVATION OF ALL
WAS OBTAINED FROM AVAILABLE RECORDS. THE CONTRACTOR
INFORMATION CONCERNING EXISTING UNDERGROUND UTILITIES
A B C D E F G H I J K L M N O
GRID
REFERENCE
ZONING CATEGORY: W&S CATEGORY:
GRID
LIBER / FOLIO
OWNER/DEVELOPER/APPLICANT
INC.SOLTESZ,
S T
A T
E
OF MARY
L A
N D
E R
N E
I
ENG
NO AL
P R
O
E
F
S
IS
E L
R E
KCAW MADA K
CI
R
T A
P
74982 .o N
230230
230230
1+00 2+00 3+00
EX. GRADE
C/L
MH
EX.
INV. IN =210.53
EX. INV. = 210.25
EX. TOP = 217.71
VR # 04-1-0124
C.O.
C.O.
INV. = 212.62
TOP = 220.00
C.O.
INV. = 211.88
TOP = 218.50
P R
O P E R T Y L
IN
E
INV. = 214.15
EX. 18" SRMP
INV. = 214.80
EX. 6" CL-50
1" = 5’ VERT.
1"= 50’ HORZ.
SEWER PROFILE
0+00
INV. = 214.12
TOP = 218.00
COVER
3.5’ MIN.
PROP. GRADE
INV. = 215.12
TOP = 219.15
C.O.
@ 1.5%
50 LF 6" PVC(SCH 4)
90 LF 6" PVC (SCH 40) @ 1.5%
@ 2.0%
75 LF 6" PVC (SCH 40)
@ 2.0%
50 LF 6" PVC (SCH 40)
@ 2.0%
40 LF 6" PVC (SCH 40)
WATERMAIN AHEAD OF LOT 15).
IN THE EVENT THAT COUNTY CONSTRUCTS
(CONTRACTOR SHALL ENCASE WATERMAIN
FUTURE 12" WATER DIP (CL 50) INV. = 209.84’
DSP-210037: MILL HILL ROAD WATERMAIN
SEWER AND ROAD REPAIR CONSTRUCTION NOTES:
5. CONTRACTOR SHALL REPAIR PAVEMENT PER DETAIL R 2.48 SHOWN ON THIS SHEET.
S 1.07 ON THIS SHEET.
4. CONTRACTOR SHALL CONNECT TO THE EX. MH 42 VIA KOR-N-SEAL AS SHOWN ON DETAIL
EXISTING FEATURES DAMAGED DURING CONSTRUCTION OF THE SEWER CONNECTION.
3. CONTRACTOR SHALL REPLACE "IN KIND" PAVEMENT, CURB, SIDEWALKS AND ANY OTHER
2. THE 6" SEWER CONNECTION AND ROAD REPAIR SHALL BE COMPLETED IN THE SAME DAY.
EXISTING STORMDRAIN, WATER AND SEWER.
1. CONTRACTOR IS RESPONSIBLE FOR TEST PIT TO VERIFY LOCATIONS AND DEPTHS OF
SEWER PROFILE AND TYPICAL DETAILS
WDHCC/PAW
AS SHOWN
3/2/2022
1/14/202136757
@ 2.0%
40 LF 6" SHC
BF = 212.27
FF = 222.02
ONE INCH
1" =
TAX MAP / PARCEL
RL (WCD)
LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS
OF THE STATE OF MARYLAND,
LICENSE NO.____________, EXPIRATION DATE:__________
TIMBERLAKE HOMES, BT.
304 HARRY TRUMAN PARKWAY
SUITE M
ANNAPOLIS, MARYLAND
PHONE# 443-837-3115
FAX# 301-366-0885
BRIAN MESSINO
SEE SEAL
PROFESSIONAL CERTIFICATION
P:\05221600\Engineer\Sheet_Files\Site\INDV-LOTS\Timberlake\NOTES AND DETAILS.sht Scale= 30.0000 sf / in. User= CChobert PLTdrv= PDF_Special_150.pltcfg Pentbl= TEXT_SUB.tbl 3/2/2022 10:59:25 AM www.solteszco.comP. 301.870.2166 F. 301.870.2884
Waldorf, MD 20602
401 Post Office Road, Suite 103
WALDORF OFFICE
If v e ri fic a tio n o f th e in fo rm a tio n c o n ta in e d h e re o n is n e e d e d co n ta ct s h o u ld b e m a d e d ir e ct ly w ith S
O L T E S Z S
O L T E S Z m a ke s n o w a rr a n tie s, e xp re ss o r im p lie d co n ce rn in g t h e a cc u ra cy o f a n y in fo rm a tio n t h a t h a s b e e n t ra n sm itt e d b y e le ct ro n ic m e a n s.
T h e o ri g in a l o f th is d ra w in g d o cu m e n t w a s p re p a re d b y S o lte sz In c.
S
O L T E S Z I f th is d o cu m e n t w a s n o t o b ta in e d d ir e ct ly f ro m S
O L T E S Z a n d /o r it w a s tr a n sm itt e d e le ct ro n ic a lly S
O L T E S Z c a n n o t g u a ra n te e t h a t u n a u th o ri ze d c h a n g e s a n d o r a lte ra tio n s w e re n o t m a d e b y o th e rs
Environmental Sciences
Planning
Surveying
Engineering
Soltesz DC, LLC
Frederick
Leonardtown
Waldorf
Lanham
Rockville
V8 - NCS
NO.
DESIGNED:
REVISIONS
TECHNICIAN:
BY DATE
CHECKED:
PROJECT NO.
THAN NOTED MAY REQUIRE REVISIONS TO THIS PLAN.
BEFORE PROCEEDING WITH CONSTRUCTION. CLEARANCES LESS
LESS, CONTACT THE ENGINEER AND THE UTILITY COMPANY
SHOWN ON THIS PLAN OR TWELVE (12) INCHES, WHICHEVER IS
THE START OF EXCAVATION. IF CLEARANCES ARE LESS THAN
CONTACT "MISS UTILITY" AT 1-800-257-7777, 48 HOURS PRIOR TO
PITS BY HAND, WELL IN ADVANCE OF THE START OF EXCAVATION.
