This file is an attachment containing location maps, a laboratory testing report, and photographs related to the Staple Bend Tunnel stabilization project at Allegheny Portage Railroad National Historical Site (ALPO). The document serves as a reference appendix providing visual and technical documentation to support contractors' understanding of the project site and existing conditions rather than specifying required products or services. The materials include geographical location maps showing the tunnel's position within the site, photographic documentation of the tunnel's current structural state, and laboratory analysis results pertaining to materials and conditions affecting stabilization requirements. These supporting documents are intended to inform bidders during the site evaluation process and help contractors assess project scope and technical challenges associated with the tunnel stabilization work.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDIX A
Tetra Tech Location Map (Figure A-1)
Tetra Tech Geologic Map (Figure A-2)
Tetra Tech Site Plan (Figure A-3)
North Portal
South Portal
Staple Bend Tunnel
C H
KD
D R
W N
PR
O
J:
D
ESN
www.tetratech.com
1/3/2025
A B C D E F
Copyright: Tetra Tech
A-1 NPS Staple Bend Tunnel Johnstown, PA Location Map
Brady G rove
Brady G rove
Sarah G arland
117-001039-24002
Sources: Google Earth 8/15/2015 Google Earth 12/31/2020
825 West Custer Ave Helena, Montana 59602
N
S
EW
Bar M easures 1 inch, otherw ise draw ing not to scale
North Portal
South Portal *Staple Bend Tunnel
C H
KD
D R
W N
PR
O
J:
D
ESN
www.tetratech.com
1/3/2025
A B C D E F
Copyright: Tetra Tech
A-3 NPS Staple Bend Tunnel Johnstown, PA Geological Map
Brady G rove
Brady G rove
Sarah G arland
117-001039-24002
*Tunnel width is not to scale
Sources: Google Earth 3/28/2024 Pennsylvania Geological Survey 1998
825 West Custer Ave Helena, Montana 59602
NS
E W
Bar M easures 1 inch, otherw
Working Area
Storage/Parking Areas
South Portal
North Portal
C H
KD
D R
W N
PR
O
J:
D
ESN
www.tetratech.com
1/3/2025
A B C D E F
Copyright: Tetra Tech
A-3 NPS Staple Bend Tunnel Johnstown, PA
Site Plan
Brady G rove
Brady G rove
Sarah G arland
117-001039-24002
Sources: 1988 NPS Staple Bend Unit Top Survey
825 West Custer Ave Helena, Montana 59602
N
S
EW
Bar M easures 1 inch, otherw
APPENDIX C
Laboratory Testing (Table C-1 and Figure C-2 through Figure C-6)
Tilt Test Results (Table C-7)
Field Measurements (Table C-8 through Table C-11, Figure C-12 and Figure C-13)
Project:
Client:
Location:
Date:
CLIENT: Great West PROJECT: JOB NO.:
LOCATION: Johnstown, PA.
S1 S2 S3 S4 S6
1/30/2023 1/30/2023 1/30/2023 1/30/2023 1/30/2023 2/13/2023 2/13/2023 2/13/2023 2/13/2023 2/13/2023
SG & SB SG & SB SG & SB SG & SB SG & SB
Sandstone Sandstone Shale Shale Shale
1 1 1 2 1
1.750 1.750 1.750 1.750
4.770 3.890 4.580 4.410
491.18 402.36 470.58 424.21
1.0829 0.8871 1.0375 0.9352
2.404 2.404 2.404 2.404
163.18 163.91 162.82 152.43
2.61 2.62 2.61 2.44 8700 9400 13400 2190
223635 241625 344425 56328 93024 100507 143268 23430
641.38 692.97 987.80 161.55 brittle fracture brittle fracture
1.750 4.230
434.94 0.9589 2.404
162.94 2.61
10500 269895 112266 774.05 horizontal/diagonal fracture shear fracture brittle fracture
ALPO Staple Bend Tunnel
NPS
Johnstown, PA 2/14/2025
Unconfined Compressive Strength
Compressive Strength (MPa):
Failure Type:
Allegheny Portage Railroad National Historic Site (ALPO)
117-001039-24002
Area of Core (in2) Wet Density (lbs/ft3):
Wet Density (g/cm3):
Peak Load (psi guage) Peak Load (lbs):
Compressive Strength (psi):
Rock Type Weathering Grade
Diameter (in):
Height (in):
Mass of Wet Rock (g):
Mass of Wet Rock (lbs):
Technician
ASTM D7012 Method C
Sample No.
