B08_Attachment_5_Construction_Contract_Administration.pdf

PDF 28 KB Posted

Attached to
PEVI-272171 Rehabilitate Failing Upper Plaza
Solicitation number
140P2024R0059
Issued by

About this file

This document appears to be a summary of the Federal Acquisition Regulation (FAR) requirements for the administration of construction contracts, specifically regarding the definitization of equitable adjustments for change orders. The summary indicates that agencies must provide a description of their policies and procedures related to this topic, as well as data on the time required to definitize such adjustments. The relevant information can be found on the Department of the Interior's website.

The document also references a related federal contract opportunity, Solicitation Number 140P2024R0059, for the "PEVI-272171 Rehabilitate Failing Upper Plaza" project. This project, issued by the Department of the Interior National Park Service, involves the restoration of the structure supporting the upper plaza and the associated waterproofing membrane, as well as modifications to the interior spaces below the upper plaza to meet current needs and improve functionality.

View the file

Other files

File Type Posted
Sol_140P2024R0059_Amd_0003.pdf PDF
B09_Amendment_03_Questions_3_0003.pdf PDF
Sol_140P2024R0059_Amd_0002.pdf PDF
B09_Amendment_02_Questions_2_0002.pdf PDF
B09_Amendment_01_Questions_Extension_Changes_4_16_24_0001.pdf PDF
Sol_140P2024R0059_Amd_0001.pdf PDF
B08_Attachment_09_Milner_Design_Analysis_-_1978.pdf PDF
B08_Attachment_08_Milner_Final_Construction_Drawings_-1978.pdf PDF
B08_Attachment_15_Upper_Plaza_Temporary_Repairs_AS-built_Drawings-2013.pdf PDF
B08_Attachment_17_Survey-2020.pdf PDF
B08_Attachment_12_Investigation_and_Stabilization_-_2008.pdf PDF
B08_Attachment_13_Upper_Plaza_Temp_Repairs-2011.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_1-1983.pdf PDF
B08_Attachment_21_Conceptual_Space_Program_Diagram-2023.pdf PDF
B08_Solit_Clauses_Construction_4_3_24.pdf PDF
B08_Attachment_22_Wage_Determination.pdf PDF
B08_Attachment_20_Geotechnical_Report-2022.pdf PDF
B08_Attachment_3__Solit_PSP_Vol_I_Propsoal_Submission_Section_L.pdf PDF
B08_Attachment_2_Letter_of_Comm__Design_Build.pdf PDF
B08_Attachment_16_CLR___EA_November-2018.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_2bb-1983.pdf PDF
B08_Attachment_1_Key_Personnel_Resume_Form.pdf PDF
B08_Attachment_14_Foundation_Document-2012.pdf PDF
B08_Attachment_4_Solit_PSP_Vol_II_Proposal_Submission_Section_L.pdf PDF
B08_Attachment_11_Condition_Assessment-1996.pdf PDF
B08_Attachment_6_NPS_272171_PEVI_DB-RFP.docx DOCX document
B08_Attachment_07_Historic_Structure_Report-1976.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_2ab-1983.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_2aa-1983.pdf PDF
Sol_140P2024R0059.pdf PDF
B08_Attachment_19_Regulated_Materials_Survey-2022.pdf PDF
B08_Attachment_10_Select_Historical_Drawings_Part_2ba-1983.pdf PDF
B08_Attachment_18_Existing_Conditions_Plan_-_2022.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Construction Contract Administration

Federal Acquisition Regulation (FAR) 36.211(b) requires agencies provide description of policies and procedures that apply to definitization of equitable adjustments for change orders under construction contracts and data on the time required to definitize equitable adjustments for change orders under construction contracts. This information can be found at:

https://www.doi.gov/pam/acquisition/policy/constructioncontract.

https://www.doi.gov/pam/acquisition/policy/constructioncontract

File details come from the government source that posted it. Updated .