This document is a Statement of Structural Tests and Special Inspections for the Rehabilitation of the Painted Desert Community Complex at Petrified Forest National Park (PMIS 267538).
The statement outlines the seismic and wind requirements, qualifications for inspectors and testing technicians, and a detailed listing of the required structural tests and special inspections. This includes inspections for steel construction, concrete, masonry, wood, soils, and helical piles. The Construction Contractor will be responsible for providing all special inspection reports and correcting any deficiencies found. The document is being submitted as required by Chapter 17 of the 2021 International Building Code.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PARK/PMIS page 1 of 17
Statement of Structural Tests and Special Inspections National Park Service (NPS) - Denver Service Center (DSC) | 6-29-21
Park: Petrified Forest National Park
Project Management Information System (PMIS) Number: 267538
Project Name: Rehabilitate Painted Desert Community Complex
Structural Engineering Firm: DCI Engineers
This Statement of Structural Tests and Special Inspections is being submitted as required by Chapter 17 of the
2021 International Building Code (IBC-21). It includes the following:
1. Seismic requirements
2. Wind requirements
3. Qualification Requirements for Inspectors and Testing Technicians
4. Listing of Required Structural Tests and Special Inspections
The Construction Contractor’s Quality Control Supervisor will provide copies of all special inspection reports and associated documentation to the Contracting Officer (CO). The Construction Contractor will be required to correct all deficiencies discovered in the Special Inspection and Structural Testing program.
Prepared By: ___ ______________________________________ (Type or print name)
Signature: ____________________________________________________ Date: ________________
Stamped by Professional Engineer (PE) or Structural Engineer (SE)
U ASANOZI
RA
R eg i s t e re d P r of e ss i ona l Eng i nee r ( S tr uctu ral)
.O
NETACIFITREC
dg eniS eta
D 53113
CHRIS
SCHLEGEL
7/16/24
Samantha Fox, PE, SE
07-16-2024
PARK/PMIS page 2 of 17
Seismic and Wind Requirements
Seismic Requirements, IBC-21 Section 1704.3
Description of seismic-force-resisting system and designated seismic systems subject to special inspections:
The seismic resisting system consists of existing masonry shear walls for all buildings supporting wood, light gauge metal deck, or concrete on metal deck diaphragms. The site is Seismic Design Category A, and therefore the construction of any new masonry walls is not subject to special inspections based on seismic-force-resisting requirements. The housing blocks also have some wood shear walls supporting the wood diaphragms in those buildings.
Wind Requirements, IBC-21 Section 1704.3
Description of wind-force-resisting system and designated wind systems subject to special inspections:
The wind-force-resisting system consists of the same elements noted above. The site is not subject to special inspections based on wind-force-resisting requirements.
PARK/PMIS page 3 of 17
Instructions:
1. Under Listing of Required Structural Tests and Special Inspections:
a. Required? - Place an X for all Special Inspections and Tests required for this project.
b. Required Qualifications - Provide qualifications for the special inspector, using the
Qualification Requirements for Inspector and Testing Technicians list below, for all required Structural Tests and Special Inspections.
c. Continuous - If marked with an X, continuous special inspection shall be as defined in Chapter
2, IBC-21.
d. Periodic - If marked with an X, provide the minimum number of tests, i.e. 20% of all field welds, or the amount of work to be inspected (e.g. 10% of all wall surfaces).
2. Attach completed Statement of Structural Tests and Special Inspections to the end of NPS DSC Division 1 Specifications Section 01 40 00 Quality Requirements.