EXISTING UTILITIES AND UTILITY CROSSINGS BY DIGGING TEST
MUST DETERMINE THE EXACT LOCATION AND ELEVATION OF ALL
WAS OBTAINED FROM AVAILABLE RECORDS. THE CONTRACTOR
INFORMATION CONCERNING EXISTING UNDERGROUND UTILITIES
A B C D E F G H I J K L M N O
GRID
REFERENCE
ZONING CATEGORY: W&S CATEGORY:
GRID
LIBER / FOLIO
OWNER/DEVELOPER/APPLICANT
INC.SOLTESZ,
S T
A T
E
OF MARY
L A
N D
E R
N E
I
ENG
NO AL
P R
O
E
F
S
IS
E L
R E
KCAW MADA K
CI
R
T A
P
74982 .o N
NOTES AND DETAILS
THE MINIMUM SOIL CONDITIONS REQUIRED FOR PERMANENT VEGETATIVE ESTABLISHMENT ARE:
B. SOLUBLE SALTS SHALL BE LESS THAN 500 PARTS PER MILLION (PPM).
D. SOIL SHALL CONTAIN 1.5% MINIMUM ORGANIC MATTER BY WEIGHT.
E. SOIL MUST CONTAIN SUFFICIENT PORE SPACE TO PERMIT ADEQUATE ROOT PENETRATION.
A. SOIL PH SHALL BE BETWEEN 6.0 AND 7.0.
MULCH: SAME AS 1 D AND E ABOVE.
AND SPECIFICATIONS FOR VEGETATIVE ESTABLISHMENT
CHARLES SOIL CONSERVATION DISTRICT DETAILS
5. MINING OPERATIONS:
1. PERMANENT SEEDING:
2. TEMPORARY SEEDING:
THE SITE SHALL HAVE 95% GROUND COVER TO BE CONSIDERED ADEQUATELY STABILIZED.
ALL OTHER DISTURBED OR GRADED AREAS ON THE PROJECT SITE. ONCE VEGETATION IS ESTABLISHED, SLOPES GREATER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND SEVEN DAYS (7) AS TO
OF ALL PERIMETER CONTROLS, DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL
STABILIZATION SHALL BE COMPLETED WITHIN THREE (3) CALENDAR DAYS AS TO THE SURFACE
FOLLOWING INITIAL SOIL DISTURBANCE OR RE -DISTURBANCE, PERMANENT OR TEMPORARY
AT LEAST 3 TO 5 INCHES ON SLOPES FLATTER THAN 3:1.
1,000 SQUARE FEET. HARROW OR DISK LIME AND FERTILIZER INTO THE SOIL TO A DEPTH OF
APPLY 100 POUNDS DOLOMITIC LIMESTONE AND 10 POUNDS OF 10-20-20 FERTILIZER PER
OTHER ACCEPTABLE MEANS BEFORE SEEDING OCCURS. FOR SITES LESS THAN 5 ACRES,
OF AT LEAST 3 INCHES. THE TOP LAYER SHALL BE LOOSENED BY RAKING, DISKING OR
SEEDBED PREPARATION: AREA TO BE SEEDED SHALL BE LOOSE AND FRIABLE TO A DEPTHB.
MAXIMUM SEED DEPTH SHOULD BE 1/4 INCH IN CLAYEY SOILS AND ‰ INCH IN SANDY SOILS.
(SLURRY INCLUDES SEEDS AND FERTILIZER, RECOMMENDED ON STEEP SLOPES ONLY).
FIRM SEEDBED WITH A CYCLONE SEEDER, CULTIPACKER SEEDER OR HYDROSEEDERMOIST
15 AND APRIL 30 OR BETWEEN AUGUST 15 AND OCTOBER 31. APPLY SEED UNIFORMLY ON A
SEEDING: APPLY 5-6 POUNDS PER 1,000 SQUARE FEET OF TALL FESCUE BETWEEN FEBRUARYC.
IMMEDIATELY AFTER GRADING AND MAINTAINED UNTIL SEEDING CAN BE PERFORMED.
CONTROL. DURING THE TIME PERIODS WHEN SEEDING IS NOT PERMITTED, MULCH SHALL BE APPLIED
AS FOUND IN THE 2011 STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT
AS PER SECTION B-4-3 ENTITLED STANDARDS AND SPECIFICATIONS FOR SEEDING AND MULCHING
MULCHING: MULCH SHALL BE APPLIED TO ALL SEEDED AREAS IMMEDIATELY AFTER SEEDINGD.
ANCHORING TOOL IS USED, APPLY 2.5 TONS PER ACRE.
TO RELATIVELY FLAT AREAS WHERE EQUIPMENT CAN OPERATE SAFELY. IF A MULCH
THE MOST EFFECTIVE METHOD FOR SECURING MULCH, HOWEVER, IT IS LIMITED
MULCH INTO THE SOIL SURFACE TO A MINIMUM DEPTH OF 2 INCHES. THIS IS
USE A MULCH-ANCHORING TOOL WHICH IS DESIGNED TO PUNCH AND ANCHOR(I)
RECOMMENDED BY THE MANUFACTURERS.
AND SEDIMENT CONTROL OR APPROVED EQUAL SHALL BE APPLIED AT RATES
BINDERS LISTED IN THE 2011 STANDARDS AND SPECIFICATIONS FOR SOIL EROSION
REMAINDER OF THE AREA SHOULD APPEAR UNIFORM AFTER BINDER APPLICATION.
WIND CATCHES MULCH, SUCH AS IN VALLEYS AND ON CRESTS OF SLOPES. THE
LIQUID BINDERS MAY BE USED. APPLY AT HIGHER RATES AT THE EDGES WHERE(III)
FERTILIZER: 10 POUNDS OF 10-20-20 PER 1,000 SQUARE FEET.
APRIL 30 OR AUGUST 15 THROUGH NOVEMBER 30).
ANNUAL RYEGRASS - 1 POUNDS PER 1,000 SQUARE FEET (FEBRUARY 15 THROUGHSEED:
MILLET - 1 POUNDS PER 1,000 SQUARE FEET (MAY 1 THROUGH AUGUST 15).
