This is a pre-bid presentation PowerPoint for a National Park Service solicitation to replace the Yampa District Multi-Operations Facility at Dinosaur National Monument in Colorado. The project involves demolishing an existing condemned maintenance building (approximately 19,000 sq ft) and constructing a new 15,000 sq ft single-story multi-operations facility to serve various park programs including Visitor & Resource Protection, Fire, Search and Rescue, River Program, and Facilities Maintenance.
The solicitation (140P2025R0077) is a small business set-aside with a Firm Fixed Price contract, NAICS code 236220, with a $20M size standard. Key dates include a pre-bid meeting and site visit today, solicitation questions due September 16, 2025 at 12:00pm MT, and offers due September 26, 2025 at 2:00pm MT. The project has a 24-month performance period from approximately December 2025-2027, with an estimated contract award by September 2025. The new facility will include administrative offices, vehicle bays, equipment caches, fitness facilities, storage spaces, and will be photovoltaic-ready with energy-saving components and comprehensive safety systems.
View the file
Other files for this federal contract opportunity
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pre-Bid Project Overview Replace Yampa District Multi-Operations Facility, Demolish Existing Structure Dinosaur National Monument
E X P E R I E N C E Y O U R A M E R I C A
PMIS #: 310253
Solicitation: 140P2025R0077
September 9, 2025
Thank you all for coming, we appreciate you making the trip here to learn more about this great opportunity at Dinosaur National Monument. This construction project is to demolish existing structures at the Yampa District and replace with a new single story multi-operations facility for park staff. This solicitation is under the number 140P2025R0077.
My name is Megan Braunschweig and am from the National Park Service, Denver Service Center – Design and Construction Division. And with me is Daryl Hawkins, the contracting specialist for this project. Some other notable members of our team is Phil Akers, superintendent at Dinosaur National Monument, and our designer of record is OTAK.
If you have not yet signed in please do so before you head out on the site visit. If you have any questions over the course of this presentation or during the site visit, please submit those in writing. No questions will be answered during this pre-bid meeting at this time.
AGENDA
Introductions Project Overview Scope of Work Site Logistics Site Layout and Orientation Site/Project Considerations Bid Information Sections L & M Pre-Bid Conference Questions Conclusion
Megan
Here is a quick agenda of the items we plan to go through in this presentation Project Overview with includes scope of work, phasing, site plans, floor plans and orientation, and the like Bid Information (specifically sections L&M and how you will be evaluated) Pre-bid conference questions and the process for that And wrap-up, which includes instructions/agenda for this site visit stops
Next slide
PROJECT OVERVIEW
General Contract Information
The work shall be conducted from NTP in approximately December 2025– December 2027 (24 months)
No concurrent projects are anticipated
The park will be open to visitors during construction; however, this area is staff use only and so no conflicts are expected
The park will address physical and site security measures at the pre-construction conference meeting and monitor for compliance throughout the contract period of performance
As a project overview to this construction project, the period of performance will be a 2-year timeframe from approximately December 2025 - 2027, dependent upon Notice to Proceed date. We hope to award this project by the end of September 2025. No concurrent projects are anticipated at this time. During construction the park will remain open, deliveries and construction traffic will need to enter through the main park entrance. The park will address physical and site security measures at the pre-construction conference meeting and monitor for compliance throughout the contract period of performance.
Existing Yampa District Maintenance building has been condemned due to structural failure
Current building, shed, trailing and shipping container space is inadequate and unsafe for use by park staff
Park has relocated its programs temporarily into conex boxes and park housing, intended for staff and volunteers, while housing is already limited
PROJECT OVERVIEW
Project Issues
In 2013, a structural evaluation was conducted and recommended against rehabilitating the existing building. The existing operations and maintenance building was then condemned for safety reasons since 2014. Shifts in the foundation damaged overall structural integrity, cracked the masonry walls and facade, and resulted in falling loose masonry. Park operations were moved out of the building into temporary facilities, conex boxes, and park housing units, resulting in inefficient operations, substandard working conditions, and dispersed personnel.
There were multiple attempts to stabilize the foundation; steel pile underpinning, steel framing modifications, and adding grout columns; however, the foundation continued to shift. The building continues to deteriorate & pose public safety hazard therefore requiring demolition.
