B08_PEFO_267538_Atch_15_Sanitary_Line_Inspection_Report.pdf

PDF 5 MB Posted

Attached to
Source Sought Notice Federal contract opportunity
Solicitation number
140P2024R0113
Issued by
Department of the Interior National Park Service National Office

About this file

This document is a Sanitary Line Inspection Report for a federal contract opportunity to rehabilitate the Painted Desert Community Complex at Petrified Forest National Park in Arizona. The report provides detailed technical information and video inspections for 24 sections of underground sanitary sewer piping, including the pipe materials, lengths, access points, water levels, and various defects observed such as deposits, obstructions, and structural issues. The project is being managed by the National Park Service with Calibre Engineering Inc. as the client and Ground Penetrating Radar Systems, LLC as the contractor performing the inspection. The report categorizes the observed pipe conditions on a scale from 1 to 5, with 5 requiring immediate attention. Based on the findings, the report provides a comprehensive assessment of the sewer infrastructure and will be used to inform the planned rehabilitation work under the federal contract opportunity.

View the file

Other files for this federal contract opportunity

Other files attached to Source Sought Notice, newest first.
File Type Posted
Sol_140P2024R0113_Amd_0004.pdf PDF
Sol_140P2024R0113_Amd_0003.pdf PDF
B09_Amendment_0003_responses_2024_10_30_0003.pdf PDF
B09_Amendment_0003_DOL-WD20240022_ApacheCty_10-04-2024_0003.pdf PDF
B09_Amendment_0003-Small_Business_Participation_Plan_Worksheet_0003.docx DOCX document
PEFO_267538_10-22-24_Prebid_2_Sign_In_Sheet_0002.pdf PDF
B08_Atch_7_Solit_PSP_SubKPlan_Vol2_0002.docx DOCX document
B08_Atch_5_Solit_PSP_Vol_I_Exp_REQD_0002.docx DOCX document
B08_Atch_5_Solit_PSP_Vol_I_PastPerf_REQD(1)_0002.docx DOCX document
PEFO_267538_Attendee_List_09-12-2024_0002.pdf PDF
Sol_140P2024R0113_Amd_0002.pdf PDF
B09_Q_and_A_Amendment_0002_PEFO_267538_0002.pdf PDF
Sol_140P2024R0113_Amd_0001.pdf PDF
B09_PEFO_267538_Amendment_0001_SITE_VISIT_No_2_0001.pdf PDF
B09_Amendment_0001_Q_A_PEFO_267538_0001.pdf PDF
B08_PEFO_267538_Atch_5_Solit_PSP_Vol_1.pdf PDF
B08_PEFO_267538_Atch_9_Price_Schedule.xlsx XLSX spreadsheet
Sol_140P2024R0113.pdf PDF
B08_PEFO_267538_Atch_1_Construction_Specifications_REV_003.pdf PDF
B08_PEFO_267538_Atch_6_Solit_PSP_Vol2.pdf PDF
B08_PEFO_267538_Atch_2_Construction_Drawings_REV_003_Part2.pdf PDF
B08_PEFO_267538_Atch_2_Construction_Drawings_REV_003_Part3.pdf PDF
B08_PEFO_267538_Atch_2_Construction_Drawings_REV_003_Part1.pdf PDF
B08_PEFO_267538_Atch_7_Rehab_PDCC_Product_File_Final.pdf PDF
B08_PEFO_267538_Atch_11-Closeout_O_M_Requirements.pdf PDF
B08_PEFO_267538_Solicitation_140P2024R0113.pdf PDF
B08_PEFO_267538_Atch_2_Construction_Drawings_REV_003_Part4.pdf PDF
B08_PEFO_267538_Atch_4__Construction_Contract_Administration.pdf PDF
B08_PEFO_267538_Atch_3_DOL_WD_AZ20240007.pdf PDF
B08_PEFO_267538_Atch_8_StatementOfStructuralTestsSpecialInspections.pdf PDF
B08_PEFO_267538_Atch_10_Submittal_List.pdf PDF
B08_PEFO_267538_Atch_12_Historic_Preservation_Report.pdf PDF
B08_PEFO_267538_Atch_13_Housing_Rehab_Design_Guidelines.pdf PDF
B08_PEFO_267538_Atch_14_CMU___Mortar_Testing_Report.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ground Penetrating Radar Systems, LLC 1901 Indian Wood Circle, Maumee, OH 43537

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Project

Project 240411_PetrifiedForestNationalParkAZ_654032

4/11/2024

Client

Name Calibre Engineering Inc

Justin Meeks, PE

8822 S Ridgeline Blvd STE 310

City Highlands Ranch, CO 80129

303.730.0434

JMeeks@Calibre-Engineering.com

Remarks

Page C-1 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Table of Contents

Page T-1

4/11/2024 Project

240411_PetrifiedForestNationalParkAZ_654032

Project Information .......................................................................................................................................................................................P-1

Legend of Classification (Section) .......................................................................................................................................................................................P-2

Section Profile .......................................................................................................................................................................................P-3

Section Summary .......................................................................................................................................................................................P-4

Project Summary .......................................................................................................................................................................................P-14

Section: 1; AMH_1 - AMH_4

Section: 2; ACOH_1 - AMH_2

Section: 3; AMH_2 - AMH_1

Section: 4; AMH_3 - AMH_2

Section: 5; AMH_4 - AMH_5

Section: 6; AMH_5 - AMH_6

Section: 7; AMH_6 - AMH_7

Section: 8; AMH_7 - AMH_8

Section: 9; AMH_8 - AMH_9

Section: 10; AMH_9 - AMH_13

Section: 11; ACOH_10 - AMH_10

Section: 12; AMH_10 - AMH_9

Section: 13; AMH_11 - ACOH_11

Section: 14; AMH_11 - AMH_8

Section: 15; ACOH_12 - AMH_12

Section: 16; AMH_12 - AMH_7

Section: 17; AMH_13 - AMH_14

Section: 18; AMH_14 - AMH_15

Section: 19; AMH_15 - AJB

Section: 20; AZ_TOILET - ACOH_201

Section: 21; ACOH_201 - ATC

Section: 22; AZ_TOILET - ATC

Section: 23; AZ_TOILET - ATC

Section: 24; AZ_TOILET - ATC https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH1 --> MH4 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH2 --> CO1 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH2 --> MH1 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH2 --> MH3 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH4 --> MH5 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH6 --> MH5 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH7 --> MH6 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH8 --> MH7 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH9 --> MH8 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH9 --> MH13 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH10 --> CO10 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH10 --> MH9 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH11 --> CO11 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH11 --> MH8 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH12 --> CO12 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH12 --> MH7 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH13 --> MH14 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH14 --> MH15 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=MH15 --> JUNCTION BOX https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=SUITE 201 --> CO201 https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=CO201 --> TEE CONNECTION https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=SUITE 208 --> TEE CONNECTION https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=SUITE 210 --> TEE CONNECTION https://web.wincan.com/#/app/guest-project/ec08e65a-e05e-4728-ae74-4e7e17cf4389/486dce76-014b-409c-8771-67ba5f3f7647?type=SECTION_VIEW&filter=SUITE 213 --> TEE CONNECTION

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Page P-1

Project Information

Client

Name: Calibre Engineering Inc

: Justin Meeks, PE

: 8822 S Ridgeline Blvd STE 310

City: Highlands Ranch, CO 80129

: 303.730.0434

: 321.626.4007

: JMeeks@Calibre-Engineering.com

Manager

Name: National Park Service US Depart of the Interior

: Stan Belinte

: Chief of Facility Management

: 1 Park Rd

City: Petrified Forest, AZ 86028

: 928.524.6228 x 247

: 928.266.6313

: Stan_Belinte@NPS.Gov

Contractor

Name: Ground Penetrating Radar Systems, LLC

: Arthur J Formoso

: Video Pipe Inspection Project Manager

: 1901 Indian Wood Circle

City: Maumee, OH 43537

: (866) 914-4718

: (480) 263-1257

: Arthur.Formoso@GPRSinc.com

4/11/2024 Project

240411_PetrifiedForestNationalParkAZ_654032

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

1: Excellent Condition

Minor Defects- Failure unlikley in the foreseeable future

2: Good Condition

Defects that have not begun to deteriorate- Pipe unlikely to fail for at least 20 years.

