B08_Solit_PSP_Vol_II_PriceSched.xlsx
XLSX spreadsheet 21 KB Posted
- Solicitation number
- 140P2022R0023
About this file
This document contains a price schedule template for a federal contract solicitation to rehabilitate an unsafe and failing electrical system at Kalaupapa National Historical Park in Hawaii. The solicitation is issued by the National Park Service's Denver Service Center and includes pricing for seven base contract line items including evaluation of schematic design, schematic design, design of three zones, permitting and compliance, and construction of three zones. Pricing is to be provided as lump sums or unit prices with extended totals as specified. The template also includes three option items for additional construction work that can be awarded post-base period. Offerors are required to submit pricing for all base and option items. The total proposed price will be the combined sum of the base line items and any selected options.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B09_Amendment_01_Q_A_0001.xlsx | XLSX spreadsheet | |
| Sol_140P2022R0023_Amd_0001.pdf | ||
| B08_NPS_Data___Materials_3.zip | ZIP file | |
| B08_Attachment_5_3-_HECO_General_Expectations_for_Design_Review_Stages.pdf | ||
| B08_Davis_Bacon_WD_HI20220001_07082022.pdf | ||
| B08_Attachment_5_2-_SubmittalList-ReviewEstimate_Template_1-27-21_v508.pdf | ||
| B08_Attachment_5_1-_Construction_Zones__APE_and_Laydown_Areas.pdf | ||
| B08_Memo_Certification_of_Vaccination_Form.pdf | ||
| B08_SF24-16d_Bid_Bond.pdf | ||
| B08_Solit_PSP_Vol_I_PastPerf_REQD.docx | DOCX document | |
| B08_NPS_Data___Materials_2.zip | ZIP file | |
| B08_Solit_PSP_Vol_I_Exp_REQD.docx | DOCX document | |
| B08_LmtOnSubconRpt_REQD.xlsx | XLSX spreadsheet | |
| B08_NPS_Data___Materials_1.zip | ZIP file | |
| B08_SF330-21.pdf | ||
| B08_KALA_217676_DB_RFP_SOW_06212022.docx | DOCX document | |
| B08_Certification_of_Vaccination_Form.pdf | ||
| B08_Solit_PSP_Vol_II_GenRefs.doc | DOC document | |
| Sol_140P2022R0023.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 4/25-18 | |||||
| Solicitation Number: 140P2022R0023 | |||||
| PARK - PMIS (Project Management Information System): KALA 217676 | |||||
| Developed Area: Kalaupapa National Historical Park, Hawaii | |||||
| Project Title: | Rehabilitate Unsafe and Failing Electrical System for Settlement | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. Refer to solicitation section “H” for additional information regarding contract options | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Evaluation of Schematic Design | 1 | Lump Sum | $0.00 | |
| 2 | Schematic Design | 1 | Lump Sum | $0.00 | |
| 3 | Design - Zones 1,2,3 | 1 | Lump Sum | $0.00 | |
| 4 | Permitting and Compliance | 1 | Lump Sum | $0.00 | |
| 5 | Construction- Zone 1 (Settlement) | 1 | Lump Sum | $0.00 | |
| 6 | Construction - Zone 3A (Settlement to Water Treatment Facility via Damien Road) | 1 | Lump Sum | $0.00 | |
| 7 | Construction - Zone 3C (Generator Building) | 1 | Lump Sum | $0.00 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 7) --------------------------------------------------------------------------------- | $0.00 | ||||
| 8 | Option - Construction Zone 3B (Connect Damien Road to Water Treatment Facility via Pump House Road) | 3200 | LF | $0.00 | |
| 9 | Option - Construction Zone 2 (Lighthouse) | 1 | Lump Sum | - 0 | |
| 10 | Option - Construction Zone 3C.1 (Fuel Storage Building and Modular Enclosure) | 1 | Lump Sum | - 0 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 8 through 10) ----------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 10) -------------------------- | $0.00 |
File details come from the government source that posted it. Updated .