Existing Yampa District Maintenance building has been condemned due to structural failure
Current building, shed, trailing and shipping container space is inadequate and unsafe for use by park staff
Park has relocated its programs temporarily into park housing, intended for staff and volunteers, while housing is already limited
Extensive spalling inside the lift station, which could result in it being compromised leading to raw sewage leaks into the ground
Project Issues
Here are some photos of the existing site where the facilities, to be demolished, are located and look like. Photo 1 (top right) is a property view looking west, photo 2 (top middle) is the existing Yampa District building west façade, photo 3 (to right) is the same building south façade, photo 4 (bottom left) is an aerial view of the property looking west, and photo 5 (bottom right) is the approach into the property and view from highway 40
Facility serves park programs, including Visitor & Resource Protection, Fire, Search and Rescue, River Program, Facilities and Maintenance
Demolition of the existing Yampa District Maintenance building, including hazardous material abatement. This also includes other buildings and site elements (total of 19,000 sf) such as:
Existing shed buildings (except 2 metal sheds) Trailer and shipping container spaces Paving Fuel tanks, and Utilities
Project Scope
This project will construct a multi-division operational support building to serve facilities, fire, search and rescue, and other park operations. Work includes demolition of the existing Yampa District Operations building and removal of the fuel system and its related components.
The existing Yampa District Maintenance/Operations Support Building is a concrete block building that has served as the primary facility for the Yampa District Maintenance Operations since its construction in 1963. Wildland Fire, Law Enforcement, and River Program joined over the years. During busy seasons, as many as twenty members of the park’s staff shared the facility.
All buildings slated for demolition have been vacated on-site and are ready to be demolished, with no coordination required to move out anything that remains.
Build a new approximately15,000 sf single-story Yampa District Multi-Operations building with all associated site and utility improvements, which includes:
Administrative Office Spaces Adjoining high-bay drive through for maintenance, fire, and operations vehicles Equipment caches Fitness facilities Laundry and kitchen Storage Photo-voltaic ready 2nd level equipment platform
PROJECT OVERVIEW
Project Scope
Site work includes all utility improvements needed to serve the new building, parking, paving, site drainage, fence repairs, security gate, and vehicle/boat wash station
Other site improvements include a lift station, water tank, communication system fire optic, generator, and radio tower
The new building will be an approximately 15,000 SF single-story structure which will provide adequate support facilities for critical park programs that provide critical life-safety service beyond the park in three Counties (law enforcement, fire-fighting and SAR). The replacement facility will contain a fire/intrusion alarm system. The project will replace security fencing only at entry gates and replace or repair parking surfaces. Site work includes stormwater drainage improvements. Utility systems to be upgraded or replaced may include water, wastewater, and electrical supply. The existing communication system will be replaced with a fiber optic system. Hazardous materials associated with the demolition will be abated.
The building will serve:
As an incident command center and training facility For the Wildland fire program will have high ceiling bays for fire engines, as well as equipment caches, and offices.
Law Enforcement will have offices in the new building Search and Rescue with a cache Shared fitness facilities with wildland fire, necessitating locker rooms The River Program will have high ceiling bays and a pully system for raft storage, as well as offices & river trip preparation facilities Interpretation will have additional storage for visitor materials Resource Stewardship & Science will have offices and a laboratory that will include animal storage freezers and climate controlled herbarium storage Maintenance program will have offices, welding and carpentry shops with ventilation systems.
The new building will also be made photovoltaic ready with rooftop mounted HVAC systems. Nearby, a back-up generator building, & propane storage tank will be constructed to serve the building. All components will be energy saving & a fire/intrusion alarm system, along with fire suppression system, will be throughout the building. Construction shall be ABAAS compliant. Aesthetics of the exterior will model the Mission 66 architecture of the building that it’s replacing.
The existing Mechanic Shop (constructed as a “temporary” alternative in 2014) will be able to expand to previous capacity once the River Program moves into the new Multi-Operations Support Building. This existing building will have exhaust systems installed, and fire/intruder alarm system.
It will provide adequate support facilities for critical park programs that provide critical life-safety service beyond the park in three Counties (law enforcement, fire-fighting and SAR). The replacement facility will contain a fire/intrusion alarm system. The project will replace security fencing only at entry gates and replace or repair parking surfaces. Site work includes stormwater drainage improvements. Utility systems to be upgraded or replaced may include water, wastewater, and electrical supply. The existing communication system will be replaced with a fiber optic system. Hazardous materials associated with the demolition will be abated.
Proposed Site Plan
Here is an overall site plan of the Yampa District baseyard. There are some existing buildings to be protected during construction, 2 in the top left for hazardous materials, another one along the left fenceline for kitchen and restroom use, and the bottom left center in the island for maintenance. It is recommended to put contractor and CMR trailers over to the right and contractor parking on the bottom right corner. Staging has some recommended locations, but the site is for overall contractor use. All existing asphalt and concrete to be demolished along with some existing perimeter fencing and gate, fuel tanks, bollards, utilities (fire hydrant, water lines, sanitary sewer).