3: Fair Condition

Moderate defects that will continue to deteriorate- Pipe may fail in 10-20 years.

4: Poor Condition

Severe Defects that will become Grade 5 defects within the foerseeable future- Pipe will probably fail in 5-10 years

5: Immediate Attention

Defects require immediate attention- Pipe has failed or will likely fail within the next 5 years or sooner.

Legend of Classification (Section)

Page P-2

4/11/2024

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Page P-3

Section Profile

No. PSR Lateral Upstream

Access Point

Lateral Downstream Access Point

Date Material Total Length Length Surveyed

4 MH2 --> MH3 AMH_3 AMH_2 4/11/2024 PVC 135.25 135.25

11 MH10 --> CO10 ACOH_10 AMH_10 4/12/2024 PVC 13.80 13.80

13 MH11 --> CO11 AMH_11 ACOH_11 4/12/2024 PVC 18.90 18.90

15 MH12 --> CO12 ACOH_12 AMH_12 4/12/2024 PVC 19.40 19.40

20 SUITE 201 --> CO201 AZ_TOILET ACOH_201 4/12/2024 PVC 5.00 5.00

21 CO201 --> TEE CONNECTION ACOH_201 ATC 4/12/2024 PVC 15.60 15.60

24 SUITE 213 --> TEE CONNECTION AZ_TOILET ATC 4/12/2024 CAS 146.30 140.60

4 Circular = 496.35 Total Length (7 Inspections, 348.55 Length Surveyed)

No. PSR Lateral Upstream

Access Point

Lateral Downstream Access Point

Date Material Total Length Length Surveyed

1 MH1 --> MH4 AMH_1 AMH_4 4/11/2024 PVC 75.44 75.44

5 MH4 --> MH5 AMH_4 AMH_5 4/11/2024 PVC 226.62 226.62

6 MH6 --> MH5 AMH_5 AMH_6 4/11/2024 PVC 86.63 86.63

7 MH7 --> MH6 AMH_6 AMH_7 4/11/2024 PVC 105.72 105.72

12 MH10 --> MH9 AMH_10 AMH_9 4/12/2024 PVC 235.33 235.33

16 MH12 --> MH7 AMH_12 AMH_7 4/12/2024 PVC 238.59 238.59

6 Circular = 1225.32 Total Length (6 Inspections, 968.34 Length Surveyed)

No. PSR Lateral Upstream

Access Point

Lateral Downstream Access Point

Date Material Total Length Length Surveyed

8 MH8 --> MH7 AMH_7 AMH_8 4/11/2024 PVC 170.00 170.00

9 MH9 --> MH8 AMH_8 AMH_9 4/11/2024 PVC 163.89 163.89

10 MH9 --> MH13 AMH_9 AMH_13 4/11/2024 PVC 79.13 79.13

17 MH13 --> MH14 AMH_13 AMH_14 4/11/2024 PVC 77.35 77.35

18 MH14 --> MH15 AMH_14 AMH_15 4/11/2024 PVC 74.74 74.74

8 Circular = 1247.11 Total Length (5 Inspections, 565.11 Length Surveyed)

2968.78 Total Length (18 Inspections, 1882.00 Length Surveyed)

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Page P-4

Number of sections 24

Total length of sewer network 2968.78 ft

Inspected length of sewer network 2264.15 ft

Not inspected length of sewer network 698.92 ft

Total abandoned inspections 11

Number of section inspection photos 49

Number of section inspection videos 27

Number of section inspection scans 0

Number of section inclination measurements 13

Pipe Segment Reference

MH1 --> MH4 Lateral Upstream Access Point

AMH_1

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_4

Street PARK RD Profile Circular 6inch

Total Length 75.4 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 5% of the vertical dimension

3 9.9 MWL Water Level, 15% of the vertical dimension

4 75.4 AMH Manhole

Pipe Segment Reference

MH2 --> CO1 Lateral Upstream Access Point

ACOH_1

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_2

Street PARK RD Profile Circular 4inch

Total Length 40.0 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 0% of the vertical dimension

3 0.3 JOLD Joint Offset Large Defective

4 0.6 DSGV Deposits Settled Gravel, 5% of cross sectional area from 6 o'clock to 7 o'clock

5 5.0 JOLD Joint Offset Large Defective

6 5.5 DSGV Deposits Settled Gravel, 10% of cross sectional area from 4 o'clock to 8 o'clock, Start

7 8.5 DSGV Deposits Settled Gravel, 10% of cross sectional area from 4 o'clock to 8 o'clock, Finish

8 8.9 OBM Obstruction Pipe Material in Invert, 10% of cross sectional area from 5 o'clock to 7 o'clock

9 9.0 DSGV Deposits Settled Gravel, 10% of cross sectional area from 4 o'clock to 8 o'clock, Start

10 9.3 OBM Obstruction Pipe Material in Invert, 25% of cross sectional area from 3 o'clock to 9 o'clock

11 12.0 DSGV Deposits Settled Gravel, 10% of cross sectional area from 4 o'clock to 8 o'clock, Finish

12 12.1 X Collapse, 100% of cross sectional area

Section Summary

4/11/2024

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Page P-5

Distance PACP Code Observation

13 12.1 MSA Miscellaneous Survey Abandoned

Pipe Segment Reference

MH2 --> MH1 Lateral Upstream Access Point

AMH_2

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_1

Street PARK RD Profile Circular 6inch

Total Length 238.0 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 0% of the vertical dimension

3 2.4 MWL Water Level, 5% of the vertical dimension

4 3.4 DSGV Deposits Settled Gravel, 10% of cross sectional area from 5 o'clock to 7 o'clock, Start

5 20.7 DSGV Deposits Settled Gravel, 10% of cross sectional area from 5 o'clock to 7 o'clock, Finish

6 25.2 MWL Water Level, 0% of the vertical dimension

7 40.2 TF Tap Factory Made at 3 o'clock, dia/height: 4inch

8 40.4 JOM Joint Offset Medium

9 45.0 DSGV Deposits Settled Gravel, 5% of cross sectional area at 6 o'clock

10 46.0 MWL Water Level, 5% of the vertical dimension

11 47.0 DSF Deposits Settled Fine, 5% of cross sectional area from 5 o'clock to 7 o'clock, Start

12 55.4 DSF Deposits Settled Fine, 5% of cross sectional area from 5 o'clock to 7 o'clock, Finish

13 101.3 DAR Deposits Attached Ragging, 10% of cross sectional area from 4 o'clock to 8 o'clock, Start

14 104.2 JOM Joint Offset Medium

15 104.5 TFA Tap Factory Activity at 12 o'clock, dia/height: 4inch

16 105.1 JAM Joint Angular Medium

17 109.0 DAR Deposits Attached Ragging, 10% of cross sectional area from 4 o'clock to 8 o'clock, Finish

18 116.2 MWL Water Level, 25% of the vertical dimension

19 121.9 MWL Water Level, 35% of the vertical dimension

20 129.2 MWL Water Level, 55% of the vertical dimension

21 130.9 MWL Water Level, 65% of the vertical dimension

22 130.9 MCU Miscellaneous Camera Underwater, Start

23 171.8 MCU Miscellaneous Camera Underwater, Finish

24 171.9 MSA Miscellaneous Survey Abandoned

25 222.1 MSA Miscellaneous Survey Abandoned

26 223.5 MMC Miscellaneous Material Change, 26

27 223.9 JOL Joint Offset Large, 1.250Inch

28 234.1 MWL Water Level, 20.000% of the vertical dimension

29 238.0 MWL Water Level, 5.000% of the vertical dimension

30 238.0 AMH Manhole

Pipe Segment Reference

MH2 --> MH3 Lateral Upstream Access Point

AMH_3

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_2

Street PARK RD Profile Circular 4inch

Total Length 135.3 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 0% of the vertical dimension

