B2.07.05_DRAFT-Sec_J_Attachment_05_SQF.pdf

PDF 425 KB Posted

Attached to
CRMF SRF Cleanroom and UPW Construction Sources Sought Notification
Solicitation number
SLAC_DRAFT_RFP_369005_CRMF_Cleanroom_Construction
Issued by

About this file

This is the SLAC National Accelerator Laboratory Subcontractor Safety Qualification Form (SQF), effective May 21, 2021, used to qualify prime subcontractors performing construction work or high-risk service work at SLAC.

The form requires comprehensive safety qualification information from subcontractors directly contracted to SLAC. Subcontractors must provide company information, list all types of work and trades to be performed (whether self-performed or managed), and submit a written health and safety manual meeting California requirements including an Injury and Illness Prevention Plan (IIPP) under 8 CCR 1509 or 8 CCR 3203, Code of Safe Practices for construction work, applicable elements for specific work types and activities, and Heat Illness Prevention Program requirements for outdoor work. Subcontractors must document relevant project experience through at least three projects with detailed information including client/general contractor name, project description, location, contract amount, dates, and key personnel contact information. The form requires submission of three years of incident history data from OSHA Form 300 (Log) and Form 300A (Summary), including recordable cases, DART cases, days away from work, fatalities, and current workers' compensation experience modification rates. Supporting documentation must include the comprehensive safety manual, project experience documentation, past three years' OSHA forms with masked employee names, current insurance experience modification rate letters or WCIRB printouts, official OSHA citations with corrective action descriptions, and details of any fatalities with preventive measures taken. The safety qualification is valid for one year and the specific work types listed. SLAC reserves the right to accept or reject subcontractors and may require conditions of acceptance. The form must be completed in its entirety with an authorized signature and submitted as a non-editable PDF.

View the file

Other files

File Type Posted
B2.03.01_DRAFT-RFP_SOW_CRMF-1.4-SW-224.docx DOCX document
B2.07.11_DRAFT-Sec_J_Attachment_11_LCPTracker_NC_091426.pdf PDF
B2.08.00_DRAFT-RFP_Section_K_(Rep and Certs).docx DOCX document
B2.02.00_DRAFT_RFP_Section_B_(Supplies or Services and Price_Costs).docx DOCX document
B2.01.00_DRAFT_RFP_Section_A_(Subcontract_Form).docx DOCX document
B2.03.03_DRAFT-RFP_IFC_Drawings_SLAC_CRMF_Cleanroom.pdf PDF
B2.03.02_DRAFT-RFP_IFC_Specs_SLAC_CRMF_Cleanroom.pdf PDF
B2.07.08_DRAFT-Sec_J_Attachment_08_NTP_Checklist_061424.pdf PDF
B2.07.12_DRAFT-Sec_J_Attachment_12_SBSP_100726.pdf PDF
B2.07.02_DRAFT-Sec_J_Attachment_02_Work_Classification.pdf PDF
B2.07.10_DRAFT-Sec_J_Attachment_10_LCPTracker_AP_091426.pdf PDF
B2.09.00_DRAFT-RFP_Sec_L_Instructions_to_Offerors_RFP_369905.docx DOCX document
B2.07.00_DRAFT-RFP_Section_J_(List of Attachments).docx DOCX document
B2.06.00_DRAFT-RFP_Section_H_(Special_TsCs).docx DOCX document
B2.10.00_DRAFT-RFP_Sec_M_Evaluation_Criteria_RFP_369905.docx DOCX document
B2.03.04_DRAFT-RFP_Acceptance_Criteria_List_CRMF-1.4-PP-319.docx DOCX document
B2.07.03_DRAFT-Sec_J_Attachment_03_IIPP_Form.pdf PDF
B2.09.3_DRAFT-RFP_Sec_L-Attachment_C_Past_Performance_Questionnaire_Draft.docx DOCX document
B2.04.00_DRAFT-RFP_Section_F_(Deliveries Performance).docx DOCX document
B2.09.01_DRAFT-Sec_L_Attachment_A_SLAC_Question-Clarifications_&_Answer_Log_(RFI).docx DOCX document
B2.07.01_DRAFT-Sec_J_Attachment_01_CWRR_WD.pdf PDF
B2.07.04_DRAFT-Sec_J_Attachment_04_SF1413.pdf PDF
B2.05.01_Fixed_Price_Construction_March_2024.pdf PDF
B2.07.09_DRAFT-Sec_J_Attachment_09_LCPTracker_NP_091426.pdf PDF
B2.07.07_DRAFT-Sec_J_Attachment_07_Final_Release.docx DOCX document
B2.07.06_DRAFT-Sec_J_Attachment_06_Final_Inspection_Report.docx DOCX document
B2.05.00_DRAFT-RFP_Section_G_(General_TsCs).docx DOCX document
B2.03.00_DRAFT-RFP_Section_C_(Specifications_SOW).docx DOCX document
B2.08.01_DRAFT_RFP_Reps_and_Certs_Supplement.pdf PDF
B2.09.02_DRAFT-Sec_L_Attachment_B_CRMF_Cleanroom_Bid_Breakdown_Draft.xlsx XLSX spreadsheet
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