Date Sampled
Date Tested
TABLE C-1
Client: ALPO NPS Date Tested:
Project: Staple Bend Tunnel Tested By:
Rock Core ID: Sandstone 01
Sample ID: SS UCS 01
Sample Location: Grab
UCS 9,390 psi
64.74 MPa
Young's Modulus 3,354,654 psi
23,129.53 MPa
Poisson's Ratio N/A psi
Unit Weight 163.18 lbs/ft
Density 2.61 g/cm3
November 14, 2024 Steve Berry
SG
RY
Testing notes Pre Test Photo Post Test Photo
Sudden quiet, brittle failure. Radial strain was affected by the discontinuity producing an unrealistic Poisson's Ratio.
Lithology Code
SS
Rock Strength/Engineering Parameters
10000
-0.0040 -0.0030 -0.0020 -0.0010 0.0000 0.0010 0.0020 0.0030 0.0040
A xi al S tr e ss p si
Axial and Lateral Strain (Unitless)
SS UCS01
Axial Stress vs. Axial Strain
Axial Stress vs. Lateral Strain
Young's Modulus (E) 3,354,654 psi
UCS 9,390 psi
Lab Testing provided by Montana Tech's Geomechanics Lab
Checked By:
QA/QC:
FIGURE C-2
Project: Staple Bend Tunnel Tested By: Steve Berry
Rock Core ID: Shale 01
Sample ID: UCS 01
Sample Location: Grab
UCS 10,500 psi
72.39 MPa
Young's Modulus 5,877,302 psi
40,522.57 MPa
Poisson's Ratio N/A
Unit Weight 162.94 lbs/ft
Density 2.61 g/cm3
November 14, 2024
Testing notes Pre Test Photo Post Test Photo
Sample failed along preexisting stained and altered discontinuity. Radial strain was affected by the discontinuity producing an unrealistic Poisson's Ratio.
Lithology Code
SH
Rock Strength/Engineering Parameters
10000
12000
-0.004 -0.003 -0.002 0.002 0.003 0.004
A xi al S tr e ss p si
-0.001 0.001
Axial and Lateral Strain (Unitless)
Shale UCS 01
Axial Stress vs. Axial Strain
Axial Stress vs. Lateral Strain
UCS 10,500 psi
Lab Testing provided by Montana Tech's Geomechanics Lab
Young's Modulus (E) 5,877,302 psi
FIGURE C-3
Rock Core ID: Shale 02
Sample ID: UCS 02
Sample Location: Grab
UCS 13,400 psi
92.39 MPa
Young's Modulus 6,110,695 psi
42,131.76 MPa
Poisson's Ratio N/A
Unit Weight 162.82 lbs/ft
Density 2.61 g/cm3
November 14, 2024
Testing notes Pre Test Photo Post Test Photo
Sample failed along preexisting stained and altered discontinuity. Radial strain was affected by the discontinuity producing an unrealistic Poisson's Ratio.
Lithology Code
SH
Rock Strength/Engineering Parameters
10000
12000
14000
16000
-0.004 -0.003 -0.002 0.002 0.003 0.004
A xi al S tr e ss p si
-0.001 0.001
Shale UCS 02
Axial Stress vs. Axial Strain
Axial Stress vs. Lateral Strain
UCS 13,400 psi
Young's Modulus (E)
6,110,695 psi
Lab Testing provided by Montana Tech's Geomechanics Lab
Axial and Lateral Strain (Unitless)
FIGURE C-4
Rock Core ID: Shale 03
Sample ID: UCS 03
Sample Location: Grab
UCS 2,080 psi
14.34 MPa
Young's Modulus 1,067,784 psi
7,362.11 MPa
Poisson's Ratio N/A
Unit Weight 152.43 lbs/ft
Density 2.44 g/cm3
November 14, 2024
Testing notes Pre Test Photo Post Test Photo
Sample failed along preexisting stained and altered discontinuity. Radial strain was affected by the discontinuity producing an unrealistic Poisson's Ratio.