3 0.3 MWL Water Level, 5% of the vertical dimension

4 5.2 DSGV Deposits Settled Gravel, 5% of cross sectional area from 5 o'clock to 7 o'clock

5 18.2 MWLS Miscellaneous Water Level, Sag, 15% of the vertical dimension, Start

6 22.3 MWLS Miscellaneous Water Level, Sag, 15% of the vertical dimension, Finish

7 22.3 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Start

Section Summary

4/11/2024

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Page P-6

Distance PACP Code Observation

8 90.0 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Finish

9 99.0 MWLS Miscellaneous Water Level, Sag, 15% of the vertical dimension, Start

10 105.3 MWLS Miscellaneous Water Level, Sag, 15% of the vertical dimension, Finish

11 107.2 MWL Water Level, 0% of the vertical dimension

12 135.3 AMH Manhole

Pipe Segment Reference

MH4 --> MH5 Lateral Upstream Access Point

AMH_4

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_5

Street PARK RD Profile Circular 6inch

Total Length 226.6 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 5% of the vertical dimension

3 27.4 DAGS Deposits Attached Grease, 5% of cross sectional area from 4 o'clock to 8 o'clock, Start

4 90.3 MWL Water Level, 25% of the vertical dimension

5 104.4 MWL Water Level, 15% of the vertical dimension

6 108.9 DAGS Deposits Attached Grease, 5% of cross sectional area from 4 o'clock to 8 o'clock, Finish

7 124.1 DAGS Deposits Attached Grease, 5% of cross sectional area from 4 o'clock to 8 o'clock, Start

8 147.8 MWL Water Level, 25% of the vertical dimension

9 155.4 DAGS Deposits Attached Grease, 5% of cross sectional area from 4 o'clock to 8 o'clock, Finish

10 155.5 JOLD Joint Offset Large Defective

11 156.5 MSA Miscellaneous Survey Abandoned

12 156.7 TFA Tap Factory Activity at 10 o'clock, dia/height: 4inch

13 159.0 MWL Water Level, 50.000% of the vertical dimension

14 164.4 MWL Water Level, 25.000% of the vertical dimension

15 210.6 DAGS Deposits Attached Grease, 5.000% of cross sectional area from 4 o'clock to 8 o'clock

16 226.6 MWL Water Level, 5.000% of the vertical dimension

17 226.6 AMH Manhole

Pipe Segment Reference

MH6 --> MH5 Lateral Upstream Access Point

AMH_5

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_6

Street PARK RD Profile Circular 6inch

Total Length 86.6 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 10% of the vertical dimension

3 19.5 MWL Water Level, 25% of the vertical dimension

4 85.1 DAR Deposits Attached Ragging, 75% of cross sectional area from 5 o'clock to 1 o'clock

5 86.6 AMH Manhole

Pipe Segment Reference

MH7 --> MH6 Lateral Upstream Access Point

AMH_6

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_7

Street PARK RD Profile Circular 6inch

Total Length 105.7 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 10% of the vertical dimension

3 105.7 AMH Manhole

Section Summary

4/11/2024

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Page P-7

Pipe Segment Reference

MH8 --> MH7 Lateral Upstream Access Point

AMH_7

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_8

Street PARK RD Profile Circular 8inch

Total Length 170.0 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 10% of the vertical dimension

3 170.0 AMH Manhole

Pipe Segment Reference

MH9 --> MH8 Lateral Upstream Access Point

AMH_8

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_9

Street PARK RD Profile Circular 8inch

Total Length 163.9 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 10% of the vertical dimension

3 10.6 MWL Water Level, 45% of the vertical dimension

4 28.0 MWL Water Level, 20% of the vertical dimension

5 63.3 MWL Water Level, 10% of the vertical dimension

6 88.6 MWL Water Level, 25% of the vertical dimension

7 133.3 MWL Water Level, 10% of the vertical dimension

8 163.9 AMH Manhole

Pipe Segment Reference

MH9 --> MH13 Lateral Upstream Access Point

AMH_9

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_13

Street PARK RD Profile Circular 8inch

Total Length 79.1 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 10% of the vertical dimension

3 42.8 DAGS Deposits Attached Grease, 5% of cross sectional area from 4 o'clock to 8 o'clock, Start

4 79.1 DAGS Deposits Attached Grease, 5% of cross sectional area from 4 o'clock to 8 o'clock, Finish

5 79.1 AMH Manhole

Pipe Segment Reference

MH10 --> CO10 Lateral Upstream Access Point

ACOH_10

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_10

Street PARK RD Profile Circular 4inch

Total Length 13.8 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 5% of the vertical dimension

3 13.5 MMC Miscellaneous Material Change, Cast iron

4 13.8 TFA Tap Factory Activity at 3 o'clock, dia/height: 4inch

5 13.8 MMC Miscellaneous Material Change, Polyvinyl chloride

6 13.8 DSZ Deposits Settled Other, 15% of cross sectional area from 4 o'clock to 8 o'clock

7 13.8 ACOH Cleanout House

Section Summary

4/11/2024

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Page P-8

Pipe Segment Reference

MH10 --> MH9 Lateral Upstream Access Point

AMH_10

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_9

Street PARK RD Profile Circular 6inch

Total Length 235.3 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 5% of the vertical dimension

3 14.7 MWL Water Level, 15% of the vertical dimension

4 18.2 MMC Miscellaneous Material Change, Ductile Iron Pipe

5 18.5 TFA Tap Factory Activity at 3 o'clock, dia/height: 4inch

6 19.3 MMC Miscellaneous Material Change, Polyvinyl chloride

7 40.4 JOL Joint Offset Large, 0.75Inch

8 40.4 MMC Miscellaneous Material Change, Ductile Iron Pipe

9 41.3 TF Tap Factory Made at 9 o'clock, dia/height: 4inch

10 41.8 MMC Miscellaneous Material Change, Polyvinyl chloride

11 47.3 MWLS Miscellaneous Water Level, Sag, 50% of the vertical dimension, Start

12 56.0 MCU Miscellaneous Camera Underwater, Start

13 61.5 MWLS Miscellaneous Water Level, Sag, 50% of the vertical dimension, Finish

14 61.5 MCU Miscellaneous Camera Underwater, Finish

15 70.2 MMC Miscellaneous Material Change, Ductile Iron Pipe

16 71.1 TF Tap Factory Made at 3 o'clock, dia/height: 4inch

17 72.0 MMC Miscellaneous Material Change, Polyvinyl chloride

18 76.5 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Start

19 84.4 MWLS Miscellaneous Water Level, Sag, 25% of the vertical dimension, Finish

20 96.1 MMC Miscellaneous Material Change, Ductile Iron Pipe

21 96.2 SSC Surface Spalling of Damage Coating from 9 o'clock to 3 o'clock, within 8 inch

22 96.2 TF Tap Factory Made at 9 o'clock, dia/height: 4inch

23 97.0 MMC Miscellaneous Material Change, Polyvinyl chloride

24 105.0 MWL Water Level, 5% of the vertical dimension

25 124.3 MMC Miscellaneous Material Change, Ductile Iron Pipe

26 124.9 TF Tap Factory Made at 3 o'clock, dia/height: 4inch

27 125.4 MMC Miscellaneous Material Change, Polyvinyl chloride

28 215.6 MWLS Miscellaneous Water Level, Sag, 15% of the vertical dimension, Start

29 224.5 MWLS Miscellaneous Water Level, Sag, 15% of the vertical dimension, Finish

30 235.1 MMC Miscellaneous Material Change, Ductile Iron Pipe

31 235.3 ADP Discharge Point

Pipe Segment Reference

MH11 --> CO11 Lateral Upstream Access Point

AMH_11

City PETRIFIED FOREST Lateral Downstream Access Point

ACOH_11

Street PARK RD Profile Circular 4inch

Total Length 18.9 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 5% of the vertical dimension

3 15.3 MMC Miscellaneous Material Change, Cast iron

4 15.4 TFA Tap Factory Activity at 3 o'clock, dia/height: 4inch

5 16.0 MMC Miscellaneous Material Change, Polyvinyl chloride

6 16.0 DSGV Deposits Settled Gravel, 10% of cross sectional area from 4 o'clock to 8 o'clock