The new facility itself will have the office space to the north and the garages to the south. The area where there are the (4) pull through garages are located in the hatched area is option A work for conditions garage space, while option B work for making all garage doors as electric roll-up. The site is to be all newly paved with asphalt and striped for parking and circulation. A new transformer and generator are to be placed on a new concrete pad in the bottom right, and a new fire water storage tank and radio tower to go in on the north end. There will be new 6” water lines, and 6” sewer lines serving the building, while having a 4” water line serving the water storage tank. Lastly, there is also a new bio-retention area to the southeast.
For all ground disturbing activities a contractor hired archaeological monitor, who will work with park staff, is required to be on-site to observe activities. Re-vegetation of native seed mix to take place around the perimeter within the dashed lines with a bioretention seed mix to the bottom right.
Proposed Floor Plan
On to the floor plan, on the far right of the garage portion is the welding shop, custodial storage, and carpentry shop. Just to the right of that is bid option A for a conditioned garage space with roll up doors. The moving right to left are 2 MOP vehicle bays, and then 2 WFD vehicle bays with unisex restroom just off the last bay in the top left.
The on the administrative end of the building the largest space in the center is the fire cache and fire equipment. Top left is the fitness room, wellness room, mens and womens restroom, with breakroom. Then there are various office spaces for the maintenance director, water records, law enforcement and evidence processing, river ranger, district range, fire, a couple open office spaces for cubicles and a conference room. Mechanical, fire riser, janitor, electrical, and IT closets are located throughout to service the building and support office spaces. This building is getting fire suppression and fire detection systems that will need to be inspected and signed off by the regional Authority with Jurisdiction in the NPS.
Proposed Building Elevations
Here are two elevations showing a view from the east (top) and north (bottom)
Proposed Building Elevations
And, Here are two elevations showing a view from the west (top) and south (bottom)
Refer to the Solicitation for complete information.
Pre-Bid Meeting and Site Visit: TODAY Solicitation Questions Due: September 16, 2025 @ 12:00pm MT Offers Due: September 26, 2025 @ 2:00pm MT Contract Requirements include:
Submission is electronic only to Stormy_Gallagher@nps.gov and Daryl_Hawkins@nps.gov Type of Contract – Firm Fixed Price NAICS Code: 236220 – Commercial and Institutional Building Construction, $20M This is a Small Business Set Aside solicitation
SUMMARY OF SOLICITATION AND AWARD
Key Dates and Information
All information for deadlines are provided as part of the solicitation.
We are currently in the pre-bid meeting and the site visit will follow Solicitation questions will be due August X by no later than 12pm MT And Bids are due August X by 2pm MT Everything should be submitted to the email addresses you see on the screen This is a firm fixed price contract and small business set aside solicitation The NAICS code is 236220 for commercial and institutional building construction and a small business size standard of $20M
Construction Documents (drawings) and Specifications Supplemental Services, Surveys, and Reports Vol 2 Appendix 01: Geotechnical Report Vol 2 Appendix 02: Hazardous Material Reports Vol 2 Appendix 03: Existing Structure Report Vol 2 Appendix 04: Existing Building Drawings
TECHNICAL DOCUMENTS
The technical documents you will find on BetaSAM include the construction document drawings and specifications. Other supplemental services, surveys and reports include a Geotechnical survey, hazardous material reports, existing structure report and drawings.
| CONTRACT LINE NUMBER (CLIN) | CONTRACT LINE ITEM (CLI) TITLE Base Contract Items | QTY | UNIT OF MEASURE | UNIT PRICE | TOTAL PRICE |
| 01 | Replace Yampa District Multi-Operations Facilities | LS | |||
| 02 | Commissioning | LS | |||
| 03 | Archaeological Monitoring | LS | |||
| 04 | Hazardous Materials Abatement | LS | |||
| TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ------------------------------- |
CONTRACT LINE NUMBER (CLIN) CONTRACT LINE ITEM (CLI) TITLE - Bid Options QTY UNIT OF MEASURE UNIT OF MEASURE UNIT PRICE UNIT PRICE TOTAL PRICE
| A | Non-Conditioned Garage Bay | LS |
| B | Electric Roll-up Doors | LS |
| TOTAL PRICE FOR ALL OPTIONS (Contract Line Item A - B) ------------------------- | ||
| TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 4 and A and B) |
Here is the contract price schedule for individual pricing to be provided for CLINs 1-4: Replace Yampa District Multi-Operations Facilities, 2 Commissioning, 3 Archaeological monitoring, and 4 hazardous material abatement; along with 2 bid options A: non-conditioned garage bay, and B: electric roll-up doors. These are all lump sum prices and you are to provide a price for each item.
