B08_-_RFP_Attachment_4_-_2_Attachments_to_IDIQ_Requirements_for_Ohmsett_RFP.docx
DOCX document 1 MB Posted
- Attached to
- OHMSETT FACILITY RFP Federal contract opportunity
- Solicitation number
- 140E0123R0006
About this file
This document package includes an RFP attachment and related federal contract opportunity notice. The RFP attachment provides details on the Ohmsett Facility, including facility diagrams, equipment inventories, procedures, and event schedules. Products and services required under the IDIQ contract include operation, maintenance and repair of the Ohmsett test tank facility. The period of performance is one base year with four one-year options. The Department of the Interior Bureau of Safety and Environmental Enforcement is the contracting agency. The pre-solicitation notice can be found on SAM.gov for contract number 140E0123R0006 to operate and maintain the Ohmsett Facility.
View the file
Other files for this federal contract opportunity
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IDIQ REQUIREMENTS FOR
OHMSETT FACILITY OPERATING SERVICES – INTEGRATED (FOS-I)
Attachment A. Government-furnished Real Property
Table 1. Facilities per Land Use Agreement of 2012, as amended.
| Facility Number |
| Real Property Name |
| Official Utilization Code and Name |
| Area |
(Square Feet)
| R-24 |
| Ocean Science Lab (Ohmsett) |
| 61010 Administrative Office |
| 7,226 |
| R-25A |
| Ohmsett Storage Facility |
| 44110 General Purpose Warehouse |
| 4,266 |
| R-26PRK |
| "Parking" |
| 85240 Misc Open Strg/Laydown-PVD |
| 286,794 |
| R-26 |
| Control Tower |
| 31037 Ocean Sciences Laboratory |
| 3,104 |
| R-26FB |
| Filter Building |
| 31037 Ocean Sciences Laboratory |
| 1,440 |
| R-26TANK |
| Wave Tank |
| 37110 Science Sys Range Facility |
| 64,014 |
| R-41 |
| Ohmsett Storage Warehouse |
| 31915 RDT&E Storage |
| 4,131 |
| R-42* |
| Ohmsett Arch Storage Building |
| 31915 RDT&E Storage |
| 2,100** |
| *Notional, not marking on site |
| Total |
| 373,075 |
**Approximate
(9 acres)
This table excludes temporary space allocations such as Facility 509A per separate Naval authorization memorandum of 8 Jul 2022. This is a 5,280 square foot portion of an existing asphalt parking lot for staging equipment during hurricane season.
Attachment B. Government-furnished Equipment, GFE
Table 1. Property summary of 31 Jan 2023.
| Category |
| Cost |
| Count |
| Computing |
| $146,210 |
| 40 |
| Equipment |
| $406,163 |
| 30 |
| Instrument |
| $94,840 |
| 13 |
| Material Handling Equipment |
| $185,892 |
| 3 |
| Vehicle |
| $21,322 |
| 4 |
| Weight Handling Equipment |
| $245,439 |
| 5 |
| Grand Total |
| $1,099,867 |
| 95 |
Table 2. Property detail of 31 Jan 2023; per item value greater than $5,000.
See separate PDF file.
Attachment C. Government-furnished information, GFI
Table 1. Publication summary of 31 Jan 2023; PDFs and website links are available.
| ID |
| Title |
| Issuing Organization |
| Reference Number |
| Summary |
| 1 |
| OIL POLLUTION RESEARCH AND |
TECHNOLOGY PLAN
Fiscal Years 2022-2027 of December 2021
INTERAGENCY COORDINATING COMMITTEE
ON OIL POLLUTION RESEARCH (ICCOPR)
| None |
| Part One, Oil Pollution Research, explains why oil pollution research is needed, the parties that are involved in the research, and presents ICCOPR’s Oil Pollution Research Categorization Framework used for organizing the priority Research Needs. Part Two, Establishing Research Priorities, presents ICCOPR’s priority Research Needs. It also explains the process that ICCOPR used to identify the research gaps and priorities, noteworthy oil spill events, and the current state of oil pollution knowledge. In future versions, Part One will remain relatively static; however, Part Two is expected to change significantly as research advances the state of knowledge and priority Research Needs are successfully addressed. |
| 2 |
| USE AGREEMENT BETWEEN DEPARTMENT OF THE NAVY AND DEPARTMENT OF THE INTERIOR - BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT (BSEE) OF NOVEMBER 2012 |
| Department of the Navy |
| Navy File No. AO-0003 |
Navy Contract No. N40085-ll-RP-00028 Establishes the terms and conditions of BSEE occupancy at the Ohmsett Facility. Specifies Naval requirements for requesting approval and obtaining Commanding Officer or delegate authorization prior to facilities conversion, alteration, and new construction.