7 18.9 ACOH Cleanout House

Section Summary

4/11/2024

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Page P-9

Pipe Segment Reference

MH11 --> MH8 Lateral Upstream Access Point

AMH_11

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_8

Street PARK RD Profile Circular 6inch

Total Length 19.0 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 5% of the vertical dimension

3 5.0 MWL Water Level, 35% of the vertical dimension

4 10.4 MCU Miscellaneous Camera Underwater, Start

5 19.0 MCU Miscellaneous Camera Underwater, Finish

6 19.0 OBZ Obstruction Other, 50% of cross sectional area from 3 o'clock to 9 o'clock

7 19.0 MSA Miscellaneous Survey Abandoned

Pipe Segment Reference

MH12 --> CO12 Lateral Upstream Access Point

ACOH_12

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_12

Street PARK RD Profile Circular 4inch

Total Length 19.4 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 5% of the vertical dimension

3 0.2 DAZ Deposits Attached Other, 5% of cross sectional area from 3 o'clock to 9 o'clock

4 17.1 MMC Miscellaneous Material Change, Cast iron

5 18.8 LR Line Right, 50%

6 19.3 LR Line Right, 50%

7 19.3 MMC Miscellaneous Material Change, Polyvinyl chloride

8 19.4 ACOH Cleanout House

Pipe Segment Reference

MH12 --> MH7 Lateral Upstream Access Point

AMH_12

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_7

Street PARK RD Profile Circular 6inch

Total Length 238.6 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 5% of the vertical dimension

3 17.1 MMC Miscellaneous Material Change, Ductile Iron Pipe

4 17.5 TFA Tap Factory Activity at 3 o'clock, dia/height: 4inch

5 18.1 MMC Miscellaneous Material Change, Polyvinyl chloride

6 40.2 MMC Miscellaneous Material Change, Ductile Iron Pipe

7 40.8 TFA Tap Factory Activity at 9 o'clock, dia/height: 4inch

8 41.6 MMC Miscellaneous Material Change, Polyvinyl chloride

9 76.5 MMC Miscellaneous Material Change, Ductile Iron Pipe

10 77.0 TF Tap Factory Made at 3 o'clock, dia/height: 4inch

11 77.4 MMC Miscellaneous Material Change, Polyvinyl chloride

12 95.9 MMC Miscellaneous Material Change, Ductile Iron Pipe

13 96.4 TF Tap Factory Made at 9 o'clock, dia/height: 4inch

14 96.5 MMC Miscellaneous Material Change, Polyvinyl chloride

15 127.8 MMC Miscellaneous Material Change, Ductile Iron Pipe

16 128.2 TF Tap Factory Made at 3 o'clock, dia/height: 4inch

17 128.9 MMC Miscellaneous Material Change, Polyvinyl chloride

Section Summary

4/11/2024

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Page P-10

Distance PACP Code Observation

18 148.3 TF Tap Factory Made at 10 o'clock, dia/height: 4inch

19 169.6 TFA Tap Factory Activity at 12 o'clock, dia/height: 3inch

20 170.0 DAR Deposits Attached Ragging, 5% of cross sectional area at 12 o'clock

21 198.7 MMC Miscellaneous Material Change, Ductile Iron Pipe

22 199.0 DAR Deposits Attached Ragging, 10% of cross sectional area from 6 o'clock to 9 o'clock

23 199.4 TFA Tap Factory Activity at 10 o'clock, dia/height: 4inch

24 200.0 MMC Miscellaneous Material Change, Polyvinyl chloride

25 201.3 MWL Water Level, 15% of the vertical dimension

26 210.2 MWL Water Level, 5% of the vertical dimension

27 230.6 MWL Water Level, 20% of the vertical dimension

28 238.6 ADP Discharge Point

Pipe Segment Reference

MH13 --> MH14 Lateral Upstream Access Point

AMH_13

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_14

Street PARK RD Profile Circular 8inch

Total Length 77.4 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 30% of the vertical dimension

3 0.0 RBJ Roots Ball Joint from 3 o'clock to 12 o'clock, 95% of cross sectional area, within 8 inch

4 1.1 MSA Miscellaneous Survey Abandoned

5 1.1 RBB Roots Ball Barrell from 12 o'clock to 12 o'clock, 100.000% of cross sectional area

6 1.1 MCU Miscellaneous Camera Underwater, Start

7 5.3 MCU Miscellaneous Camera Underwater, Finish

8 8.1 MWL Water Level, 45.000% of the vertical dimension

9 14.7 MWL Water Level, 15.000% of the vertical dimension

10 77.4 MWL Water Level, 10.000% of the vertical dimension

11 77.4 AMH Manhole

Pipe Segment Reference

MH14 --> MH15 Lateral Upstream Access Point

AMH_14

City PETRIFIED FOREST Lateral Downstream Access Point

AMH_15

Street PARK RD Profile Circular 8inch

Total Length 74.7 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 5% of the vertical dimension

3 74.7 AMH Manhole

Pipe Segment Reference

MH15 --> JUNCTION BOX Lateral Upstream Access Point

AMH_15

City PETRIFIED FOREST Lateral Downstream Access Point

AJB

Street PARK RD Profile Circular 8inch

Total Length 682.0 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AMH Manhole

2 0.0 MWL Water Level, 10% of the vertical dimension

3 4.6 MWL Water Level, 40% of the vertical dimension

4 5.7 MCU Miscellaneous Camera Underwater, Start

5 5.7 MWL Water Level, 60% of the vertical dimension

6 62.7 MCU Miscellaneous Camera Underwater, Finish

Section Summary

4/11/2024

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Page P-11

Distance PACP Code Observation

7 62.7 MSA Miscellaneous Survey Abandoned

Pipe Segment Reference

SUITE 201 --> CO201 Lateral Upstream Access Point

AZ_TOILET

City PETRIFIED FOREST Lateral Downstream Access Point

ACOH_201

Street PARK RD Profile Circular 4inch

Total Length 5.0 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 AZ Access Point Other

2 0.0 MWL Water Level, 15% of the vertical dimension

3 1.3 TF Tap Factory Made at 3 o'clock, dia/height: 3inch

4 1.3 MWL Water Level, 5% of the vertical dimension

5 5.0 ACOH Cleanout House

Pipe Segment Reference

CO201 --> TEE CONNECTION Lateral Upstream Access Point

ACOH_201

City PETRIFIED FOREST Lateral Downstream Access Point

ATC

Street PARK RD Profile Circular 4inch

Total Length 15.6 Material Polyvinyl Chloride

Distance PACP Code Observation

1 0.0 ACOH Cleanout House

2 0.0 MWL Water Level, 5% of the vertical dimension

3 6.6 JSM Joint Separated Medium

4 7.7 LRD Line Right Down, 25%

5 8.6 LLD Line Left Down, 25%

6 13.4 LLD Line Left Down, 50%

7 15.1 TFA Tap Factory Activity at 3 o'clock, dia/height: 4inch

8 15.6 ATC Tee Connection

Pipe Segment Reference

SUITE 208 --> TEE CONNECTION Lateral Upstream Access Point

AZ_TOILET

City PETRIFIED FOREST Lateral Downstream Access Point

ATC

Street PARK RD Profile Circular 4inch

Total Length 96.8 Material Cast Iron

Distance PACP Code Observation

1 0.0 AZ Access Point Other

2 0.0 MWL Water Level, 0% of the vertical dimension

3 0.0 DSZ Deposits Settled Other, 5% of cross sectional area from 5 o'clock to 7 o'clock, Start

4 0.2 TF Tap Factory Made at 9 o'clock, dia/height: 4inch

5 0.3 LR Line Right, 50%

6 14.9 DSZ Deposits Settled Other, 5% of cross sectional area from 5 o'clock to 7 o'clock, Finish