And with that, on to Joe to provide specifics regarding the solicitation and technical evaluation
FORMAT: One electronic copy
2. ORGANIZATION:
FACTOR 1 – PROJECT EXPERIENCE
FACTOR 2 – TECHNICAL AND MANAGEMENT APPROACH
FACTOR 3 – SCHEDULE
FACTOR 4 – KEY PERSONNEL EXPERIENCE
FACTOR 5 – PAST PERFORMANCE
3. CONTENTS : EXPLANATION OF EACH FACTOR
SECTION L TECHNICAL PROPOSAL VOLUME 1
Daryl
FACTOR 1: Project Experience Submit the attached “Project Experience” form addressing specific experience aspects below for up to three (3) relevant projects completed in the last five (5) years. Submit separate forms for each project.
Teaming Experience: Describe your experience as a prime contractor working with the proposed team (key personnel and key subcontractors). Prime contractor experience is experience as a general contractor managing multiple subcontractors on projects. Previous experience with proposed subcontractors will be rated more favorably.
New Construction Experience: Describe experience in new construction projects you completed on-time and within budget that are similar in scope, magnitude, and complexity to this solicitation. Specifically describe experience working within more remote setting with sensitive cultural and natural resources as required in this solicitation
NOTE: The same projects evaluated for experience under this factor shall also be evaluated for Past Performance (Factor 5) Projects determined more relevant under this factor will be given more weight in the Past Performance evaluation.
FACTOR 2: Technical and Management Approach Technical approach is your means and methods to complete a technical aspect of required work in this solicitation. Submit no more than 10 pages describing your technical and management approach to the specific aspects below. Management Approach is organizational structure and business processes to manage, control, and oversee your firm's operations. Additional pages will not be evaluated. Pictures can be included and will count towards the page limitation. There is no preprinted form for this submittal.
Approach to Critical Contract Requirements: Describe your approach to successfully accomplish the project within proposed contract performance period and budget. Specifically describe your approach to the sequencing of construction and the coordination of subcontractors to ensure the timely delivery of the project. Demonstrate a clear understanding of the project scope and offer realistic strategies and methods for delivering a successful project.
Risk Analysis: Submit a risk analysis identifying critical issues, potential problems, and/or areas of concern with recommended solutions. Include strategies to manage project risks. Identify potential related risks or reasons for project time or cost impacts and your solutions to mitigate and resolve them.
Technical and Management Approach Cont'd:
Natural/Cultural/Historic Protection & Preservation Plan: Describe your approach to the protection and preservation of the natural, cultural, and historic resources as required by the solicitation.
Management Approach is organizational structure and business processes to manage, control, and oversee your firm's operations. Keep to 2 pages of the 10 total pages. There is no preprinted form for this submittal.
Organization Chart: Submit an organizational chart identifying the project team with major Subcontractors and key personnel, identifying specific roles, responsibilities, and lines of authority.
Firm Hierarchy: Describe the hierarchy within your firm between your corporate leadership and proposed project team and how it relates to cost and quality control for this specific project.
Owner & Regulatory Entity Coordination: Describe proposed coordination with the project owner (National Park Service), and other (State, City, Local) regulatory entities to complete work within all parameters of the solicitation.
FACTOR 3: Schedule Submit your proposed construction schedule for THIS SPECIFIC PROJECT showing completion within the required period of performance contained in this solicitation accompanying schedule narrative. Submit your schedule in MS project Gantt Chart format; for evaluation purposes only assume a Notice to Proceed date of December 15, 2025; and include specific activities required for this project and a clear critical path with major milestones and applicable predecessor activities. In your accompanying narrative, explain schedule logic, critical path activities, key considerations and constraints. There is no printed form for this submittal.
FACTOR 4: Key Personnel Experience Submit no more than 2-page resumes for key personnel as identified in Section H of this solicitation and listed below. All personnel proposed are subject to substitution requirements contained in this solicitation. There is no preprinted form for this submittal.
Project Manager Superintendent On-Site Quality Control Specialist On-Site Safety Specialist
FACTOR 5: Past Performance Submit Past Performance information for the same projects submitted under Project Experience (Factor 2) using the attached Past Performance Questionnaire. Information may be regarding the Offeror’s firm and/or its proposed subcontractors performing key trades and other construction activities. Subcontractor past performance will only be considered if it correlates to the work the subcontractor will be performing on this requirement.
