B08_-_Attachment_7_-_ALPO_Staple_Bend_Tunnel_-_Submittal_List.xlsx
XLSX spreadsheet 28 KB Posted
- Attached to
- ALPO STABILIZATION OF STAPLE BEND TUNNEL
- Solicitation number
- 140P4226R0026
- Issued by
- Not on record
About this file
This is a Submittal List with Review Estimate template for the National Park Service (NPS) Denver Service Center used during design and construction phases of federal projects. The document provides instructions for the Design Architect/Engineer (A/E) and Construction Contracting Officer Representative (COR) to establish construction submittal requirements and estimate the level of effort needed for Government review of those submittals.
For the Staple Bend Tunnel Stabilization project at Allegheny Portage Railroad National Historical Site (ALPO/PMIS 215161), the template identifies required submittals including: construction schedule, informational submittals, archeological protection plan, safety plan, historic preservation plan, construction waste management and disposal plan, construction layout plan, closure plan, concrete mix design and testing, rock bolting installation, and pre-construction survey. The template distinguishes between Action submittals (requiring Government responsive action) and Informational submittals (reviewed by Construction Management Representative only). Architects/Engineers must indicate estimated review hours by discipline (Architect, Civil Engineer, Structural Engineer, Mechanical Engineer, Electrical Engineer, Project Manager Coordination, and Landscape Architect) for each Action submittal. These hour estimates are then multiplied by hourly rates from the applicable Indefinite Delivery/Indefinite Quantity (IDIQ) contract to establish the Government's cost estimate for submittal review services during construction services task order negotiation.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| Submittal List with Review Estimate Instructions | |
| National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21 | |
| DESIGN SERVICES (Construction Documents (CD) Phase) | |
| Responsible Party: Design Architect/Engineer (A/E) | |
| 1 | Enter Park Acronym, Project Management Information System (PMIS) Number, and Project Title. |
| 2 | Record construction submittal requirements. Complete Specification Section, Paragraph Number, and Description sections. Insert additional rows as required for sections containing multiple submittals. |
| 3 | In Requirements section, enter X for submittal requirements where applicable. Insert additional columns as needed under Informational or Action. Refer to Specification Section 01 33 23 for clarification. (Action submittals require Government resposive action and Informational submittals do not.) Division 1 Specifications submittals are Information submittals. |
| 4 | Attach black and white version to Specification Section 01 33 23 in project manual. Delete instructional note on top of page. |
| CONSTRUCTION SERVICES (Construction Phase) | |
| Responsible Party: Construction Contracting Officer Representative (COR) | |
| 1 | Use Submittal List submitted with Final Construction Documents. Copy/paste submittal information into Submittal List with Review Estimate Template. If amendments issued, adjust submittal requirements as necessary. |
| 2 | Attach this template to Architect/Engineer (A/E) Construction Services Scope of Services. |
| 3 | Use Review Estimate to estimate time required for Architect/Engineer to accomplish Action submittal reviews. Enter estimated whole or partial number of hours per discipline. |
| 4 | Add discipline heading column as required. |
| 5 | Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate Government estimate for submittal reviews. |
| 6 | Use information from this template to negotiate submittal review portion of Architect/Engineer Construction Services task order. |
| 7 | Provide template to Construction Management Representative (CMR) to show submittals they are responsible for and submittals to be forwarded to the Architect/Engineer. All Informational submittals will be reviewed by Construction Management Representative. |
| Responsible Party: Architect/Engineer (A/E) | |
| 1 | Indicate level of effort required for each Action submittal review by entering number of whole or partial hours for each discipline under Architect/Engineer Review Time section. |
| 2 | All Informational submittals will be reviewed by Construction Management Representative (CMR). |
| 3 | Use total number of hours per discipline at bottom of template and apply hourly rates listed in Indefinite Delivery/Indefinite Quantity (IDIQ) contract (using appropriate option period rates) to formulate estimate. |
| 4 | Use this estimate to negotiate submittals review portion of Architect/Engineer Construction Services portion of the task order. |
&8&K01+024Submittal List with Review Estimate Instructions | National Park Service (NPS) - Denver Service Center (DSC) &8&K01+024page &P of &N
Template
| Submittal List with Review Estimate Template |
| National Park Service (NPS) - Denver Service Center (DSC) | 1-27-21 |
| SUBMITTAL LIST | ACTION SUBMITTAL | ||||||||||
| REVIEW ESTIMATE | |||||||||||
| Park Acronym/Project Management Information System (PMIS) Number: | ALPO/215161 | (Complete this portion for Architect / Engineer (A/E) | |||||||||
| Project Title: | Staple Bend Tunnel Stabilization | construction service task order negotiation.) | |||||||||
| SUBMITTAL | REQUIREMENTS | ARCHITECT / ENGINEER REVIEW TIME | |||||||||
| (Indicate with X) | (Indicate in whole or partial hours.) | ||||||||||
| INFORMATIONAL | ACTION | ||||||||||
| SPECIFICATION SECTION | PARAGRAPH NUMBER | DESCRIPTION | CERTIFICATIONS OR LABORATORY TESTS | REPORTS OR CALCULATIONS | |||||||
| OR PLAN | MANUFACTURER DATA | ||||||||||
| AND INSTRUCTIONS | OTHER | SAMPLES | SHOP DRAWINGS | MANUFACTURER DATA | |||||||
| AND INSTRUCTIONS | OTHER | ARCHITECT | CIVIL ENGINEER | STRUCTURAL ENGINEER | MECHANICAL ENGINEER | ELECTRICAL ENGINEER | PROJECT MANAGER COORDINATION | LANDSCAPE ARCHITECT | |||
| 13216 | Construction Schedule | X | |||||||||
| 13323 | Informational Submittals | X | X | X | |||||||
| 13513 | Archeological Protection Plan | X | |||||||||
| 13523 | Safety Plan | X | |||||||||
| 13591 | Historic Prevention Plan | X | |||||||||
| 15719 | Noise and Acoustic Management Plan | X | |||||||||
| 17419 | Construction Waste Management and Disposal Plan | X | |||||||||
| 17419 | Construction Layout Plan | X | |||||||||
| 17700 | Closure Plan | X | |||||||||
| 33000 | Concrete Mix Design and Testing | X | X | X | X | ||||||
| 40519 | Rock Bolting Installation | X | X | X | X | ||||||
| 130901 | Concrete Mix Design and Testing | X | X | X | X | ||||||
| 134700 | Pre-Construction Survey | X |
Total: 0 0 0 0 0 0 0