| 3 |
| FIRST MODIFICATION TO USE AGREEMENT N40085-ll-RP-00028 OF DECEMBER 2014 |
| Department of the Navy |
| Navy File No. AO-0003 |
Navy Contract No. N40085-ll-RP-00028 Incorporates 1.0 acres of open land and Facility R-41 for storage.
| 4 |
| MASTER NETWORK FACILITY AGREEMENT |
By and Between PACIFIC OCEAN ENERGY TRUST And BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT (BSEE), OHMSETT FACILITY OF JANUARY 2022
| Pacific Ocean Energy Trust (POET) on behalf of the Department of Energy (DoE) |
| 4817-2660-0899.2 |
| Establishes the terms and conditions of BSEE requirements for Ohmsett Facility to participate in the DoE-funded program administered by POET. |
| 5 |
| Federal Plain Language Guidelines of March 2011 |
| PlainLanguage.gov |
| Rev 1, May 2011 |
| The Plain Language Action and Information Network (PLAIN) outlines and discusses editorial best practices for clear communications. |
| 6 |
| OBTAINING WORK PERMITS of 22 Sep 2017 |
| COMMANDER NAVY REGION MID-ATLANTIC |
| COMNAVREGMIDLANTINST 11011.12B |
| Provide guidance for the preparation and processing of work permits for all new construction, repair, maintenance, and alteration of Commander, Navy Region MidAtlantic (COMNA VREG MIDLANT) controlled Class I or II property not administered by Naval Facilities Engineering Command, Mid-Atlantic (NAVFAC MIDLANT). This process will help ensure that all project work will be completed in compliance with applicable laws and regulations, within a reasonable time period and cost, and at the level of quality commensurate with the requirement and NAVFAC |
criteria.
| 7 |
| Dig Safe (Mark-out & Dig Permit Process) of 1 Apr 2019 |
| NAVFAC MIDLANT NWS EARLE |
| Procedure Number XXX-XXX |
| This SOP shall be used to identify key stakeholders, responsible authorities, and processes to be followed by NAVFAC and Contractors for requesting utility Mark-Outs and issuing of Dig Permits at NWS Earle, NJ. The purpose of mark-outs is to locate underground piping, utilities, and facilities before any digging operations begin. Requiring the use of a Permit program will ensure each step in the Dig Safe process is followed. |
| 8 |
| UNMANNED AIRCRAFT SYSTEMS POLICY of 8 Jun 2021 |
| NAVAL WEAPONS STATION EARLE |
| NWSEARLEINST 3710.l |
| To establish procedures for the safe operation of authorized/approved Unmanned Aircraft Systems (UAS) over Naval Weapons Station (NWS) Earle property and to prohibit the unauthorized possession and operation of UAS for the protection and security of the installation. |
| 9 |
| Region Space Management of 22 May 2016 |
| COMMANDER NAVY REGION MID-ATLANTIC |
| COMNAVREGMIDLANTINST 11010.45C |
| Provide guidelines for space allocation, and prescribe procedures to request, allocate, and assign space in the Navy Region Mid-Atlantic (NRMA). These criteria and procedures are designed to promote flexibility, encourage communication, and ensure proper prioritization and equitable use of the limited space available. |
| 10 |
| SITE APPROVAL REQUEST PROCESS of 12 JUNE 2018 |
| Naval Facilities Engineering Command |
| NAVFACINST 11010.45A |
| To publish guidance, policy, and procedures for tenant initiation, coordination, and Command approval of site approval requests for tenant facilities projects and qualifying events aboard Navy installations. |
| 11 |
| Navy Facilities Projects of 24 Jun 2015 |
| Chief of Naval Operations |
| OPNAV INSTRUCTION 11010.20H CHANGE TRANSMITTAL 1 |
| This instruction provides policy, guidance, and tenant responsibilities for the classification, preparation, submission, review, programming, approval, and reporting of real property facilities work at Navy shore installations and sites. |
| 12 |
| Recommended Practices for Safety and Health Programs of October 2016 |
| Occupational Safety and Health Administration |
| OSHA 3885 |
| Provides responsible employers, workers, and worker representatives, with a sound, flexible framework for addressing safety and health issues in diverse workplaces. |