LB/AC
SEEDING RATE
LB/1000 SF
0.23
0.34
0.09
(PANICUM VIRGATUM)
SWITCH GRASS
(FESTUCA RUBRA)
CREEPING RED FESCUE
FASCICULATE)
(CHAMAECRISTA
PARTRIDGE PEA
2/15 - 4/30 5/01 - 5/31
DEPTH
SEEDING
1/4" -1/2"
1000 SF)
(2 LB/
90 LB/AC
FERTILIZER RATE
1000 SF)
(2 LB/
90 LB/AC
1000 SF)
(1.0 LB/
45 LB/AC
2/15 - 4/30 5/01 - 5/31 1/4" -1/2"
2/15 - 4/30 5/01 - 5/31 1/4" -1/2"
PERMANENT SEEDING SUMMARY
SEED MIXTURE (_____)
HARDNESS ZONE (_____)
2011 MD STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL VEGETATIVE PRACTICES.
NOTE: USE OF THIS INFORMATION DOES NOT PRECLUDE MEETING ALL OF THE REQUIREMENTS OF THE
2011 MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL.
USE OF THIS INFORMATION DOES NOT PRECLUDE MEETING ALL OF THE REQUIREMENTS OF THE NOTE:
DATES
SEEDING
N P O
2 5 K O
7A
1000 SF)
(100 LB/
2 TONS/AC
LB/AC
SEEDING RATE
LB/1000 SF
0.23
0.34
0.09
(PANICUM VIRGATUM)
SWITCH GRASS
(FESTUCA RUBRA)
CREEPING RED FESCUE
FASCICULATE)
(CHAMAECRISTA
PARTRIDGE PEA
2/15 - 4/30 5/01 - 5/31
DEPTH
SEEDING
1/4" -1/2"
1000 SF)
(2 LB/
90 LB/AC
FERTILIZER RATE
1000 SF)
(2 LB/
90 LB/AC
1000 SF)
(1.0 LB/
45 LB/AC
2/15 - 4/30 5/01 - 5/31 1/4" -1/2"
2/15 - 4/30 5/01 - 5/31 1/4" -1/2"
SEED MIXTURE (_____)
HARDNESS ZONE (_____)
2011 MD STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL VEGETATIVE PRACTICES.
NOTE: USE OF THIS INFORMATION DOES NOT PRECLUDE MEETING ALL OF THE REQUIREMENTS OF THE
DATES
SEEDING
N P O
2 5 K O
7A
1000 SF)
(100 LB/
2 TONS/AC
CURRENT 2011 MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL.
TOPSOIL SHALL BE APPLIED AS PER THE STANDARD AND SPECIFICATIONS FOR TOPSOIL FROM THE6.
SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL.
MIXES ARE TO BE USED, SAID SELECTIONS MUST MEET THE 2011 STANDARDS AND
SUPPORT ADEQUATE GROWTH UNTIL VEGETATION IS FIRMLY ESTABLISHED. IF OTHER SEED
WHEN USING OTHER THAN THE HYDROSEEDER METHOD. IRRIGATE WHERE NECESSARY TO
ACTIVE SEDIMENT AND EROSION CONTROL PLAN.
ALL EXCESS DIRT TO BE REMOVED TO AN APPROVED SITE WITH AN APPROVED AND 26.
FILL, COMPACTING, SEEDING AND MULCH.
THE SEDIMENT CONTROL DEVICES WILL BE REMOVED BY BACKFILLING WITH CLEAN 25.
THOSE SHOWN HEREON.
CONTRACTOR TO VERIFY ALL EXISTING UTILITIES, BUT MAY NOT BE LIMITED TO 24.
SEDIMENT TRAPS SHALL BE CONSTRUCTED PER DETAIL.23.
SILT FENCE INSTALLATION SHALL BE PER S.C.S. STANDARD DETAIL E-1. 22.
DETAIL B-1.
STABILIZED CONSTRUCTION ENTRANCE TO BE INSTALLED PER S.C.S. STANDARD 21.
FINAL STABILIZATION OF ALL SITES BEFORE REMOVAL OF THE SEDIMENT CONTROLS.
APPROVAL SHALL BE OBTAINED BY THE OWNER/ DEVELOPER/ CONTRACTOR UPON 20.
SEEDING UPON COMPLETION OF FINAL GRADING.
ALL DISTURBED AREAS SHALL BE ADEQUATELY STABILIZED WITH PERMANENT 19.
PROPERTIES AFFECTED BY THIS PLAN.
GRADING OR OTHER WORK TO BE PERFORMED ON ADJACENT OR DOWNSTREAM
PRACTICES AND THE DISCHARGE OF STORM WATER ONTO OR ACROSS AND
THE SEDIMENT AND EROSION CONTROL PRACTICES, STORM WATER MANAGEMENT
EASEMENTS, RIGHT, AND/OR RIGHTS-OF-WAY PURSUANT TO THE DISCHARGE FROM
THE DEVELOPER IS RESPONSIBLE FOR THE ACQUISITION OF ALL REQUIRED 18.
INSPECTOR HAS APPROVED SUCH REMOVAL.
UNTIL THE UPHILL AREAS HAVE BEEN STABILIZED AND THE SEDIMENT CONTROL
FREE OF ANY DEPOSITS OF SEDIMENT, I.E. THROUGH USE OF INLET PROTECTION
THE THROATS OF ALL STORM DRAINAGE INLETS SHALL BE PROTECTED AND KEPT 17.
PLACED IN 6" LIFTS AND COMPACTED AS PLACED.
AS PER MD 378 CONSTRUCTION SPECIFICATIONS REQUIREMENTS. FILLS ARE TO BE
OF 10% SHALL BE ALLOWED FOR SETTLEMENT. COMPACTION FOR PONDS IS TO BE
WOODY VEGETATION, ROCKS, AND OTHER OBJECTIONABLE MATERIAL. A MINIMUM
MATERIAL TAKEN FROM APPROVED BORROW AREAS AND SHALL BE FREE OF ROOTS,
ALL STRUCTURES UTILIZING COMPACTED EARTH FOR FILL ARE TO BE COMPOSED OF 16.
AND STABILIZE THAT SAME DAY.
INSPECTOR. AFTER REMOVAL OF SEDIMENT PRACTICES, CONTRACTOR TO SHAPE
DEVICES SHALL BE WITH THE APPROVAL OF THE COUNTY SEDIMENT CONTROL
DEVELOPMENT SHALL BE DONE IMMEDIATELY WHEN REQUIRED. REMOVAL OF THESE
CONTROL DEVICES DURING THE UNDERGOING GRADING, CONSTRUCTION AND
CONTRIBUTING WATER-SHED HAS BEEN STABILIZED. MAINTENANCE TO SEDIMENT
ALL SEDIMENT CONTROL DEVICES ARE TO REMAIN IN PLACE UNTIL THE 15.
REMOVED BY THE DEVELOPER.
PERIODIC CLEAN OUT OF SEDIMENT ABOVE THE DESIGN CLEAN OUT SHALL BE
SEDIMENT TRAPS AND OTHER ITEMS MUST BE MAINTAINED AND INSPECTED AND 14.