Qualification Requirements for Inspectors and Testing Technicians
PE/SE Structural Engineer – licensed PE or SE specializing in the design of buildings and structures
PE/GE Geotechnical Engineer – licensed PE specializing in soil mechanics and foundations
EIT Engineer-In-Training – graduate engineer who has passed the Fundamentals of engineering examination
American Concrete Institute (ACI) Certification
ACI-CCSI Concrete Construction Special Inspector
ACI-LTT Concrete Laboratory Testing Technician Level 1 or 2
ACI-STT Concrete Strength Testing Technician
ACI-FTT Concrete Field Testing Technician – Grade I
American Society of Non-Destructive Testing (ASNT) Certification
Non-Destructive Testing Technician – Level II or III
American Welding Society (AWS) Certification
AWS-CWI Certified Welding Inspector
Exterior Design Institute (EDI) Certification
EDI-EIFS Certified EIFS inspector
International Code Council (ICC) Certification
ICC-PCSI Prestressed Concrete Special Inspector
ICC-RCSI Reinforced Concrete Special Inspector
ICC-SSI Soils Special Inspector
ICC-SFSI Spray-applied Fireproofing Special Inspector
ICC-SMSI Structural Masonry Special Inspector
ICC-SSBSI Structural Steel and Bolting Special Inspector
ICC-SWSI Structural Welding Special Inspector
National Institute for Certification in Engineering Technologies (NICET) Certification
NICET-CT Concrete Technician – Levels I, II, III and IV
NICET-GET Geotechnical Engineering Technician - Levels I, II, III and IV
NICET-ST Soils Technician - Levels I, II, III and IV
PARK/PMIS page 4 of 17
Other
PARK/PMIS page 5 of 17
Listing of Required Structural Tests and Special Inspections R e q u ir e d
Structural Test or Special Inspection Required
Qualifications
C o n ti n u o u s
P e ri o d ic Frequency of
Periodic Test or Inspection
Steel Construction (IBC-21 Section 1705.2; American Institute of Steel Construction: AISC 360-16 Chapter N, AISC 341- 16 Chapter J)
Prior to Welding (AISC 360-16 Table N5.4-1) x
1. Welder qualification records and continuity records
AWS-CWI
X
2. Welding procedure specifications (WPS) available
3. Manufacturer certifications for welding consumables available x 4. Material identification (type/grade) AWS-CWI X 1 x 5. Welder identification system AWS-CWI X 1
6. Fit-up of groove welds (including joint geometry) x a. Joint preparation AWS-CWI X 1 x
b. Dimensions (alignment, root opening, root face, bevel)
AWS-CWI
X x c. Cleanliness (condition of steel surfaces) AWS-CWI X 1 x d. Tacking (tack weld quality and location) AWS-CWI X 1
e. Backing type and fit (if applicable) AWS-CWI X
7. Fit-up of CJP (complete joist penetration) groove welds of HSS (hollow structural sections) T-, Y- and K-joints without backing (including joint geometry)
a. Joint preparation AWS-CWI
b. Dimensions (alignment, root opening, root face, bevel)
c. Cleanliness (condition of steel surfaces) AWS-CWI
d. Tacking (tack weld quality and location) AWS-CWI
PARK/PMIS page 6 of 17
R e q u ir e
Qualifications
C o n ti n u o ri o d ic Frequency of
Periodic Test or Inspection
8. Configuration and finish of access holes AWS-CWI X
9. Fit-up of fillet welds
a. Dimensions (alignment, gaps at root) AWS-CWI X
b. Cleanliness (condition of steel surfaces) AWS-CWI X
c. Tacking (tack weld quality and location) AWS-CWI X
10. Check welding equipment AWS-CWI X
During Welding (AISC 360-16 Table N5.4-2)
1. Control and handling of welding consumables x a. Packaging AWS-CWI X 1 x b. Exposure control AWS-CWI X 1 x 2. No welding over cracked tack welds AWS-CWI X 1
3. Environmental conditions x a. Wind speed within limits AWS-CWI X 1 x b. Precipitation and temperature AWS-CWI X 1
4. WPS followed x a. Settings on welding equipment AWS-CWI X 1 x b. Travel speed AWS-CWI X 1 x c. Selected welding materials AWS-CWI X 1 x d. Shielding gas type/flow rate AWS-CWI X 1 x e. Preheat applied AWS-CWI X 1 x