7 24.6 LD Line Down, 50%

8 24.9 LRD Line Right Down, 50%

9 25.1 TF Tap Factory Made at 9 o'clock, dia/height: 4inch

10 26.3 LR Line Right, 50%

11 30.9 TF Tap Factory Made at 9 o'clock, dia/height: 3inch

12 48.8 MMC Miscellaneous Material Change, Polyvinyl chloride

13 49.1 JOM Joint Offset Medium

14 49.7 JOLD Joint Offset Large Defective

15 50.1 DSGV Deposits Settled Gravel, 10% of cross sectional area from 5 o'clock to 7 o'clock, Start

16 57.7 DSGV Deposits Settled Gravel, 10% of cross sectional area from 5 o'clock to 7 o'clock, Finish

17 78.8 MMC Miscellaneous Material Change, Ductile Iron Pipe

Section Summary

4/11/2024

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Page P-12

Distance PACP Code Observation

18 78.8 DSF Deposits Settled Fine, 10% of cross sectional area from 4 o'clock to 8 o'clock, Start

19 79.5 SSC Surface Spalling of Damage Coating from 7 o'clock to 1 o'clock, within 8 inch

20 79.9 TF Tap Factory Made at 9 o'clock, dia/height: 4inch

21 81.3 MMC Miscellaneous Material Change, Polyvinyl chloride

22 88.4 DSF Deposits Settled Fine, 10% of cross sectional area from 4 o'clock to 8 o'clock, Finish

23 96.8 MSA Miscellaneous Survey Abandoned

Pipe Segment Reference

SUITE 210 --> TEE CONNECTION Lateral Upstream Access Point

AZ_TOILET

City PETRIFIED FOREST Lateral Downstream Access Point

ATC

Street PARK RD Profile Circular 4inch

Total Length 5.3 Material Cast Iron

Distance PACP Code Observation

1 0.0 AZ Access Point Other

2 0.0 MWL Water Level, 5% of the vertical dimension

3 0.0 RBL Roots Ball Lateral from 12 o'clock to 12 o'clock, 65% of cross sectional area, Start

4 3.8 RBL Roots Ball Lateral from 12 o'clock to 12 o'clock, 65% of cross sectional area, Finish

5 3.8 MSA Miscellaneous Survey Abandoned

Pipe Segment Reference

SUITE 213 --> TEE CONNECTION Lateral Upstream Access Point

AZ_TOILET

City PETRIFIED FOREST Lateral Downstream Access Point

ATC

Street PARK RD Profile Circular 4inch

Total Length 146.3 Material Cast Iron

Distance PACP Code Observation

1 0.0 AZ Access Point Other

2 0.0 MWL Water Level, 5% of the vertical dimension

3 2.1 TF Tap Factory Made at 9 o'clock, dia/height: 4inch

4 2.8 LR Line Right, 50%

5 23.9 LR Line Right, 50%

6 24.4 TFA Tap Factory Activity at 9 o'clock, dia/height: 4inch

7 25.5 LR Line Right, 50%

8 29.4 TF Tap Factory Made at 9 o'clock, dia/height: 3inch

9 42.5 RMJ Roots Medium Joint from 3 o'clock to 9 o'clock, 10% of cross sectional area, within 8 inch

10 44.3 RMB Roots Medium Barrell from 3 o'clock to 9 o'clock, 10% of cross sectional area, Start

11 49.7 RMB Roots Medium Barrell from 3 o'clock to 9 o'clock, 10% of cross sectional area, Finish

12 56.1 RMB Roots Medium Barrell from 1 o'clock to 5 o'clock, 15% of cross sectional area, Start

13 56.8 MWLS Miscellaneous Water Level, Sag, 50% of the vertical dimension, Start

14 57.9 MCU Miscellaneous Camera Underwater, Start

15 62.3 RMB Roots Medium Barrell from 1 o'clock to 5 o'clock, 15% of cross sectional area, Finish

16 70.1 MWL Water Level, 10% of the vertical dimension

17 71.6 MCU Miscellaneous Camera Underwater, Finish

18 71.6 MWLS Miscellaneous Water Level, Sag, 75% of the vertical dimension, Finish

19 80.1 MMC Miscellaneous Material Change, Vitrified clay pipe

20 80.2 TF Tap Factory Made at 9 o'clock, dia/height: 4inch

21 80.6 MMC Miscellaneous Material Change, Polyvinyl chloride

22 80.8 MWLS Miscellaneous Water Level, Sag, 50% of the vertical dimension, Start

23 81.7 MCU Miscellaneous Camera Underwater, Start

24 88.3 MCU Miscellaneous Camera Underwater, Finish

25 90.6 MWLS Miscellaneous Water Level, Sag, 50% of the vertical dimension, Finish

26 96.7 MWL Water Level, 10% of the vertical dimension

27 115.8 MMC Miscellaneous Material Change, Cast iron

Section Summary

4/11/2024

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Page P-13

Distance PACP Code Observation

28 116.0 DAGS Deposits Attached Grease, 10% of cross sectional area from 3 o'clock to 9 o'clock, Start

29 118.8 MMC Miscellaneous Material Change, Vitrified clay pipe

30 137.6 LR Line Right, 50%

31 138.8 DAGS Deposits Attached Grease, 10% of cross sectional area from 3 o'clock to 9 o'clock, Finish

32 139.5 MMC Miscellaneous Material Change, Polyvinyl chloride

33 140.6 ATC Tee Connection

Section Summary

4/11/2024

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Project Summary Project Project Number Project Date

240411_PetrifiedForestNationalParkAZ_654032 4/11/2024

Pipe Summary

No. Type Pipe Name Upstream Node Downstream Node Road Town Use Mat. Profile Length

1 SEC MH1 --> MH4 AMH_1 AMH_4 Park Rd Petrified Forest SS PVC Circular 6inch 75.44

2 SEC MH2 --> CO1 ACOH_1 AMH_2 Park Rd Petrified Forest SS PVC Circular 4inch 40.00

3 SEC MH2 --> MH1 AMH_2 AMH_1 Park Rd Petrified Forest SS PVC Circular 6inch 238.00

4 SEC MH2 --> MH3 AMH_3 AMH_2 Park Rd Petrified Forest SS PVC Circular 4inch 135.25

5 SEC MH4 --> MH5 AMH_4 AMH_5 Park Rd Petrified Forest SS PVC Circular 6inch 226.62

6 SEC MH6 --> MH5 AMH_5 AMH_6 Park Rd Petrified Forest SS PVC Circular 6inch 86.63

7 SEC MH7 --> MH6 AMH_6 AMH_7 Park Rd Petrified Forest SS PVC Circular 6inch 105.72

8 SEC MH8 --> MH7 AMH_7 AMH_8 Park Rd Petrified Forest SS PVC Circular 8inch 170.00

9 SEC MH9 --> MH8 AMH_8 AMH_9 Park Rd Petrified Forest SS PVC Circular 8inch 163.89

10 SEC MH9 --> MH13 AMH_9 AMH_13 Park Rd Petrified Forest SS PVC Circular 8inch 79.13

11 SEC MH10 --> CO10 ACOH_10 AMH_10 Park Rd Petrified Forest SS PVC Circular 4inch 13.80

12 SEC MH10 --> MH9 AMH_10 AMH_9 Park Rd Petrified Forest SS PVC Circular 6inch 235.33

13 SEC MH11 --> CO11 AMH_11 ACOH_11 Park Rd Petrified Forest SS PVC Circular 4inch 18.90

14 SEC MH11 --> MH8 AMH_11 AMH_8 Park Rd Petrified Forest SS PVC Circular 6inch 18.98

15 SEC MH12 --> CO12 ACOH_12 AMH_12 Park Rd Petrified Forest SS PVC Circular 4inch 19.40

16 SEC MH12 --> MH7 AMH_12 AMH_7 Park Rd Petrified Forest SS PVC Circular 6inch 238.59

17 SEC MH13 --> MH14 AMH_13 AMH_14 Park Rd Petrified Forest SS PVC Circular 8inch 77.35

18 SEC MH14 --> MH15 AMH_14 AMH_15 Park Rd Petrified Forest SS PVC Circular 8inch 74.74

19 SEC MH15 --> JUNCTION BOX AMH_15 AJB Park Rd Petrified Forest SS PVC Circular 8inch 682.00

20 SEC SUITE 201 --> CO201 AZ_TOILET ACOH_201 Park Rd Petrified Forest SS PVC Circular 4inch 5.00

21 SEC

CO201 --> TEE

CONNECTION

ACOH_201 ATC Park Rd Petrified Forest SS PVC Circular 4inch 15.60

22 SEC

SUITE 208 --> TEE

CONNECTION

AZ_TOILET ATC Park Rd Petrified Forest SS CAS Circular 4inch 96.80

23 SEC

SUITE 210 --> TEE

CONNECTION

AZ_TOILET ATC Park Rd Petrified Forest SS CAS Circular 4inch 5.30

24 SEC

SUITE 213 --> TEE

CONNECTION

AZ_TOILET ATC Park Rd Petrified Forest SS CAS Circular 4inch 146.30

Total: 2968.78

240411_PetrifiedForestNationalParkAZ_654032 P-14

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Project Summary Project Project Number Project Date