21 May 2021 SLAC-I-730-0A21J-027-R010 1 of 5

ENVIRONMENT, SAFETY & HEALTH DIVISION

Chapter 42: Subcontractor Safety Subcontractor Safety Qualification Form Product ID: 456 | Revision ID: 2364 | Date Published: 21 May 2021 | Date Effective: 21 May 2021 URL: https://www-group.slac.stanford.edu/esh/eshmanual/references/subcontractorFormSQF.pdf

This form applies to prime subcontractors (those directly contracted to SLAC)1, performing construction work2 or high-risk service work3 (see Subcontractor Safety: Non-green Work Procedure [SLAC-I-730-0A21C-024]).

The safety qualification is valid for (a) one year and (b) the type of work listed below. Please fill out this form completely. Do not leave items blank and provide all required supporting documents. SLAC reserves the right to accept or reject any directly-contracted subcontractor based on the qualification criteria. SLAC may also require conditions of acceptance. If the subcontractor acts as the general subcontractor, SLAC will evaluate whether it has adequate knowledge and experience to supervise lower tier subcontractors.

1 Company Company Name Year Founded

Address Phone

License Classifications (if construction use California License Classification) License #

2 Types of Work / Trades List types of work and/or trades, whether self-performed or managed, to be done at SLAC (qualification will be valid for what is listed). Your firm must be properly licensed in California to perform the proposed work.

Description (if construction list California License Classification and description: eg, B - General Building) Manage? Self-perform?

1 As SLAC is a contractor to the Department of Energy, all outside contractors working at SLAC are considered subcontractors. Consequently, a contractor considered a “general contractor” outside of SLAC is considered a “general subcontractor” at SLAC.

2 Construction work is defined as the combination of erection, installation, assembly, demolition, or fabrication activities involved to create a new facility or to alter, add to, rehabilitate, dismantle, or remove an existing facility. It also includes the alteration and repair (including dredging, excavating, and painting) of buildings, structures, or other real property, as well as any construction, demolition, and excavation activities conducted as part of environmental restoration or remediation efforts.

3 Service work is defined as any work involving maintenance, repair, cleaning, or testing; technical or administrative services; or other tasks that are not construction activities. Service work may be associated with a construction project. High-risk service work is service work that has an above average risk of a serious injury or illness, environmental release, or property damage incident occurring.

https://esh.slac.stanford.edu/general/subcontractor/ https://www-internal.slac.stanford.edu/esh/docreview/reports/revisions.asp?ProductID=456 https://www-group.slac.stanford.edu/esh/eshmanual/references/subcontractorFormSQF.pdf https://www-group.slac.stanford.edu/esh/eshmanual/references/subcontractorProcedNonGreen.pdf https://www.cslb.ca.gov/About_Us/Library/Licensing_Classifications/ https://www.cslb.ca.gov/About_Us/Library/Licensing_Classifications/

SLAC National Accelerator Laboratory Environment, Safety & Health Division Subcontractor Safety | Subcontractor Safety Qualification Form

21 May 2021 SLAC-I-730-0A21J-027-R010 2 of 5

3 Written Health and Safety Manual Prime subcontractors performing construction or high-risk service work must submit a comprehensive written health and safety manual to SLAC for review. (Even if subcontractors wil opt to follow SLAC’s IIPP rather than their own, they must submit these documents as part of the qualification process.) At a minimum the manual must include the following:

California Injury and Illness Prevention Plan (IIPP) (8 CCR 1509 or 8 CCR 3203) required elements

Code of Safe Practices (8 CCR 1509[b]) (if construction work)

Applicable elements for type of work / trade and activity (see below)

Heat Illness Prevention Program (8 CCR 3395) (if working outdoors or in very warm interior environment)

The manual and code of safe practices must include safety policies and/or procedures for each type of work / trade (as indicated on page 1) and activity (below) you propose to perform or manage at SLAC. The policies and/or procedures must meet the requirements of any listed regulation or standard. A prime subcontractor that will supervise the work of one or more sub-tier contractors must have safety/health manual elements for each area of its work and the work of its sub-tier contractors.

Check each applicable activity below that you might perform or manage while working at SLAC.

Hazardous Energy Control (Lockout / Tagout) Concrete Placing and Finishing

Welding, Cutting, or Other Hot Work Demolition

Power Tool Use Housekeeping

Material Handling – Manual Heavy Equipment Use (backhoe, excavator, etc.)

