This document is a Closeout and Operation & Maintenance (O&M) Requirements Template for a National Park Service (NPS) project. It outlines the various closeout and O&M requirements for the PEFO 267538 Rehabilitate Painted Desert Community Complex contract, including record drawings, system training, tools and spare parts, equipment extra stock, reports, keys and keying, warranties and guarantees, and protection requirements for the installed products. The related federal contract opportunity is a Source Sought Notice for this project, solicitation number 140P2024R0113, issued by the Department of the Interior National Park Service National Office. The document does not provide any additional details about the specific products or services required for the contract.
View the file
Other files for this federal contract opportunity
Show all 34
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Closeout and Operation & Maintenance (O&M) Requirements Template National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21
Topic Specification
Section Requirement
Submittal
Date Completed
Received by Park
017700 Project Record Drawings
Project Record
Drawings 03 30 00 Record locations of embeeded utilities and componenets concealed from view.
05 14 00 Installation record for each Helical Pier
Drawings
21 00 00 Fire Suppression record drawings
21 13 00 Fire Sprinkler Shop level drawings with calculations
22 00 00 Plumbing record drawings
23 00 00 Mechanical record drawings
26 00 00 Electrical record drawings
26 24 16 Record changes in panelboard schedules and circuiting plans
26 43 00 Record actual locations of surge protective devices.
27 00 00 Communications record drawings
27 15 00 Note labeling information at each outlet on the record drawings.
27 41 16 AV Systems and Equipment record drawings
28 00 00 Electronic Safety and Security Basic Requirements
28 31 00 Fire Alarm record drawings
31 22 13 Record locations of utilities remaing by horizontal dimensions.
32 84 00 Irrigation As-Builts
33 05 61 Record locations of manholes and connections, and record invert elevations.
33 14 17 Reord locations of piping mains, curb stops, connections, thrust restraints, pressure-pipe centerline elevations, and gravity-pipe invert elevations.
33 42 00 Record locations of pipe runs, connections, catch basins, cleanouts, and invert elevations. Identify and describe unexpected variations to subsoil conditions or discovery of uncharted utilities.
33 42 36 Record locations of installed trench drains and accessories.
017823 System Training: Irrigation System, Dry Well Maintenance, Infiltration Trench Maintenance, Radon System Monitoring
System
Demonstration and Training
017823 System Training: Metal Shingle Paint Maintenance, Linseed Oil Paint Maintenance, Storm Windows Maintenance and Repair
13 31 00 Training on proper removal and reinstallation of shade fabric
14 24 00 Hydraulic Elevator system demonstration and training
21 00 00 Fire Sprinkler system training: operations, scheduled inspection times, hands-on instructions
22 00 00 Plumbing equipment and system demonstration and training.
22 30 00 Technical training of maintenance staff includes two hours minimum per each piece of equipment.
23 00 00 Mechanical equipment and system demonstration and training.
26 00 00 Electrical equipment and system demonstration and training.
26 09 24 Provide minimum of 2-hour training session to Government at a time approved by Contracting Officer. Training to include discussion of operation, adjustment, and replacement of sensors, photocells and control.
26 27 13 One-hour video recorded training period for Government in use of meter.
26 31 00
Provide Government minimum two 2-hour training sessions on separate days with factory support, for use of both internet portal and review installation of communications system. As part of this training establish an emergency operations plan with facility personnel for emergency shutdown, de-energization, and isolation of equipment, and for procedures to be followed in case of fire, explosion, release of liquids or vapors, or other potentially dangerous conditions. Provide audio/video record of both sessions.
26 36 00 Train Government's personnel on operation, adjustment, and maintenance of transfer switches. Provide minimum of four hours of training. Intructor: Manufacturer's authorized representative.
27 00 00 Training of Operating Personnel
Closeout and Operation Maintenance (O) Requirements Template | National Park Service (NPS) - Denver Service Center (DSC) page 1 of 6
Topic Specification
Section Requirement
Submittal
Date Completed
Received by Park
28 00 00 Training of Operating Personnel
28 10 00 Provide eight hours of training of operational instruction and two hours of maintenance instruction.
28 31 00 Fire alarm system training: basic operation, detailed operation, hands-on instruction, classroom instruction.
Tools
Spare Parts 21 13 00 Provide extra sprinklers per code.
21 13 00 Provide wrenches for each sprinkler type and metal storage cabinet in riser room.
22 40 00 Furnish special wrenches and other devices necessary for servicing plumbing fixtures and trim to Contracting Officer.
26 32 14 Provide spare lamps to allow future addition of other alarm and status functions to annunciator.