240411_PetrifiedForestNationalParkAZ_654032 4/11/2024

Pipe Levels

No. Pipe Name Upstream Node Upstream C.L. Upstream I.L. Upstream I.D. Downstream Node Downstream

C.L.

Downstream

I.L.

Downstream

I.D.

1 MH1 --> MH4 AMH_1 6.750 AMH_4 0.000

2 MH2 --> CO1 ACOH_1 0.000 AMH_2 2.800

3 MH2 --> MH1 AMH_2 2.800 AMH_1 6.750

4 MH2 --> MH3 AMH_3 2.250 AMH_2 2.800

5 MH4 --> MH5 AMH_4 0.000 AMH_5 12.800

6 MH6 --> MH5 AMH_5 12.800 AMH_6 0.000

7 MH7 --> MH6 AMH_6 0.000 AMH_7 0.000

8 MH8 --> MH7 AMH_7 0.000 AMH_8 0.000

9 MH9 --> MH8 AMH_8 0.000 AMH_9 9.400

10 MH9 --> MH13 AMH_9 9.400 AMH_13 0.000

11 MH10 --> CO10 ACOH_10 1.200 AMH_10 3.600

12 MH10 --> MH9 AMH_10 3.600 AMH_9 9.400

13 MH11 --> CO11 AMH_11 3.600 ACOH_11 2.250

14 MH11 --> MH8 AMH_11 3.600 AMH_8 0.000

15 MH12 --> CO12 ACOH_12 2.400 AMH_12 3.600

16 MH12 --> MH7 AMH_12 2.400 AMH_7 0.000

17 MH13 --> MH14 AMH_13 0.000 AMH_14 8.700

18 MH14 --> MH15 AMH_14 8.700 AMH_15 0.000

19 MH15 --> JUNCTION BOX AMH_15 0.000 AJB 0.000

20 SUITE 201 --> CO201 AZ_TOILET 2.750 ACOH_201 0.000

CO201 --> TEE

CONNECTION

ACOH_201 0.000 ATC 0.000

SUITE 208 --> TEE

CONNECTION

AZ_TOILET 1.000 ATC 0.000

SUITE 210 --> TEE

CONNECTION

AZ_TOILET 1.500 ATC 0.000

SUITE 213 --> TEE

CONNECTION

AZ_TOILET 1.600 ATC 0.000

240411_PetrifiedForestNationalParkAZ_654032 P-15

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Project Summary Project Project Number Project Date

240411_PetrifiedForestNationalParkAZ_654032 4/11/2024

Pipe Summary by Profile

Profile Total Length No. Pipes

Circular 4inch 40.00

Circular 4inch 135.25

Circular 4inch 13.80

Circular 4inch 18.90

Circular 4inch 19.40

Circular 4inch 5.00

Circular 4inch 15.60

Circular 4inch 96.80

Circular 4inch 5.30

Circular 4inch 146.30

Circular 4inch = 496.35 10

Circular 6inch 75.44

Circular 6inch 238.00

Circular 6inch 226.62

Circular 6inch 86.63

Circular 6inch 105.72

Circular 6inch 235.33

Circular 6inch 18.98

Circular 6inch 238.59

Circular 6inch = 1225.32 8

Circular 8inch 170.00

Circular 8inch 163.89

Circular 8inch 79.13

Circular 8inch 77.35

Circular 8inch 74.74

Circular 8inch 682.00

Circular 8inch = 1247.11 6

Total = 2968.78 24

Inspection Summary

Pipe No.

Insp.

No.

Upstream Node Downstream Node Dir. Operator Insp. Date Insp. Time Str Ser Final Observation Length

1 1 AMH_1 AMH_4 DS

Arthur J Formoso

04/11/2024 10:04 AMH, AMH_4 75.44

240411_PetrifiedForestNationalParkAZ_654032 P-16

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Project Summary Project Project Number Project Date

240411_PetrifiedForestNationalParkAZ_654032 4/11/2024

Pipe No.

Insp.

No.

Upstream Node Downstream Node Dir. Operator Insp. Date Insp. Time Str Ser Final Observation Length

2 1 ACOH_1 AMH_2 US

Arthur J Formoso

04/11/2024 16:39 3 3 MSA, COLLAPSE 12.10

3 1 AMH_2 AMH_1 DS

Arthur J Formoso

04/11/2024 11:41 3 3 AMH, AMH_1 238.00

4 1 AMH_3 AMH_2 US

Arthur J Formoso

04/11/2024 16:38 2 2 AMH, AMH_3 135.25

5 1 AMH_4 AMH_5 DS

Arthur J Formoso

04/11/2024 16:18 2 2 AMH, AMH_5 226.62

6 1 AMH_5 AMH_6 US

Arthur J Formoso

04/11/2024 16:06 5 5 AMH, AMH_5 86.63

7 1 AMH_6 AMH_7 US

Arthur J Formoso

04/11/2024 15:55 AMH, AMH_6 105.72

8 1 AMH_7 AMH_8 US

Arthur J Formoso

04/11/2024 14:05 AMH, AMH_7 170.00

9 1 AMH_8 AMH_9 US

Arthur J Formoso

04/11/2024 13:48 AMH, AMH_8 163.89

10 1 AMH_9 AMH_13 DS

Arthur J Formoso

04/11/2024 14:28 2 2 AMH, AMH_13 79.13

11 1 ACOH_10 AMH_10 US

Arthur J Formoso

04/12/2024 12:52 3 3 ACOH, CO10 13.80

12 1 AMH_10 AMH_9 DS

Arthur J Formoso

04/12/2024 10:20 3 3 ADP, EXTERNAL DROP INLET MH9 235.33

13 1 AMH_11 ACOH_11 US

Arthur J Formoso

04/12/2024 12:53 2 2 ACOH, CO11 18.90

14 1 AMH_11 AMH_8 DS

Arthur J Formoso

04/12/2024 9:30 4 4 MSA, OBSTRUCTION 18.98

15 1 ACOH_12 AMH_12 US

Arthur J Formoso

04/12/2024 12:52 3 3 ACOH, CO12 19.40

16 1 AMH_12 AMH_7 DS

Arthur J Formoso

04/12/2024 8:08 2 2 ADP, EXTERNAL DROP INLET MH7 238.59

17 1 AMH_13 AMH_14 DS

Arthur J Formoso

04/11/2024 15:18 AMH, AMH_14 77.35

18 1 AMH_14 AMH_15 DS

Arthur J Formoso

04/11/2024 14:59 AMH, AMH_15 74.74

19 1 AMH_15 AJB DS

Arthur J Formoso

04/11/2024 15:04 4 4 MSA, CANNOT SEE TO INSPECT 62.69

240411_PetrifiedForestNationalParkAZ_654032 P-17

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Project Summary Project Project Number Project Date

240411_PetrifiedForestNationalParkAZ_654032 4/11/2024

Pipe No.

Insp.

No.