IMMEDIATELY AFTER THEY ARE CONSTRUCTED.
SEDIMENT TRAPS AND DIVERSION DIKES ARE TO RECEIVE TEMPORARY SEEDING 13.
RESPONSIBLE PERSON, AND ANY NEEDED MAINTENANCE PERFORMED IMMEDIATELY
WEEKLY AND AFTER EACH RAIN FALL EVENT, BY THE CONTRACTOR OR OTHER
EROSION AND SEDIMENT PRACTICES, AND SITE IN GENERAL, MUST BE INSPECTED 12.
DAY.
ALL SEDIMENT CONTROL STRUCTURES SHALL BE FUNCTIONAL AT THE END OF EACH 11.
CONTROL MATTING (AS APPLICABLE OR REQUIRED).
SOD OR WITH A COMBINATION OF SEED, SOIL, SOIL AMENDMENT, AND EROSION
ALL GRADED SLOPES STEEPER THAN (3:1) SHALL BE STABILIZED IMMEDIATELY WITH 10.
LENGTH OF WIDTH OF THE STABILIZED CONSTRUCTION ENTRANCES.
PUBLIC RIGHTS-OF WAY BY MEANS OF 2�-3�AGGREGATE AT A DEPTH OF 6�OVER THE
ALL AREAS OF INGRESS-EGRESS ARE TO BE PROTECTED FROM TRACKING MUD ONTO 9.
AND MULCHING. SEE SEEDING NOTES.
WITHIN SEVEN (7) DAYS ARE TO BE STABILIZED WITH A PERMANENT TYPE SEEDING
AREAS DISTURBED BY ON SITE GRADING THAT ARE NOT TO BE CONSTRUCTED ON 8.
BEGINS.
APPROVAL OF COUNTY SEDIMENT CONTROL INSPECTOR BEFORE CONSTRUCTION
TO CONSTRUCTION AND THEY SHALL BE IN AN OPERATIONAL CONDITION WITH THE
ALL SEDIMENT AND EROSION CONTROL PRACTICES ARE TO BE CONSTRUCTED PRIOR 7.
CONTROL, HEREIN REFERRED TO AS THE STANDARDS AND SPECIFICATIONS (S.C.S).
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT
CONTRACTOR INSTALLING THE ABOVE SHALL OBTAIN AND FOLLOW THE 2011 6.
STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL.
MAINTAINED IN ACCORDANCE WITH THE APPLICABLE PUBLISHED 2011 MARYLAND
ALL EROSION AND SEDIMENT CONTROL PRACTICES ARE TO BE CONSTRUCTED AND 5.
AND EROSION BEGINNING THE PROJECT.
ENVIRONMENT APPROVED TRAINING PROGRAM FOR THE CONTROL OF SEDIMENT
PROJECT WILL HAVE A CERTIFICATION OF TRAINING AT A DEPARTMENT OF
THIS PLAN AND THAT RESPONSIBLE PERSONNEL INVOLVED IN THE CONSTRUCTION
CONSTRUCTION, OR DEVELOPMENT. OR, ALL OF THESE, WILL BE DONE PURSUANT TO
CERTIFICATION BY THE OWNER OR DEVELOPER THAT ANY CLEARING, GRADING,
PERMIT REQUIREMENTS ARE MET.
GROUND COVER TO BE CONSIDERED ADEQUATELY STABILIZED) AND ALL
STABILIZED (ONCE VEGETATION IS ESTABLISHED, THE SITE SHALL HAVE 95%
MAINTAINED ON A CONTINUING BASIS UNTIL THE SITE IS PERMANENTLY
PROJECT SITE. THE IN-PLACE SEDIMENT CONTROL MEASURES WILL BE
SEVEN DAYS AS TO ALL OTHER DISTURBED OR GRADED AREAS ON THE b.
HORIZONTAL TO 1 VERTICAL (3H : 1V); AND
SWALES, DITCHES PERIMETER SLOPES AND ALL SLOPES GREATER THAN 3
THREE CALENDAR DAYS AS TO THE SURFACE OF ALL PERIMETER DIKES, a.
TEMPORARY STABILIZATION SHALL BE COMPLETED WITHIN:
FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, PERMANENT OR 4.
CONTROLS.
AFTER FINIAL STABILIZATION AND AFTER THE REMOVAL OF SEDIMENT f.
UPON FINAL STABILIZATION BEFORE REMOVAL OF SEDIMENT CONTROLS; ANDe.
DEPARTMENT MIGHT DEEM APPROPRIATE
THE DEPARTMENT MAY MAKE ADDITIONAL INSPECTIONS AS SUCH
OTHER WORK IN ACCORDANCE WITH THE DEVELOPMENT SERVICES PERMIT.
UPON COMPLETION OF INSTALLATION OF ALL VEGETATIVE MEASURES AND ALL d.
CONTROL FACILITIES, BUT PRIOR TO ANY SEEDING , SODDING ,OR PLANTING;
COMPLETION OF FINAL GRADING, PERMANENT DRAINAGE AND EROSION
PERMANENT DRAINAGE OR OTHER SITE DEVELOPMENT IMPROVEMENTS;UPON
UPON COMPLETION OF ROUGH GRADING, BUT PRIOR TO PLACING TOP SOIL, c.
GROUND TO RECEIVE FILL, BUT PRIOR TO BEGINNING ANY PLACEMENT;
DISPOSAL OF ALL UNSUITABLE MATERIALS, AND PREPARATION OF THIS
UPON COMPLETION OF STRIPPING, THE STOCKPILING OF TOP SOIL, THE b.
AUTHORIZED UNTIL INITIAL APPROVAL BY THE DEPARTMENT IS MADE;
GRADING. OTHER BUILDING OR GRADING INSPECTION APPROVALS MAY NOT BE
CONTROLS, PRIOR TO PROCEEDING WITH ANY OTHER EARTH DISTURBANCE OR
UPON COMPLETION OF INSTALLATION OF PERIMETER EROSION AND SEDIMENT a.
DEVELOPMENT OF THE SITE, OR OF EACH SUBDIVISION THEREOF:
INSPECTIONS BY THE DEPARTMENT AT THE FOLLOWING STAGES IN THE
AFTER COMMENCING INITIAL OPERATION, THE PERMITTEE SHALL REQUIRE 3.
COMMENCING WORK.