Equipment
Extra Stock
09 93 00 Stain and transparent finish materials, 1 gal of each color and type
21 13 00 Stock of spare sprinkler heads with associated wrench
22 40 00 Furnish special wrenches and other devices necessary for servicing plumbing fixtures and trim to Contracting Officer.
23 33 00 Extra Fusible Links: One of each type and size.
23 40 00 Two extra sets of filters for each piece of equipment.
23 72 23 Filters: Two sets of filters for each unit.
32 84 00 Furnish the following items to Owner: 30 Drip emitters of each type used, 1 Electric Control Valve of each type used, 10
Bubbler heads of each type used
013233 Complete set of digital image electronic files
Reports 015639 Tree/Vegetation Maintenance Schedule
017419 Project Waste Management Plan worksheet for solid waste disposal and diversion
017700 NPS Required forms for occupancy, Fire Alarm acceptance, and other similar forms or certificates
017700 Environmental Record Documents: IAQ Management Plan
017700 Environmental Record Documents: Moisture Control Inspection and Reports
017700 Environmental Record Documents: Material Safety Data Sheets
017700 Pest Control Report
02 41 00 Inventory: Submit a list of items that have been removed and salvaged
21 00 00 Commissioning Report
21 30 00 Fire pump intial start-up report, and pressure test
22 00 00 Commission Report
22 05 93 Plumbing test and Balance Report
23 00 00 Commissioning Report
23 00 00 Equipment Startup Reports
Closeout and Operation Maintenance (O) Requirements Template | National Park Service (NPS) - Denver Service Center (DSC) page 2 of 6
Section Requirement
Submittal
Date Completed
Received by Park
23 05 93 TAB Pre-Construction Report
23 05 93 TAB Contract Documents Examination Report
23 05 93 TAB Final Report
26 00 00 Commissioning Report
26 05 19 Cable Insulation test reports
26 05 26 Grounding and Bonding test reports
26 05 73 Electrical Distribution Systems Study, submit report showing final adjusted settings of protective devices.
26 09 20 Prepare and complete report of test procedures and results.
26 09 23 Provide complete report of test procedures and results.
26 41 13 Final Inspection Report
27 00 00 Commissioning Report
28 00 00 Commissioning Report
28 31 00 Fire alarm test reports, certification of installation
01 77 00 Make final changeover of permanent locks and deliver keys to Contracting Officer. Advise Park personnel of changeover in security provisions.
Keys & Keying
08 31 00 Two keys for each unit
Schedule 08 71 00 Arrange for a keying meeting, with Architect, Owner and ahrdware supplier, and other involved parties to ensure locksets, and locking hardware are functionally correct and keying complies with project requirements
10 28 00 Provide Two keys for each accessory
26 24 16 Two keys per panel all keyed alike.
28 31 00 Fire alarm keys, control panel accessible function keys
32 84 00 Two keys for automatic controller
O&M Data
Warranties 07 18 00 2 year manufacturers warranty
Guarantees 07 19 00 Correct defective work within a five year period after Date of Substantial Completion
07 54 00 Material warranty: 5 years, System warranty: 20 years
07 62 00 Installer warranty or minimum 3 years
07 72 00 Roof access hatch - 2 year warranty, Manufacturers warranty - 5 years, Installer warranty - 5 years, 07 92 00 2 year manufacturer warranty
08 11 16 Corrected defective work within five year period after Date of Substantial Completion. 10 year Manufacturer warranty
08 14 16 Manufacturer warranty on interior doors for the life of the installation. Include coverage for delamination of veneer, warping beyond specefied installation tolerances, defective materials, and telegraphing core construction.
08 32 23 Corrected defective work within five year period after Date of Substantial Completion. 5 year Manufacturer warranty
08 43 13 Corrected defective work within five year period after Date of Substantial Completion. 5 year Manufacturer warranty. Special
Assembly warranty.
08 51 13 Corrected defective work within five year period after Date of Substantial Completion. 5 year Manufacturer warranty.
08 71 00 Manufacturer warranty: Closers 25 years min., Exit devices 3 years min., Lockset and Cylinders 3 years min.
08 71 13 O&M Data. Automatic Door Operators to be free of defects in material and workmanship for a period of 2 years from the
Date of Substantial Completion.