| 13 |
| Protecting Controlled Unclassified Information in Nonfederal Systems |
and Organizations of Feb 2020
| National Institute of Standards and Technology (NIST) |
| NIST SP800-171 Rev 2 |
| The protection of Controlled Unclassified Information (CUI) resident in nonfederal systems and organizations is of paramount importance…This publication provides agencies with recommended security requirements for protecting the confidentiality of CUI when the information is resident in nonfederal systems and organizations; when the nonfederal organization is not collecting or maintaining information on behalf of a federal agency or using or operating a system on behalf of an agency; and where there are no specific safeguarding requirements for protecting the confidentiality of CUI prescribed by the authorizing law, regulation, or governmentwide policy for the CUI category listed in the CUI Registry. The requirements apply to all components of nonfederal systems and organizations that process, store, and/or transmit CUI, or that provide protection for such components. |
| 14 |
| BSEE Branding & Visual Identity Guidelines of Dec 2022 |
| BSEE Office of Public Affairs |
| None |
| The BSEE brand is one component of our strategy to continually enhance understanding and confidence. When people see the BSEE brand, it’s important they see a consistent image that affirms we are the bureau that vigorously promotes safety, protects the environment and conserves resources throughout the U.S. Outer Continental Shelf. Consistent use and application are vital to making the BSEE brand a success. |
Attachment D. Reduce, Recycle, Reuse Program
1. Exert best efforts to manage Ohmsett in a manner to promote the protection or enhancement of the natural environment and well-being of all personnel. Green purchasing or environmentally preferable contracting includes these initiatives:
a. Alternative Fuels and Vehicles are described at http://www.afdc.energy.gov/afdc/
b. Biobased Products are described at http://www.biopreferred.gov/
c. Energy efficient products are described at http://energystar.gov/products for Energy Star products and at http://www.eere.energy.gov/femp/procurement for FEMP designated products
d. Environmentally Preferable Computers are described at http://www.epeat.net
e. Non-Ozone Depleting Products are described at http://www.epa.gov/Ozone/snap/index.html
f. Recycled Products are described at http://epa.gov/cpg
g. Water efficient products are described at http://epa.gov/watersense/
2. Furnish the environmentally preferable product type from above, unless that product type is not available competitively within a reasonable time, at a reasonable price, is not life-cycle cost efficient in the case of energy consuming products or does not meet reasonable performance standards. The clauses at FAR 52.223- 2, Affirmative Procurement of Biobased Products under Service and Construction Contracts, 52.223-15, Energy Efficiency in Energy Consuming Products, and 52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts, Section I requires the use of products that have biobased content, are energy efficient, or have recycled content.
3. Any electronic device such as desktops, laptops, or monitors delivered hereunder shall be energy efficient such that it is compliant with EnergyStar or FEMP standards as set forth at 48 CFR 52.223-15. Likewise, when supplying electronic devices hereunder, the Contractor shall ensure that the equipment is rated at least “silver” pursuant to IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products as set forth at 48 CFR 52.223-16 – Alternate I.
4. Address federal recycling mandates by implementing a strategy to manage and enhance waste minimization and recycling.
Attachment E. Official Events Event logistics are subject to change without notice but represent the most likely place of performance. Other factors affecting travel include conversion from live to virtual forums contingent upon pandemic conditions.