COUNTY SEDIMENT CONTROL INSPECTION: 301 645 0700) AT LEAST 5 DAYS PRIOR TO
CONTRACTOR / DEVELOPER MUST NOTIFY THE COMPLIANCE PROGRAM (CHARLES 2.
PRIOR TO THE START OF ANY CONSTRUCTION.
CONTRACTOR SHALL NOTIFY CHARLES COUNTY DEPT. OF PUBLIC WORKS 3 DAYS 1.
SEDIMENT CONTROL NOTES
ANALYSES WILL BE PROVIDED TO THE GRADING INSPECTOR AS WELL AS THE CONTRACTOR.
GRADING OR AS RECOMMENDED BY THE SEDIMENT CONTROL INSPECTOR. RATES AND
GREATER THAN 5 ACRES. SOIL TESTS WILL BE DONE AT COMPLETION OF INITIAL ROUGH
SOIL TESTS: LIME AND FERTILIZER WILL BE APPLIED PER SOIL TESTS RESULTS FOR SITESA.
THEN A SANDY SOIL (<30% SILT PLUS CLAY) WOULD BE ACCEPTABLE.
MOISTURE. AN EXCEPTION IS IT LOVEGRASS OR SERECIA LESPEDEZA IS TO BE PLANTED,
(>30% SILT PLUS CLAY) TO PROVIDE THE CAPACITY TO HOLD A MODERATE AMOUNT OF
C. THE SOIL SHALL CONTAIN LESS THAN 40% CLAY BUT ENOUGH FINE GRAINED MATERIAL
MULCH UNIFORMLY, MECHANICALLY OR BY HAND, TO A DEPTH OF 1-2 INCHES.
KINDS OF WEEDS AND SHALL BE COMPLETELY FREE OF PROHIBITED NOXIOUS WEEDS. SPREAD
IS USED, APPLY 2.5 TONS PER ACRE. MULCH MATERIALS SHALL BE RELATIVELY FREE OF ALL
PER ACRE OR 90 POUNDS PER 1,000 SQUARE FEET (2 BALES). IF A MULCH-ANCHORING TOOL
MULCH SHALL BE UNROTTED, UNCHOPPED, SMALL GRAIN STRAW APPLIED AT A RATE OF 2 TONS
METHODS ARE PERMITTED:
MULCH APPLICATION TO MINIMIZE MOVEMENT BY WIND OR WATER. THE FOLLOWING
SECURING STRAW MULCH: STRAW MULCH SHALL BE SECURED IMMEDIATELY FOLLOWINGE.
USE 50 POUNDS OF WOOD CELLULOSE FIBER PER 100 GALLONS OF WATER.
BINDER AT A NET DRY WEIGHT OF 750 POUNDS PER ACRE. IF MIXED WITH WATER,
WOOD CELLULOSE FIBER MAY BE USED FOR ANCHORING STRAW. APPLY THE FIBER(II)
RECOMMENDATIONS.
WILL BE STAPLED TO THE GROUND ACCORDING TO MANUFACTURER’S
LIGHTWEIGHT PLASTIC NETTING MAY BE USED TO SECURE MULCH. THE NETTING(IV)
100 POUNDS OF DOLOMITIC LIMESTONE PER 1,000 SQUARE FEET.LIME:
SLIPPAGE.
OTHER FILLS SHALL BE COMPACTED SUFFICIENTLY SO AS TO BE STABLE AND PREVENT EROSION AND
EMBANKMENTS SHALL BE COMPACTED AS PER MD-378 CONSTRUCTION SPECIFICATIONS. ALL
WITHIN THE BUILDING AREA IS TO BE COMPACTED TO A MINIMUM OF 95% DENSITY. FILLS FOR POND AND PARKING AREAS ARE TO BE CLASSIFIED AS PER CHARLES COUNTY REQUIREMENTS. ANY FILL LAYERS, EACH LAYER HAVING A LOOSE THICKNESS OF NOT MORE THAN 8 INCHES. ALL FILL IN ROADWAYS NO FILLS MAY BE PLACED ON FROZEN GROUND. ALL FILL TO BE PLACED IN APPROXIMATELY HORIZONTAL3.
RAINFALL, IRRIGATION SHOULD BE PERFORMED TO ENSURE ESTABLISHMENT OF SOD.
EXTREME TEMPERATURE MAY ADVERSELY AFFECT ITS SURVIVAL. IN THE ABSENCE OF ADEQUATE FROZEN GROUND. SOD SHALL NOT BE TRANSPLANTED WHEN MOISTURE CONTENT (DRY OR WET) AND/OR ADDITIONAL WATERING FOR ESTABLISHMENT MAY BE REQUIRED. SOD IS NOT TO BE INSTALLED ON
TO BE PERMANENTLY SODDED OR PROTECTED WITH AN APPROVED EROSION CONTROL NETTING.
INSURE POSITIVE ROOT CONTACT WITH THE SOIL. ALL SLOPES STEEPER THAN 3:1, AS SHOWN, ARE
ABUTTING. JOINTS ARE TO BE STAGGERED BETWEEN ROWS. WATER AND ROLL OR TAMP SOD TO
IRRIGATE SOIL PRIOR TO LAYING SOD. SOD IS TO BE LAID ON THE CONTOUR WITH ALL ENDS TIGHTLY APPROVED SOD; LIME AND FERTILIZER PER PERMANENT SEEDING SPECIFICATIONS AND LIGHTLY SOD SHALL BE AS NOTED IN SECTION (B) ABOVE. PERMANENT SOD IS TO BE TALL FESCUE, STATE INSTALLATION OF SOD SHOULD FOLLOW PERMANENT SEEDING DATES. SEEDBED PREPARATION FOR
AND MIXTURES:
SEDIMENT CONTROL PLANS FOR MINING OPERATIONS MUST INCLUDE THE FOLLOWING SEEDING DATES
SERICEA LESPEDEZA AT THE MINIMUM RATE OF 0.5 POUNDS PER 1,000 SQUARE FEET.
USE SEED MIXTURE OF TALL FESCUE AT THE RATE OF 2 POUNDS PER 1,000 SQUARE FEET AND FOR SEEDING DATES OF FEBRUARY 1 THROUGH APRIL 30 AND AUGUST 15 THROUGH OCTOBER 31, AND SPECIFICATIONS FOR EROSION AND SEDIMENT CONTROL.