f. Interpass temperature maintained
(minimum/maximum)
AWS-CWI
X x g. Proper position (F, V, H, OH) AWS-CWI X 1
PARK/PMIS page 7 of 17 e q u ir e
Qualifications
C o n ti n u o ri o d ic Frequency of
Periodic Test or Inspection x
h. Intermix of filler metals avoided unless approved (reference: AISC 341-10 Table J6.2)
AWS-CWI
X x 5. Use of qualified welders AWS-CWI X
6. Welding techniques x a. Interpass and final cleaning AWS-CWI X 1 x b. Each pass within profile limitations AWS-CWI X 1 x c. Each pass meets quality requirements AWS-CWI X 1
7. Placement and installation of headed stud anchors
After Welding (AISC 360-16 Table N5.4-3) x 1. Welds cleaned AWS-CWI X 1 x 2. Size, length and location of welds AWS-CWI X
3. Welds meet visual acceptance criteria x a. Crack prohibition AWS-CWI X x b. Weld/base-metal fusion AWS-CWI X x c. Crater cross section AWS-CWI X x d. Weld profiles AWS-CWI X x e. Weld size AWS-CWI X x f. Undercut AWS-CWI X x g. Porosity AWS-CWI X x 4. Arc strikes AWS-CWI X x 5. k-area AWS-CWI X
6. Weld access holes in rolled heavy shapes and built-up heavy shapes
7. Backing removed and weld tabs removed (if required)
PARK/PMIS page 8 of 17 e q u ir e
Qualifications
C o n ti n u o ri o d ic Frequency of
Periodic Test or Inspection x 8. Repair activities AWS-CWI X x
9. Document acceptance or rejection of welded joint or member
10. No prohibited welds have been added without the approval of the EOR (Engineer of Record)
11. Placement of reinforcing or contouring fillet welds (if required) (reference: AISC 341-16)
Nondestructive Testing (AISC 360-16 Section N5 and AISC 341-16 Section J6)
1. Risk Category II Structures - Perform Ultrasonic Testing on 10% of CJP groove welds in butt, T-and corner joints subject to transversely applied tension loading, in materials 5/16 inch thick or greater.
Non-destructive Testing Technician
– Level II or Level III X
2. Risk Category III or IV Structures - Perform Ultrasonic Testing on all CJP groove welds subject to transversely applied tension loading in butt, T- and corner joints, in materials 5/16 inch thick or greater.
3. Access Holes – Perform Magnetic Particle Testing or Liquid Penetrant Testing when the flange thickness exceeds 2 inches for rolled shapes, or when the web thickness exceeds 2 inches for built-up shapes.
4. Welded Joints Subject to Fatigue X
Nondestructive Testing (AISC 341-16 Section J6)
Column Splice and Column to Base Plate PJP Groove Weld (AISC 341-16 Section J6 2b)
1. Perform Ultrasonic Testing on 100% of PJP
(partial-joint-penetration) groove welds in column splices and column to base plate welds
2. CJP Groove weld X
3. Lamellar tearing X
4. Beam cope and access hole X
5. Reduced beam section repair X
PARK/PMIS page 9 of 17 e q u ir e
Qualifications
C o n ti n u o ri o d ic Frequency of
Periodic Test or Inspection
6. Weld tab removal X
Prior to Bolting (AISC 360-16 Table N5.6-1)
These inspections are not required for snug-tight joints.
1. Manufacturer’s certifications available for fastener materials
ICC-SSBSI
2. Fasteners marked in accordance with ASTM requirements
3. Correct fasteners selected for the joint detail
(grade, type, bolt length if threads are to be excluded from shear plane)
4. Correct bolting procedure selected for joint detail
5. Connecting elements, including the appropriate faying surface condition and hole preparation, if specified, meet applicable requirements
6. Pre-installation verification testing by installation personnel observed and documented for fastener assemblies and methods used
7. Protected storage provided for bolts, nuts, washers and other fastener components
During Bolting (AISC 360-16 Table N5.6-2)
These inspections are not required for snug-tight joints.