08 80 00 IGU: 5 year manufacturer warranty; Laminted Glass: 5 year manufacturer warranty
08 91 00 5 year manufacturer warranty
13 31 00 Shade structure canopy and connection assembly warranty
14 24 00 O&M Data
21 00 00 Operation and Maintenance Manuals for devices valves and sprinkler heads, including air compressor and associated parts
Closeout and Operation Maintenance (O) Requirements Template | National Park Service (NPS) - Denver Service Center (DSC) page 3 of 6
Section Requirement
Submittal
Date Completed
Received by Park
21 00 00 Installing contractor warranty and guaranty certificates; 1-year labor.
22 00 00 Plumbing Contractor 1-year Warranty and O&M Data
22 10 00 O&M Manual. Plumbing Piping Warranty
22 30 00 Plumbing Equipment Warranty and O&M Data. Gas water heater: three year unconditional tank replacement, one year on parts and devices.
22 40 00 Plumbing Fixture Warranty and O&M Data
23 00 00 Mechanical Contractor 1-year Warranty and O&M Data
23 05 93 TAB 90-Day Warranty and Gaurantees
23 62 01 VRF Compressor 5-year Warranty
23 81 43 Heat Pump Compressor 5-year Warranty
26 00 00 Electrical Contractor 1-year Warranty and O&M Data
26 24 16 O&M Data.
26 27 13 O&M Data.
26 31 00 O&M Data. Minimum 20 year warranty on power output of PV modules. Provide HGII and BESS with minimum 10 year replacement warranties from th manufacturer covering parts and labor.
26 43 00 O&M Data. 10-year warranty, incorporating unlimited replacements of SPD if they are destroyed by transients within warranty period.
26 51 00
O&M Data. Not less than 5 years for luminaire based on date of substantial completion. Includes cost of labor to replace luminaire. Replacement luminaire will match physical dimensions, physical appearance, chromaticity, lumen output and photometric characteristics of original installed equipment.
27 00 00
Communications Contractor 1-year Warranty and O&M Data. Labor, materials and documentation according to selected manufacturer requirements necessary to ensure that the Government will be furnished with an Extended Product Warranty and Application Assurance Warranty will cover the failure of the wiring system to support current or future applications that are designed for the link / channel specifications of ANSI/TIA/EIA-568-C. Provide a warranty on the physical installation.
27 13 00
O&M Data. Labor, materials and documentation according to selected manufacturer requirements necessary to ensure that the Government will be furnished with an Extended Product Warranty and Application Assurance of a minimum of 20 years in length. The Application Assurance Warranty will cover the failure of the wiring system to support current or future applications that are designed for the link/channel specifications of ANSI/TIA/EIA-568-C. Provide a warranty on the physical installation.
27 15 00
O&M Data. Labor, materials and documentation according to selected manufacturer requirements necessary to ensure that the Government will be furnished with an Extended Product Warranty and Application Assurance of a minimum of 20 years in length. The Application Assurance Warranty will cover the failure of the wiring system to support current or future applications that are designed for the link/channel specifications of ANSI/TIA/EIA-568-C.1. A warranty on the physical installation.
28 00 00 Contractor 1-year Warranty and O&M Data
28 10 00 O&M Data
28 31 00
Warranty covering fire alarm system for one year. Operation and maintenance manual with catalog cut sheets, installation sheets, manufacturer O&M manuals, data file printout, record drawings, warranty, record of completion, test reports, instruction charts.
32 31 19 Fence Maintenance Data
32 33 00 Maintenance Data - Site Furnishings
32 84 00 Irrigation Operation Instructions
32 93 00 Maintenance Data - Plant Maintenance
Protection
02 41 00
Provide temporary barricades and other protection required to prevent injury to people and damage to adjacent buildings and facilities to remain. Design, provide and maintain shoring, bracing, and structural supports as required to preserve stability and prevent movement, settlement, or collapse of construction and finishes to remain, and to prevent unexpected or uncontrolled movement or collapse of construction being demolished. Remove temporary barricades and protections where hazards no longer exist.
02 41 19 Protect existing work to remain.
03 30 00 Do not permit traffic unprotected floor surface until fully cured.
Closeout and Operation Maintenance (O) Requirements Template | National Park Service (NPS) - Denver Service Center (DSC) page 4 of 6
Section Requirement
Submittal
Date Completed
Received by Park
03 54 00 Protect against direct sunlight, heat, and wind; prevent rapid drying to avoid shrinkage and cracking. Do not permit traffic over unprotected floor underlayment surfaces.
04 20 00
Without damaging completed work, provide protective boards at exposed external corners that are subjected to damage by construction activities. Provide water repellents over full surface of exterior masonry at locations indicated on drawings as described in Section 07 19 00 Water Repellents.