Lithology Code
SH
Rock Strength/Engineering Parameters
-0.006 -0.004 -0.002 0.000 0.002 0.004 0.006
A xi al S tr e ss p si
Shale UCS 03
Axial Stress vs. Axial Strain
Axial Stress vs. Lateral Strain
UCS 2,080 psi
Young's Modulus (E) 1,067,784 psi
Lab Testing provided by Montana Tech's Geomechanics Lab
FIGURE C-5
Rock Core ID: Sandstone 04
Sample ID: UCS 04
Sample Location: Grab
UCS 6,800 psi
46.88 MPa
Young's Modulus 7,961,421 psi
54,892.06 MPa
Poisson's Ratio N/A
Unit Weight 162.94 lbs/ft
Density 2.61 g/cm3
November 14, 2024
Testing notes Pre Test Photo Post Test Photo
Sample failed along preexisting stained and altered discontinuity. Radial strain was affected by the discontinuity producing an unrealistic Poisson's Ratio.
Lithology Code
SS
Rock Strength/Engineering Parameters
10000
-0.003 -0.002 -0.001 0.001 0.002 0.003
A xi al S tr e ss p si
0.000
SS UCS 04
Axial Stress vs. Axial Strain
Axial Stress vs. Lateral Strain
UCS 6,800 psi
Young's Modulus (E) 7,961,421 psi
Lab Testing provided by Montana Tech's Geomechanics Lab
FIGURE C-6
Location:
Date:
Test Number Sandstone Shale
1 26 37
2 32 34
3 34 37
4 36 35
5 27 32
6 33 34
7 35 36
8 29 27
9 30 38
10 33 36
Average 32 35
Tilt Test Results Angle (°)
ALPO Staple Bend Tunnel
NPS
Johnstown, PA 2/17/2025
TABLE C-7
Location:
Date:
Dip Dip Direction Location Description Dip Dip Direction Location Description
71 21 1+50 Joint 86 145 3+35 Joint
70 315 1+50 Joint 14 210 3+35 Bedding
8 330 1+50 Bedding 88 205 3+40 Joint
12 10 1+60 Contact 13 225 3+40 Contact
78 340 1+70 Joint 88 132 3+50 Joint
81 356 1+80 Joint 79 120 3+50 Joint
10 265 1+80 Bedding 84 1 3+60 Joint
89 79 2+00 Joint 89 25 3+60 Joint
4 330 2+00 Bedding 84 35 3+70 Joint
62 260 2+20 Joint 4 90 3+70 Contact
8 260 2+20 Bedding 88 45 3+75 Joint
85 240 2+30 Joint 81 320 3+80 Joint
75 30 2+40 Joint 33 250 3+80 Joint
75 290 2+50 Joint 88 140 3+80 Joint
55 321 2+50 Joint 85 350 3+80 Joint
72 25 2+50 Joint 88 25 4+05 Joint
89 68 2+50 Joint 88 40 4+05 Joint
70 105 2+60 Joint 83 55 4+10 Joint
20 270 2+70 Contact 76 142 4+10 Joint
86 40 2+70 Joint 85 40 4+10 Joint
80 295 2+70 Joint 32 153 4+10 Joint
78 355 2+70 Joint 82 275 4+20 Joint
85 120 2+70 Joint 60 245 4+20 Joint
82 350 2+70 Joint 12 5 4+20 Contact
82 118 2+85 Joint 86 320 4+20 Joint
89 195 3+20 Joint 88 70 4+20 Joint
ALPO Staple Bend Tunnel
NPS
Johnstown, PA 2/17/2025
Field Measurements Field Measurements
TABLE C-8
