Sol_140P2021R0007_Amd_0003.pdf

PDF 85 KB Posted

Attached to
GRSM 158579/202623 - Look Rock Rehabilitation
Solicitation number
140P2021R0007
Issued by

About this file

This document is an amendment to a solicitation for the GRSM 158579/202623 - Look Rock Campground Rehabilitation project at Great Smoky Mountains National Park. Amendment 03 extends the offer submission deadline from June 8, 2021 to June 17, 2021. It also increases the period of performance from July 2021 through October 2021 to September 15, 2021 through March 13, 2022. The amendment was issued by the National Park Service Contracting Services Division and administered by the National Park Service National Office. The solicitation seeks offers for repair and alteration work at the Look Rock Campground in Great Smoky Mountains National Park.

View the file

Other files

File Type Posted
B09_Amend04_Solit_SF1442_140P2021R0007_0004.pdf PDF
Sol_140P2021R0007_Amd_0004.pdf PDF
B09_Amend03_Solit_SF1442_140P2021R0007_0003.pdf PDF
B09_Amend03_Attach_ConstrClause_page_0003.pdf PDF
Sol_140P2021R0007_Amd_0002.pdf PDF
B09_140P2021R0007_Amend_02-extend_0002.pdf PDF
Sol_140P2021R0007_Amd_0001.pdf PDF
B11_PreProposal Presentation_GRSM158579 202623_0001.pptx PPTX presentation
B09_140P2021R0007_Amendment_01_0001.pdf PDF
B09_140P2021R0007_Amend_01_SiteVisitAttendees_Attachment_0001.pdf PDF
B08_GRSM_158579_202623_Solit_Attach 07 - Gen Refs.doc DOC document
B08_GRSM_158579_202623_Solit_Attach 04 - Exp.docx DOCX document
B08_GRSM_158579_202623_Solit_Attach 02c - pg 21 to 30 -Drawings.pdf PDF
B08_GRSM_158579_202623_Solit_Attach 05 - Past Perf.docx DOCX document
B08_GRSM_158579_202623_Solit_Attach 01 - Specifications.pdf PDF
B08_GRSM_158579_202623_Solit_Attach_10_CROMTankInspectionReport_081820.pdf PDF
B08_GRSM_158579_202623_Solit_Attach 02d - pg 31 to 55 -Drawings.pdf PDF
B08_GRSM158579_202623_Solit_Attach_09_GeotechReport_081820.pdf PDF
B08_GRSM_158579_202623_Solit_Attach 02a - pg 1 to 10 -Drawings.pdf PDF
B08_GRSM_158579_202623_Solit__SF1442_ConstructionClauses.pdf PDF
B08_GRSM_158579_202623_Solit_Attach 02e - pg 56 to 80 -Drawings.pdf PDF
B08_GRSM_158579_202623_Solit_Attach_08_Deliverables_LmtOnSubconRpt.xlsx XLSX spreadsheet
B08_GRSM_158579_202623_Solit_Attach 03 - WageDetermination.pdf PDF
Sol_140P2021R0007.pdf PDF
B08_GRSM_158579_202623_Solit_Attach 02b - pg 11 to 20 -Drawings.pdf PDF
B08_GRSM_158579_202623_Solit_Vol_II_PriceSchedule.xlsx XLSX spreadsheet
B08_GRSM_158579_202623_Solit_Attach 06 - SF 24 Bid Bond.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P2021R0007 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy DOI, NPS, DSC Contracting Services

PDS

Denver CO 80225-0287 P.O. Box 25287 12795 W. Alameda Pkwy NPS, DSC Contracting Services Div

GRSM 15857905/13/20210003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/03/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 03: Purpose of Amendment 03 is to:

1.) Extend the Offer submission date FROM: 10:00 AM MST on 06/08/2021; TO: 10:00 AM MST on

06/17/2021.

As a result of this amendment the due date is hereby extended to Thursday, June 17, 2021 at

10:00 AM MST.

2.) The Period of Performance (POP) is hereby changed FROM: July 2021-October 2021; TO:

09/15/2021-03/13/2022

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

John Babcock

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P2021R0007/0003

As a result of this amendment the POP is hereby increased to 180 calendar days starting September

15, 2021 through March 13, 2022.

All other items remain unchanged.

Legacy Doc #: NPS

Period of Performance: 09/15/2021 to 03/13/2022

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110