B08_Project_Experience_Questionnaire_Attachement__9.docx
DOCX document 40 KB Posted
- Attached to
- Olympic NP REHAB KALALOCH APARTMENTS
- Solicitation number
- 140P8325R0004
About this file
This document is a Project Experience Questionnaire for Solicitation 140P8325R0001, specifically designed for a NEPE (National Environmental Policy Act) Rehabilitation Restroom project. The questionnaire requires offerors to provide detailed information about their past project experiences, including three projects completed within the last five years that demonstrate relevant capabilities. Respondents must comprehensively address seven key questions covering project work details, contractor roles, price and schedule changes, problem resolution, successful methods, and additional project insights.
The questionnaire is structured to capture granular details about previous projects, such as project title, location, performance period, owner information, contractor list, trade pricing, and performance duration. Contractors must articulate their specific roles, explain any variations from original project plans, describe challenges encountered and resolved, and demonstrate how their past experience directly relates to the current solicitation for rehabilitation work with the Department of the Interior National Park Service Southeast Region. The document appears to be a supporting attachment for the Olympic NP REHAB KALALOCH APARTMENTS solicitation (140P8325R0004), focusing on providing comprehensive project experience evidence.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation 140P8325R0001 NEPE Rehab Restroom Attachment #5 Project Experience Questionnaire Solicitation: 140P8325R0001
Submit responses to the questions below that demonstrate your relevant experience successfully completing projects of a similar nature and scope as this requirement per the instructions provided in Section L of the Solicitation. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).
| Offeror |
| Company Name |
REFERENCED PROJECT INFORMATION
| Project Title |
| Title |
| Project Location |
| City, State |
| Period of Performance: |
| MM/DD/YYYY – MM/DD/YYYY |
| Brief Project Description |
| Description |
| Project Owner |
| Company Name |
| POC: |
| First & Last Name |
| Phone: |
| (XXX) XXX-XXXX |
CONTRACTOR LIST
List Contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (i.e. prime and subcontractors), provide information specific to that contractor.
| Contractor Name |
| Role on Referenced Project |
(Prime or Sub)
| Trade |
| Price |
(list for each contractor’s specific work) Performance Period (calendar days) (list for each contractor’s specific work)
| Original |
| Final |
| Original |
| Final |
Choose an item.
| $XXX,XXX |
| $X,XXX,XXX |
| XX |
| XX |
Choose an item.
| $X,XXX,XXX |
| $X,XXX,XXX |
| XXX |
| XXX |
Choose an item.
PROJECT EXPERIENCE QUESTIONS
1. Describe the project work performed by all contractors listed above.
Response
2. Identify which Project Experience elements listed in section L of the solicitation each contractor’s work addresses.
Response
3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.
Response
4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.
Response
5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.
Response
6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?
Response
7. Provide any other additional project information you believe should be presented.
Response
Provide at least 3 projects within the last 5 years.