B2.09.02_DRAFT-Sec_L_Attachment_B_CRMF_Cleanroom_Bid_Breakdown_Draft.xlsx
XLSX spreadsheet 26 KB Posted
- Solicitation number
- SLAC_DRAFT_RFP_369005_CRMF_Cleanroom_Construction
- Issued by
-
Department of Energy Office of Science
About this file
This is a bid breakdown form for the Cryomodule Repair and Maintenance Facility (CRMF) Cleanroom Construction project, formatted using the Uniformat II classification system. The document serves as a template for contractors to submit pricing proposals for cleanroom installation inside the existing CRMF building at SLAC National Accelerator Laboratory in Menlo Park, California. The bid breakdown is organized into two primary sections: Building Elements (Categories A through F, including substructure, shell, interiors, services, equipment and furnishings, and special construction) and Sitework (Category G, encompassing site preparation, improvements, and utilities). Contractors are required to provide line-item pricing for each category, with subtotals for Building & Sitework, followed by markups for overhead and general conditions, design fees, bonds and insurance, and contractor's fee to arrive at a total base scope price. The form includes a note that basic construction elements should not exceed 6% of the construction estimate, and a separate line item for Option 01 pricing, which covers the installation of an Ultra-Pure Water (UPW) system adjacent to the cleanroom.
The bid breakdown template explicitly identifies all services expected to be included in contractor proposals, encompassing both design and construction phases. Required services include site mobilization, temporary utilities, deferred design submittals for mechanical, electrical, plumbing, and fire protection systems, verification of existing conditions, value engineering reviews with SLAC personnel, start-up and commissioning of all utilities and equipment, preparation of as-built drawings and operations manuals, and professional design and construction consulting services as needed for substitutions to existing designs. This template is part of the draft RFP for a Sources Sought Notice issued by the Department of Energy Office of Science, with the project directly funded by DOE's Office of Science. No award will be made from this sources sought notification; rather, it is intended to identify qualified General Contractors before issuance of a formal solicitation.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base + Option 01 Source Selection Sensitive Information Cleanroom Installation inside an existing Cryomodule Repair and Maintenance Facility (CRMF) Building Bid Form Breakdown (Uniformat II)
ITEM # DESCRIPTION Price
| A-F | BUILDING ELEMENTS (Cleanroom Base Scope) | Price | |||
| A | SUBSTRUCTURE | SUBSTRUCTURE TOTAL | $ - 0 | ||
| A10 | FOUNDATIONS | $ - 0 | |||
| A20 | BASEMENT CONSTRUCTION | $ - 0 | |||
| B | SHELL | SHELL TOTAL | $ - 0 | ||
| B10 | SUPERSTRUCTURE | $ - 0 | |||
| B20 | EXTERIOR ENCLOSURE | $ - 0 | |||
| B30 | ROOFING | $ - 0 | |||
| C | INTERIORS | INTERIORS TOTAL | $ - 0 | ||
| C10 | INTERIOR CONSTRUCTION | $ - 0 | |||
| C20 | STAIRS | $ - 0 | |||
| C30 | INTERIOR FINISHES | $ - 0 | |||
| D | SERVICES | SERVICES TOTAL | $ - 0 | ||
| D10 | CONVEYING SYSTEMS | $ - 0 | |||
| D20 | PLUMBING SYSTEMS | $ - 0 | |||
| D30 | HVAC SYSTEMS | $ - 0 | |||
| D40 | FIRE PROTECTION SYSTEMS | $ - 0 | |||
| D50 | ELECTRICAL SYSTEMS | $ - 0 | |||
| E | EQUIPMENT AND FURNISHINGS | EQUIPMENT AND FURNISHINGS TOTAL | $ - 0 | ||
| E10 | EQUIPMENT | $ - 0 | |||
| E20 | FURNISHINGS | $ - 0 | |||
| F | SPECIAL CONSTRUCTION | SPECIAL CONSTRUCTION TOTAL | $ - 0 | ||
| F10 | SPECIAL CONSTRUCTION | $ - 0 | |||
| F20 | SELECTIVE BUILDING DEMOLITION | $ - 0 | |||
| A-F | BUILDING ELEMENTS SUBTOTAL | A-F BUILDING SUBTOTAL | $ - 0 |
| G | SITEWORK | Price | ||
| G10 | SITE PREPARATION | $ - 0 | ||
| G20 | SITE IMPROVEMENTS | $ - 0 | ||
| G30 | SITE MECHANICAL UTILITIES | $ - 0 | ||
| G40 | SITE ELECTRICAL UTILITIES | $ - 0 | ||
| G50 | OTHER SITE CONSTRUCTION | $ - 0 | ||
| G | SITEWORK | G. SITEWORK SUBTOTAL | $ - 0 |
| MARK-UP | Rate | Price | |
| BUILDING & SITEWORK SUBTOTAL | A-G BUILDING & SITEWORK SUBTOTAL | $ - 0 | |
| OVERHEAD / GENERAL CONDITIONS | 0.00% | $ - 0 | |
| DESIGN FEE (* See below notes) | 0.00% | $ - 0 | |
| SUBTOTAL With Overhead and Design | $ - 0 | ||
| BONDS AND INSURANCE | 0.00% | $ - 0 | |
| CONTRACTOR'S FEE | 0.00% | $ - 0 | |
| TOTAL BASE SCOPE PRICING PROPOSAL (Cleanroom Base Scope) | $ - |
| *NOTE: | BASIC CONSTRUCTION ELEMENTS TYPICALLY DO NOT EXCEED 6% OF CONSTRUCTION ESTIMATE | |
| Services typically included in Basic Design Fee | ||
| A | All efforts, whether expended by a company in-house workforce or outsourced to a tier subcontractor(s) that are integral part of the actual construction of the project. | |
| B | Efforts at joint reviews with SLAC personnel during the various stages of deferred design submittals, including Value Engineering reviews. | |
| Services included from the Construction Proposal and Construction Scope | ||
| a | Site walks/visits (multiple job walks, as needed); Mobilization and Maintain SWPPP; Temporary utilitie;s site office, laydown; and staging areas | |
| b | Verification of Existing Conditions | |
| c | Additional professional services of design and construction consultants,as needed, when planning substitutions to exsiting designs:drawings and specifications. | |
| d | Deferred Design submittals, including but not limited to: M.E.P. equipment individual structrual support systems; Fire Protection - Sprinkler and VESDA Systems | |
| e | Start-up; Testing and Commissioning of All Utilities and Equipment | |
| f | Preparation of as-built drawings and turnover of Maintenance and Operations Manuals | |
| g | Preparation of general and developmental criteria. | |
| h | Preparation of general and feature design memoranda. | |
| i | ||
| j | ||
| k | ||
| l | ||
| m | ||
| n |
| Summary Price for Bid Alternates (to include all overhead, and profit as applicable) | ||
| OPTION 01 | Installation of a new Ultra-Pure Water (UPW) system next to the cleanroom inside the CRMF Building. | $ - 0 |
File details come from the government source that posted it. Updated .