B08_Price_Schedule_Sheet_attachment_3.pdf
PDF 95 KB Posted
- Attached to
- Olympic NP REHAB KALALOCH APARTMENTS
- Solicitation number
- 140P8325R0004
About this file
This document is a Contract Price Schedule for a National Park Service project to rehabilitate Kalaloch Apartments. The solicitation (Number 140P8325R0004) outlines eight contract line items (CLINs), including five base items and three optional items. Base line items cover apartment rehabilitation, metal roof replacement, exterior door and window replacement, HVAC system replacement, and exterior painting and preparation. Optional items include accessible parking and exterior walkway improvements, seismic improvements, and residential appliances.
The pricing schedule is structured with a lump-sum (LS) measurement for each line item, and currently shows $0.00 for all items. Offerors are required to submit pricing for both base and option line items, with a warning that failure to do so may render the proposal unacceptable. The document specifies that in case of calculation errors, unit prices will govern, and all prices should be rounded to whole dollars. Additional measurement and payment information is referenced in Division 01 Specifications Section 01 27 00.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contract Price Schedule National Park Service (NPS)
Solicitation Number:
PARK - PMIS: OLYM 313785
(Project Management Information System)
Developed Area: Kalaloch Project Title: Rehabilitate Kalaloch Apartments
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars.
Contract Line Item Number
(CLIN)
Contract Line Item (CLI) Title Quantity Unit of Measure Unit Price Total Price
1 Rehabilitate Apartments 1 LS $0.00
2 Metal Roof Replacement 1 LS $0.00
3 Exterior Door and Window Replacement 1 LS $0.00
4 HVAC System Replacement 1 LS $0.00
5 Exterior Painting and Preparation 1 LS $0.00
TOTAL BASE PRICE (Contract Line Item Number 1 through 5) --------------------------------------------------------------------------------- $0.00
6 OPTION A, Accessibe Parking and Exterior Walkway Improvements 1 LS $0.00
7 OPTION B, Seismic Improvements 1 LS $0.00
8 OPTION C, Residential Appliances 1 LS $0.00
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 6 through 8) ----------------------------------------------------------- $0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 8) -------------------------- $0.00
All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items.
140P8325R0004