B08_Relevant_Project_Experience_Questionnaire.docx

DOCX document 40 KB Posted

Attached to
PUMPING SEPTIC TANKS & VAULT TOILETS, LEWI
Solicitation number
140P8326Q0036
Issued by

About this file

This is a Relevant Project Experience Questionnaire template designed to evaluate contractor qualifications for the septic tank and vault toilet pumping services contract at Lewis and Clark National Historical Park in Oregon.

The questionnaire appears to be a standard evaluation tool that requests offerors to demonstrate their relevant past performance and project experience related to septic system maintenance and vault toilet servicing. As part of a 100% small business set-aside solicitation (NAICS code 562991, with a $9.0 million size standard), this document would allow the National Park Service to assess bidders' technical capability and past performance—two of the three primary evaluation factors alongside price. Offerors selected through this solicitation would be awarded a firm-fixed-price contract for a one-year base period with up to four one-year options to provide pumping and servicing at multiple park locations. The questionnaire serves as a mechanism for responsible offeror determination under FAR subpart 9.1 and supports the government's goal of selecting the offer most advantageous to the government.

View the file

Other files

File Type Posted
Septic_and_Vault_Toilet_Locations.jpg JPG image
Sol_140P8326Q0036.pdf PDF
LEWI_Septic_Pumping_SOW.docx DOCX document
B08_Forms_to_Return_LEWI_Septic_Vault_Pumping.docx DOCX document
SCA_WD__2015-5577.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Relevant Project Experience Questionnaire Solicitation: 140P8326Q0036

Submit responses to the questions below that demonstrate your relevant experience successfully completing projects of a similar nature and scope as this requirement per the instructions in the Solicitation. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).

Offeror
Company Name

REFERENCED PROJECT INFORMATION

Project Title
Title
Project Location
City, State
Period of Performance:
MM/DD/YYYY – MM/DD/YYYY
Brief Project Description
Description
Project Owner
Company Name
POC:
First & Last Name
Phone:
(XXX) XXX-XXXX

CONTRACTOR LIST

List Contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (i.e. prime and subcontractors), provide information specific to that contractor.

Contractor Name
Role on Referenced Project

(Prime or Sub)

Trade
Price

(list for each contractor’s specific work) Performance Period (calendar days) (list for each contractor’s specific work)

Original
Final
Original
Final

Choose an item.

Choose an item.

Choose an item.

PROJECT EXPERIENCE QUESTIONS

1. Describe the project work performed by all contractors listed above.

Response

2. Identify which Project Experience elements listed in section L of the solicitation each contractor’s work addresses.

Response

3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.

Response

4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.

Response

5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.

Response

6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?

Response

7. Provide any other additional project information you believe should be presented.

Response

File details come from the government source that posted it. Updated .