Location:
Date:
Dip Dip Direction Location Description Dip Dip Direction Location Description
67 5 4+25 Joint 46 310 5+40 Joint
87 75 4+25 Joint 6 245 5+40 Contact
5 120 4+25 Bedding 86 310 5+55 Joint
86 300 4+25 Joint 85 30 5+70 Joint
85 340 4+40 Joint 85 350 5+70 Joint
87 60 4+40 Joint 87 196 6+00 Joint
52 280 4+60 Joint 85 320 6+00 Joint
85 19 4+70 Joint 84 191 6+00 Joint
89 10 4+70 Joint 85 35 6+20 Joint
86 315 4+70 Joint 38 4 6+25 Joint
85 295 4+70 Joint 74 190 6+20 Joint
11 30 4+70 Contact 76 305 6+20 Joint
85 90 4+80 Joint 68 142 6+20 Joint
84 250 4+80 Joint 76 265 6*30 Joint
85 15 4+80 Joint 74 134 6+40 Joint
84 100 4+80 Joint 80 199 6+40 Joint
9 350 4+80 Contact 86 41 6+60 Joint
83 265 4+85 Joint 51 289 6+60 Joint
85 185 4+85 Joint 86 8 6+60 Bedding
64 160 4+90 Joint 83 234 6+60 Joint
86 190 4+90 Joint 5 64 6+50 Bedding
62 124 4+95 Joint 85 357 6+65 Joint
79 122 4+95 Joint 88 162 6+65 Joint
66 133 5+00 Joint 88 52 6+80 Joint
84 175 5+00 Joint 76 181 6+80 Joint
79 110 5+10 Joint 4 313 6+80 Bedding
ALPO Staple Bend Tunnel
NPS
Johnstown, PA 2/17/2025
Field Measurements Field Measurements
TABLE C-9
Location:
Date:
Dip Dip Direction Location Description
89 239 6+80 Joint
88 270 6+80 Joint
73 312 6+80 Joint
75 215 6+80 Joint
87 221 6+80 Joint
78 174 6+90 Joint
14 25 6+90 Bedding
81 192 7+05 Joint
85 188 7+20 Joint
5 329 7+20 Bedding
89 60 7+20 Joint
82 59 7+20 Joint
88 87 7+20 Joint
84 188 7+20 Joint
9 360 7+20 Bedding
71 196 7+30 Joint
86 86 7+30 Joint
83 357 7+30 Joint
83 157 7+30 Joint
13 313 7+40 Bedding
ALPO Staple Bend Tunnel
NPS
Johnstown, PA 2/17/2025
Field Measurements
TABLE C-10
Project:Staple Bend Tunnel Client: NPS
Location: Johnstown, PA Date: 10/16/2024
Station - Average values for rock type
B - Systematic Bolting sfr - Fiber reinforced sprayed concrete E1000 - Energy absorbtion in fibre reinforced sprayed concrete D - Double layer Rebars 4Ø16 - Rebar diameter is 16 mm.
si30/6 - Single layer of 6 rebars, 30 cm thickness of sprayed concrete
Support Cat. 3 1 3 1
B+sfr Unsupported Spot Bolting B+sfr Unsupported Spot
Bolting
SRF 1 1 1 1
Q 2.063 4.950 2.063 4.950
Ja 3 2 3 2 Jw 0.66 0.66 0.66 0.66
Jn 12 9 12 9 Jr 1.5 1.5 1.5 1.5
Input Parameters Input Values Input Values Input Values Input Values
RQD 75 90 75 90
Bolt Length (m) 2.4
Siltstone Fractured Sandstone Worst Best Worst Best
NGI Q-System Rock Support
Span (m) 6.25
ESR 1.6
TABLE C-11