PREPARATION, TOPSOIL AND SOIL AMENDMENTS AS FOUND IN THE 2011 MARYLAND STANDARDS
ACCORDANCE WITH SECTION B-4-2 TITLED STANDARD AND SPECIFICATIONS FOR SOIL
F. IF THESE CONDITIONS CANNOT BE MET BY SOILS ON SITE, ADDING TOPSOIL IS REQUIRED IN
(10 - 20 - 20)
FERTILIZER RATE
(10 LB/1000 SF)
436 LB/AC
1000 SF)
(90 LB/
2 TONS/AC
2/15 - 4/30 8/15 - 11/30 2/15 - 4/30 8/15 - 11/30 2/15 - 4/30 8/15 - 11/30
DEPTH
SEEDING
1"
1"
1"
SEEDING RATE
LB/AC LB/1000 SF
2.8
2.2
1.7
2011 MD STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL VEGETATIVE PRACTICES.
NOTE: USE OF THIS INFORMATION DOES NOT PRECLUDE MEETING ALL OF THE REQUIREMENTS OF THE
RYE3
1 BARLEY
OATS
NO. SPECIES
DATES
SEEDING
FROM TABLE 26
SEED MIXTURE (HARDNESS ZONE _____)
RATE
LIME
7A
(10 - 20 - 20)
FERTILIZER RATE
(10 LB/1000 SF)
436 LB/AC
1000 SF)
(90 LB/
2 TONS/AC
2/15 - 4/30 8/15 - 11/30 2/15 - 4/30 8/15 - 11/30 2/15 - 4/30 8/15 - 11/30
DEPTH
SEEDING
1"
1"
1"
SEEDING RATE
LB/AC LB/1000 SF
2.8
2.2
1.7
2011 MD STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL VEGETATIVE PRACTICES.
NOTE: USE OF THIS INFORMATION DOES NOT PRECLUDE MEETING ALL OF THE REQUIREMENTS OF THE
TEMPORARY SEEDING SUMMARY
RYE3
1 BARLEY
OATS
NO. SPECIES
DATES
SEEDING
FROM TABLE 26
SEED MIXTURE (HARDNESS ZONE _____)
RATE
LIME
7A
SEQUENCE OF CONSTRUCTION
PROFILE
EXISTING PAVEMENT
EARTH FILL
PIPE (SEE NOTE 6)
5:
1 5:1
PLAN VIEW
GROUND
EXISTING
W
ID
T H
F T
M
IN
(6 IN MIN.)
MOUNTABLE BERM
3 FT
EXISTINGPAVEMENT
EDGE OF
50 FT MIN.
LENGTH *
50 FT MIN.
SCE
AND WIDTH OF ENTRANCE
AGGREGATE OVER LENGTH
MIN. 6 IN OF 2 TO 3 IN
GEOTEXTILE
NONWOVEN
IS DIRECTED TO AN APPROVED SEDIMENT CONTROL PRACTICE.
ROADWAY TO REMOVE MUD TRACKED ONTO PAVEMENT IS NOT ACCEPTABLE UNLESS WASH WATER
TRACKED ONTO ADJACENT ROADWAY BY VACUUMING, SCRAPING, AND/OR SWEEPING. WASHING
SPECIFIED DIMENSIONS. IMMEDIATELY REMOVE STONE AND/OR SEDIMENT SPILLED, DROPPED, OR
OTHER REPAIRS AS CONDITIONS DEMAND TO MAINTAIN CLEAN SURFACE, MOUNTABLE BERM, AND
MAINTAIN ENTRANCE IN A CONDITION THAT MINIMIZES TRACKING OF SEDIMENT. ADD STONE OR MAKE 5.
(WITHOUT REBAR) AT LEAST 6 INCHES DEEP OVER THE LENGTH AND WIDTH OF THE SCE.
PLACE CRUSHED AGGREGATE (2 TO 3 INCHES IN SIZE) OR EQUIVALENT RECYCLED CONCRETE 4.
PREPARE SUBGRADE AND PLACE NONWOVEN GEOTEXTILE, AS SPECIFIED IN SECTION H-1 MATERIALS.3.
NOT LOCATED AT A HIGH SPOT.
DRAINAGE TO CONVEY, A PIPE IS NOT NECESSARY. A MOUNTABLE BERM IS REQUIRED WHEN SCE IS
AS SPECIFIED ON APPROVED PLAN. WHEN THE SCE IS LOCATED AT A HIGH SPOT AND HAS NO
BERM WITH 5:1 SLOPES AND A MINIMUM OF 12 INCHES OF STONE OVER THE PIPE. PROVIDE PIPE
MAINTAINING POSITIVE DRAINAGE. PROTECT PIPE INSTALLED THROUGH THE SCE WITH A MOUNTABLE
PIPE ALL SURFACE WATER FLOWING TO OR DIVERTED TOWARD THE SCE UNDER THE ENTRANCE, 2.
MINIMUM AT THE EXISTING ROAD TO PROVIDE A TURNING RADIUS.
FEET FOR SINGLE RESIDENCE LOT). USE MINIMUM WIDTH OF 10 FEET. FLARE SCE 10 FEET
MUST TRAVEL OVER THE ENTIRE LENGTH OF THE SCE. USE MINIMUM LENGTH OF 50 FEET (*30
PLACE STABILIZED CONSTRUCTION ENTRANCE IN ACCORDANCE WITH THE APPROVED PLAN. VEHICLES 1.
CONSTRUCTION SPECIFICATIONS
STANDARD SYMBOL
ENTRANCE CONSTRUCTION
STABILIZED DETAIL B-1
WATER MANAGEMENT ADMINISTRATION
MARYLAND DEPARTMENT OF ENVIRONMENT
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL
NATURAL RESOURCES CONSERVATION SERVICE
U.S. DEPARTMENT OF AGRICULTURE
MIN.
FT
FLOW
POSTS
CROSS SECTION
ELEVATION
STEP 1 STEP 2
GROUND
UNDISTURBED
INTO GROUND
8 IN MIN. DEPTH
THE GROUND
A MIN. OF 16 IN INTO
FENCE POST DRIVEN
FENCE SECTIONS (TOP VIEW)
JOINING TWO ADJACENT SILT
CENTER TO CENTER
6 FT MAX.
DRIVEN MIN. 16 IN INTO GROUND
36 IN MIN. FENCE POST LENGTH
POST LENGTH
36 IN MIN. FENCE
STEP 3
STAPLE
1 OF 2 2 OF 2
SF
ABOVE GROUND
FENCE POST 18 IN MIN.