Material Handling – Mechanical (forklifts, gradalls, etc) Working within the Limited Approach Boundary of Exposed Electrical Parts

Hoisting and Rigging Respirator Use

Working from Heights (fall protection, ladder safety) Other:

Scaffold Erection Other:

Use of Scissor and Boom Lifts Other:

Confined Space Entry Other:

These documents are submitted with the subcontractor’s initial SQF; they do not need to be resubmitted with each SQF unless the proposed scope of work changes or the documents on file with SLAC become outdated.

Select one:

Written safety manual attached Version on file with SLAC is current and applicable to proposed work (version date: _______________) https://www.dir.ca.gov/Title8/1509.html https://www.dir.ca.gov/Title8/3203.html https://www.dir.ca.gov/Title8/1509.html https://www.dir.ca.gov/title8/3395.html

Subcontractor Safety | Subcontractor Safety Qualification Form

21 May 2021 SLAC-I-730-0A21J-027-R010 3 of 5

4 Firm Project Experience Please complete this page (or attach) with information about your company’s project experience that is relevant to the type of work listed on page

1. List at least three projects. If bidding as a general subcontractor, firm must have adequate knowledge and experience to supervise lower tier subcontractors. Superintendent / foreman (construction)/ site manager / supervisor (service) refers to the on-site staff person who directly supervised the project’s line workers.

4.1 Project 1

Client or General Contractor Name

Project Name

Project Location Contract Amount

Project Start Date Project End Date

Project Description

Contact Name (Client or GC) Phone E-mail

May we contact concerning your safety / environmental performance? Yes No

Project Manager Superintendent / Foreman / Site Manager / Supervisor

4.2 Project 2

Client or General Contractor Name

Project Name

Project Location Contract Amount

Project Start Date Project End Date

Project Description

Contact Name (Client or GC) Phone E-mail

May we contact concerning your safety / environmental performance? Yes No

Project Manager Superintendent / Foreman / Site Manager / Supervisor

4.3 Project 3

Client or General Contractor Name

Project Name

Project Location Contract Amount

Project Start Date Project End Date

Project Description

Contact Name (Client or GC) Phone E-mail

May we contact concerning your safety / environmental performance? Yes No

Project Manager Superintendent / Foreman / Site Manager / Supervisor

Subcontractor Safety | Subcontractor Safety Qualification Form

21 May 2021 SLAC-I-730-0A21J-027-R010 4 of 5

5 Incident History Submit the following information for review. After February 1, provide data for previous calendar year. Refer to your company’s OSHA Form 300 (Log) and OSHA Form 300A (Summary) for each of the past three years.

NAICS Code: ____ Previous Year 1 20__

Previous Year 2 20__

Previous Year 3 20__

3 Year Total Y1+Y2+Y3

Number of Recordable Cases [Form 300A: Sum of H+I+J]

Number of DART Cases (Days Away, Restricted, or Transferred) [Form 300A: Sum of H+I]

Number of Days Away from Work [Form 300A: K]

Number of Days on Job Restriction or Transfer [Form 300A: L]

Total Hours Worked [Form 300A: right side of page]

Fatalities [Form 300A: G]

OSHA (or State OSHA) Citations

Current Worker’s Compensation Experience Modification Rate (EMR) (or other modifier)

Submit the following supporting documentation:

1. Copies of past three years OSHA Form 300 (Log) and OSHA Form 300A (Summary). Mask names for privacy. Attached

2. Official documentation of current workers’ compensation insurance experience modification rate (letter from insurer or broker on their letterhead or copy of WCIRB printout). Attached

3. Official copy of OSHA (or state OSHA) citation(s) received over past three years. Provide details and circumstances of the violation and describe what corrective actions have been taken. Attached N/A

4. Description of any fatalities including the cause and corrective/preventive actions taken since the incident. Attached N/A

6 Required Supporting Documents Submit the following required documents. This form will not be accepted by SLAC without all of these.

1. Comprehensive company health and safety manual: Attached Version SLAC has on file is still valid

2. Firm project experience: Attached Page on this form completed

3. Copies of past three years’ OSHA Form 300 (Log) and OSHA Form 300A (Summary). Mask names for privacy. Attached

4. Insurer experience modification rate (or other rate modifier) documentation (letter or WCIRB printout) Attached

5. Official record of OSHA citation(s) received and explanation of corrective actions taken: Attached N/A

6. Description of any fatalities including the cause and any corrective/preventive action taken since: Attached N/A https://www.bls.gov/bls/naics.htm

Subcontractor Safety | Subcontractor Safety Qualification Form

21 May 2021 SLAC-I-730-0A21J-027-R010 5 of 5

7 Subcontractor Acknowledgement Firm attests that the information presented here is accurate and truthful. Failure to provide accurate information may result in disqualification. Firm acknowledges that it is responsible for the safety of its workers and its sub-tier workers. Firm represents that all employees and sub-tier subcontractors have, or will have, the required training to perform their contracted work safely, prior to the start of work. (Upon contract award, records of current training must be presented with the site-specific safety plan.)