"#$%�&'((�)*'+,-.��/��� 0� 0"/1� �2� �3���4� �'�5"6
7#+-�+849-:�,4�&�;#2��5"����5<'4�#2�:8,9:-�,4�& �5" ����=���� ���> ���> ���> ?�> !�> ��> @ A B C D E F G HIIJ��KLK�MNO�PIIJ��KLK�QNR�PIIJ��KLK�QNS�PIIJ��KLK�TNU�PIIJ��KLK�TNO�P
VW82'98�X#+-�(<'$,49�3,-:�5;2
VW82'98�X#+-�(<'$,49�3,-:#*-�5;2
"YZ[�\V55�/]V̂_̀a�Vb1�"YZ[�5]ccY"̀d�0$8<-,#4'++.<##2 �0-28&8+.<##2 e82.<##2 c##2 6',2 f##gh i j k l me82.9##g �0-28&8+.9##g �0$8<n9##g IIJ�ooo IIJ�oo IIJ�o
�� p��qrstu�vwx�yzr{rvx|�v}�x~��q�vx�vwx�rq��}�v��xyqs�x|xtvr Tunnel Span = 20 feet
= 6.25 m
Qsh = 0.008 - 0.125 Qss = 0.017 - 0.083
FIGURE C-12
SARAH.GARLAND
Line
SARAH.GARLAND
Line
SARAH.GARLAND
Line
SARAH.GARLAND
Line
SARAH.GARLAND
Line
-.//012�3425601758� 9:;<==>?@AB�>?�;=>@�C>D@E:F� G=>@�C>D@E:FH�IJ� GK;@ALM@EN�C>D@E:FH�OC?A�?AE:P>?NAB�;=?MKAB�N>:N?A@AH�QRS�NLH�JTIUV� WEC?A�?AE:P>?NAB�;=?MKAB�N>:N?A@A�M:B�C>D@E:FH�SRX�NLH�IUV�YZ[\\]TJ� WEC?A�?AE:P>?NAB�;=?MKAB�N>:N?A@A�M:B�C>D@E:FH�XR̂_�NLH�IUV�YZ̀\\]TJ� WEC?A�?AE:P>?NAB�;=?MKAB�N>:N?A@A�M:B�C>D@E:FH�̂_R̂Q�NL�T�?AE:P>?NAB�� ?EC;�>P�;=?MKAB�N>:N?A@A�M:B�C>D@E:FH�IUV�YZ̀\\]TaaI�b�TJ� WEC?A�?AE:P>?NAB�;=?MKAB�N>:N?A@A�ĉQ�NL�T�?AE:P>?NAB�?EC;�>P�;=?MKAB�� N>:N?A@A�M:B�C>D@E:FH�IUV�YZd\\\]TaaI�bbTJ� eM;@�N>:N?A@A�DE:E:FH�ffg�>?�IUV�YZd\\\]TaaI�bbbTJ� G=ANEMD�AhMD<M@E>:i>D@;�;=MNE:F�E;�LME:DK�CM;AB�>:�j_k�LLl�m�l:A?FK�MC;>?C@E>:�E:�OC?A�?AE:P>?NAB�;=?MKAB�N>:N?A@AlGn�m�loNMhM@E>:�G<==>?@�nM@E>p?AM;�qE@r�BM;rAB�DE:A;�rMhA�:>�AL=E?ENMD�BM@M �GEsktS�m�GE:FDA�DMKA?�>P�S�?ACM?;H� ��sk�NL�@rENu:A;;�>P�;=?MKAB�N>:N?A@A� v�m�v><CDA�DMKA?�>P�?ACM?;�j Ŝ�m�nACM?�BEMLA@A?�E;�̂S�LL�NtN�m�nGG�;=MNE:FH�NA:@?A�R�NA:@?A� �� ww-�x�;=MNE:F�?ADM@AB�@>�yRhMD<A����Iz{\|}��~d}���~�\�Y�����d\�]�� v�ktST_�j ŜR_k��;=M:�_kL��� GEsQtS��j ŜR_k��;=M:�QL��� ��[|}���~d}��\�Y�����d\�]�� vQQtST��j_k��;=M:�_kL��� v�ktST��j ŜR_k��;=M:�Q�L��� ��[[|}���~�\�Y�����d\��]�� G=ANEMD�AhMD<M@E>:��;=M:�_k�L�
� b�bb�bbb
FIGURE C-13
SARAH.GARLAND
Line
SARAH.GARLAND
Line
SARAH.GARLAND
Line
SARAH.GARLAND
Line
SARAH.GARLAND
Line
SARAH.GARLAND
Line
APPENDIX E
Staple Bend Tunnel Site Photos (Figure E-1 through E-12)
1+50 South Wall 1+55 South Wall 1+60 South Wall 1+65 South Wall 1+85 South Wall 2+15 South Wall
1+50 North Wall 1+55 North Wall 1+60 North Wall 1+65 North Wall 1+85 North Wall 2+15 North Wall
Stations 1+50 to 2+15
FIGURE E-1
2+25 South Wall 2+35 South Wall 2+40 South Wall 2+45 South Wall 2+55 South Wall 2+65 South Wall
