B08_Attachment_5_2-_SubmittalList-ReviewEstimate_Template_1-27-21_v508.pdf
PDF 16 KB Posted
- Solicitation number
- 140P2022R0023
About this file
This document is a submittal list template for a construction project to rehabilitate an unsafe and failing electrical system at Kalaupapa National Historical Park. The template includes a list of submittal requirements organized by specification section and paragraph number. For each required submittal, the template indicates whether it is for information only or requires action and estimates review time needed from various engineering disciplines. Submittals include a biosecurity standard operating procedure, SWPPP, schedule of values, quality control plan, test reports, temporary sanitary facility plan, accident prevention program, as-built drawings, GIS files, O&M data, shop drawings for structural elements, reinforcing steel, doors and windows, and equipment. The total estimated review time for all submittals by various engineers is shown as zero hours.
The related federal contract opportunity is solicitation number 140P2022R0023 from the National Park Service to rehabilitate the unsafe and failing electrical system at Kalaupapa National Historical Park for $217,676.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B09_Amendment_01_Q_A_0001.xlsx | XLSX spreadsheet | |
| Sol_140P2022R0023_Amd_0001.pdf | ||
| B08_NPS_Data___Materials_3.zip | ZIP file | |
| B08_Attachment_5_3-_HECO_General_Expectations_for_Design_Review_Stages.pdf | ||
| B08_Davis_Bacon_WD_HI20220001_07082022.pdf | ||
| B08_Attachment_5_1-_Construction_Zones__APE_and_Laydown_Areas.pdf | ||
| B08_Memo_Certification_of_Vaccination_Form.pdf | ||
| B08_SF24-16d_Bid_Bond.pdf | ||
| B08_Solit_PSP_Vol_I_PastPerf_REQD.docx | DOCX document | |
| B08_NPS_Data___Materials_2.zip | ZIP file | |
| B08_Solit_PSP_Vol_I_Exp_REQD.docx | DOCX document | |
| B08_LmtOnSubconRpt_REQD.xlsx | XLSX spreadsheet | |
| B08_Solit_PSP_Vol_II_PriceSched.xlsx | XLSX spreadsheet | |
| B08_NPS_Data___Materials_1.zip | ZIP file | |
| B08_SF330-21.pdf | ||
| B08_KALA_217676_DB_RFP_SOW_06212022.docx | DOCX document | |
| B08_Certification_of_Vaccination_Form.pdf | ||
| B08_Solit_PSP_Vol_II_GenRefs.doc | DOC document | |
| Sol_140P2022R0023.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Submittal List with Review Estimate Template National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
SUBMITTAL LIST ACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number: KALA 217676 (Complete this portion for Architect / Engineer (A/E) Project Title: Rehabilitate Unsafe and Failing Electrical System for Settlement construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
TE
C
H N
IC
AL
R
EQ
U
IR
EM
EN
T
SE
C
TI
O N
PA
R
AG
R
AP
H
N U
M
BE
R
DESCRIPTION
C
ER
TI
FI
C
AT
IO
N
S O
R
LA
BO
R
AT
O
R Y
TE
ST
S
R
EP
O R
TS
O
R C
AL
C
U
LA
TI
O
N S
O R
P
LA
N
M
AN
U
FA
C
TU
R
ER
D
AT
A
AN
D
IN
ST
R
U C
TI
O
N S
O
TH
ER
SA
M
PL
ES
SH
O
P D
R
AW
IN
G
S
M
AN
U
FA
C
TU
R
ER
D
AT
A
AN
D
IN
ST
R
U C
TI
O
N S
O
TH
ER
AR
C
H
IT
EC
T
C
IV
IL
E
N G
IN
EE
R
ST
R
U C
TU
R
AL
E
N G
IN
EE
R
M
EC
H
AN
IC
AL
E N
G
IN
EE
R
EL
EC
TR
IC
AL
E
N G
IN
EE
R
PR
O
JE
C
T M
AN
AG
ER
C
O O
R D
IN
AT
IO
N
LA
N
D
SC
AP
E
AR
C
H
IT
EC
T
DB RFP 2.1.5 Biosecurity standard operating procedure X
DB RFP 2.3.1.1.4 SWPPP X
DB RFP 2.3.2 Schedule of Values X DB RFP 2.3.8.3 Quality Control Plan X DB RFP 2.3.8.3 Daily Reports X DB RFP 2.3.8.3 Test Reports X DB RFP 2.3.8.3 Accessibility Inspection Report X DB RFP 2.3.8.3 Off-site inspection report X DB RFP 2.3.10.11 Temporary sanitary facility plan X DB RFP 2.3.15.1 Accident prevention program X DB RFP 2.3.18.2 As built drawings X DB RFP 2.3.18.3 GIS Files X DB RFP 2.3.18.5 Final Inspection Documentation X DB RFP 2.3.18.6 O&M data X