Table 1. Historical events from 2020, likely recurring, and requiring participation.
| Event |
| Duration |
(Days) Remarks (all sites visited on 27 Jul 2022)
| American Petroleum Institute (API) Oil Spill Emergency Preparedness and Response Sub-committee (OSEPR) Meeting |
| 1 |
| https://events.api.org/ |
| API Advisory Group Meeting |
| 1 |
| https://events.api.org/ |
| Arctic and Marine Oil Spill Program (AMOP) Technical Seminar on Environmental Contamination and Response |
| 3 |
| https://www.canada.ca/en/environment-climate-change/services/science-technology/arctic-marine-oilspill-program.html |
| ASTM F20 Committee Meeting |
| 2 |
| https://www.astm.org/get-involved/technical-committees/committee-f20 |
| Chevron/California Department of Fish and Wildlife OSPR Workshop for Oil Spill Response |
| 3 |
| https://wildlife.ca.gov/OSPR/Science |
| Clean Events 2020 Industry Summit: Response in a Pandemic |
| 1 |
| https://www.cleanevents.org/ |
| Clean Gulf |
| 4 |
| https://www.cleanevents.org/ |
| Clean Pacific Conference |
| 2 |
| https://www.cleanevents.org/ |
| Clean Waterways |
| 3 |
| https://www.cleanevents.org/ |
| Federal Laboratory Consortium Northeast Region Meeting |
| 2 |
| https://federallabs.org/events/2021-mid-atlantic-northeast-regional-meeting |
| Gulf of Mexico Research Initiative (GoMRI) Synthesis Dispersant Workshop |
| 5 |
| https://gulfresearchinitiative.org/gulf-mexico-oil-spill-ecosystem-science-conference/ |
| Webinars (Hosts vary) |
| 1 |
| Historical examples: |
ExxonMobil Dispersant Webinar National Oceanic and Atmospheric Administration (NOAA) Monthly Webinar Series
| Industry Technical Advisory Committee (ITAC) |
| 2 |
| https://ustr.gov/issue-areas/environment |
| International Conference on Ocean Energy (ICOE) |
| 3 |
| https://www.icoe-conference.com/about-icoe/conferences/icoe-oee-2022-donostia-san-sebastian/ |
| International Oil Spill Conference (IOSC) |
| 5 |
| https://iosc.org/ |
https://sites.events.concordia.ca/sites/mpri/en/international-oil-spill-science-conference-2022
| Marine Renewable Energy Conference |
| 1 |
| https://pacificoceanenergy.org/orec/ |
| National Academies of Science, Engineering and Medicine (NASEM) Gulf Research Program Offshore Situation Room |
| 3 |
| https://www.nationalacademies.org/our-work/offshore-situation-room-enhancing-resilience-to-oil-disasters-in-the-gulf-of-mexico |
| Northwest Oil Spill Control Course |
| 2 |
| https://response.restoration.noaa.gov/oil-and-chemical-spills |
| Ocean Plastic Forum – International Online Matchmaking Event |
| 1 |
| https://opfme2020.b2match.io/ |
| Pacific States/British Columbia Oil Spill Task Force Annual Meeting |
| 1 |
| https://oilspilltaskforce.org/task-force-events/past-annual-meetings/2021-annual-meeting/ |
| Spill Control Association of America Annual Meeting |
| 1 |
| http://www.scaa-spill.org/annual-meeting.html |
| World Ocean Summit |
| 5 |
| https://events.economist.com/world-ocean-summit/ |
Attachment F. Facility diagrams.
Figure 1A. Plan view of Main Bridge (top) and Auxiliary Bridge (bottom). Note, recovery tanks at lower-left hand side, see Figure 1B.
Figure 1B. Oil recovery diagram at Auxiliary Bridge.
Figure 2A. Discharge one-line diagram to TOMSA. Note, “GAC Treatment” in upper left-hand corner, see Figure 2B.
Figure 2B. Granular Activated Carbon (GAC) process diagram.
Figure 3. Filtration system overview.
Figure 4A. Plan view of oil storage and transfer piping at Facility R-26 (top) and Main Bridge (bottom). Note, equilization pits at lower-right hand corner, see Figure 4B.
Figure 4B. Plan view of equalization pits at Facility R-26TANK (northeast end), facing west. Note, “Scum Pipe” at top-middle through center, see Figure 4C.
Figure 4C. Section view of “Scum pipe”, facing south.
Figure 7. Profile view of “beach” for wave energy dissipation at Facility R-26TANK (north end).
Attachment G. Deliverables Below is the Contract Data Requirements List (CDRL) with Data Item Descriptions (DIDs) representing a summary of AVAILABLE deliverables for SELECTION at the Task Order level. Refer to the specific DID for minimum essential content standards, see separate PDF file, Attachment H.