2+25 North Wall 2+35 North Wall 2+40 North Wall 2+45 North Wall 2+55 North Wall 2+65 North Wall
Stations 2+25 to 2+65
FIGURE E-2
2+70 South Wall 2+80 South Wall 2+90 South Wall 3+00 South Wall 3+35 South Wall 3+60 South Wall
2+70 North Wall 2+80 North Wall 2+90 North Wall 3+00 North Wall 3+35 North Wall 3+60 North Wall
Stations 2+70 to 3+60
FIGURE E-3
3+70 South Wall 3+80 South Wall 3+90 South Wall 4+00 South Wall 4+10 South Wall 4+20 South Wall
3+70 North Wall 3+80 North Wall 3+90 North Wall 4+00 North Wall 4+10 North Wall 4+20 North Wall
Stations 3+70 to 4+20
FIGURE E-4
4+25 South Wall 4+40 South Wall 4+50 South Wall 4+55 South Wall 4+65 South Wall 4+70 South Wall
4+25 North Wall 4+40 North Wall 4+50 North Wall 4+55 North Wall 4+65 North Wall 4+70 North Wall
Stations 4+25 to 4+70
FIGURE E-5
4+85 South Wall 4+95 South Wall 5+05 South Wall 5+15 South Wall 5+20 South Wall
4+85 North Wall 4+95 North Wall 5+05 North Wall 5+15 North Wall 5+20 North Wall
Stations 4+85 to 5+20
FIGURE E-6
5+25 South Wall 5+40 South Wall 5+45 South Wall 5+50 South Wall 5+60 South Wall 5+65 South Wall
5+25 North Wall 5+40 North Wall 5+45 North Wall 5+50 North Wall 5+60 North Wall 5+65 North Wall
Stations 5+25 to 5+65
FIGURE E-7
5+70 South Wall 5+75 South Wall 5+80 South Wall 5+85 South Wall 5+90 South Wall 6+00 South Wall
5+70 North Wall 5 +75 North Wall 5+80 North Wall 5 +85 North Wall 5+90 North Wall 6+00 North Wall
Stations 5+70 to 6+00
FIGURE E-8
6+05 South Wall 6+15 South Wall 6+20 South Wall 6+25 South Wall 6+30 South Wall 6+35 South Wall
6+05 North Wall 6+15 North Wall 6+20 North Wall 6+25 North Wall 6+30 North Wall 6+35 North Wall
Stations 6+05 to 6+35
FIGURE E-9
6+45 South Wall 6+50 South Wall 6+65 South Wall 6+70 South Wall 6+75 South Wall 6+85 South Wall
6+45 North Wall 6+50 North Wall 6+65 North Wall 6+70 North Wall 6+75 North Wall 6+85 North Wall
Stations 6+45 to 6+85
FIGURE E-10
6+90 South Wall 7+00 South Wall 7+05 South Wall 7+10 South Wall 7+15 South Wall 7+20 South Wall
6+90 North Wall 7+00 North Wall 7+05 North Wall 7+10 North Wall 7+15 North Wall 7+20 North Wall
Stations 6+90 to 7+20
FIGURE E-11
7+25 South Wall 7+30 South Wall 7+35 South Wall 7+40 South Wall 7+45 South Wall 7+50 South Wall
7+25 North Wall 7+30 North Wall 7+35 North Wall 7+40 North Wall 7+45 North Wall 7+50 North Wall
Stations 7+25 to 7+50
FIGURE E-12
| ALPOSitePlan.pdf |
| Sheets and Views |
| TT |