These inspections are not required for pretensioned joints and slip-critical joints, when the installer is using the turn-of-nut method with matchmarking techniques, the direct-tension-indicator method, or the twist-off-type tension control bolt method.
1. Fastener assemblies, of suitable condition, placed in all holes and washers (if required) are positioned as required
2. Joint brought to the snug-tight condition prior to the pretensioning operation
3. Fastener component not turned by the wrench prevented from rotating
PARK/PMIS page 10 of 17 e q u ir e
Qualifications
C o n ti n u o ri o d ic Frequency of
4. Fasteners are pretensioned in accordance with the RCSC (Resource Council on Structural Connections) Specification, progressing systematically from the most rigid point toward the free edges
After Bolting (AISC 360-16 Table N5.6-2)
Document acceptance or rejection of bolted connections.
ICC-SSBSI
Other Inspection Tasks (AISC 360-16 Section N5.7)
1. Verify compliance of fabricated steel with the details shown on the approved shop drawings.
ICC-SSBSI
X x
2. Verify compliance of the erected steel frame with the details shown on the approved erection drawings, including braces, stiffeners, member locations and joint details.
ICC-SSBSI
3. Anchor rods and other embedments support structural steel
a. Verify the diameter, grade, type and length of the anchor rod or embedded item.
ICC-SSBSI
X x
b. Verify the extent or depth of embedment into the concrete.
ICC-SSBSI
4. RBS (reduce beam section) requirements, if applicable (AISC 341-16)
a. Contour and finish ICC-SSBSI X
b. Dimensional tolerances ICC-SSBSI X
5. Protected zone - no holes and unapproved attachments made by fabricator or erector, as applicable. (AISC 341-16)
6. H-piles - Protected zone - no holes and unapproved attachments made by the responsible contractor, as applicable. (AISC 341-16)
Cold-formed Steel Deck (IBC-21 1705.2.2) x 1. Special inspections in accordance with QA/QC- 2017 Standard for Quality control (QC) and
ICC-SSBSI/SWSI 1
PARK/PMIS page 11 of 17 e q u ir e
Qualifications
C o n ti n u o ri o d ic Frequency of
Periodic Test or Inspection
Quality assurance (QA) for Installation of Steel Deck
Concrete Construction (IBC-21 Section 1705.3)
1. Inspect reinforcing steel, including prestressing tendons, and placement.
ACI-FTT
X
2. Inspection of reinforcing steel welding
a. Verify weldability of reinforcing bars other than ASTM A706.
ACI-FTT
b. Inspect single pass fillet welds, maximum
5/16 inch.
c. Inspect all other welds. ACI-FTT X x 3. Inspection of anchors cast in concrete. ACI-FTT X 1
4. Inspection of anchors post-installed in hardened concrete members.
a. Adhesive anchors installed in horizontally or upwardly inclined orientations to resist sustained tension load
b. Mechanical anchors and adhesive anchors not defined in 4 a
ACI-FTT
X x 5. Verify use of approved design mix. PE X 1 x
6. Prior to placement fabricate specimens for strength tests, perform slump and air content tests, and determine the temperature of the concrete.
7. Inspect concrete and shotcrete placement for proper application techniques.
8. Inspect for maintenance of specified curing temperature and techniques.
ACI-FTT
X
9. Inspection of prestressed concrete:
a. Application of prestressing forces ACI-FTT X
b. Grouting of bonded prestressing tendons in the seismic-force-resisting system.
10. Erection of precast structural members ACI-FTT X
PARK/PMIS page 12 of 17 e q u ir e
Qualifications
C o n ti n u o ri o d ic Frequency of
11. For precast concrete diaphragm connections or reinforcement at joints classified as moderate or high deformability elements (MDE or HDE) in structures assigned to Seismic Design Category C, D, E, or F, inspect such connections and reinforcement in the field for:
a. Installation of the embedded parts ACI-FTT X
b. Completion of the continuity of reinforcement across joints
c. Completion of connections in the field ACI-FTT X
12. Inspect installation tolerances of precast concrete diaphragm connections for compliance with ACI 550.5 (American Concrete Institute).
