This file is a Contract Price Schedule Template for a National Park Service project at Dinosaur National Monument. The solicitation seeks a contractor to replace the Yampa District Multi-Operations Facility and includes base line items and optional elements. The base line items (CLINs 1-4) cover facility replacement, commissioning, archaeological monitoring, and hazardous materials abatement, with two optional add-ons: a non-conditioned garage bay and electric roll-up doors. The pricing template requires offerors to submit complete pricing for all base and optional line items, with each line item priced as a lump sum. The project is located in Dinosaur, Colorado, and is being conducted by the Department of the Interior National Park Service, with the solicitation number 140P2025R0077.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Template
| Contract Price Schedule Template | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | |||||
| PARK - PMIS: | DINO - 310253 | ||||
| Developed Area: | Dinosaur National Monument | ||||
| Project Title: | Replace Yampa District Multi-Operations Facility, Demolish Existing Structures | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Contract Line Item Number (CLIN) | Contract Line Item (CLI) Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Replace Yampa District Multi-Operations Facility | 1 | Lump Sum | $0.00 | |
| 2 | Commissioning | 1 | Lump Sum | $0.00 | |
| 3 | Archeological Monitoring | 1 | Lump Sum | $0.00 | |
| 4 | Hazardous Materials Abatement | 1 | Lump Sum | $0.00 | |
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) --------------------------------------------------------------------------------- | $0.00 | ||||
| 5 | OPTION A, Non-Conditioned Garage Bay | 1 | Lump Sum | $0.00 | |
| 6 | OPTION B, Electric Roll-up doors | 1 | Lump Sum | $0.00 | |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 5 through 6) ----------------------------------------------------------- | $0.00 | ||||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Number 1 through 6) -------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |