This document is a Questions and Answers (Q&A) file for a construction project located within Dinosaur National Monument Park. The Q&A covers multiple technical specifications and clarifications, including details about transformer and generator pads, radio tower foundations, tile colors, flooring installations, shower assemblies, and utility connections. Key responses include confirmation that electronic proposal submission is preferred, showers will be tiled (not prefabricated), and the contractor is responsible for grading and ground preparation prior to revegetation. The project involves specific technical requirements such as sound control underlayment, LVT flooring adhesive compatibility, and precise locations for underground services like water, sewer, and drainage lines. The document indicates the project will require full depth asphalt reconstruction and involves multiple detailed site-specific inquiries resolved by NPS (National Park Service) and Otak representatives between 9/12/2025 and 9/18/2025.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Yampa District Multi-Operational Facility, newest first.
File Type Posted
B11_PreBid_DINO_310253_0003.pptx PPTX presentation
Sol_140P2025R0077_Amd_0003.pdf PDF
B09_Amendment_0003_Q_A_RFP_140P2025R0077_doc_0003.pdf PDF
Sol_140P2025R0077_Amd_0002.pdf PDF
C10_GRADING_EAST_0002.pdf PDF
B11_PreBid_Draft_DINO_310254_0002.pdf PDF
C12_LAYOUT_PTS_I_0002.pdf PDF
Sol_140P2025R0077_Amd_0001.pdf PDF
Sol_140P2025R0077.pdf PDF
B08_Attachment_5b_SF24-23a.pdf PDF
B08_Attachment_7_ContractPriceSchedule.xlsx XLSX spreadsheet
B08_DINO_310253_Sol_140P2025R0077_08_27_2025_Binder1.pdf PDF
B08_Attachment_4b_Project_Experience_Questionnaire_.docx DOCX document
B08_Attachment_1_Volume_1_DINO_NPS_31025_Construction_Specifications_Final_CD_2025-05-30_(1).pdf PDF
B08_Attachment_4d_Solit_PSP_Vol_I_PastPerf_REQD(1).pdf PDF
B08_Attachment_4c__Key_Personnel_Resume_Form.pdf PDF
B08_Attachment_4A_Solit_VOLUME_I_PSP_Cover.pdf PDF
B08_Attachment_3b_WDCO20250001_07_10_2025_gov.pdf PDF
B08_Attachment_3a_WD_UT20250077_07_10_2025_gov.pdf PDF
B08_Attachment_6_Construction_Contract_Administration.pdf PDF
B08_Attachment_5a_Solit_VOLUME_II_PSP_Cover.pdf PDF
B08_Attachment_3_CD_Complete_00-Combined_signed.pdf PDF
B08_Attachment_5c_Solit_PSP_Vol_II_GenRefs.pdf PDF
B08_Attachment_2_Volume_2_DINO_NPS_31025_Construction_Specifications_Final_CD_2025-05-30.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date Question Response Date Response By

9/12/2025 Confirm Bid Bond Percentage

"Bid Bond" is not required. See solicitation clause 52.228-1 - Performance and Payment Bonds- Construction 9/12/2025 NPS

9/12/2025 Is it acceptable to submit your proposal electronically in lieu of a hard copy? Yes, please submit electronically. It is preferred. 9/17/2025 NPS

9/12/2025 Can you please provide details for the transformer, generator and radio tower pads?

Radio Tower: See radio tower pad detail on 2/S8.

Layout points are on C11.

Transformer/Generator pad: Layout points for the location of the pad are shown on sheet C10 - Grading and Drainage Plan-East. Concrete pavement detail is shown on C16; see detail 6. Revised sheets C10 and C12 have been provided. 9/18/2025 Otak

9/12/2025 Can you please provide a detail for the bollards? See bollard details on sheet C19. 9/18/2025 Otak

9/12/2025 Can you please share the powerpoint presentation that was shown during the site visit? Yes. Power Point presentation is attached. 9/12/2025 NPS

9/12/2025

Specs are calling for sound control underlayment. This is not typically used over Concrete. Can you confirm sound underlayment is required for LVT over concrete floors? Please provide underlayment as specified. 9/18/2025 Otak

9/12/2025

Specs are calling for WAKOL MS-552 adhesive . These product is not provided by flooring manufacturer? Also confirm that adhesive is required for LVT over concrete floors?

Adhesive shall be compatible with LVT flooring provided. Substitutions are permitted per section 01 67 00 Product Requirements. 9/18/2025 Otak

9/12/2025 Confirm that showers are prefabricated inserts and not tiled pans.

Showers are tiled pans and walls. See interior elevations and finish schedule. 9/18/2025 Otak

9/12/2025 Verify that cove base is required on all walls of the vehicle bays. It is only calling for it on one wall on the drawings.

Cove base is only required where wall finish is gyp bd.

Not required at Concrete stem wall or plywood. See details 7/A24, 1/A30, 2/A30. 9/17/2025 Otak

9/12/2025 Confirm that no base is required in the fire equipment room.

No wall base required at Fire Equipment Room -plywood wall finish to start at floor and run to 8'-0" AFF. 9/17/2025 Otak

9/12/2025

Interior finish schedule references walk-off mat carpet tile, but I don’t see this reflected in the room finish schedule. Can you clarify?

See room finish schedule for 100A Corridor (Comments) and Floor Plan - West A8. Walk-off mat located at interior of door 100A. 9/17/2025 Otak

9/12/2025 Can you please provide color selections for these two tiles?

Tile colors are as follows:

CT-1 Wall tile: Aqua CT-2 Floor tile and cove base: Midnight CT-3 Kitchen tile: Hood River Gloss 9/18/2025 Otak

9/12/2025 Drawings state that revegetation to be performed by park as needed. What cost if any should be carried for this work?

Contractor is still required to do all grading and ground prep prior to re-vegetation. All placement of seed and maintenance is on the park. 9/17/2025 NPS

9/12/2025 Can you please clarify the requirements and elevation for the future storage area shown on Sheet S2 if any? None. Please disregard. 9/17/2025 Otak

9/12/2025

Do the limits of the Dinosaur National Monument Park encompass the building location? Will there be any state required inspections? What permits will be required for this project

Yes, the limits of the project are within the boundaries of the Monument. Spec Section 01 31 00-1.9.B lists the likely permits required by the contractor and also shows the delegated responsibility for determining and obtaining permits. No state required inspections that we are aware of. Any inspections required by the contractor are noted in 01 40 00 as noted in structural tests and special inspections (STSI). The government will have the A/E contracted to provide other interim and punchlist inspections of work. 9/17/2025 NPS

9/17/2025

Sound Underlayment: Please clarifiy the requirement for sound control underlayment over a concrete subfloor in conjunction with Shaw LVT. Specification sections are attached for reference.

https://mpglobaproducts.com/underlayment/soundstep-lv Please provide underlayment as specified. 9/18/2025 Otak

9/17/2025

Special Adhesive-WAKOL MS-552: Shaw has requested clarification regarding the specified WAKOL MS-522 adhesive, as it is not a Shaw -provided product. PLease confirm if this adhesive is required or if a Shaw recommended altrnative is acceptable. https://www.wakol-usa.com/us/PM/Products?Installin-Resilient- Flooring/WAKOL-MS-552

Adhesive shall be compatible with LVT flooring provided. Substitutions are permitted per section 01 67 00 Product Requirements. 9/18/2025 Otak

9/17/2025

Shower Assemblies: Please confirm whether the showers are to be prefabricated insert units or constructed with tiled pans and walls.

Showers are tiled pans and walls. See interior elevations and finish schedule. 9/18/2025 Otak

9/17/2025

Cove Base – Room 129 (WFD Vehicle Bay): Clarification requested on the extent of cove base installation in Room

129. Is cove base required on only one side? No other vehicle bays appear to receive cove base per the drawing set.

Cove base is only required where wall finish is gyp bd.

Not required at Concrete stem wall or plywood. See details 7/A24, 1/A30, 2/A30. 9/17/2025 Otak

9/17/2025

Fire Equipment Room 127 – Base Requirement: Please confirm whether any type of wall base is required in Fire Equipment Room 127, as none appears to be called out.

No wall base required at Fire Equipment Room -plywood wall finish to start at floor and run to 8'-0" AFF. 9/17/2025 Otak

9/17/2025

Walk-Off Mat Carpet Tile: The interior finish schedule references walk-off mat carpet tile; however, this material is not identified on the floor plan or drawings.

Please clarify location and intent.

See room finish schedule for 100A Corridor (Comments) and Floor Plan - West A8. Walk-off mat located at interior of door 100A. 9/17/2025 Otak

9/17/2025

Ceramic Tile CT-1 & CT-2 – Color Selection: Please confirm color selections for CT-1 and CT-2 ceramic tiles.

While color does not impact pricing, confirmation prior to bid submission would be appreciated.

Tile colors are as follows:

CT-1 Wall tile: Aqua CT-2 Floor tile and cove base: Midnight CT-3 Kitchen tile: Hood River Gloss 9/18/2025 Otak

9/17/2025 Responsibility for Permitting Building, Septic and Water.

Spec Section 01 31 00-1.9.B lists the likely permits required by the contractor and also shows the delegated responsibility for determining and obtaining permits. 9/17/2025 NPS

9/17/2025

In the Drawing set, sheet C2 the Generator and Transformer shows a new concrete pad at this location. What will be the size of this pad and is there any details about it in the civil and or structural plans.

Layout points for the location of the pad are shown on sheet C10 - Grading and Drainage Plan-East. Concrete pavement detail is shown on C16; see detail 6.

Revised sheets C10 and C12 have been provided. 9/18/2025 Otak

9/17/2025

In the Drawing set, sheet C14 in the layouts for all of the underground services for Under drains, Roof Drains, Perimeter drains Water and Sewer Lines as well as the Oil Sand Separator, Sanitary Sewer manhole and the Fire Hydrant will there be exact locations especially for exiting the building for these to be installed.

Exact locations for utilities can be located on the following sheets:

Water: C4 Sewer: C6 Roof Drain: C7 Foundation Drain: C8 Storm: C8 Underdrain: C15 9/18/2025 Otak

9/17/2025

In the Drawing set, sheet C17, Detail 3 Fire Water Storage Tank, is there a specific Manufacturer or Model number and material it is made from, or will it be manufactured on site assuming Steel or Concrete.

Fire water storage tank basis of design manufacturer and materials are located in spec section 33 16 00 - Water Utility Storage Tanks. 9/18/2025 Otak

9/17/2025

In the Drawing set, sheet C2 shows the location for the FW Storage tank and the Radio Tower, what will be the size of this pad. Sheet S8 shows a detail of the Depth and Reinforcing but not overall size.

Layout points for the storage tank and radio tower foundation are located on sheet C11. Pad will extend from points B7-B8-B9-B10-B11. 9/18/2025 Otak

9/17/2025 For Asphalt Repaving will a Full Depth Sub Base and Base Reconstruction be required or Proof Roll Existing

Asphalt repaving shall be full depth reconstruction per geotechnical engineer recommendations. 9/18/2025 Otak