13. Verification of in-situ concrete strength, prior to stressing of tendons in post-tensioned concrete and prior to removal of shores and forms from beams and structural slabs.
14. Inspection formwork for shape, location and dimensions of the concrete member being formed.
ACI-FTT
X
Masonry Construction (IBC-21 Section 1705.4)
1. Inspect masonry construction in accordance with IBC-21 Section 1705.4 and TMS 602-13 (The Masonry Society)/ACI 530.1-13 Article 1.6.
ICC-SMSI
Level A Quality Assurance
Tests: None.
Inspection: Verify compliance with the approved submittal and project specifications.
Level B Quality Assurance
Tests:
x
1. Verify slump flow and Visual Stability Index (VSI) as delivered to the project site in accordance with TMS 602-13/ACI 530.1-13 Specification Article 1.5B.1.b.3 for self-consolidating grout.
PARK/PMIS page 13 of 17 e q u ir e
Qualifications
C o n ti n u o ri o d ic Frequency of
Periodic Test or Inspection x
2. Verify f’m and f’aac in accordance with TMS 602-13/ACI 530.1-13 Specification Article 1.4B prior to construction, except where specifically exempted.
Inspection:
1. Verify compliance with the approved submittals and project specifications.
ICC-SMSI
X
2. At the start of masonry construction, verify:
x a. Proportions of site-prepared mortar. ICC-SMSI X 1 x b. Construction of mortar joints. ICC-SMSI X 1 x
c. Grade and size of prestressing tendons and anchorages.
d. Location of reinforcement, connectors, prestressing tendons and anchorages.
ICC-SMSI
X
e. Prestressing technique. X
f. Properties of thin-bed mortar for AAC (autoclaved aerated concrete) masonry.
(Continuous inspection is required for the first 5000 square feet of AAC masonry.
Periodic inspection is required after the first 5000 square feet of AAC masonry.)
X X
3. Prior to grouting, verify:
x a. Grout space is clean. ICC-SMSI X 1 x
b. Grade, type and size of reinforcement and anchor bolts, and prestressing tendons and anchorages.
ICC-SMSI
X x
c. Placement of reinforcing and connectors, and prestressing tendons and anchorages.
ICC-SMSI
X x
d. Proportions of site-prepared grout and prestressing grout for bonded tendons.
ICC-SMSI
X x e. Construction of mortar joints. ICC-SMSI X 1
4. During masonry construction, verify:
x a. Size and location of structural members. ICC-SMSI X 1
PARK/PMIS page 14 of 17 e q u ir e
Qualifications
C o n ti n u o ri o d ic Frequency of
Periodic Test or Inspection x
b. Type, size and location of anchors, including other details of anchorage of masonry to structural members, frames, or other construction.
ICC-SMSI
X
c. Welding of reinforcement. X x
d. Preparation, construction and protection of masonry during cold weather (temperature below 40 degrees Fahrenheit) or hot weather (temperature above 90 degrees Fahrenheit).
ICC-SMSI
e. Application and measurement of prestressing force.
f. Placement of grout and prestressing grout for bonded tendons is in compliance.
g. Placement of AAC masonry units and construction of thin-bed mortar joints.
(Continuous inspection is required for the first 5000 square feet of AAC masonry.
Periodic inspection is required after the first 5000 square feet of AAC masonry.)
X X
5. Observe preparation of grout specimens, mortar specimens and/or prisms.
ICC-SMSI
X
Level C Quality Assurance
Tests:
1. Verify f’m and f’aac in accordance with TMS 602-13/ACI 530.1-13/ASCE 6-13 Specification Article 1.4B prior to construction, and for every 5000 square feet during construction.
2. Verify proportions of materials in premixed or pre-blended mortar, prestressing grout, and grout other than self-consolidating grout as delivered to the project site.
3. Verify slump flow and Visual Stability Index (VSI) as delivered to the project site in accordance with TMS 602-13/ACI 530.1- 13/ASCE 6-13 Specification Article 1.5B.1.b.3 for self-consolidating grout.
Inspection:
PARK/PMIS page 15 of 17 e q u ir e
Qualifications
C o n ti n u o ri o d ic Frequency of
1. Verify compliance with the approved submittals and project specifications.
2. Verify:
a. Proportions of site-prepared mortar, grout and prestressing grout for bonded tendons.
b. Grade, type and size of reinforcement and anchor bolts, and prestressing tendons and anchorages.
c. Placement of masonry units and construction of mortar joints.
d. Placement of reinforcement, connectors and prestressing tendons and anchorages.
e. Grout space prior to grouting. X
f. Placement of grout and prestressing grout for bonded tendons.
g. Size and location of structural elements. X
h. Type, size and location of anchors, including other details of anchorage of masonry to structural members, frames or other construction.
i. Welding of reinforcement. X
j. Preparation, construction and protection of masonry during cold weather (temperature below 40 degrees Fahrenheit) or hot weather (temperature above 90 degrees Fahrenheit).
k. Application and measurement of prestressing force.
l. Placement of AAC masonry units and construction of thin-bed mortar joints.
m. Properties of thin-bed mortar for AAC masonry.
3. Observe preparation of grout specimens, mortar specimens and/or prisms.
Wood Construction (IBC-21 Section 1705.5)
PARK/PMIS page 16 of 17 e q u ir e
Qualifications
C o n ti n u o ri o d ic Frequency of
1. Inspect prefabricated wood structural elements in accordance with Section 1704.2.5.
EIT/PE
2. High load diaphragms: EIT/PE
a. Verify sheathing grade and thickness. EIT/PE X
b. Verify nominal size of framing members at adjoining panel edges.
c. Verify nail or staple diameter and length. EIT/PE X
d. Verify number of fastener lines. EIT/PE X
e. Verify spacing between fasteners in each line and at panel edges.
3. Shearwalls:
x a. Verify sheathing grade and thickness. EIT/PE X x
b. Verify nominal size of framing members at adjoining panel edges.
x c. Verify nail or staple diameter and length. EIT/PE X x d. Verify number of fastener lines. EIT/PE X x
e. Verify spacing between fasteners in each line and at panel edges.
x f. Location and size of holdowns. EIT/PE X
4. Verify nailing, bolting, anchoring and fastening of:
x a. Drag struts and collectors. EIT/PE X 1 x b. Braces. EIT/PE X 1 x c. Hold-downs. EIT/PE X 1
5. Metal-plate-connected wood trusses spanning
60 feet or greater:
a. Verify temporary installation restraint/bracing installed in accordance with the approved shop drawings.
PARK/PMIS page 17 of 17 e q u ir e
Qualifications
C o n ti n u o ri o d ic Frequency of
b. Verify permanent individual truss member restraint/bracing installed in accordance with the approved shop drawings.
Soils (IBC-21 Section 1705.6)
1. Verify materials below shallow foundations are adequate to achieve the required bearing capacity.
NICET-ST
X x
2. Verify excavations are extended to proper depth and have reached proper material.
NICET-ST
X x
3. Perform classification and testing of compacted fill materials.
NICET-ST
X x
4. During fill placement, verify use of proper materials and procedure in accordance with the provisions of the approved geotechnical report.
Verify densities and lift thicknesses during placement and compaction of compacted fill.
NICET-ST
5. Prior to placement of compacted fill, inspect subgrade and verify that site has been prepared properly.
NICET-ST
X
Helical Piles (IBC-21 Section 1705.10)
1. Verify pile locations. X x a. Verify installation equipment used. EIT/PE X x b. Verify pile dimensions. EIT/PE X x c. Verify tip elevations. EIT/PE X x d. Verify final depth. EIT/PE X x e. Verify final installation torque. EIT/PE X x