A-series CDRLs represent common or frequent requirements. B-Series CDRLs are normally applicable to the Government (BSEE) for IDIQ and Task Order MRO-level reporting and records, although other Task Orders may apply. Distribution requires the COR with exception per paragraph 4.10.5.
Table 1. A-series Deliverables for electronic or hardcopy production.
| CDRL |
| DID |
| Nominal Title |
| Distribution |
| A001 |
| DI-ADMN-81249 |
| Meeting Agenda |
| To: Participants |
Cc: COR
| A002 |
| DI-ADMN-81250 |
| Meeting Minutes |
| To: Participants |
Cc: COR
| A003 |
| DI-ADMN-81373 |
| Presentation Material |
| To: Participants |
Cc: COR
| A004 |
| DI-ADMN-81308A |
| Conference Report |
| To: Task Order POC |
Cc: COR
| A005 |
| DI-MGMT-80507C |
| Project Planning Chart |
| To: Task Order POC |
Cc: COR
| A006 |
| DI-MGMT-88845 |
| After Action Report |
| To: Task Order POC |
Cc: COR
| A007 |
| DI-ALSS-81610 |
| Scanning or Digitizing Media |
| To: Task Order POC |
Cc: COR
| A008 |
| DI-MISC-80711 |
| Scientific Report |
(Then select CDRL A008-A OR A008-B) To: Task Order POC Cc: COR
| A008-A |
| Per above |
| Attachment A to Scientific Report |
(OSPD Report Specifications) Per above
| A008-B |
| Per above |
| Attachment B to Scientific Report |
(ANSI or NISO Report Specifications) Per above
| A009 |
| DI-MISC-80508B |
| Technical Report |
| To: Task Order POC |
Cc: COR
| A010 |
| DI-MISC-81457A |
| Lesson Strategy Report (LSR) |
| To: Task Order POC |
Cc: COR
| A010-A |
| DI-MISC-81458B |
| Attachment A to LSR |
(Instructor Plan) To: Task Order POC Cc: COR
| A010-B |
| DI-MISC-81456B |
| Attachment B to LSR |
(Student Guide) To: Task Order POC Cc: COR
| A010-C |
| DI-MISC-81459B |
| Attachment C to LSR |
(Syllabus) To: Task Order POC Cc: COR
Table 2. B-series Deliverables for electronic or hardcopy production.
| CDRL |
| DID |
| Nominal Title |
| Distribution |
| B001 |
| DI-MGMT-80368 |
| Monthly Status Report (MSR) |
| To: Task Order POC |
Cc: COR
| B001-A |
| DI-MISC-81920 |
| Attachment A to MSR |
(List of all Deliverables) Per above
| B001-B |
| DI-MGMT-80269 |
| Attachment B to MSR |
(Status of GFE) Per above
| B001-C |
| DI-MGMT-80259 |
| Attachment C to MSR |
(Physical Inventories Report) Per above
| B001-D |
| DI-MISC-80761 |
| Attachment D to MSR |
(Test Scheduling Report) Per above
| B002 |
| DI-OSPD-80170OT |
| Task Order Proposal (TOP) |
| To: CO |
Cc: COR
| B003 |
| DI-ADMIN-81401C |
| Contract Change Proposal (CCP) |
| To: CO |
Cc: COR
| B004 |
| DI-MGMT-81808 |
| Contractor’s Risk Management Plan |
| To: BSEE Ohmsett Manager |
Cc: COR
| B005 |
| DI-MISC-81423A |
| Facilities Maintenance Report |
| To: BSEE Ohmsett Manager |
Cc: COR
| B006 |
| DI-SESS-82178 |
| Logistics Plan |
| To: BSEE Ohmsett Manager |
Cc: COR
| B007 |
| DI-MISC-81489B |
| Real Property Facilities As-Built Drawings |
| To: BSEE Ohmsett Manager |
Cc: COR
| B008 |
| DI-SAFT-80106 |
| Health Hazard Assessment Report |
| To: Task Order POC |
Cc: COR
| B009 |
| DI-SAFT-82112 |
| Safety Data Sheet (SDS) Report |
| To: BSEE Ohmsett Manager |
Cc: COR
| B010 |
| DI-SAFT-81563 |
| Accident or Incident Report |
| To: BSEE Ohmsett Manager |
Cc: COR
| B011 |
| DI-OSPD-81371OT |
| Alternatives Comparison |
| To: Task Order POC |
Cc: COR
Attachment H. Liquid Product Inventory (approximate types and values) Table 1. Facility R-26 Tank Farm Status as of September 2022.