Complete Section I and II only of the attached Past Performance Questionnaire and forward to your client reference. The reference shall be someone who was substantially involved with the project and can provide a complete, objective assessment of your performance (i.e. project owner). In the case of past performance references for subcontractors, the reference shall not be the prime contractor under which they performed the work for. Direct them to complete and submit the survey to the address and point of contact in Paragraph B above by the due date and time for proposal receipt.
Submit a narrative disclosing any instances of past performance that may be considered less than fully satisfactory. Describe pertinent facts, circumstances and any remedial action taken or to be taken to correct the deficiency. Failure to disclose such instances could result in an unfavorable assessment of the Offeror’s past performance record.
FORMAT: One electronic copy
ORGANIZATION:
| a. | SF 1442 | |
| b. | AMENDMENTS | |
| c. | SECTION B PRICE SCHEDULE | |
| d. | SF 24 BID BOND | |
| e. | SECTION K REPRESENTATION & CERTIFICATIONS | |
| f. | GENERAL REFERENCE | |
| g. | CONTENTS : EXPLANATION OF EACH SECTION |
SECTION L BUSINESS & PRICE PROPOSAL VOL. 2
Initial Review Non-Price Evaluation Past Performance Evaluation Consensus Rating Price Evaluation Tradeoff Analysis Selection
SECTION M EVALUATION PROCESS
The Government will conduct a source selection using the Best Value Continuum Tradeoff Process defined at FAR Part 15.1. The Contracting Officer (CO) will obligate and award a contract to the offeror who submits a proposal the Source Selection Authority (SSA) determines conforms to solicitation requirements; is fair and reasonable; and provides the best value to the government considering all evaluation factors combined as detailed below.
The Government may accept other than the lowest priced proposal when the perceived benefits of a higher priced proposal merit the price differential.
Additionally, pursuant to FAR 52.215-1(f), Contract Award, contained herein:
The Government may reject any or all proposals if such action is in the Government’s interest.
The Government may waive informalities and minor irregularities in proposals received.
The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the CO later determines them to be necessary.
SECTION M BASIS OF AWARD
RELATIVE IMPORTANCE
TECHNICAL PROPOSAL: FACTORS 1-4 ARE LISTED IN DESCENDING ORDER OF IMPORTANCE
PAST PERFORMANCE: FACTOR IS APPROXIMATELY EQUALLY IMPORTANT TO ALL TECHNICAL FACTORS COMBINED
OVERALL: PROPOSED PRICING IS AN EVALUATION FACTOR. ALL EVALUATION FACTORS OTHER THAN PRICE, WHEN COMBINED ARE SIGNIFICANTLY MORE IMPORTANT THAN PRICE
2. SECTION M PROVIDES HOW THE TECHNICAL FACTORS WILL BE EVALUATED
SECTION M EVALUATION FACTORS
Except when it is determined not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the options.
SECTION M EVALUATION OF OPTIONS
Wage Determination:
Current Wage Determination: CO20250001 – Dated: 05/16/2025 (Section J – Attachment 8) Ensure all subcontractor’s wages incorporate the current wage determination rates into their proposals.
Work Hours:
Ensure the work hours identified in Division 1 are considered when developing your proposed schedule
Self-Performance:
Clause 52.236-1 identifies the prime contractor self-performance requirement, the prime contractor is required to perform on site, with its own organization 15% of the total amount of work to be performed under the contract.
WAGE DETERMINATION / WORK HOURS / SELF PERFORMANCE
Period of Performance Contractor shall begin performance 10 calendar days from Notice to Proceed and shall complete the work within 730 calendar days.
Notice to Proceed Date The Notice to Proceed is expected to be issued in conjunction with pre-construction meeting upon acceptance of all Division 1 submittals.
Liquidated Damages Liquidated Damages will be assessed in the amount of $1,498.00 per day for each calendar day of delay until the work is completed or accepted.
PERIOD OF PERFORMANCE AND NOTICE-TO-PROCEED DATE
Date/Time: TODAY Location: Meet at Yampa District Operations Yard Please bring a notepad and pencil/pen to write down notes and questions. All questions must be submitted via e-mail only. Handwritten questions will not be accepted at the on-site visit.
DISCLAIMER:
Any information obtained from either site visit meeting shall not be interpreted as additional contract requirements or changes to the contract requirements. All terms and conditions are documented within the solicitation and its amendments. All proposals shall be based upon those documents.
SITE VISIT
See you at the Yampa District Operations Yard Thank You!
image2.jpeg image3.png image4.png image5.jpeg image6.jpeg image7.png image8.jpeg image9.jpeg image10.png image11.png image12.png image13.png image14.png image15.jpg image1.jpeg
File details come from the government source that posted it. Updated .