TWIST POSTS TOGETHERSTAPLE
STAPLE STAPLE
STAPLE STAPLE
STAPLESTAPLE
WOVEN SLIT FILM GEOTEXTILE
16 IN MIN. HEIGHT OF
GEOTEXTILE
WOVEN SLIT FILM
OF GEOTEXTILE.
THE SOIL ON BOTH SIDES
BACKFILL AND COMPACT
INTO THE GROUND.
MIN. OF 8 IN VERTICALLY
EMBED GEOTEXTILE
OCCURS, REINSTALL FENCE.
SEDIMENT REACHES 25% OF FENCE HEIGHT. REPLACE GEOTEXTILE IF TORN. IF UNDERMINING
OR WHEN IN SILT FENCEREMOVE ACCUMULATED SEDIMENT AND DEBRIS WHEN BULGES DEVELOP 8.
ENDS OF THE SILT FENCE.
45 DEGREES TO THE MAIN FENCE ALIGNMENT TO PREVENT RUNOFF FROM GOING AROUND THE
EXTEND BOTH ENDS OF THE SILT FENCE A MINIMUM OF FIVE HORIZONTAL FEET UPSLOPE AT7.
ACCORDANCE WITH THIS DETAIL.
WHERE TWO SECTIONS OF GEOTEXTILE ADJOIN: OVERLAP, TWIST, AND STAPLE TO POST IN 6.
COMPACT THE SOIL ON BOTH SIDES OF FABRIC.
EMBED GEOTEXTILE A MINIMUM OF 8 INCHES VERTICALLY INTO THE GROUND. BACKFILL AND 5.
REQUIREMENTS IN SECTION H-1 MATERIALS.
INSPECTION/ENFORCEMENT AUTHORITY SHOWING THAT THE GEOTEXTILE USED MEETS THE
PROVIDE MANUFACTURER CERTIFICATION TO THE AUTHORIZED REPRESENTATIVE OF THE 4.
AND MID-SECTION.
GEOTEXTILE SECURELY TO UPSLOPE SIDE OF FENCE POSTS WITH WIRE TIES OR STAPLES AT TOP
USE WOVEN SLIT FILM GEOTEXTILE AS SPECIFIED IN SECTION H-1 MATERIALS AND FASTEN 3.
APART.
USE 36 INCH MINIMUM POSTS DRIVEN 16 INCH MINIMUM INTO GROUND NO MORE THAN 6 FEET 2.
NOT LESS THAN 1 POUND PER LINEAR FOOT.
AN ALTERNATIVE TO WOODEN POST USE STANDARD "T" OR "U" SECTION STEEL POSTS WEIGHING
INCH (MINIMUM) SQUARE CUT OF SOUND QUALITY HARDWOOD. AS 16
3 X 14
3USE WOOD POSTS 11.
CONSTRUCTION SPECIFICATIONS
B A
A
A
B
B
B
A
STANDARD SYMBOL
SILT FENCEDETAIL E-1SF
STANDARD SYMBOL
SILT FENCEDETAIL E-1
WATER MANAGEMENT ADMINISTRATION
MARYLAND DEPARTMENT OF ENVIRONMENT
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL
NATURAL RESOURCES CONSERVATION SERVICE
U.S. DEPARTMENT OF AGRICULTURE
WATER MANAGEMENT ADMINISTRATION
MARYLAND DEPARTMENT OF ENVIRONMENT
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL
NATURAL RESOURCES CONSERVATION SERVICE
U.S. DEPARTMENT OF AGRICULTURE
CONFIGURATION
FINAL
30’
3/2/2022 C.C. C.C.
36757 1/14/2021
6 IN MIN.
5 FT
MB
STONE
2 TO 3 IN
10 FT MIN.
FLOW
2 TO 3 IN STONE
ROADWAY
ROADWAY
EARTH DIKE
EARTH DIKE
A
A
SECTION A-A
ISOMETRIC VIEW
POSITIVE DRAINAGE.
DEMAND TO MAINTAIN SPECIFIED DIMENSIONS. REMOVE ACCUMULATED SEDIMENT AND DEBRIS. MAINTAIN
MAINTAIN LINE, GRADE, AND CROSS SECTION. ADD STONE OR MAKE OTHER REPAIRS AS CONDITIONS 4.
LENGTH AND WIDTH OF THE MOUNTABLE BERM.
PLACE 2 TO 3 INCH STONE OR EQUIVALENT RECYCLED CONCRETE AT LEAST 6 INCHES DEEP OVER THE 3.
PRIOR TO PLACING STONE.
PLACE NONWOVEN GEOTEXTILE, AS SPECIFIED IN SECTION H-1 MATERIALS, OVER THE EARTH MOUND 2.
USE MINIMUM WIDTH OF 10 FEET TO ALLOW FOR VEHICULAR PASSAGE. 1.
CONSTRUCTION SPECIFICATIONS
GEOTEXTILE
NONWOVEN
30 IN MIN/B DIKE
18 IN MIN/A DIKE
COMPACTED EARTH
STANDARD SYMBOL
MOUNTABLE BERMDETAIL C-8
WATER MANAGEMENT ADMINISTRATION
MARYLAND DEPARTMENT OF ENVIRONMENT
MARYLAND STANDARDS AND SPECIFICATIONS FOR SOIL EROSION AND SEDIMENT CONTROL
NATURAL RESOURCES CONSERVATION SERVICE
U.S. DEPARTMENT OF AGRICULTURE
25 FT (A DIKE) / 35 FT (B DIKE)
ON THE SAME DAY AS THE REMOVAL OF THE SEDIMENT AND EROSION CONTROLS WITH SOD.
REMOVE SEDIMENT AND EROSION CONTROLS. ALL DISTURBED AREAS MUST BE STABILIZED
9. WITH THE APPROVAL OF THE INSPECTORS, AND ADEQUATE VEGATATIVE ESTABLISHMENT,
MAINTAINED THROUGHOUT SITE CONSTRUCTION.
8. SITE MUST BE GRADED IN SUCH A MANNER THAT THE APPROVED DRAINAGE DIVIDES ARE
INSPECTOR HAS APPROVED SUCH REMOVAL.