A10 Foundations
1.5 All structural elements necessary for construction X X
B20 Exterior Enclosure
1.4 Shop drawings for reinforcing steel in masonry walls, doors, door hardware, windows, storefront, curtainwall, glazing, paint, exterior enclosure barrier systems, and visible exterior materials
X X
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 1 of 3
SUBMITTAL LIST ACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number: KALA 217676 (Complete this portion for Architect / Engineer (A/E) Project Title: Rehabilitate Unsafe and Failing Electrical System for Settlement construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
TE
C
H N
IC
AL
R
EQ
U
IR
EM
EN
T
SE
C
TI
O N
PA
R
AG
R
AP
H
N U
M
BE
R
DESCRIPTION
C
ER
TI
FI
C
AT
IO
N
S O
R
LA
BO
R
AT
O
R Y
TE
ST
S
R
EP
O R
TS
O
R C
AL
C
U
LA
TI
O
N S
O R
P
LA
N
M
AN
U
FA
C
TU
R
ER
D
AT
A
AN
D
IN
ST
R
U C
TI
O
N S
O
TH
ER
SA
M
PL
ES
SH
O
P D
R
AW
IN
G
S
M
AN
U
FA
C
TU
R
ER
D
AT
A
AN
D
IN
ST
R
U C
TI
O
N S
O
TH
ER
AR
C
H
IT
EC
T
C
IV
IL
E
N G
IN
EE
R
ST
R
U C
TU
R
AL
E
N G
IN
EE
R
M
EC
H
AN
IC
AL
E N
G
IN
EE
R
EL
EC
TR
IC
AL
E
N G
IN
EE
R
PR
O
JE
C
T M
AN
AG
ER
C
O O
R D
IN
AT
IO
N
LA
N
D
SC
AP
E
AR
C
H
IT
EC
T
1.4 All structural elements necessary for construction. X X
F20 Selective Building Demolition
1.5 Engineering Safety Survey X X
1.5 Stamped engineering drawings for modifications to the existing structures as required for completion of the project X
1.5 Demolition Plan/ Deconstruction Plan X
1.5 Dirt and Dust Control Plan X
G40 Site Electrical Utilities
1.5
OMSI Information for Electrical Equipment (if OMSI Manual for the entire project is not already required); all action item submittals listed in the submittals of the specification sections identified in the Design Submittals
X
1.3.1 Qualified Testing Organization X
D50 Electrical
1.3 Submit Qualifications, Certifications, and Test Plans X
1.5 Electrical Equipment X X
1.5 OMSI information for equipment X X
1.5 Prefabrciated modulus electrical enclosure shop drawings X X
D30 HVAC
1.6 Ventilation system equipment and control devices, and associated Operations and Maintenance information for all equipment and control devices
X
1.6 Fuel-oil storage tank and associated pumping and piping system, and associated Operations and Maintenance information for tanks and pumps.
X
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 2 of 3
SUBMITTAL LIST ACTION SUBMITTAL
REVIEW ESTIMATE
Park Acronym/Project Management Information System (PMIS) Number: KALA 217676 (Complete this portion for Architect / Engineer (A/E) Project Title: Rehabilitate Unsafe and Failing Electrical System for Settlement construction service task order negotiation.)
SUBMITTAL REQUIREMENTS ARCHITECT / ENGINEER REVIEW TIME
(Indicate with X) (Indicate in whole or partial hours.)
INFORMATIONAL ACTION
TE
C
H N
IC
AL
R
EQ
U
IR
EM
EN
T
SE
C
TI
O N
PA
R
AG
R
AP
H
N U
M
BE
R
DESCRIPTION
C
ER
TI
FI
C
AT
IO
N S
O R
LA
BO
R
AT
O R
Y
TE
ST
S
R
EP
O R
TS
O
R C
AL
C
U
LA
TI
O
N S
O R
P
LA
N
M
AN
U
FA
C
TU
R
ER
D
AT
A
AN
D
IN
ST
R
U C
TI
O
N S
O
TH
ER
SA
M
PL
ES
SH
O
P D
R
AW
IN
G
S
M
AN
U
FA
C
TU
R
ER
D
AT
A
AN
D
IN
ST
R
U C
TI
O
N S
O
TH
ER
AR
C
H
IT
EC
T
C
IV
IL
E
N G
IN
EE
R
ST
R
U C
TU
R
AL
E
N G
IN
EE
R
M
EC
H
AN
IC
AL
E N
G
IN
EE
R
EL
EC
TR
IC
AL
E
N G
IN
EE
R
PR
O
JE
C
T M
AN
AG
ER
C
O O
R D
IN
AT
IO
N
LA
N
D
SC
AP
E
AR
C
H
IT
EC
T
G10 Site Preparation
1.4 Waste Management Plan (Also in DB RFP section 2.3.1) X
Total: 0 0 0 0 0 0 0
Submittal List with Review Estimate Template | National Park Service (NPS) - Denver Service Center (DSC) page 3 of 3
File details come from the government source that posted it. Updated .