05 73 00
Protect installed components and finishes from damage after installation. Repair damage to exposed, making indistinguishable from undamaged areas. Replace finishes and components that have irreperable damage. Ensure dmaged areas are indistinguishable from undamaged finishes and surfaces.
06 10 00 Protect wood that has been treated with inorganic boron (SBX) from weather. Protect rough carpentry from weather.
06 18 00
Do not remove wrappings on individually wrapped members until they no longer serve a useful purpose, including protection from weather, sunlight, soiling, and damage from work of other trades. Slit underside of wrapping to prevent accumulation of moisture inside the wrapping.
06 20 00 Protect installed products from damage from weather and other causes during remainder of the construction period. Remove and replace finish carpentry materials that are wet, moisture damaged, and mold damaged.
07 13 00 Do not permit traffic over unprotected or uncovered membrane
07 17 16 Do not permit traffic over unprotected or uncovered waterproofing. Cover installed waterproofing with temporary polyethylene sheeting, remove sheeting just before backfilling or pouring of concrete begins
07 18 00 Do not permit traffic over unprotected surfaces
07 21 00 Do not permit installed insulation to be damaged prior to its concealement
07 21 23 Place temporary signs warning workers in areas that contain loose-fill insulated walls to use caution and to prevent loss of insulation when cutting into walls
07 25 00 Do not leave materials exposed to weather longer than recommended by manufacturer
07 42 13 Protect metal wall panels until completion of project. Touch-up, repair, or replace damaged wall panels or accessories before
Date of Substantial Completion.
07 54 00 Protect installed roofing and flashings from construction operations. Where traffic must continue over finished roof membrane, protect surfaces using durable materials.
07 62 00
08 11 16
Protect products of this section from damage caused by subsequent construction until Date of Substantial Completion.
Replace damaged or defective components that cannot be repaired to a condition indistinguishable from undamaged components.
08 32 23 Protect installed products from damage until Date of Substantial Completion
08 43 13 Protect installed products from damage until Date of Substantial Completion
08 71 00 Protect finished work under provisions of section 017000 - Execution and Closeout Requirements. Do not permit adjacent work to damage hardware or finish.
08 80 00 After installation, mark pane with 'X' by using removable plastic tape or paste; do not mark heat absorbing or reflective glass units. Remove and replace glass that is damaged during construction period prior to Dat of Substantial Completion.
09 21 16
Provide final protection and maintain conditions in a manner acceptable to installer that will make sure that gypsum boad assemblies are undamaged or deteriorated, and ready for finishing by other trades prior to the time of Substantial
Completion.
09 30 00 Do not permit traffic over finished floor surface for 4 days after installation.
09 65 00 Prohibit traffic on resilient flooring for 48 hours after installation. Cover resilient products until Substantial Completion
09 67 00 Prohibit traffic on floor finish for 48 hours after installation. Barricade area to protect flooring until fully cured.
09 91 23 Protect finishes until completion of project. Touch-up damaged finishes after Substantial Completion.
09 93 00 Protect finishes until completion of project. Touch-up damaged finishes after Substantial Completion.
09 96 00 Protect finished work from damage.
10 28 00 Protect installed accessories from damage due to subsequent contruction operations
Closeout and Operation Maintenance (O) Requirements Template | National Park Service (NPS) - Denver Service Center (DSC) page 5 of 6
Section Requirement
Submittal
Date Completed
Received by Park
12 36 00 Protect installed products until completion of project. Touch-up, repair or replace damaged products before Date of
Substantial Completion.
14 24 00 Do not permit construction traffic within car after cleaning, protect installed products until date of substanital completion, Touch-up, repair or replace damaged produts and materials prior to Date of Substantial Completion
22 40 00 Protect fixtures and equipment from damage. Cover finished fixtures with cardboard and sheet plastic. Fixtures are not to be used during construction. Replace damaged items with new.
32 13 13
Immediatly after placement, protect paving from premature drying, excessinve hot or cold temperatures, and mechanical injury. Do not permit pedestrain vehicular traffic over paving fro 7 days minimum after finishing, until 75 percent design strength of concrete has been achieved.
32 16 23
Immediatly after placement, protect paving from premature drying, excessinve hot or cold temperatures, and mechanical injury. Do not permit pedestrain vehicular traffic over paving fro 28 days minimum after finishing, until percent design strength of concrete has been achieved.
33 31 00 Protect pipe and aggregate cover from damage or displacement until backfilling operation is in progress. Cap open ends of piping during periods of Work stoppage.
33 42 00 Protect pipe and aggregate cover from damage or displacement until backfilling operations is in progress.