Sign the page with an official electronic signature or print the document, sign it, and scan as pdf. Do not leave this form in editable pdf format.

Name Date

Signature Phone

Title Cell

Company Name E-mail

Subcontractor Safety Qualification Form
1 Company
2 Types of Work / Trades
3 Written Health and Safety Manual
4 Firm Project Experience
4.1 Project 1
4.2 Project 2
4.3 Project 3
5 Incident History
6 Required Supporting Documents
7 Subcontractor Acknowledgement
Company Name:
Year Founded:
Address:
Phone:
Classification:
License:
Manage_0: Off
Description_0:
Description_1:
Description_2:
Description_3:
Description_4:
Description_5:
Description_6:
Description_7:
Description_8:
Description_9:
Self_0: Off
Manage_1: Off
Self_1: Off
Manage_2: Off
Self_2: Off
Manage_3: Off
Self_3: Off
Manage_4: Off
Self_4: Off
Manage_5: Off
Self_5: Off
Manage_6: Off
Self_6: Off
Manage_7: Off
Self_7: Off
Manage_8: Off
Self_8: Off
Manage_9: Off
Self_9: Off
Heat Illness Prevention Plan: Off
Code of Safe Practices: Off
Loto: Off
Welding: Off
Power Tools: Off
Material Handling: Off
Material Handling: Mechanical: Off
Hoisting and Rigging: Off
Working from Heights: Off
Scaffold Erection: Off
Use of Scissor and Boom Lifts: Off
Confined Space Entry: Off
Concrete Placing and Finishing: Off
Demolition: Off
Housekeeping: Off
Heavy Equipment: Off
Electrical Work: Off
Respirator: Off
Other:
Other_c1: Off
Other_2:
Other_c2: Off
Other_3:
Other_c3: Off
Other_4:
Other_c4: Off
Written Safety Manual Attached: Off
Written Safety Manual on file: Off
Written Safety Manual date:
Project Experience Attached: Off
Project_1_Client or General Contractor Name:
Project_1_Project Name:
Project_1_Project Location:
Project_1_Contract Amount:
Project_1_Project Start Date:
Project_1_Project End Date:
Project_1_Project Description:
Project_1_Contact Name Client or GC:
Project_1_Phone:
Project_1_Email:
Project_1_May we contact?: Off
Project_1_Project Manager:
Project_1_Onsite Super/foreman:
Project_2_Client or General Contractor Name:
Project_2_Project Name:
Project_2_Project Location:
Project_2_Contract Amount:
Project_2_Project Start Date:
Project_2_Project End Date:
Project_2_Project Description:
Project_2_Contact Name Client or GC:
Project_2_Phone:
Project_2_Email:
Project_2_May we contact?: Off
Project_2_Project Manager:
Project_2_Onsite Super/foreman:
Project_3_Client or General Contractor Name:
Project_3_Project Name:
Project_3_Project Location:
Project_3_Contract Amount:
Project_3_Project Start Date:
Project_3_Project End Date:
Project_3_Project Description:
Project_3_Contact Name Client or GC:
Project_3_Phone:
Project_3_Email:
Project_3_May we contact?: Off
Project_3_Project Manager:
Project_3_Onsite Super/foreman:
NAICS Code:
Year1:
Year2:
Year3:
TRC_1:
TRC_2:
TRC_3:
TRC_total:
DART_1:
DART_2:
DART_3:
DART_total:
Days Away from Work_1:
Days Away from Work_2:
Days Away from Work_3:
Days Away from Work_total:
Days Restricted or Transferred_1:
Days Restricted or Transferred_2:
Days Restricted or Transferred_3:
Days Restricted or Transferred_total:
Hours Worked_1:
Hours Worked_2:
Hours Worked_3:
Hours Worked_total:
Fatalities_1:
Fatalities_2:
Fatalities_3:
Fatalities_total:
OSHA Citations_1:
OSHA Citations_2:
OSHA Citations_3:
OSHA Citations_total:
Current EMR:
OSHA attached: Off
EMR attached: Off
OSHA citations attached: Off
OSHA citations not applicable: Off
Fatalities attached: Off
Fatalities not applicable: Off
Acknowledgment Name:
Acknowledgement Date:
Acknowledgement Phone:
Acknowledgement Title:
Acknowledgement Cell:
Acknowledgement Company Name:
Acknowledgement Email:
Safety manual attached: Off
Safety manual on file: Off
Project experience attached: Off
Project experience on this form: Off
OSHA 300 attached: Off

File details come from the government source that posted it. Updated .