Upstream Node Downstream Node Dir. Operator Insp. Date Insp. Time Str Ser Final Observation Length

20 1 AZ_TOILET ACOH_201 DS

Arthur J Formoso

04/12/2024 12:52 ACOH, SOUTH CO COMBO 5.00

21 1 ACOH_201 ATC DS

Arthur J Formoso

04/12/2024 12:52 4 4 ATC 15.60

22 1 AZ_TOILET ATC DS

Arthur J Formoso

04/12/2024 12:56 3 3 MSA, TOO MANY BENDS TO CONTINUE DUE TO FRICTION96.80

23 1 AZ_TOILET ATC DS

Arthur J Formoso

04/12/2024 12:53 4 4 MSA, OBSTRUCTION ROOTS 3.80

24 1 AZ_TOILET ATC DS

Arthur J Formoso

04/12/2024 12:55 3 3 ATC 140.60

Total: 2314.37

Inspection Summary by Profile

Profile Total Length No. Inspections

Circular 4inch 12.10

Circular 4inch 135.25

Circular 4inch 13.80

Circular 4inch 18.90

Circular 4inch 19.40

Circular 4inch 5.00

Circular 4inch 15.60

Circular 4inch 96.80

Circular 4inch 3.80

Circular 4inch 140.60

Circular 4inch = 461.25 10

Circular 6inch 75.44

Circular 6inch 238.00

Circular 6inch 226.62

Circular 6inch 86.63

Circular 6inch 105.72

Circular 6inch 235.33

Circular 6inch 18.98

Circular 6inch 238.59

Circular 6inch = 1225.31 8

Circular 8inch 170.00

Circular 8inch 163.89

Circular 8inch 79.13

240411_PetrifiedForestNationalParkAZ_654032 P-18

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Project Summary Project Project Number Project Date

240411_PetrifiedForestNationalParkAZ_654032 4/11/2024

Profile Total Length No. Inspections

Circular 8inch 77.35

Circular 8inch 74.74

Circular 8inch 62.69

Circular 8inch = 627.80 6

Total = 2314.37 24

Defect Summary CCTV Drainage Survey Observation Count

General Structural Condition Service Condition Misc

Sect.

No.

Insp.

No. Upstream Node Downstream Node In s p

L e n g th

N o

G ra d e

/5 O b s

S u rv e y A b a n d o n e d

C a m e ra U n d e r

W a te r

C ra c k s

F ra c tu re s

B ro k e n

D e fo rm e d

C o ll a p s e d

H o le s

S u rf a c e

D a m a g e

D is p la c e d J o in ts

O p e n

J o in ts

R o o ts

In fi lt ra ti o n

E n c ru s ta ti o n

S il t

G re a s e

O b s tr u c ti o n

W a te r

L e v e l

L in e D e v ia te s

1 1 AMH_1 AMH_4 75.4

2 1 ACOH_1 AMH_2 12.1 4 1 2

3 1 AMH_2 AMH_1 238.0 2

4 1 AMH_3 AMH_2 135.3

5 1 AMH_4 AMH_5 226.6 1

6 1 AMH_5 AMH_6 86.6 1

7 1 AMH_6 AMH_7 105.7

8 1 AMH_7 AMH_8 170.0

9 1 AMH_8 AMH_9 163.9

10 1 AMH_9 AMH_13 79.1

11 1 ACOH_10 AMH_10 13.8

12 1 AMH_10 AMH_9 235.3 2 1

13 1 AMH_11 ACOH_11 18.9

14 1 AMH_11 AMH_8 19.0 2 1

15 1 ACOH_12 AMH_12 19.4 2 2

16 1 AMH_12 AMH_7 238.6

17 1 AMH_13 AMH_14 77.4 3 2

18 1 AMH_14 AMH_15 74.7

240411_PetrifiedForestNationalParkAZ_654032 P-19

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Project Summary Project Project Number Project Date

240411_PetrifiedForestNationalParkAZ_654032 4/11/2024

Sect.

No.

Insp.

No. Upstream Node Downstream Node In s p

L e n g th

N o

G ra d e

/5 O b s

S u rv e y A b a n d o n e d

C a m e ra U n d e r

W a te r

C ra c k s

F ra c tu re s

B ro k e n

D e fo rm e d

C o ll a p s e d

H o le s

S u rf a c e

D a m a g e

D is p la c e d J o in ts

O p e n

J o in ts

R o o ts

In fi lt ra ti o n

E n c ru s ta ti o n

S il t

G re a s e

O b s tr u c ti o n

W a te r

L e v e l

L in e D e v ia te s

19 1 AMH_15 AJB 62.7 1

20 1 AZ_TOILET ACOH_201 5.0

21 1 ACOH_201 ATC 15.6 3 3

22 1 AZ_TOILET ATC 96.8 5 1 4

23 1 AZ_TOILET ATC 3.8 1 2

24 1 AZ_TOILET ATC 140.6 8 5 4

Total: 2,314.4 35 1 2 9 3 13

240411_PetrifiedForestNationalParkAZ_654032 P-20

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Inspection report Date: Work Order: Pipe Segment Ref.:Weather: Surveyed By: Certificate Number:

Year laid: Pre-cleaning: Pipe Joint Length:Direction: Total Length: Length Surveyed:

240411_PetrifiedForestNationalParkAZ_654032 // Page: 1

City: PETRIFIED FOREST Drainage Area: Upstream MH: AMH_1

Street: PARK RD Media Label: Up Rim to Invert: 6.8

Location Code: Parking lot Flow Control: Not Controlled Downstream MH: AMH_4

Location Details: VISITOR CENTER WALKWAYSheet Number: Down Rim to Invert:

Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0

Pipe size: 6 " Sewer Category: SEC Joints passed: 0

Pipe material: Polyvinyl Chloride Purpose: Resurvey For Any Reason Joints failed: 0

Lining Method: Owner:

Additional Info:

1:570 Distance Code Observation Counter Photo Grade

0.0 AMH Manhole / AMH_1 00:00:00

0.0 MWL Water Level, 5% of the vertical dimension 00:00:02

9.9 MWL Water Level, 15% of the vertical dimension 00:01:21

75.4 AMH Manhole / AMH_4 00:04:52

4/11/2024 267538 Dry ARTHUR J FORMOSO U-0521-70401915 MH1 --> MH4

No Pre-Cleaning Downstream 75.4 ' 75.4 '

QSR QMR SPR MPR OPR SPRI MPRI OPRI

0000 0000 0.0 0.0 0.0 0.0 0.00.0

QOR

AMH_1

AMH_4

Section Inclination - 4/11/2024 - MH1 --> MH4

1901 Indian Wood Circle, Maumee, OH 43537

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Lateral Segment Reference Date Time Surveyed By City Street Direction Length Surveyed

MH1 --> MH4 4/11/2024 10:04 AM ARTHUR J FORMOSO PETRIFIED FOREST PARK RD Downstream 75.21 Pipe Shape Size Width Lateral Upstream Access Point Lateral Downstream Access Point Start altitude End altitude Measured Inc

Circular 6 6 AMH_1 AMH_4 0.000 1.648 -7.191 %

240411_PetrifiedForestNationalParkAZ_654032 2

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Inspection report Date: Work Order: Pipe Segment Ref.:Weather: Surveyed By: Certificate Number:

Year laid: Pre-cleaning: Pipe Joint Length:Direction: Total Length: Length Surveyed:

240411_PetrifiedForestNationalParkAZ_654032 // Page: 3

City: PETRIFIED FOREST Drainage Area: Upstream MH: ACOH_1

Street: PARK RD Media Label: Up Rim to Invert:

Location Code: Parking lot Flow Control: Not Controlled Downstream MH: AMH_2

Location Details: NORTHWEST OF BLDG IN PARKING LOTSheet Number: Down Rim to Invert: 2.8

Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0

Pipe size: 4 " Sewer Category: SEC Joints passed: 0

Pipe material: Polyvinyl Chloride Purpose: Resurvey For Any Reason Joints failed: 0

Lining Method: Owner:

Additional Info:

