B08_GRSM_158579_202623_Solit_Attach 05 - Past Perf.docx

DOCX document 45 KB Posted

Attached to
GRSM 158579/202623 - Look Rock Rehabilitation
Solicitation number
140P2021R0007
Issued by

About this file

This document contains a past performance questionnaire for a contractor to complete regarding prior work on a National Park Service project. The questionnaire requests information on a past contract to repair and rehabilitate the Look Rock Campground in Great Smoky Mountains National Park, including the contract number, awarded price of $X.X million, period of performance from XX/XX/XXXX to XX/XX/XXXX, and a brief scope of work description. References are asked to evaluate and provide comments on the contractor's performance in areas such as quality, schedule adherence, cost control, management, regulatory compliance, and small business subcontracting. The reference is to return the completed questionnaire to the identified National Park Service contracting officer by a specified time and date.

View the file

Other files

File Type Posted
B09_Amend04_Solit_SF1442_140P2021R0007_0004.pdf PDF
Sol_140P2021R0007_Amd_0004.pdf PDF
Sol_140P2021R0007_Amd_0003.pdf PDF
B09_Amend03_Solit_SF1442_140P2021R0007_0003.pdf PDF
B09_Amend03_Attach_ConstrClause_page_0003.pdf PDF
Sol_140P2021R0007_Amd_0002.pdf PDF
B09_140P2021R0007_Amend_02-extend_0002.pdf PDF
Sol_140P2021R0007_Amd_0001.pdf PDF
B11_PreProposal Presentation_GRSM158579 202623_0001.pptx PPTX presentation
B09_140P2021R0007_Amendment_01_0001.pdf PDF
B09_140P2021R0007_Amend_01_SiteVisitAttendees_Attachment_0001.pdf PDF
B08_GRSM_158579_202623_Solit_Attach 07 - Gen Refs.doc DOC document
B08_GRSM_158579_202623_Solit_Attach 04 - Exp.docx DOCX document
B08_GRSM_158579_202623_Solit_Attach 02c - pg 21 to 30 -Drawings.pdf PDF
B08_GRSM_158579_202623_Solit_Attach 01 - Specifications.pdf PDF
B08_GRSM_158579_202623_Solit_Attach_10_CROMTankInspectionReport_081820.pdf PDF
B08_GRSM_158579_202623_Solit_Attach 02d - pg 31 to 55 -Drawings.pdf PDF
B08_GRSM158579_202623_Solit_Attach_09_GeotechReport_081820.pdf PDF
B08_GRSM_158579_202623_Solit_Attach 02a - pg 1 to 10 -Drawings.pdf PDF
B08_GRSM_158579_202623_Solit__SF1442_ConstructionClauses.pdf PDF
B08_GRSM_158579_202623_Solit_Attach 02e - pg 56 to 80 -Drawings.pdf PDF
B08_GRSM_158579_202623_Solit_Attach_08_Deliverables_LmtOnSubconRpt.xlsx XLSX spreadsheet
B08_GRSM_158579_202623_Solit_Attach 03 - WageDetermination.pdf PDF
Sol_140P2021R0007.pdf PDF
B08_GRSM_158579_202623_Solit_Attach 02b - pg 11 to 20 -Drawings.pdf PDF
B08_GRSM_158579_202623_Solit_Vol_II_PriceSchedule.xlsx XLSX spreadsheet
B08_GRSM_158579_202623_Solit_Attach 06 - SF 24 Bid Bond.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAST PERFORMANCE QUESTIONNAIRE

INSTRUCTIONS: Offeror to complete Sections A and B and transmit questionnaire to reference.

Reference to complete Sections C and D and transmit back to Contracting Officer listed in section E.

A. CONTRACTOR INFORMATION

Company Name
Company
Street Address
Address
City
City
State
State
Zip Code
XXXXX
DUNS Number
XXXXXXX
Point of Contact
Name, Email, Phone

B. CONTRACT INFORMATION

Project Title
Title
Contract Number
XXXXXXXXXX
Contract Type
Firm Fixed Price / Time & Materials / Cost Reimbursable / Other
Awarded Contract Price
$X,XXX,XXX
Current / Final Price
$X,XXX,XXX
Contract Award Date
XX/XX/XXXX
Contract Completion Date
XX/XX/XXXX
Period of Performance
XX/XX/XXX – XX/XX/XXX
Project Location
Park or Street address, City, State
Client / Owner
Company
Brief description of the contract & work effort:
Scope of work description

C. REFERENCE:

Name
First, Last
Position / Title
Title
Organization
Agency or Company
Phone Number
XXX-XXX-XXXX
Email Address
Email
Signature
Signature
Date
XX/XX/XXXX

D. EVALUATION

Rating
Definition
Exceptional
Performance met contractual requirements and exceeded many to the owner’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good
Performance met contractual requirements and exceeded some to the owner’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory
Performance met contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal
Performance did not meet some contractual requirements. The element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.
Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Evaluation Area
Rating

Quality

Quality of workmanship (including subcontractors)?
Choose an item.
Quality of and adherence to quality control plan?
Choose an item.
Quality of informational and technical submittals?
Choose an item.
Overall Quality Rating
Choose an item.
Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Schedule (& Time Management)

Met project schedule milestones?
Choose an item.
Responded to owner requests in a timely manner?
Choose an item.
Informational and technical submittals submitted timely?
Choose an item.
Promptly addressed scheduling issues?
Choose an item.
Overall Schedule (& Time Management) Rating
Choose an item.
Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Cost Control

Addressed differing & unforeseen site conditions so as to minimize additional costs?
Choose an item.
Provided fair and reasonable pricing for contract modifications?
Choose an item.
Submitted accurate and complete invoices?
Choose an item.
Promptly paid subcontractors and suppliers?
Choose an item.
Overall Cost Control Rating
Choose an item.
Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Management

General oversight by project manager and superintendent?
Choose an item.
Coordination with and control of subcontractors?
Choose an item.
Avoidance of accidents & safety violations?
Choose an item.
Addressed location factors (especially remote locations)?
Choose an item.
Maintained good working relationship with owner representatives?
Choose an item.
Demonstrated flexibility, innovativeness and cooperation in resolving potential problems?
Choose an item.
Overall Management Rating
Choose an item.
Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Small Business Subcontracting (& Labor Standards)

Met regulatory and contractual labor standards?
Choose an item.
Successfully contracted with small and socio-economically disadvantaged businesses?
Choose an item.
Quality and adherence to applicable subcontracting plans?
Choose an item.
Overall Small Business Subcontracting (& Labor Standards) Rating
Choose an item.
Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Regulatory Compliance

Met building and life safety codes?
Choose an item.
Overall Regulatory Compliance Rating
Choose an item.
Overall Recommendation:
Given what I know today about the contractor's ability to perform in accordance with the contract’s most significant requirements, I would recommend them for similar contracts:
Choose an item.
Overall Comments:

E. RETURN:

Return by
Time / Date
Name
CO or CS name
Title
Contracting Officer / Contract Specialist
Organization
National Park Service – Denver Service Center
Email
First_Last@nps.gov

File details come from the government source that posted it. Updated .