| Compiled Appendix AsOf 2-18-2025.pdf |
| SD Appendix Titles.pdf |
| ALPOLocationMap.pdf |
| Sheets and Views |
| TT |
| ALPOGeologyMap.pdf |
| Sheets and Views |
| TT |
| Lab Testing Table.pdf |
| ALPOLab Testing.pdf |
| ALPO Tilt Test.pdf |
| 1+50 to 5+20.pdf |
| 5+25 to 7+50.pdf |
| NPS Sustainability Checklist.pdf |
| NPS-ProjectSustainabilityChecklist_4-5-23_508.pdf |
| Binder1.pdf |
| NPS-ProjectSustainabilityChecklist_4-5-23_508_2.pdf |
NPS Constructability Checklist.pdf
| NPS Structural Geology - Planar 105.pdf |
| NPS Structural Geology - Wedge 285.pdf |
| NPS Structural Geology - Planar 285.pdf |
| NPS Structural Geology - Wedge 105.pdf |
| NPS Structural Geology - Toppling 105.pdf |
| NPS Structural Geology - Toppling 285.pdf |
| Combined Unwedge.pdf |
| 1+75 |
| 2+15 |
| 2+35 |
| 5+40 |
| 6+45 |
| 6+45E |
| 6+75 |
| 1999_ALPO Staple Bend Tunnel Preservation_1999 CDs.pdf |
| staples_scan_1712098751438 |
| staples_scan_1712098806590 |
| staples_scan_1712098848895 |
| staples_scan_1712098889578 |
| STAPLE BEND TUNNEL.pdf |
| Sheets and Views |
| 1 G1 COVER SHT |
| 2 G2 STG PLAN - 2 |
| 3 S1 SITE LAY - 3 |
| 4 S2 GEO PROF 1 - 4 |
| 5 S3 GEO PROF 2 - 5 |
| 6 S4 GEO PROF 3 - 6 |
| 7 S5 GEO PROF 4 - 7 |
| 8 S6 RB & SHORTING LOC - 8 |
| 9 S7 RB & SHORTING DTL - 9 |
| 10 S8 TYP TNL SECT - 10 |
| NPS Cost Estimate.pdf |
| Sheet1 |
| Sheet2 |
| Sheet3 |
| Sheet4 |
| Sheet5 |
| Sheet6 |
| Sheet7 |
| Sheet8 |
| CL1 |
| CL2 |
| CL3 |
| CL4 |
| CL5 |
| CL6 |
| CL7 |
| CL8A |
| CL8B |
| CL9 |
| CL10 |
| CL11 |
| CL12 |
| CL13 |
| CL14 |
| CL15 |
| Sheet9 |
| Sheet10 |
| Proposed Wedge Combined.pdf |
| 1+75P |
| 2+15P1 |
| 2+15P2 |
| 2+35P |
| 2+70P |
| 3+40P |
| 3+90P |
| 4+55P |
| 4+90 P |
| 5+40 P |
| 6+45 P |
| 6+75 P |
| STAPLE BEND TUNNEL.pdf |
| Sheets and Views |
| 1 G1 COVER SHT |
| 2 G2 STG PLAN - 2 |
| 3 S1 TNL ORI - 3 |
| 4 S2 PROP & EX MIT 1 - 4 |
| 5 S3 GEO PROF 2 - 5 |
| 6 S4 GEO PROF 3 - 6 |
| 7 S5 GEO PROF 4 - 7 |
| 8 S6 RB & SHORTING LOC - 8 |
| 9 S7 RB & SHORTING DTL - 9 |
| 10 S8 TYP TNL SECT - 10 |
| STAPLE BEND TUNNEL.pdf |
| Sheets and Views |
| 1 G1 COVER SHT |
| 2 G2 STG PLAN - 2 |
| 3 S1 TNL ORI - 3 |
| 4 S2 PROP & EX MIT 1 - 4 |
| 5 S3 GEO PROF 2 - 5 |
| 6 S4 GEO PROF 3 - 6 |
| 7 S5 GEO PROF 4 - 7 |
| 8 S6 RB & SHORTING LOC - 8 |
| 9 S7 RB & SHORTING DTL - 9 |
| 10 S8 TYP TNL SECT - 10 |
File details come from the government source that posted it. Updated .