GROUNDCOVER TO BE CONSIDERED ADEQUATELY STABILIZED AND THE SEDIMENT CONTROL
STABILIZATION. ONCE VEGETATION IS ESTABLISHED, THE SITE SHALL HAVE 95%
7. SEDIMENT AND EROSION CONTROLS CAN NOT BE REMOVED UNTIL THE SITE HAS ADEQUATE
GARDEN. (SAME DAY)
UPON COMPLETION OF FINAL GRADING, CONTRACTOR SHALL INSTALL AND STABALIZED ESD RAIN
AREA HAS ACHIEVED 95% VEGETATION STABILIZATION. (2 MONTHS)
MATTING. STORM WATER DEVICES SHALL NOT BE INSTALLED UNTIL THE CONTRIBUTING DRAINAGE
LOCATED IN HIGH EROBILE SOILS SHALL BE PERMANENTLY STABALIZE WITH SOIL STABALIZATION
SHALL BE FINE GRADED AND PERMANENTLY STABLIZED WITH SEED AND MULCH. LOTS THAT ARE
6. UPON COMPLETION OF CONSTRUCTION, DISTURBED AREAS
(2 MONTHS)
COUNTY INSPECTION, BEGIN BUILDING CONSTRUCTION, INSTALL THE PERMANENT DRIVEWAY.
SPECIFICATION FOR VEGATATIVE ESTABLISHMENT OF TEMPORARY STABILIZATION. FOLLOWING
NOTIFIED OF THE DISPOSAL LOCATION. TOP SOIL SHALL BE PROVIDED PER 2011 TOPSOIL
APPROVED EROSION AND SEDIMENT CONTROL PLAN WHICH THE SITE INSPECTOR MUST BE
SHOWN ON THIS LOT. IF EXCESS MATERIAL MUST BE TAKEN FROM SITE TO A SITE WITH AN
NECESSARY, CONTRACTOR SHALL PLACE SOIL WITHIN THE TEMPORARILY STOCKPILE AREA
AROUND SITE SO THAT NO STOCKPILE IS NECESSARY. IF IMPORT OF BACKFILL MATERIAL IS
BUILDING SITE AS NECESSARY FOR THE BUILDING FOOTERS. EXCAVATED SOIL TO BE SPREAD
5. INSTALL AND STABILIZE TEMPORARY ACCESS DRIVE TO BUILDING SITE. EXCAVATE THE
PERSONNEL, AND ANY NEEDED MAINTENANCE PERFORMED IMMEDIATELY.
AND AFTER EACH RAINFALL EVENT, BY THE CONTRACTOR OR OTHER RESPONSIBLE
4. EROSION AND SEDIMENT PRACTICES, AND SITE IN GENERAL, MUST BE INSPECTED WEEKLY
AS SHOWN ON PLAN. (3 DAYS)
DISTURBED BY THIS CONSTRUCTION. TEMPORARILY STABILIZE WITH SEED AND MULCH
3. AFTER APPROVAL OF THE COUNTY INSPECTOR, CLEAR AND GRUB THE AREAS TO BE
OTHER EARTH DISTURBANCE OR GRADING.
OF PERIMETER EROSION AND SEDIMENT CONTROLS, BUT BEFORE PROCEEDING WITH ANY
THE APPROVAL OF THE SEDIMENT CONTROL INSPECTOR IS REQUIRED UPON INSTALLATION
APPROVED BY THE CHARLES SOIL CONSERVATION DISTRICT.
CONFLICT WITH THIS PLAN, WILL REQUIRE PLAN REVISIONS FOR ALL AFFECTED PLANS
SEDIMENT AND EROSION CONTROL PLAN WITH A SEQUENCE AND/OR PRACTICES WHICH
95% GROUNDCOVER TO BE CONSIDERED ADEQUATELY STABILIZED. ANY OTHER APPROVED
STABILIZATION IS INSTALLED. ONCE VEGETATION IS ESTABLISHED, THE SITE SHALL HAVE
TEMPORARILY STABILIZED WITH STRAW DURING CONSTRUCTION UNTIL PERMANENT
BY THE END OF EACH DAY. ANY STEEP SLOPES ALONG THE SIDES OF THE LOT SHALL BE
SEDIMENT CONTROLS SHALL BE PROVIDED ONLY IF INSTALLATION CANNOT BE STABALIZED
DISTURBANCE FOR WATERLINE AND SEWER LINE CONSTRUCTION, OTHERWISE EROSION AND
ACTIVE GRADING. SAME DAY STABALIZATION SHALL BE COMPLETED UPON ANY
DAYS AS TO ALL OTHER DISTURBED OR GRADED AREAS ON THE PROJECT SITE NOT UNDER
SLOPES, AND ALL SLOPES GREATER THEN 3 HORIZONTAL TO 1 VERTICAL (3:1); AND SEVEN (7)
TO THE SURFACE OF ALL PERIMETER CONTROLS, DIKES, SWALES, DITCHES, PERIMETER
TEMPORARY STABILIZATION SHALL BE COMPLETED WITHIN THREE (3) CALENDAR DAYS AS
FOLLOWING INITIAL SOIL DISTURBANCE OR RE-DISTURBANCE, SEEDING FOR PERMANENT OR
CONSTRUCTION ENTRANCE AS SHOWN ON PLAN. (7 DAYS)
FENCE, EARTH DIKE, SUPER SILT FENCE, DIVERSION FENCE, TSOS, AND STABILIZED
2. CLEAR AND GRUB ONLY AS REQUIRED TO INSTALL PERIMETER CONTROLS INCLUDING SILT
AT 301-645-0700, FIVE (5) DAYS PRIOR TO COMMENCING WORK.
1. CONTRACTOR / DEVELOPER MUST NOTIFY THE COUNTY SEDIMENT CONTROL INSPECTOR
SPECIES OF PLANTS AND PROPER SPACING PER RAIN GARDEN AREA.
NOTE: THIS IS AN EXAMPLE PLANTING PLAN ONLY, CONTRACTOR SHALL DETERMINE
RAIN GARDEN MATERIAL EXAMPLE
RAIN GARDEN MATERIAL SPECIFICATIONS
RAIN GARDEN CONSTRUCTION, INSPECTION, & MAINTENANCE CRITERIA
TYPICAL RAIN GARDEN DETAIL
| 22_0302 Sheet1_Lot15 |
| 22_0302 Sheet2_Lot15 |
| 22_0302 Sheet3_Lot15 |
| 2022-03-03T10:45:42-0500 | |
| Patrick Adam Wackerle |
| 2022-03-03T10:45:57-0500 | |
| Patrick Adam Wackerle |
| 2022-03-03T10:46:12-0500 | |
| Patrick Adam Wackerle |
| 2022-03-03T10:46:29-0500 | |
| Patrick Adam Wackerle |
File details come from the government source that posted it. Updated .