1:302 Distance Code Observation Counter Photo Grade

0.0 AMH Manhole / AMH_2 STARTING AT 4'-08" 00:00:00

0.0 MWL Water Level, 0% of the vertical dimension

0.3 JOLD Joint Offset Large Defective 00:00:37 MH2 --_

CO1_adcc 2a5b-176a

S4

0.6 DSGV Deposits Settled Gravel, 5% of cross sectional area from 6 o'clock to 7 o'clock

00:01:00 MH2 --_

CO1_bbcd 7bb8-c0ac

M2

5.0 JOLD Joint Offset Large Defective 00:01:06 MH2 --_

CO1_e717 2c7e-4d76

S4

5.5 S01 DSGV Deposits Settled Gravel, 10% of cross sectional area from 4 o'clock to 8 o'clock, Start

00:01:09 MH2 --_

CO1_bca4 8ee3-124d

8.5 F01 DSGV Deposits Settled Gravel, 10% of cross sectional area from 4 o'clock to 8 o'clock, Finish

00:01:16 M2

8.9 OBM Obstruction Pipe Material in Invert, 10% of cross sectional area from 5 o'clock to 7 o'clock / BROKEN PIPE PIECE

00:01:27 MH2 --_

CO1_b766 c36d-d611

M2

9.0 S02 DSGV Deposits Settled Gravel, 10% of cross sectional area from 4 o'clock to 8 o'clock, Start

00:01:29 MH2 --_

CO1_2e2c 6cca-53b0

9.3 OBM Obstruction Pipe Material in Invert, 25% of cross sectional area from 3 o'clock to 9 o'clock / BROKEN PIPE PIECE

00:01:31 MH2 --_

CO1_c62f b58c-7df7-

M4

12.0 F02 DSGV Deposits Settled Gravel, 10% of cross sectional area from 4 o'clock to 8 o'clock, Finish

00:01:48 M2

12.1 X Collapse, 100% of cross sectional area / BROKEN PIPE, GRAVEL, UNDERLAYMENT VISIBLE

00:01:48 MH2 --_

CO1_20be f777-8936-

S5

12.1 MSA Miscellaneous Survey Abandoned / COLLAPSE 00:02:16

40.0 End of pipe

4/11/2024 267538 Dry ARTHUR J FORMOSO U-0521-70401915 MH2 --> CO1

No Pre-Cleaning Upstream 40.0 ' 12.1 '

QSR QMR SPR MPR OPR SPRI MPRI OPRI

5142 4124 13.0 12.0 4.3 2.4 3.125.0

QOR

AMH_2

ACOH_1

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Section Pictures - 4/11/2024 - MH2 --> CO1

PETRIFIED FOREST PARK RD 4/11/2024 MH2 --> CO1 2

MH2 --_

CO1_adcc2a5b-176a-4331-ba3f-a1c0752dcaca_20240411_1 91502_555.jpg, 00:00:37, 0.30ft Joint Offset Large Defective

MH2 --_

CO1_e7172c7e-4d76-47ec-bb17-af4c72f3ba37_20240411_19 1708_180.jpg, 00:01:06, 5.00ft Joint Offset Large Defective

MH2 --_

CO1_bbcd7bb8-c0ac-4ee1-901f-b64a1d43aa81_20240411_1 91617_891.jpg, 00:01:00, 0.60ft Deposits Settled Gravel, 5% of cross sectional area from 6 o'clock to 7 o'clock

MH2 --_

CO1_bca48ee3-124d-4ddd-b25d-6ef7a6d5ce43_20240411_1 91818_092.jpg, 00:01:09, 5.50ft Deposits Settled Gravel, 10% of cross sectional area from 4 o'clock to 8 o'clock, Start

City Street Date Lateral Segment Reference Section No.

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Section Pictures - 4/11/2024 - MH2 --> CO1

PETRIFIED FOREST PARK RD 4/11/2024 MH2 --> CO1 2

MH2 --_

CO1_b766c36d-d611-4fcf-8738-3ff249d098eb_20240411_192 158_660.jpg, 00:01:27, 8.90ft Obstruction Pipe Material in Invert, 10% of cross sectional area from 5 o'clock to 7 o'clock / BROKEN PIPE PIECE

MH2 --_

CO1_c62fb58c-7df7-4a14-89ad-2cac560371b2_20240411_19 2259_481.jpg, 00:01:31, 9.30ft Obstruction Pipe Material in Invert, 25% of cross sectional area from 3 o'clock to 9 o'clock / BROKEN PIPE PIECE

MH2 --_

CO1_2e2c6cca-53b0-4894-ba9f-349397ed0df1_20240411_19 2340_681.jpg, 00:01:29, 9.00ft Deposits Settled Gravel, 10% of cross sectional area from 4 o'clock to 8 o'clock, Start

MH2 --_

CO1_20bef777-8936-481c-bdc2-f01f29be97dd_20240411_19 2704_234.jpg, 00:01:48, 12.10ft Collapse, 100% of cross sectional area / BROKEN PIPE, GRAVEL, UNDERLAYMENT VISIBLE

Tel. (866) 914-4718 Arthur.Formoso@GPRSinc.com

Inspection report Date: Work Order: Pipe Segment Ref.:Weather: Surveyed By: Certificate Number:

Year laid: Pre-cleaning: Pipe Joint Length:Direction: Total Length: Length Surveyed:

240411_PetrifiedForestNationalParkAZ_654032 // Page: 6

City: PETRIFIED FOREST Drainage Area: Upstream MH: AMH_2

Street: PARK RD Media Label: Up Rim to Invert: 2.8

Location Code: Parking lot Flow Control: Not Controlled Downstream MH: AMH_1

Location Details: NORTHWEST OF BLDG IN PARKING LOTSheet Number: Down Rim to Invert: 6.8

Pipe shape: Circular Sewer Use: Sanitary Sewage Pipe Total gallons used: 0.0

Pipe size: 6 " Sewer Category: SEC Joints passed: 0

Pipe material: Polyvinyl Chloride Purpose: Resurvey For Any Reason Joints failed: 0

Lining Method: Owner:

Additional Info:

1:809 Distance Code Observation Counter Photo Grade

0.0 AMH Manhole / AMH_2 00:00:00

0.0 MWL Water Level, 0% of the vertical dimension 00:00:01

2.4 MWL Water Level, 5% of the vertical dimension 00:00:21

3.4 S05 DSGV Deposits Settled Gravel, 10% of cross sectional area from 5 o'clock to 7 o'clock, Start

00:00:30 MH2 --_

MH1_fce6 ae24-bff2-

20.7 F05 DSGV Deposits Settled Gravel, 10% of cross sectional area from 5 o'clock to 7 o'clock, Finish

00:01:51 M2

25.2 MWL Water Level, 0% of the vertical dimension 00:02:11

40.2 TF Tap Factory Made at 3 o'clock, dia/height: 4inch 00:03:51

40.4 JOM Joint Offset Medium 00:04:26 MH2 --_

MH1_2e22 47c7-b434

S3

45.0 DSGV Deposits Settled Gravel, 5% of cross sectional area at 6 o'clock

00:05:31 MH2 --_

MH1_eb6d ca25-f485-

M2

46.0 MWL Water Level, 5% of the vertical dimension 00:05:40

47.0 S02 DSF Deposits Settled Fine, 5% of cross sectional area from 5 o'clock to 7 o'clock, Start

00:05:46 MH2 --_

MH1_392c dcb5-c7ef-

55.4 F02 DSF Deposits Settled Fine, 5% of cross sectional area from 5 o'clock to 7 o'clock, Finish

00:06:20 M2

101.3 S03 DAR Deposits Attached Ragging, 10% of cross sectional area from 4 o'clock to 8 o'clock, Start

00:08:56 MH2 --_

MH1_d5d0 3dd6-8e4c

104.2 JOM Joint Offset Medium 00:09:28 MH2 --_

MH1_f461 db6f-6d6b-

S3

104.5 TFA Tap Factory Activity at 12 o'clock, dia/height: 4inch 00:09:45

105.1 JAM Joint Angular Medium 00:09:58 MH2 --_

MH1_d93b a587-14fa-

S3

4/11/2024 267538 Dry ARTHUR J FORMOSO U-0521-70401915 MH2 --> MH1

No…

This is the start of the file's text. The full file is on GovTribe.