| Location |
| Capacity (gal) |
| Condition |
| Oil Type/Description |
| Quantity (gal) |
| Tank Farm 1A |
| 5,000 |
| Refurbished |
| For reuse or recycling (FROR) |
| 4,763 |
| Tank Farm 1B |
| 5,000 |
| Weathered |
| HOOPS |
| 1,724 |
| Tank Farm 2A |
| 5,000 |
| New |
| Calsol 8240 |
| 2,495 |
| Tank Farm 2B |
| 5,000 |
| Refurbished |
| Training Blend |
| 1,978 |
| Tank Farm 3 |
| 10,000 |
| New |
| Hydrocal 300 |
| 5,149 |
| Tank Farm 4 |
| 10,000 |
| N/A |
| Empty |
| 0 |
| Tank Farm 5 |
| 10,000 |
| Refurbished |
| Calsol 8240 (comingled) |
| 4,218 |
| Tank Farm 6 |
| 10,000 |
| Refurbished |
| Hydrocal 300 |
| 2,993 |
| Mixing Tank |
| 2,000 |
| N/A |
| Empty |
| 0 |
| Main Bridge Tank |
| 1,000 |
| N/A |
| Empty |
| 0 |
| Total |
| 63,000 |
23,320
Table 2. Facility R-41 Status as of September 2022.
| Oil |
| Totes |
| Drums |
| Buckets |
| Volume (gal) |
85W Gear Oil (Natural Science)
Anadarko
ANS (bp)
ANS (weathered 20%)
Bakken Crude
Black Bear Hydraulic Oil
BP Dorado
Calsol 875
Calsol 8240 (Natural Science)
Calsol 8240
Dilbit (Fresh)
DOBA (Chad)
Endicott (EPA Cincinnati)
Ewing Bank 873
ExxonMobil HE-26
ExxonMobil Excel 46
Freeport McMoran (Point Aguillo)
Harmony
| 0 |
| 1 |
| 2 |
Hibernia
Hydrocal 38
Hydrocal 300
IFO 120
IFO 380
MC 252
Mix Oils
NorthStar
Platform Gina H-7
Platform Gina (Fresh)
Platform Gina H-14
Platform Henry (Drum A)
Platform Henry (Drum B)
Pt Mac
Recco 40A
Terra Nova
| 3 |
| 15 |
Tesoro Decant Oil
| 2 |
| 10 |
Tesoro Decant Oil
VLSFO
| 13 |
| 78 |
West Delta 30
| ANS (Used) |
| 1 |
| ANS (Weathered/NOAA) |
| 1 |
| ANS (Weathered/SL Ross) |
| 1 |
ANS
(Weathered/Water Mapping)
| ANS Crude |
| 6 |
| Cal Sol 8240 |
| 4 |
| Cal Sol 8240 (Used) |
| 1 & 2 |
| DCORR A-28 |
| 1 |
| DCORR HE-5 |
| 1 |
| Diesel |
| 3 & 1 |
| HOOPS |
| 9 |
1,775
| HOOPS (ExxonMobil) |
| 5 |
1,319
| HOOPS (Weathered NOAA) |
| 1 |
| HOOPS (Weathered SL Ross) |
| 1 |
| Hydrocal 300 |
| 3 |
| Hydrocal 300 |
| 13 |
3,831
| GOM Crude Oil (LSU) |
| 1 |
| Midel 7131 |
| 1 |
| Oily Waste |
| 1 |
| Pacific Energy A-38 |
| 1 |
| Pacific Energy A-40 |
| 1 |
| PXP 01 |
| 1 |
| Tesoro Decant Oil |
| 2 & 1 |
| Thunderhorse (ExxonMobil) |
| 2 |
| Total |
| - |
| - |
| - |
| 16,383 |
image1.png image2.png image3.png image4.png image5.png image6.png image7.png image8.png image9.png